About this file

Specifications--Volume 2-5

View the file

Other files

File Type Posted
09R0015-SPECS-AM5.PDF PDF
09R0015 Amnd4-Specs .pdf PDF
09R0015-Specs-Am3-1.PDF PDF
09R0015-Dwgs-Am3.pdf PDF
09R0015-Specs-Am3-2.pdf PDF
00120 Prop Eval Factors - Attachments.doc DOC document
09R0015-SPECS-AM2.PDF PDF
09R0015-SPECS-AM1.PDF PDF
Site_Visit_Attendance_Sheet.pdf PDF
09R0015-Specs-VOL2-3.PDF PDF
09R0015-Specs-VOL1.PDF PDF
09R0015-Specs-VOL2-4.PDF PDF
09R0015-Dwgs-2.PDF PDF
RFI Example.xls XLS spreadsheet
09R0015-Specs-VOL2-2.PDF PDF
09R0015-Dwgs-1.PDF PDF
09R0015-Specs-VOL2-1.PDF PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix N

AFMES Facility Final Specifications – Phase 1 Demolition

RFP W912BU-09-R-0015

Appendix N Page 1

Appendix N Page 2

Appendix N Page 3

Appendix N Page 4

Appendix N Page 5

Appendix N Page 6

Appendix N Page 7

Appendix N Page 8

Appendix N Page 9

Appendix N Page 10

Appendix N Page 11

Appendix N Page 12

Appendix N Page 13

Appendix N Page 14

Appendix N Page 15

Appendix N Page 16

Appendix N Page 17

Appendix N Page 18

Appendix N Page 19

Appendix N Page 20

Appendix N Page 21

Appendix N Page 22

Appendix N Page 23

Appendix N Page 24

Appendix N Page 25

Appendix N Page 26

Appendix N Page 27

Appendix N Page 28

Appendix N Page 29

Appendix N Page 30

Appendix N Page 31

Appendix N Page 32

Appendix N Page 33

Appendix N Page 34

Appendix N Page 35

Appendix N Page 36

Appendix N Page 37

Appendix N Page 38

Appendix N Page 39

Appendix N Page 40

Appendix O

Topographic Survey

Appendix O Page 1

Appendix O Page 2

Appendix O Page 3

Appendix O Page 4

Appendix P

Dover Air Force Base Architectural Compatibility Plan

Appendix P Page 1

Appendix P Page 2

Appendix P Page 3

Appendix P Page 4

Appendix P Page 5

Appendix P Page 6

Appendix P Page 7

Appendix P Page 8

Appendix P Page 9

Appendix P Page 10

Appendix P Page 11

Appendix P Page 12

Appendix P Page 13

Appendix P Page 14

Appendix P Page 15

Appendix P Page 16

Appendix P Page 17

Appendix P Page 18

Appendix P Page 19

Appendix P Page 20

Appendix P Page 21

Appendix P Page 22

Appendix P Page 23

Appendix Q

Dover Air Force Base Local MILCON and RPMC Design Guide

Appendix Q Page 1

Dover Air Force Base Local MILCON and RPMC Design Guide

Effective 28 May 2009

Previous Design Guides Obsolete

Appendix Q Page 2

Table of Contents

Section

General 1.0

Civil 2.0

Environmental 3.0

Landscaping 4.0

Architecture 5.0

Mechanical 6.0

Plumbing 7.0

Fire Suppression Systems 8.0

Fire Alarm/Mass Notification Systems 9.0

Electrical 10.0

Communication 11.0

CAD Standards 12.0

GIS / Geo-referencing 13.0

Appendix Q Page 3

1.0 General:

1.1 O&M Standards

1.1.1 Provide 1 hardcopy and 1 electronic copy on compact disc (.pdf format) of all O&M manuals to DAFB.

1.1.2 Comply with AF ETL 89-2 Standard Guidelines for Submission of Facility Operating and Maintenance Manuals

1.1.3 Provide as-built shop drawings for facility systems and subsystems in reproducible format.

1.2 Interior and Exterior Signage shall comply with the IAW UFC 3-120-1, DAFB Architectural Compatibility Plan, and AMC standards.

1.3 Construction signage shall be IAW ETL 02-9 Construction Signs for MILCON Projects.

Color of signs will be brown.

1.4 Provision of construction/security fence is required.

1.4.1 Fence shall enclose the Contractor Work Limit (CWL) and contractor lay-down area(s) with a 6ft – 8ft tall chain linked fence.

1.4.2 Carefully edit applicable UFGS section accordingly.

1.5 Projects shall adhere to all applicable military standards (Unified Facility Criteria (UFC), Air Force Engineer Technical Letters (ETL), and utilize Unified Facility Guide Specifications (UFGS)). See the following links:

UFCs: http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

ETLs: http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125

UFGSs: http://www.wbdg.org/ccb/browse_org.php?o=70

1.6 Each building shall be protected by a single fire protection system, either sprinklers or heat detectors. Child Development Centers, residential occupancies, and special occupancies are the only facilities that require supplemental smoke detectors features. Only the following buildings require both manual fire alarm pull stations and sprinklers: childcare, health care, and residential (dorms, lodging, TLFs).

1.7 All hydrant barrels will be architectural brown in color. All hydrant bonnets will be IAW

NFPA 291.

1.8 Defense Reutilization and Marketing Office (DRMO): According to UFGS, unless there is a published list, contractor shall remove all equipment including consumable and recoverable material and report any recycled material to CES/CEV.

1.9 Generators shall comply with DNREC regulations. Contact BCE for specific Generator Permitting.

Appendix Q Page 4

1.10 Utilities Meter Requirements

1.10.1 Electric, water, and natural gas utilities shall be metered at every Dover AFB facility so that consumption for each facility can be monitored and tracked over time.

