Amendment No. 0004

View the file

Other files

File Type Posted
09R0015-SPECS-AM5.PDF PDF
09R0015-Specs-Am3-1.PDF PDF
09R0015-Dwgs-Am3.pdf PDF
09R0015-Specs-Am3-2.pdf PDF
00120 Prop Eval Factors - Attachments.doc DOC document
09R0015-SPECS-AM2.PDF PDF
09R0015-SPECS-AM1.PDF PDF
Site_Visit_Attendance_Sheet.pdf PDF
09R0015-Specs-VOL2-3.PDF PDF
09R0015-Specs-VOL1.PDF PDF
09R0015-Specs-VOL2-4.PDF PDF
09R0015-Dwgs-2.PDF PDF
09R0015-Specs-VOL2-5.PDF PDF
RFI Example.xls XLS spreadsheet
09R0015-Specs-VOL2-2.PDF PDF
09R0015-Dwgs-1.PDF PDF
09R0015-Specs-VOL2-1.PDF PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC:MICHELLE L. JOHNSON

WANAMAKER BLDG

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PROPOSAL RECEIPT DATE IS EXTENDED TO 2:00 P.M., LOCAL TIME ON JULY 24, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

U 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-09-R-0015

X 9B. DATED (SEE ITEM 11)

3-June-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer x is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) Design-Build Armed Forces Medical Examiners System Facility, Dover Air Force Base, Dover, Delaware

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-July-2009

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTCMLJ

FACILITY CODECODE

EMAIL:TEL:

Amendment No. 0004

Request for Proposals

W912BU-09-R-0015

14. DESCRIPTION OF AMENDMENT (continued)

a. RFIs with RESPONSES: RFIs with responses, annotated Amendment No. 0004 are attached to this amendment.

b. VOLUME 1 OF 2:

(1) Section 01 10 00 STATEMENT OF WORK: Please delete the following pages in this section in their entirety and substitute the revised pages of the same numbers, annotated Amendment No. 0004, attached hereto.

(2) Section 01 33 16 DESIGN AFTER AWARD: Please delete page 21 of this section in its entirety and substitute the revised page of the same number, annotated Amendment No. 0004, attached hereto.

c. VOLUME 2 OF 2:

(1) Appendix H ROOM DATA SHEETS: Please delete the Appendix H issued by Amendment No. 0003 in its entirety. Please utilize the Appendix H included with the advertised project on 3 June 2009 found in the Specs-VOL2-3.pdf file.

(a) Please delete the following pages from that version of Appendix H in their entirety and substitute the revised pages of the same number, annotated Amendment No. 0004, attached hereto.

(b) Please add the new sheet 212.1 to that version of Appendix H.

(2) AGRAM 08-03 for fire protection redundancy, referenced in RFP, provided for your use.

d. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of the bid.

RFP W912BU-09-R-0015

FOR INFORMATION ONLY

REQUESTS FOR INFORMATION with RESPONSES

Solicitation No. W912BU-09-R-0015 7/14/2009

RFI #

Dwg Sheet/Spec Section Comment Response

115 01 10 00

Paragraph 6.6.6.10(13), page 152 thru 157, refers to high density files systems. The total size of the systems (number of carriages, number of shelves per carriage, type of contents, etc.) are not provided. Please provide configuration of the systems so that a total weight can be determined for design of the slab-on-grade.

A thickened slab is indicated in the RFP already and the storage loads are indicated as well. Please price per the RFP.

116 01 10 00

Para. 6.15.1.3 states that overall fire protection design to also be in accordance with the requirements of AGRAM 08-03 for Fire Protection Redundancy. Assume this is a standard or technical directive which has not been included in the Government documents. Also cannot find on the internet. We assume that the requirements of this standard have been incorporated into the RFP. Please provide a copy of this standard or information on where it can be acquired. AGRAM 08-03 included with

Amendment No. 0004

117 01 10 00

Para. 6.15.1.4 specify that the fire protection systems design shall also incorporate the requirements of NFPA 232. This standard addresses other design requirements beyond fire protection systems per se and it is assumed that these requirements shall be applied to spaces such as the Repository and other areas that contain (storage?) of foil wrapped index cards?

Correct, NFPA 232 requirements apply only to the storage of the foil wrapped index cards. Please price per the RFP.

