W912BU-10-R-0033 0010 CHANGE POP EXTEND RESPONSE DATE.pdf

PDF 273 KB Posted

Attached to
AWARD OF DRY DOCKING & REPAIR FOR THE DREDGE MCFARLAND
Solicitation number
W912BU-10-R-0033
Issued by

About this file

CHANGE PERIOD OF PERFORMANCE TO BEGIN o/a 1FEB2011 Extend The Response date.

View the file

Other files

File Type Posted
ETMS 215-276.xls XLS spreadsheet
ETMS 277-282.xls XLS spreadsheet
ETMS 084-133.xls XLS spreadsheet
W912BU-10-R-0033 0013 LINE ITEMS SPECS SECT H EXTEND RESPONSE DATE.pdf PDF
ETMS 035-083.xls XLS spreadsheet
W912BU-10-R-0033 PRICING WORKBOOK 24NOV10.xls XLS spreadsheet
ETMS 134-199.xls XLS spreadsheet
ETMS COVER-LETTER.xls XLS spreadsheet
ETMS 001-034.xls XLS spreadsheet
ETMS ASBESTOS REPORTS.xls XLS spreadsheet
MF-H5-057-3 22NOV.TIF TIF image
FIBER OPTICS TEST PROCEDURE 22NOV.pdf PDF
MF-H5-051 22NOV.TIF TIF image
MF-H5-57 22NOV.tif TIF image
Mf-h5-51 22NOV.tif TIF image
MF-H5-116 22NOV.TIF TIF image
MF-H5-049-R3 22NOV .TIF TIF image
MF-H2-032 22NOV.TIF TIF image
MASTER CABLE LIST REV_B 22NOV.pdf PDF
MF-H5-115 22NOV.TIF TIF image
MF-H5-057 22NOV.TIF TIF image
MF-H5-080 22NOV.TIF TIF image
MF-H5-050 22NOV.TIF TIF image
MF-H3-024 Pilot House 22NOV.pdf PDF
MF-H5-057-1 22NOV.TIF TIF image
MF-H4-25 22NOV.tif TIF image
MF-H5-058 22NOV.TIF TIF image
333-F518-01 -- JETTING SYSTEM MODIFICATIONS REV_A.pdf PDF
MF-M1-8-1 22NOV —
MF-M1-8-2 22NOV —
MF-H2-114 22NOV.TIF TIF image
MF-H5-053 22NOV.TIF TIF image
MF-H5-049-R2 22NOV.TIF TIF image
MF-H5-059 22NOV.TIF TIF image
MF-M1-8-3 22NOV —
LIGHTING PANEL LOCATIONS.pdf PDF
MF-H5-057-2 22NOV.TIF TIF image
9-7-281 -- JETTING WATER AND HOPPER WASHDOWN SYSTEM PLANS SECTIONS AND ELEVATIONS REV_A 22NOV.pdf PDF
MF-H4-012-2 22NOV —
MF-H5-049-R1 22NOV.TIF TIF image
WB912BU-10-R-0033 AMENDMENT 0012.pdf PDF
10-R-0033-0011.pdf PDF
W912BU-10-R-0033 0009 EXTEND RESPONSE DATE.pdf PDF
W912BU-10-R-0033 0008 ADDTNL VESSEL VISIT.pdf PDF
W912BU-10-R-0033 0007 MCH301D EXTND DATE.pdf PDF
MF-M3-60 -- ARRANGEMENT OF CENTRAL CONTROL STATION.TIF TIF image
080310-3 ENGINE MONITORING SYSTEM CABLING REQUIREMENTS.pdf PDF
MF-M3-61 -- CABLING AND CONNECTION DIAGRAM CENTRAL ENG CONTROL STAION PANELS AND CONSOLES.TIF TIF image
080310-2 REVD ENGINE MONITORING SYSTEM.PDF PDF
9-7-2514 -- Engine Starting Monitoring Console.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: EDWARD A. BODDIE

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W25PHS01110555A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

CHANGE RESPONSE DATE TO 04 NOV 2010

CHANGE PERIOD OF PERFORMANCE TO BEGIN ON OR ABOUT 01 FEB 2011.

1. CONTRACT ID CODE PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0033

X 9B. DATED (SEE ITEM 11)

07-Jul-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES T HE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Oct-2010

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTSEAB

FACILITY CODECODE

EMAIL:TEL:

E5CTSEAB

Typewritten Text

E5CTSEAB

Typewritten Text

W912BU-10-R-0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Oct-2010 03:30 PM to 04-Nov-2010 03:30 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

The text regarding the period of performance contained in section L-1 has been changed

From - “The total performance period for this procurement will be ninety (90) calendar days. Work to begin on or about 01 December 2010, and be completed by 28 February 2011. However, if circumstances change between the receipt of a successful proposal and 01 December, the actual work on the vessel may be started sooner, with the period of performance to remain 90 calendar days, if mutually agreed upon by both parties. It is the intention of the Government to award the contract as soon as possible after receipt, evaluation, and determination of a successful proposal to allow for efficient planning of the work.”

To – “The total performance period for this procurement will be ninety (90) calendar days. Work to begin on or about 01 February 2011, and be completed by 01 May 2011. However, if circumstances change between the receipt of a successful proposal and 01 February 2011, the actual work on the vessel may be started sooner, with the period of performance to remain 90 calendar days, if mutually agreed upon by both parties. It is the intention of the Government to award the contract as soon as possible after receipt, evaluation, and determination of a successful proposal to allow for efficient planning of the work.”

File details come from the government source that posted it. Updated .