Water meters will be located above ground and inside the mechanical room.

1.10.2 Meters will be digital, equipped with a pulse output, and must be accessible through E-Mon Energy Software.

1.10.3 A Local Area Network connection shall be installed near each meter for the E-Mon Software interface.

1.10.4 Recommended Products for Use

Electric Meters E-Mon Class 3000 Series

Water Meters E-Mon T4000 Cold Water Meter or Elster TS4000 Turbine Meter

Gas Meters Advanced type meter with pulse output

Software

All meters must be compatible with E-Mon Energy Software (already in use by Dover AFB)

1.11 Anti-Terrorism Force Protection:

1.11.1 Provide design analysis, including comply with UFC 4-010-01 DoD Minimum Anti-Terrorism Standards for Buildings, including standoff distances for fuel tanks, parking and refuse containers.

1.11.2 Incorporate emergency shutdown push button and button cover for HVAC systems per UFC4-010-01. The exact location of this button shall be coordinated during the design phase.

1.11.3 Mass notification required IAW UFC 4-021-01 Design and O&M Mass Notification Systems. See 6.8.18 for additional requirements.

1.11.4 Special procedures will be required to establish construction sites inside restricted and controlled areas.

1.12 Airfield: The following applies to all project operations on the airfield or within the airspace clear zones.

1.12.1 Airfield Safety Precautions FAR Clause 252.236-7005

See also DFARS 236.570 (B) (3)

1.12.2 Radio communication with tower is required when applicable.

Appendix Q Page 5

1.12.3 Special FAA waivers may be required for crane use on Dover Air Force Base. An airfield construction waiver may also be required. Application process must initiate through BCE (minimum 60 days approval).

1.12.4 Ensure that special airfield obstruction lighting is in complete compliance with all military standards (Section 1.5).

1.12.5 All vehicle operators require airfield drives training through 436 OSS.

2.0 Civil

2.1General

2.1.1 Construction drawings shall include a project location plan showing the location of the project on Dover Air Force Base. The plan shall show the Commercial Gate Entrance and the contractor’s access/haul route to the project site.

2.1.2 The construction drawings shall include a project site plan showing the contractor’s material staging and construction trailer areas and location of temporary construction fencing.

2.1.3 All contract drawing plans, including project location plan, project site plans, and floor plans for all disciplines shall include “True North” and “Project North” arrows.

These arrows shall be consistent between all sheets. “Project North” shall be oriented upwards on the drawing sheet (preferred) or to the left.

2.2 Roadways and Parking

2.2.1 Specify standard DelDOT asphalt mix designs for graded aggregate base material, intermediate and wearing surface asphalt concrete courses.

2.2.2 All roadway and parking lot curb shall be integral curb and gutter and shall comply with DelDOT Type 3 Integral Curb and Gutter. Upon approval by Dover AFB, exceptions may be permitted in situations where small portions of existing curb are replaced and must match existing.

2.2.3 Utilize DelDOT standard details for Accessible Curb Ramps.

2.2.4 Minimize placement of new manholes, cleanouts, valves, etc. within paved areas or areas to be paved. Provide reinforced concrete collars around all new cleanouts and valve boxes located within turfed areas.

2.2.5 Standard parking shall be perpendicular configuration with 18’ stall depth, 10’ stall width, and 26’ two way aisle width. Stall widths of 9.5’ and/or diagonal parking configurations (60 degree) shall only be considered in unusually constrained site plans.

2.2.6 Truncated domes required by ADA shall be terracotta red.

Appendix Q Page 6

2.3 Concrete

2.3.2 All pavements and structural concrete must comply with ETL 06-2: Alkali- Aggregate Reaction in Portland Cement Concrete (PCC) Airfield Pavements, section 12:

Avoiding ASR in New Construction.

2.3.3 If a potentially reactive aggregate must be used, then a low-alkali mixture is mandatory and active mitigation methods must also be used.

2.3.4 No recycled concrete shall be used as aggregate in new concrete

2.3.5 Recycled concrete may be used as a graded aggregate base material for roadway pavements.

2.3.6 Recycled concrete shall not be used for airfield pavements.

2.3.7 The limited use of recycled concrete shall comply with ETL 06-2 to include ensuring, if it must be used, a low-alkali mixture.

2.3.8 White pigmented liquid membrane forming curing compound is required for all concrete unless it is to receive a architectural finish surface coating. For those surfaces, use of continuous moisture curing is acceptable. Clear curing compound or polyethylene sheeting is not permitted. All exposed concrete surfaces shall be protected with curing compound immediately after final concrete finishing is accomplished. Surfaces exposed through removal of formwork prior to the end of the required curing period will be provided with supplemental curing materials until the curing period ends.

2.3.9 All concrete will be provided with sufficient crack control and expansion joints and will be shown on the design drawings.

2.3.10All floor slabs and equipment pads will be provided with either steel reinforcing bars or welded wire fabric. Finer reinforcement alone shall not be allowed.

2.4 Utilities

2.4.1 Existing known underground utilities to be taken out of service under the project design or unknown and found during construction shall not be abandoned in place.

Discontinued utilities shall be removed back to the system main. Utilities to be disposed of shall be properly tested (such as asbestos water line) prior to disposal. The vacated trench shall be backfilled and compacted IAW construction standards.

2.4.2 Gas distribution: DAFB owns the gas system on its property. All gas line installation (including regulators and meters) is part of construction contract for this project. Provide drip legs and isolation valves at each piece of gas equipment. Base distribution gas pressure is 35 psig. (The Gas System may be privatized in 2009)

Appendix Q Page 7

2.4.3 Storm Water Systems Discharge rainwater from roof downspouts directly by piping to the storm water collection system.

2.4.4 Sanitary Sewers: PVC is the preferred material for new sanitary sewer mains and laterals. As a minimum, provide a clean-out on the main sanitary sewer lateral at the 5’ building line.