118 01 10 00

Para. 6.15.1.4 specify that the fire protection systems design shall also incorporate the requirements of NFPA 232. This allow for specific methods of storage based on the types of records to be stored as defined in NFPA 232 (i.e. Vital, Important, Archival material, Permanent, Active, Inactive, Unscheduled records). Based on the Type of Records and the resulting method of storage, there are specific requirements for fire ratings, method of operation of shelving, storage volume limitations smoke detection in addition to fire suppression, etc. Please define the type of records per these NFPA 232 definitions.

Please see Amendment No. 0004.

119 01 10 00

Para. 6.15.2.2 Based on the description in this paragraph and the Hazardous Materials/Chemical List In Appendix K, it is assumed that the quantities of Hazardous Materials can be accommodated by treating the entire building as one control area;

no control areas separations would be required and the structure can generally remain non-fire rated. If this is not the case, fire proofing of the structure would be likely to accommodate additional control areas especially those on the second level.

Please confirm.

Addressed in a previous RFI.

120 01 10 00

Para. 6.15.2.6 No information can be found in the Government documentation that indicates the occupancy and construction type of the existing Building 116. This is needed to confirm proper rating of the fire wall at the new/existing building juncture.

Regardless, the possible S-1 occupancy in the new building would drive the fire wall rating to 3 hours vs. 2 (IBC Table 705.4) as stated in the RFP.

The existing building is considered B Use Group and Type 2B construction. We do not see that the new building will become an S-1 use Group since the storage area is less than 10% of the building area.

Please price per the RFP.

Drawing A-01; 01 10

Para. 6.15.2.6 The fire wall is indicated to be a back to back double wall construction. By code including NFPA 221, each individual wall making up this double wall assembly would need its own fire rated opening protective (door) and a vestibule would be created between these doors with thee fire rating wrapping around each side of the vestibule; This is not currently shown. It is assumed the additional doors and vestibule will be required and shall be provided. Please confirm.

There are methods of complying with NFPA 221 that do not require vestibules. Please price per the

RFP.

RFI Answers Page 1 of 3

Appendix "H"

Appendix “H” page 301 Receiving Room (#158) – In the remarks section “Provide refrigerated section for cold storage.” Does this mean to provide a cold box or will the Owner be providing refrigerators in the room for storage? If a cold box is required please provide the size of the box?

Please see Amendment No. 0004.

123 01 10 00

Para. 5.10.4.15 Past experience has included galvanized piping for dry and preaction sprinkler systems. Not indicated in RFP. It is assume that galvanized piping is not required. Please confirm.

Addressed in a previous RFI.

Section 5.12.1.1/ Drawing CP101

Please confirm that the footprint of the building meets all ATFP standoff criteria (UFC 4-010-01 B-1.1, Table B-1) for conventional construction both from the controlled perimeter and to parking and roadways within the controlled perimeter. In order for this requirement to be met there must be continuously controlled access to the loading dock access road per UFC 4- 010-01 B-1.1.3 and B-1.3. Controlled access of the loading dock road is only shown at the south entrance to this road on sheet CP101 of the RFP. Please confirm that access is controlled currently at the north entrance to the loading dock road.

There is access control at the north entry to the loading dock. Please price per the RFP.

Section 6.8.2.8

The vibration analysis requires that all structure supporting laboratory spaces shall be stiffened to limit vibrations to 1000 micro-inches per second with a minimum footfall load of an 185 lb person walking 75 steps per minute in the laboratories and 100 steps per minute in corridors. Please confirm that this requirement is intended to be met for the entire lab area and that there are not areas within the lab space that can be designed to less stringent criteria.

Addressed in a previous RFI.

Section 3.4 and 6.18.5.1

Section 3.4, Item 1a (page 13) indicates that furniture 150 square feet and over will be tenant provided, however, Section

6.18.5.1 item (2), page 247 indicates 110 sf and larger will contain office furniture provided by the government. Which is correct?

Addressed in a previous RFI.

Section 5.3.5.1

Please clarify the format for furniture procurement documentation. Are we to specify a single manufacturer's product that meets the design criteria; specify a preferred product vendor with three alternates that also meet the guidelines or specify a generic product that can be an open bid?

Please see Amendment No. 0004.

Appendix H Page 248drawings QL102

& QL202B

Please clarify - the Lab Plan does not match Room Data Sheets. For example Reagent Prep [C7.01] does not match with respect to doors or fume hood. Unless notified otherwise, we assume Appendix H is correct.