2.4.5 Kent County Sewer Impact Fees/Permits

2.4.5.1 The sanitary sewer collection and local transmission system on Dover Air Force Base is owned and maintained by Kent County, Delaware. All work, as shown on the contract drawings and required by the contract specifications, associated with the sanitary sewer collection and local transmission system is subject to permitting and inspection by the Kent County Public Works Department in accordance with Kent County Code, Chapters 128 and 180, as amended, and will be conducted in accordance with the related Kent County Public Works Department sewer construction permit. Project designs will contain an assessed Equivalent Dwelling Unit (EDU) count, an estimated Impact Fee, and Inspection Fee. At final design Current fees are published on the Kent County Public Works Department website and are subject to periodic adjustment.

http://www.co.kent.de.us/Departments/PublicWorks/index.htm scroll down to public works fee schedule.

2.4.5.2 A Sewer Permit is required for all new construction or a Sewer Abandonment Permit for all demolition work associated with the sanitary sewer collection and local transmission system, as applicable, from the Kent County Public Works Department (302-744-2430). The necessary application documents and payments of required fees in order to obtain the necessary permits associated with the connection, modification, abandonment, or demolition of the sanitary sewer collection and local transmission system, in accordance with Kent County Code, Chapter 128 and 180, as amended, shall be submitted by the Contractor to the Kent County Public Works Department.

2.4.5.3 Copies of the obtained permits shall be submitted to the Contracting Officer for approval and a copy forwarded to the Base Civil Engineer (BCE). No construction activities on the sanitary sewer collection and local transmission system shall be performed until the necessary permits have been obtained and submitted to the Government for approval.

2.4.5.4 All notifications regarding required inspections of the work by the County shall be made by the Contractor and directed to the Kent County Public Works Department as required by the County’s permit.

2.4.5.5 The Construction Representative shall be notified a minimum of 24 hours in advance of all work on the sanitary sewer collection and local transmission system or as required under the special clauses specification on interruption of utilities. This is a Mandatory Verification contract requirement as required by the respective contract schedule.

Appendix Q Page 8

2.4.5 Water Distribution

2.4.5.1 ASTM C900 PVC piping for underground water distribution and fire suppression service lines is preferred.

2.4.5.2 Disinfection of water distribution system piping and appurtenances shall be in conformance with AWWA C651. Coordinate with Contracting Officer Representative for samples to be taken by Government for final clearance to place system in service.

2.4.5.3 Prepare reports of disinfection activities.

2.4.5.4 Fire hydrants shall be detailed on the plans to show the centerline height of the main pumper nozzle to be between 18” and 24” above final grade.

2.5 Monitoring Wells shall either be relocated or properly abandoned if in the way of construction. This will be determined by BCE. Contact BCE for specific monitoring well requirements.

3.0 Environmental:

3.1 Sediment and Erosion control plan

3.1.1 The project design will include a sediment and erosion control plan IAW State of Delaware Department of Natural Resources and Environmental Control (DNREC) standards. The plan will be titled “Recommended Erosion and Sediment Control Plan” and will include a standard list of Dover Air Force Base specific erosion and sediment control notes. The Contractor will prepare and submit an erosion and sediment control plan prior to initiating any ground disturbing activity. The plan may consist of the already reviewed “Recommended Erosion and Sediment Control Plan” as indicated on the contract drawings, a modified version of the plan indicated on the contract drawings, or another plan prepared by the Contractor. Whichever alternative is selected, the Contractor shall submit the plan to the Dover AFB Environmental and Engineering Flights for review and coordination to ensure compliance with applicable federal and state regulations.

3.1.2 Dover AFB will review the submitted plan for compliance. Dover AFB shall provide comments be implemented or provide a "Review Complete" status for the plans.

The plans submitted with the contract drawings already have a "Review Complete" status but still shall be submitted to Dover AFB. If the Contractor chooses to revise the "Review Complete" Sediment and Erosion Control Plan provided in the contract drawings, any delays or increase in costs resulting from the revised Plan shall be the sole responsibility of the Contractor. Upon receiving a "Review Complete" status, the Contractor must file the Notice of Intent with the EPA for this project. The Contractor is the holder of the sediment and erosion control permit, not Dover AFB. A copy of the filed Notice of Intent shall be provided to Dover AFB. (Note: The EPA does not review drawings, but if they perform an inspection, the drawings shall be made available to them.)

3.1.3 Pre-construction conference - Before initiating construction, the Contractor shall schedule and coordinate a meeting to include the Contractor, the associated certified

Appendix Q Page 9 construction reviewer (CCR) (see paragraph entitled "Compliance during Construction" below) and Dover AFB representatives. No construction shall begin until the plans have been reviewed, the Notice of Intent filed and the pre-construction meeting has occurred.

3.1.4 Compliance during Construction

The Contractor shall ensure permit compliance during the term of the permit. To ensure continued compliance, the Contractor shall have a licensed certified construction reviewer (CCR), as defined by the DNREC Sediment and Storm Water Regulations, Section 12.0, to perform weekly inspections as required by those same regulations.

3.1.5 CCR reports

3.1.5.1A copy of the completed CCR reports shall be provided to Dover AFB at the end of each month. Dover AFB, however, reserves the right to request these reports more frequently if problems persist or an issue of non-compliance SECTION 01 57 13 Page 1 Invitation for Bids, W912BU-08-B-0002, is observed.

3.1.5.2 Dover AFB CCR inspections - Dover AFB CCRs will perform an independent inspection at their discretion to ensure continued compliance with the submitted plan and contract requirements. A copy of the Dover AFB CCR reports can be obtained by the Contractor upon written request.

3.1.6 Changes

In-field Changes shall be submitted prior to implementation and shall be reviewed by all applicable entities in the Civil Engineer Squadron. Particularly, environmental compliance changes, i.e. changes to sediment and erosion control practices, will be reviewed by the environmental flight. These requested changes shall still comply with all applicable federal and state environmental regulations.

3.1.7 Non-compliance issues

3.1.7.1 Dover AFB Non-Compliance Issues

After non-compliance issues are identified on either the Contractor's internal CCR reports or a Dover AFB CCR report, the Contractor shall address the situation within the workweek (5 workdays). If long-term repairs are necessary, a continuance of 5 days may be granted. Repeated non-compliance or ignoring non-compliance issues will result in a deficiency notice issued through the Contracting Officer. Deficiency notices shall constitute a violation of environmental requirements and will result in less favorable reviews pertaining to environmental compliance on subsequent projects at Dover AFB.

Continued deficiency notices will result in work stoppage by the Contracting Officer to correct sediment and erosion control issues. This type of work stoppage will not add additional days to the end of the contract for completion.

3.1.7.2 Regulatory Non-Compliance Issues

Continued non-compliance issues identified on Contractor's CCR and/or Dover AFB CCR reports may be forwarded to the EPA enforcement division for their action.

EPA enforcement issues resulting from forwarding of CCR reports or from an unannounced EPA inspection, will be resolved between the permit holder (the Contractor) and the EPA.�

Appendix Q Page 10

3.2 Energy Policy

3.2.1 All construction shall comply with energy conservation standards set by latest version of UFC 3-400-01.

3.2.2 All new buildings and existing buildings undergoing major renovations to supply not less than 30 percent of the hot water requirements through solar heating if life cycle is cost effective to be in compliance with the Energy Independence and Security Act of 2007.

3.3 Termite Treatment: All new below grade and at-grade construction shall utilize materials which are not susceptible to insect infestation. Termite treatment is therefore not required and shall not be incorporated in project requirements.

3.4 Underground oil storage tank removal: oil shall be pumped out and placed where government indicates. Dispose of all residual waste (sludge), cleaning water (triple rinse) and clean tank (tank shall be rendered useless by punching holes in it or cutting into pieces).

3.5 Asbestos abatement: Survey all possible materials (do not forget floor tiles under carpet and determine number of layers of floor tile). Remove all asbestos materials unless approved otherwise.

3.6 Lead-based paint removal: It is usually more cost effective to demolish and dispose of lead-painted items than to remove paint from them. Survey all painted surfaces that will be affected by construction.

3.7 Soil Disposal Procedures

3.7.1 The BCE will upon request, identify potentially contaminated soil and groundwater in the vicinity of any proposed demolition of facilities and subsequent construction of new facilities. Groundwater and soil may potentially be contaminated and if encountered needs to be addressed appropriately during design.

3.7.2 No known soil contamination may be present; however, the industrial activities associated with some facilities may lead to the potential for the identification of contaminated soil during construction. Therefore, any soil deemed for removal off-site must be analyzed to determine proper disposal avenues. Project designs should include unit price items for disposal of contaminated soils.

3.7.3 Each stockpile of soil needs to be analyzed for the following items:

a) Full toxicity characteristic leach ate procedure (TCLP) to include ignitability, reactivity, corrosiveness, metals, organics, pesticides, and herbicides.

b) Total petroleum Hydrocarbons (TPH)

c) Polychlorinated Biphenyls (PCBs)

d) Benzene, Toluene, Xylene, and Ethyl Benzene (BTEX)

e) Percent Solids

3.7.4 The sample results shall be submitted to CES/CEA for interpretation. CEA will be utilizing the hazardous waste limitations when evaluating the TCLP results to determine if the soil shall be disposed of as hazardous waste. The other remaining parameters are required for disposal at a Delaware Solid Waste Authority facility and have associated

Appendix Q Page 11

DSWA limitations. Those limitations will be compared to the results to determine if the soil can be disposed of accordingly at the disposal facility permitted to accept hazardous waste. If the soil in non-hazardous waste but does not meet the limitations of the DSWA, the soil shall be disposed of at a disposal facility permitted to accept such waste.

3.8 Recycled Construction Material: Contractors are required to submit their recycled construction material on the DAFB Construction & Demolition Debris Worksheet on a quarterly basis. Contact BCE for specific recycling requirements and latest worksheet.

4.0 Landscaping

4.1 All landscaping shall comply with Dover Air Force Base: Architectural Compatibility Plan. (See changes to ACP in section 5.1of this document.)

4.2 All disturbed areas not to be paved shall be repaired with sod. Turfed areas will include an irrigation system as approved on a project specific basis.

5.0 Architecture:

5.1 Incorporate Dover AFB Architectural Compatibility Plan.

5.1.1 The following are changes to the ACP:

5.1.1.1 DO NOT utilize the following landscaping material, from Appendix A3:

5.1.1.1.1 Shrubs- Berberis thunbergii, Euonymus alata compacta, Spiraea japonica “Anthony Waterer”, Spiraea japonica “Little Princess”, Viburnum plicatum var. tomentosum, Dwarf Spirea (Little Princess), and Double File Viburnum .

5.1.1.1.2 Groundcovers and Vines- Hedra helix “Baltica”, Vinca minor Periwinkle, and Hardy English Ivy.

5.1.1.2 Exterior Color Application, from Appendix A2 should read the following:

5.1.1.2.1 Eagle Feather Tan (Dover Tan) - ICI Devoe Pastel Tint Base #BLK

1P32 YOX 1P39 OXR 19

5.1.1.2.2 Bald Eagle Brown (Dark Bronze) - ICI Devoe #4216-7460

5.2 All building items will be color coordinated and finished to match adjacent material.

These items include heat vents, transformers, fire hydrants, vent stacks, louvers, appurtenances, and all exterior metal.