Please see Amendment No. 0004

"QL201B

"Please Confirm / Clarify DCID 6/9 Requirements. DCID 6/9 indicates a range of possible protection levels. The following is our understanding as applicable to this project:

QY101

- the focus is to construct the area in accordance with DCID 6/9 section 3, so as to restrict and detect physical access at the perimeter of these areas by the prescribed electronic monitoring and physical barriers.

QY102 - adjacent spaces (above, below or lateral to the SCIF) are not restricted in use or required to be additionally controlled.

Section 01 10 00

- there are no TEMPEST requirements nor any additional restrictions on the material or labor sources used to construct these areas."

DCID 6/9" Correct statements. Please price per the RFP.

Section 01 10 00 page 16 # 4g. "Please clarify the statement 4g ""Lab Space built to DCID 6/9 Standards.""

Please price per the RFP.

Is the intent that this apply to each individual laboratory space as individually separate SCIFs, or collectively so that groupings of adjacent lab spaces constitute a single SCIF perimeter.

RFI Answers Page 2 of 3

Unless notified otherwise we understand groupings of adjacent lab spaces to constitute a single SCIF perimeter. For example laboratories with a common demising wall do not need to build that wall to meet DCID 6/9 or SCIF standards. "

There are specific rooms refernced on the QY drawings and in the Room Data Sheets that require SCIF Construction. Groupings of SCIF areas is not possible. Please price per the RFP.

CL101

Is the emergency generator is supposed to be within the 33 feet ATFP unobstructive zone. Unless directed otherwise, the generator will be moved outside the ATFP unobstructive zone per the RFP Section 01 10 00, 5.12.1.1 and UFC 4-010-01, 1- 6.1, definition of unobstructive space on page A-5, and Appendix B-1.1.

Emergency generator to be located outside of the 33 foot clear zone.

Please price per the RFP.

Appendix Q, 10.6.2.1

There is a contradiction regarding the location of Panelboards within the building. The Dover AFB local MILCON requires Panelboards to be mounted within an electrical room not in the corridors. RFP Section 01 10 00, 6.12.23.6 allows labs to be powered from panleboards in the cooridor outside the lab. Which method of panelboard installation is required for this project? Unless directed otherwise, the panelboards will be mounted in an electrical room except for panelboards providing power to labs, which will have panelboards mounted in the cooridor outside the lab rooms.

Addressed in a previous comment.

Appendix H, Page 54

100 foot candle requirement exceeds ASHRAE 90.1, 2004 requirement, is this value and other lab rooms illumination values correct? Unless otherwise directed, ASHRAE 90.1, 2004 standards will be used for illumenation values for the lab rooms.

Addressed in a previous comment.

RFP Section 01 10 00, 3.7.14.5

Door size indicated is 36 inches wide and the switchgear will require a larger door. Can a larger door be used to allow the proper size switchgear to be moved for installation and replacment? Unless otherwise directed, the door size will be adjusted to accommodate the switchgear dimensions.

There are a pair of 3'-0" wide doors indicated for the switchgear room on the floor plan. The referenced para is for interior electrical rooms.

Please price per the RFP.

RFP Section 01 10 00, 6.19 (1)

The RFP states, "The contractor will include all devices … to provide a fully functional and operational security system."

What are all devices? Unless otherwise directed, it will be assumed that the devices are the equipment provided by the government as stated in the paragraph in RFP 01 10 00, 6.19. Correct statement. Please price per the RFP.

E04

The estimate power requirement of the building loads, 2,500kVA will require front and back access to the Switchgear. Can the location of the switchgear and room size be modified to accommodate the switchgear to meet NEC 110 requirements?

Unless directed otherwise, it will be assumed the main electrical room size and switchgear location can be changed to meet NEC 110 requirements.

Addressed in a previous comment.

E04

The estimate power requirement of the building loads, 2,500kVA will require the ATS and room 151A to be modified to meet NFPA 70 requirements.Can the ATS and room size be modified to accommodate the ATS to meet NEC 110 requirements?

Unless directed otherwise, it will be assumed room 151A size and ATS location can be changed to meet NEC 110 requirements.

Addressed in a previous comment.

RFI Answers Page 3 of 3

SECTION 01 33 16 Page 21 each room with a voice data outlet, the type of outlet, number of outlets, number of telephones required and type of telephone required.

3.5.8.10. Design of the information systems shall include a layout of the voice/data outlets (including voice only wall phones) on telecommunication floor plan drawing, location of SIPRNET data outlets, and a legend and symbol definition to indicate height above finished floor. Show voice, data, CATV cable/conduit/raceway and cable-tray, and a System Riser Diagram. Show size of conduit and cable type and size on Riser Diagram. Do not show conduit runs between backboard and outlets on the floor plans. Show underground telephone telecommunication distribution conduit and cable with sizing from point of presence to entrance facility of building. Provide calculations showing the signal loss of the CATV system and signal to be provided to the most distant outlet.

3.5.8.11. LEED: Project checklist indicating credits claimed, all required design phase supporting documentation and completed submittals checklist.

3.6. FINAL DESIGN REVIEWS AND CONFERENCES

A final design review and review conference will be held upon completion of final design at the project installation, or – where equipment is available - by video teleconference or a combination thereof, for any design package to receive Government acceptance to allow release of the design package for construction.

For smaller separate design packages, the parties may agree on alternative reviews and conferences (e.g., conference calls and electronic file sharing, etc.) through the Partnering process. The Offeror shall include the final design conference in the project schedule and shall indicate what part of the design work is at 100% completion. The final design conference will be held after the Government has had up to seven (7) calendar days after receipt of the submission to review the final design package and supporting data. For smaller packages, especially those involving only one or a few design disciplines the parties may agree on a shorter period.

3.7. FINAL DESIGN REQUIREMENTS

Final design deliverables for a design package shall consist of 100% complete drawings, specifications, submittal register, design analysis for Government review and acceptance. The 100% design submission shall consist of drawings, specifications, and design analysis and any permits required by the contract for each package submitted. In order to expedite the final design review, prior to the conference, the Offeror shall ensure that the design configuration management data and all review comment resolutions are up-to-date. The Offeror shall also have performed independent technical reviews and back-checks of previous comment resolutions, as required by Section 01 45 04 CONTRACTOR QUALITY CONTROL.

The Offeror shall include the 100% SID and 100% FF&E binders for government approval.

3.7.1. Drawings:

3.7.1.1. Submit drawings complete with all contract requirements incorporated into the documents to provide a 100% design for each package submitted.

Appendix H Page 6

Appendix H Page 14

Appendix H Page 19

Appendix H Page 18

Appendix H Page 22

Appendix H Page 30

Appendix H Page 35

Appendix H Page 56

Appendix H Page 57

Appendix H Page 54

Appendix H Page 59

Appendix H Page 63

Appendix H Page 64

Appendix H Page 66

Appendix H Page 81

Appendix H Page 95

Appendix H Page 105

Appendix H Page 117

UTILIZATION

Hours of Use

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

Locate condensing unit above room; access from service corridor

X

X

X

X

X

X

SHELVING

7'-6" min

WALK-IN -20C FREEZER (LONG TERM STORAGE)

D1.04

D. FORENSIC TOXICOLOGY

65% max

BAS interface for remote monitoring/alarm

All finishes by room manufacturer/card reader

X

X

D1. ADMIN

-20C +/-0.5C

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 96

FD

SHELVING

6A

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

WALK-IN -20C FREEZER (LTS)

D1.04A

Amendment No. 0004

Appendix H Page 97

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

X

X

X

X

This space is designated for research and development of new detection techniques in support of the division’s missions, as well as short term or unique missions such as training kit development for the military drug dog program; locate remotely from other laboratories

X

X

X

X

X

X

X

X

X

X

X

2X

4X

X

X

X

X

X

Wire mesh security partition w/i room

X

Lab standard

X

X

X

SPECIAL PROJECTS

D2.01

D. FORENSIC TOXICOLOGY

X

X

Epoxy

Steel

X

X

CCTV monitoring

Controlled substances

Securtiy 24 hour monitored alarm with motion detector/card reader

X

X

D2. RESEARCH / SPECIAL PROJECTS

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 103

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

HCW

PW

EW

CW

CS

AIR

VAC

SS

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

OUTLETS @ 60" O.C.