5.3 All facilities shall have a Knox Box.

Appendix Q Page 12

5.4 Standing Seam Metal Roofs:

5.4.1 Coordination Meeting. A coordination meeting shall be held within 45 days after contract award for mutual understanding of the Structural Standing Seam Metal Roof (SSSMR) System contract requirements. This meeting shall take place at the building site and shall include representatives from the Contractor, the roof system manufacturer, the roofing supplier, the erector, the designer, and the Contracting Officer, and base representative. All items required by paragraph SUBMITTALS shall be discussed, including applicable standard manufacturer shop drawings, and the approval process.

The Contractor shall coordinate time and arrangements for the meeting.

5.4.2 Materials- Steel Panels. Steel panels shall be zinc coated steel conforming to ASTM A 653/A 653M; aluminum zinc alloy coated steel conforming to ASTM A 792/A 792M, AZ 55 coating; or aluminum coated steel conforming to ASTM A 463/A 463M, Type 2, coating designation T2 65. Uncoated panels shall be 0.759 mm (0.0299 inch) thick minimum. Panels shall be within 95 percent of nominal thickness. Prior to shipment, mill finish panels shall be treated with a passivating chemical to inhibit the formation of oxide corrosion products. Panels that have become wet during shipment and have started to oxidize shall be rejected.

5.4.3 Provide minimum 22 gage base metal thickness galvanized roof panels of a with a Kynar finish.

5.4.4 Provide roof systems which incorporate concealed fasteners to the maximum extent possible.

5.4.5 Provide sloped roofs with continuous ridge vents and soffit vents. Install two pipe ice guard system that clamps to the standing seam ribs.

5.4.6 Provide a permanent fall protection system in accordance with OSHA guidance

(CFR) 1926.

5.4.7 Warranty

5.4.7.1 A complete sample warranty for the roof as described in paragraph b. below shall be provided in the initial submittal for the roof. Government approval of the warranty is required prior to commencement of roof work.

5.4.7.2 Warranty certificate. At the completion of the project the Contractor shall furnish signed copies of the 5-year Warranty for Structural Standing Seam Metal Roof (SSSMR) System, a sample copy of which is attached to this section, and the 20-year Manufacturer's Material Warranties.

5.4.7.3 Sample roof warranty:

The Structural Standing Seam Metal Roof (SSSMR) shall be warranted by the Contractor on a no penal sum basis for a period of five years against material and workmanship deficiencies; system deterioration caused by exposure to the elements; and /or inadequate resistance to specified service design loads, water leaks, and wind uplift damage. The SSSMR system covered under this warranty shall include the entire roofing system including, but not limited to, the standing

Appendix Q Page 13 seam metal roof panels, fasteners, connectors, roof securing components, and assemblies tested and approved in accordance with ASTM E 1592. In addition, the system shall consist of panel finishes, slip-sheet, insulation, vapor retarder, all accessories, components, and trim and all connections with roof panels. This includes roof penetration items such as vents, curbs, and skylight; interior or exterior gutters and downspouts; eaves, ridge, hip, valley, rake, gable, wall, or other roof system flashings installed and any other components specified within this contract to provide a weather tight roof system; and items specified in other sections of these specifications that are part of the SSSMR system. All material and workmanship deficiencies, system deterioration caused by exposure to the elements and/or inadequate resistance to specified design loads, water leaks, and wind uplift damage shall be repaired as approved by the Contracting Officer.

This warranty shall warrant and cover the entire cost of repair or replacement, including all material, labor, and related markups. The Contractor shall supplement this warranty with written warranties from the installer and system manufacturer, which shall be submitted along with the Contractor’s warranty;

however, the Contractor shall be ultimately responsible for this warranty. The Contractor’s written warranty shall start upon final acceptance of the facility. It is required that the Contractor provide a separate bond in an amount equal to the installed total roofing system cost in favor of the owner (Government) covering the Contractor’s warranty responsibilities effective throughout the five year Contractor’s warranty period for the entire SSSMR system as outlined above.

Manufacturer’s Material Warranties: The Contractor shall furnish, in writing, the following manufacturer’s material warranties which cover all SSSMR system components such as roof panels, anchor clips and fasteners, flashings, accessories, and trim, fabricated from coil material:

1) A manufacturer’s 20-year material warranty warranting the aluminum, zinc-coated steel, aluminum-zinc alloy coated steel or aluminum-coated steel as specified herein will not rupture, structurally fail, fracture, deteriorate, or become perforated under normal design atmospheric conditions and service design loads. Liability under this warranty shall be limited exclusively to the cost of either repairing or replacing nonconforming, ruptured, perforated, or structurally failed coil material.

2) A manufacturer’s 20 year exterior material warranty on the factory colored finish warranting that the finish, under normal atmospheric conditions at the site, will not crack, peel, or delaminate; chalk in excess of a numerical rating of eight, as determined by ASTM D 4214 test procedures; or change color in excess of five CIE or Hunter Lab color difference (delta E) units in accordance with ASTM D 2244. Liability under this warranty is exclusively limited to refinishing with an air-drying version of the specified finish or replacing the defective coated material.

3) A roofing system manufacturer’s 20 year, non-prorated, system weather tightness warranty.

5.5 Roof Ventilation: Attic ventilation provided by natural convection is the preference where possible through the use of soffit and continuous ridge vents. Secondary mechanical ventilation may also be necessary.

Appendix Q Page 14

5.6 Keying:

5.6.1 Locks shall be keyed in sets or subsets as scheduled. Locks shall be furnished with the manufacturer's standard construction key system. Change keys for locks shall be stamped with change number and the inscription "U.S. Property - Do Not Duplicate."

Keys shall be supplied as follows:

Locks: 3 change keys each lock.

Master keyed sets: 3 keys each set.

The keys and cylinders shall be “Certified Mail” directly from the manufacturer to:

For MILCON projects:

Military Construction Element, 436 CES/CEPM 600 Chevron Avenue Dover AFB, DE 19902-5600

For RPMC projects:

Real Estate Element, 436 CES/CEAR 600 Chevron Avenue Dover AFB, DE 19902-5600

5.6.2 Lock Cylinders (Mortise, Rim, and Bored): All locks, keying, and hardware to comply with Builders Hardware Manufacturer’s Association (BHMA).

5.6.3 Key cylinders shall contain a Schlange C123 compatible keyway and utilize a Small Format Everest IC core. Cylinders shall have key removable type cores.

5.7 Structural

5.7.1 All drawing depicting structural steel requirements shall also detail the specific connection requirements, either welded or bolted, including sizes, types, spacing, etc.

Detailing of connection requirements shall not be left to the shop drawings.

5.7.2 All light gage framing requirements shall be detailed on the plans, including gage, sizes, and spacing of members.

6.0 Mechanical:

6.1 Heating, Ventilating, and Air Conditioning (HVAC)

6.1.1 All air handlers, chillers, and compressors shall be provided by TRANE, YORK, or

CARRIER.

6.1.2 The use of cooling tower type cooling systems is not permissible on Dover AFB.

6.1.3 All heating/cooling mechanical systems must provide control of temperature and humidity in all occupied spaces. Design day conditions shall be 95F DB/78F WB in the

Appendix Q Page 15 summer and 10F DB in winter. The mechanical system shall be designed around shutoff VAV, low temperature VAV air handling units (50-degree max supply air); high delta T chilled water systems and hot water boiler. To comply with the demand limiting need of DAFB the use of ICE storage systems shall be provided for systems larger than 30 tons.

6.1.4 In cases where ceiling space does not allow the room for ductwork and piping, low temperature terminal units shall be used. The definition of terminal unit is fan coil units or unit ventilators that are piped in a chase for installation in a classroom or office. These systems shall be installed with air-cooled chillers and ice where needed. Fan coil units (FCU’s) and unit ventilators shall be installed with reheat and be provided with variable air volume controls to match room load with the ability to provide zone temperature and humidity control. In terminal unit applications, a 4-pipe auto changeover control system shall be provided to allow the chilled water coils in the terminal units to provide adequate heat when reheat coils are not adequate to meet heating load. Unit Ventilators shall be provided with face & bypass coil control.

6.1.5 When VAV AHU’s are not an option due to ceiling space, outside air introduction and building pressurization should be provided by a dehumidification air handling unit that provides tempered dehumidified OA at 72F 45% RH introduced directly to the space.

Energy recovery of exhausted air should be used in all cases.

6.1.6 Building pressurization in both VAV AHU’s and FCU’s with central OA units shall be controlled directly by the EMCS system to be slightly positive to reduce infiltration.

6.1.7 Mechanical piping systems shall have independent chilled water and hot water for a true 4-pipe system. Chilled water and hot water systems design should be based on a concentration of propylene glycol necessary to protect from freezing down to +10 degrees Fahrenheit. Chilled water piping shall be designed around a 10-degree F delta T.

Hot water piping/pumping shall be designed around 20-degree F delta T. This requirement will provide an industry standard pipe sizing. Statements of work will require testing to confirm freeze protection at 10 degrees Fahrenheit for both chilled and hot water systems.

6.1.8 The base design temperature for heating hot water systems shall be 180 degrees F supply and 140 degrees return water (40-degree delta T) however, the heating hot water temperatures should fluctuate based on outdoor temperature. Special attention should be paid to hot water boiler condensation and low flow on chillers to avoid falling below the manufacturer’s low temperature/flow requirements

6.1.9 Both of the above systems are to use ICE storage for demand limiting purposes and to provide low temperature water to the VAV air handlers or terminal units. To minimize “dumping”, “stratification” and to avoid the use of fan powered VAV the minimum setting for cooling airflow should be set for 30% (field adjustable).

6.1.10 All systems are to be installed in a manner to allow continued maintenance per the manufacturer’s installation manual.

6.1.10.1 Show unions or flanges and shut off valves at each piece of equipment for maintenance. Ensure unions or flanges are located to allow easy heat exchanger or coil removal. Show coil, heat exchanger and filter removal areas. Weatherproof vents and air intakes should be installed. For all hydronic heating and cooling systems, indicate the installation of shot feeders with chemical treatments (install

Appendix Q Page 16 feeder on outlet of circulation pump with throttling valve in between connections) and diaphragm expansion tanks. All chemically treated water shall be tested by contractor.

6.1.10.2 Use packaged chillers when chilled water systems are specified to keep noise and refrigerant out of mechanical room. If chillers are specified, provide valve and capped with 3” camlock connections near chillers for connection of temporary chillers. +10� F food grade propylene glycol is required for closed loop hydronic systems. Compliance test results are required after construction. Do not specify % of concentration of propylene glycol in lieu of +10� F. Ethylene glycol is prohibited.

6.1.10.3 Flexible ductwork shall not be used for duct mains and runs shall not exceed 12 feet in length. Fiberglass ductboard is not acceptable for use on DAFB.

6.1.10.4 Minimize ceiling and roof-mounted equipment. If equipment must be mounted on the roof, provide metal walkways with fall protection anchors to allow for maintenance. If equipment must be mounted in the ceiling, provide catwalks with access ladders to provide for maintenance of these items.

6.1.10.5 Victaulic (grooved) fittings are prohibited for low temperature HW circulation systems. 600�F HP valves and gaskets are required on HTHW lines.

Dual fuel boilers will be used on all hydronic heating systems.

6.1.10.6 Do not install any mechanical equipment more than 12 inches above suspended ceilings. Equipment must be reachable for service.

6.1.10.7 Do not use 4-pipe fan coil units. They do not control humidity well or provide conditioned ventilation air.

6.1.10.8 All HVAC condensate shall be routed to the exterior of the building. The condensate terminations shall be located as to prevent ice hazards in the winter months.

6.1.11 Five year extended manufacturer’s warranty for parts only is required for mechanical HVAC system components.

6.1.12 A written pre-commissioning and commissioning plan is required for HVAC equipment and digital controls at the material submittal phase.

6.1.13 HVAC System Control Requirements

6.1.13.1 All HVAC direct digital controls shall be TRANE TRACER SUMMIT.

6.1.13.2 The control system shall be an open implementation of LonWorks technology using ANSI/EIA 709.1B as the communications protocol and using LonMark Standard Network Variable Types as defined in LonMark SNVT Master List for communication over the network.

Appendix Q Page 17

6.1.13.3 LonWorks Network Services (LNS) shall be used for all network management including addressing and binding of network variables. A copy of the LNS database shall be submitted to the project site as specified.

6.1.13.4 The hardware shall perform the control sequences as specified and shown to provide control of the equipment as specified and shown.

6.1.13.5 Control sequence logic shall reside in DDC hardware in the building. The building control network shall not be dependent upon connection to a Energy Monitoring Control System (EMCS) for performance of control sequences in this specification. The hardware shall, to the greatest extent practical, perform the sequences without reliance on the building network.

6.1.13.6 The hardware shall be installed such that individual control equipment can be replaced by similar control equipment from other equipment manufacturers with no loss of system functionality.

6.1.13.7 All necessary documentation, configuration information, configuration tools, programs, drivers, and other software shall be licensed to and otherwise remain with the Government such that the Government or their agents are able to perform repair, replacement, upgrades, and expansions of the system without subsequent or future dependence on the Contractor.

6.1.13.8 The Contractor shall provide sufficient documentation and data, including rights to documentation and data, such that the Government or their agents can execute work to perform repair, replacement, upgrades, and expansions of the system without subsequent or future dependence on the Contractor.

6.1.13.9 Hardware shall be installed and configured such that the Government or their agents are able to perform repair, replacement, and upgrades of individual hardware without further interaction with the Contractor.

6.1.13.10 Control hardware shall be installed and configured to provide all input and output Standard Network Variables (SNVTs) as shown and as needed to meet the requirements of this specification.

6.1.13.11 All DDC devices installed under this specification shall communicate via ANSI/EIA 709.1B. The control system shall be installed such that a SNVT output from any node on the network can be bound to any other node in the domain.

6.1.13.12 The building control network shall connect to the Utility Monitoring and Control System located in the 436 Civil Engineer Squadron HVAC shop located in Bldg 615 via the base LAN.

6.1.13.12.1 To operate on the LAN, the contractor shall obtain an Interim Authority To Operate (IATO) from the 436 Communications Squadron.

Approval of the IATO can take up to 8 weeks. An Internet Security Scan (ISS) is a required attachment of the IATO. 436 Civil Engineer Squadron will schedule the ISS through the 436 Communications Squadron.

Appendix Q Page 18

6.1.13.12.2 Upon issuance of the IATO, the contractor shall obtain the Authority to Operate through submission of the AMC Form 1014. This form can be obtained from 436 Civil Engineer Squadron.

6.1.13.13 Monitoring and Controlling shall, as a minimum, include but not be limited to the following equipment:

6.1.13.13.1 Air terminals.

6.1.13.13.2 Air handlers:

a. Start-stop.

b. Entering air temperature.

c. Leaving air temperature.

d. Entering chilled water temperature.

e. Leaving chilled water temperature.

f. Entering heating water temperature.

g. Leaving heating water temperature.

h. Supply fan airflow damper position.

i. Return fan airflow damper position.

j. Exhaust fan airflow damper position.

k. Outside airflow damper position.

l. Filter static pressure.

6.1.13.13.3 Chillers:

a. Start-stop.

b. Entering chilled water temperature.

c. Leaving chilled water temperature.

d. Entering condenser water temperature.

e. Leaving condenser water temperature.

f. Percent of full load.

g. Chilled water flow.

h. Condenser water flow.

i. Safety controls.

6.1.13.13.4 Boilers:

a. Start-stop.

b. Entering water temperature.

c. Leaving water temperature.

d. Percent of full load.

e. Safety controls.

f. System hot water flow.

6.1.13.13.5 Packaged terminal air-conditioning units.

6.1.13.13.6 Fan coil units.

6.1.13.13.7 Unit ventilators.

Appendix Q Page 19

6.1.13.13.8 Pumps:

a. Start-stop.

b. Variable speed drives.

c. Constant speed drives.

6.1.14 Electric controls should be used for room fan coils. Indicate that duct smoke detectors are to be powered, supervised, and re-settable from the facility fire alarm panel.

6.1.15 Consider aesthetics in design. Use visual screens for exterior equipment. Hide fire sprinkler test lines. Use white coated sprinkler heads on SAT ceilings and center sprinkler heads in tile.

6.1.16 Insulation. Verify condition and quantity of existing insulation. In many cases, re-insulation of existing piping, equipment, and ductwork is needed.

6.1.17 All projects shall have AFCESA Field Support Directorate, Civil Engineering Maintenance, Inspection, and Repair Team (CEMIRT ), review HVAC system designs.

6.1.18 All condensation should be routed to the buildings sanitary system.

7.0 Plumbing:

7.1 All plumbing fixtures shall be commercial/industrial grade. Clean-outs shall be provided at a minimum every 75' and as required by the IPC section 708. Provide a tracer wire over plastic underground drain and sewer pipe for pipe locating purposes.

Specify battery powered electronic operating fittings for high use facilities. All exterior hose bibs shall be frost-proof with integral backflow preventers. Specify 90% flushing of test media for toilets. Specify that all lavatory faucets meet the requirements of Section 9 of NSF Standard 61 (Jan 97) for residential/drinking water faucets to prevent lead problems.�

7.2 Locate a hose bib in each mechanical room, mechanical yard and at each condenser.

C-900 PVC is preferred for water distribution on-site, with tracer wire installed for pipe location underground. Indicate the installation of reduced pressure backflow preventers on all make-up water systems and underground lawn sprinkler systems.

7.3 Sites with landscaping should have underground sprinkler system considered with automatic controls including rain sensors.

7.4 Cleaning: Clean and disinfect water-distribution piping as follows:

7.4.1 Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.

7.4.2 Use purging and disinfecting procedure described in AWWA C651. Coordinate with Contracting Officer Representative for samples to be taken by Government for final clearance to place components in service.

7.4.3 Prepare reports of purging and disinfecting activities.

Appendix Q Page 20

7.5 Plumbing roof vents shall be minimized and shall be located on the rear elevation of the facility to the maximum extent possible.

8.0 Fire Suppression Systems

8.1 Spaces both below suspended ceilings and above suspended ceilings with combustible material shall be protected by sprinkler systems. Designer of Record will perform or contract for fire hydrant flow tests. Results will be placed on the project drawings. Provide UL-listed backflow device between domestic water system and fire suppression system’s fire department connection. Specify dry pipe fire suppression systems in non-environmentally controlled areas.

8.2 Provide wet chemical fire suppression systems for commercial kitchen hoods.

Specify small packaged systems (like The Guardian by Twenty First Century Int’l Fire Equip & Svc Corp, tel 214/252-6201) for residential style hoods.

8.3 If wet-pipe fire suppression systems are used, attic spaces must be insulated or hot tape systems must be installed to prevent pipes from freezing.

8.4 Fire extinguishers must be placed in flush mount cabinets for finished interiors.

8.5 Fire Department Connections on exterior of new facilities will be 5 inch Stortz. Do not use a Wye Connection.

8.6 For fire suppression systems in critical electronic equipment spaces refer to Engineering Technical Letter (ETL) 01-18: Fire Protection Engineering Criteria – Electronic Equipment Installations.

9.0 Fire Alarm and Mass Notification Systems

9.1 The fire detection system and alarm system shall be configured in accordance with NFPA 72 and UFC 3-600-01 for addressable systems.

9.1.1 The equipment furnished shall be compatible and be UL listed, FM approved, or approved by a nationally recognized testing laboratory in accordance with the applicable NFPA standards.

9.1.2 The control panel shall be Monaco Enterprises Inc model M-2, fully compatible with Dover AFB Proprietary Supervising Station, Monaco model # D-21M operating at 138.925 MHZ. Panels manufactured by other companies are not acceptable.

9.1.3 A looped conduit system shall be provided in accordance with NFPA 72.

9.1.4 Each initiating device shall report uniquely to the Fire Department.

9.1.5 Electrical and mechanical rooms to have strobes only, no horns required.

Appendix Q Page 21

9.1.6 All FA circuits shall be supervised. Four-wire FA circuits are required, and must be specified as listed in the current edition of NFPA 72. Wire size and type shall be as recommended by the manufacturer.

9. 2 Fire alarm certification testing shall be performed by a factory-authorized representative.

9.3 All necessary documentation, configuration information, configuration tools, programs, drivers, and other software shall be licensed to and otherwise remain with the Government such that the Government or their agents are able to perform repair, replacement, upgrades, and expansions of the system without subsequent or future dependence on the Contractor.

9.4 The Contract documents shall contain sufficient documentation and data, including rights to documentation and data, such that the Government or their agents can execute work to perform repair, replacement, upgrades, deletions, and expansions of the system without subsequent or future dependence on the Contractor.

9. 5 Hardware shall be installed and configured such that the Government or their agents are able to perform repair, replacement, modifications, and upgrades of individual hardware without further interaction with the Contractor.

9. 6 The fire alarm control system shall provide supervised addressable relays for HVAC shutdown. All AHU in a facility will be programmed to shut down upon activation of a single alarm. An override at the HVAC panel shall not be provided. Duct detectors shall receive their power and reset from the Fire Alarm Control Unit.

9. 7 The control panel and any field panels shall be software reprogrammable to enable expansion or modification of the system without replacement of hardware or firmware.

Examples of required changes: adding or deleting devices or zones; changing system responses to particular input signals; programming certain input signals to activate auxiliary devices.

9. 8 Remote System Audible/Visual Graphic Display Annunciator Audible appliance, consider utilization of text display where required. �

9. 9 Technical data and computer software (meaning technical data which relates to computer software) which is specifically identified in this project, and which may be defined/required in other specifications, shall be delivered, strictly in accordance with the contract clauses, and in accordance with the Contract Data Requirements List, DD form 1423. Data delivered shall be identified by reference to the particular specification paragraph against which it is furnished. Data to be submitted shall include complete system, equipment, and software descriptions. Description shall show how the equipment will operate as a system to meet performance requirements of this contract.

The data package shall also include the following:

9.9.1 Identification of programmable portions of system equipment and capabilities.

9.9.2 Description of system revision and expansion capabilities and methods of implementation detailing both equipment and software requirements.

Appendix Q Page 22

9.9.3 Provision of operational software data on all modes of programmable portions of the fire alarm and detection system.

9.9.4 Description of Fire Alarm Control Panel equipment operation.

9.9.5 Description of auxiliary and remote equipment operations.

9.9.6 Library of application software.

9.9.7 Operation and maintenance manuals as specified.

9.10 Software (to include any passwords required for access), connecting cables and proprietary equipment, necessary for the maintenance, testing, modification, and reprogramming…