@ LAB BENCHES

WITH MIN.(1)

SPECIALTY OUTLET

EVERY 10'-0"

WIRE MESH SECURITY

PARTITION AND DOOR

WITHIN ROOM

6A

VAC

FD

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

SPECIAL PROJECTS

D2.01A

Amendment No. 0004

Appendix H Page 104

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

X

X

X

This space is designated for toxicology screening of samples using automated immunoassays

X

X

X

X

X

X

X

1X

8X

X

X

X

X

X

X

X

X

X

X

Lab standard

X

X

X

X

IMMUNOASSAY / SCREENING

D3.01

D. FORENSIC TOXICOLOGY

X

X

Epoxy

Steel

X

Supply air hydrocarbon filtration

X

CO, 2 FLOOR DRAINS

View windows from personnel corridor/card reader

X

X

D3. POSTMORTEM / HUMAN PERFORMANCE LAB

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 102

SS

HCW

PW

EW

FD

FD

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

HCW

PW

EW

6A

6A

6A

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

OUTLETS @ 60" O.C.

@ LAB BENCHES

WITH MIN.(1)

SPECIALTY OUTLET

EVERY 10'-0"

1414 1414

11 6A

29 29

AI

R

VA

C

N

AI

R

VA

C

13 111

6A10 10 15

VAC

AIR

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

IMMUNOASSAY / SCREENING

D3.01A

Amendment No. 0004

Appendix H Page 123

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

X

6X

X

This space is designated for extraction of samples for analysis of accessioned materials

X

X

X

X

X

X

X

X

X

X

2X

6X

X

X

X

X

X

X

X

X

X

Lab standard

X

X

X

EXTRACTION

D3.02

D. FORENSIC TOXICOLOGY

X

X

X

Epoxy

Steel

X

Supply air hydrocarbon filtration

X

Pure, small mol gas manifolds

View windows from personnel corridor/card reader on both entry doors

X

X

D3. POSTMORTEM / HUMAN PERFORMANCE LAB

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 124

113 113

113 113

C W

C S

C W

C S

C W

C S

C W

C S

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

VAC

AIR

N2

5 5

5 5

5 5

5 5

5 5

5 5

5 5

5 521

6A

6A

6A

6A

SS

HCW

PW

EW HCW

PW

EW

AIR

VAC

AIR

VAC

AIR

VAC

AIR

VAC

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

OUTLETS @ 60" O.C.

@ LAB BENCHES

WITH MIN.(1)

SPECIALTY OUTLET

EVERY 10'-0"

8 20 11 8 20 11 8 20 11 8 20 11

13 CW

CS

CW

CS

28 29 29 6A 29 29 28 28

AIR

VAC

N2

AI

R

VA

C

N

AI

R

VA

C

N

AI

R

VA

C

N

AI

R

VA

C

N

AIR

VAC

N2

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

EXTRACTION

D3.02A

Amendment No. 0004

Appendix H Page 125

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

To airlock

Airlock to corridor

X

X

X

X

This space is designated for automated analysis of samples using GC/MS and LC/MS instruments

X

X

X

X

X

X

X

X

X

2X

8X

X

X

X

X

X

X

Lab standard

X

X

X

INSTRUMENT

D3.03

D. FORENSIC TOXICOLOGY

X

X

Epoxy

Steel

X

Supp;y air hydrocarbon filtration

X

Pure, small mol gas manifolds, Argon

View windows from personnel corridor/card reader

X

X

D3. POSTMORTEM / HUMAN PERFORMANCE LAB

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 126

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

AIR

N2

HE

AR

8 8 8 8 8 8 8 8 8

8 8 8 8 8 8

14 14

AIR

VAC

AIR

VAC

6A

AIR

VAC

6A

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

OUTLETS @ 60" O.C.

@ LAB BENCHES

WITH MIN.(1)

SPECIALTY OUTLET

EVERY 10'-0"

VESTIBULE

D3.03

D3. POSTMORTEM / HUMAN

PERFORMANCE LAB

VESTIBULE

D3.03

D3. POSTMORTEM / HUMAN

PERFORMANCE LAB

20 11 20 11 20 11 20 11 20 11

20 11 20 11 20 11

HCW

EW

PW

AIR

VAC

12 1212

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

INSTRUMENT

D3.03A

Amendment No. 0004

Appendix H Page 127

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

To airlock

Airlock to corridor

X

X

X

This space is designated for preparation and toxicology screening of samples for volatile compounds using automated analyzers

X

X

X

X

X

X

X

X

X

1X

7X

X

X

X

X

X

X

Lab standard

X

X

X

VOLATILE ANALYSIS

D3.04

D. FORENSIC TOXICOLOGY

X

X

Epoxy

Steel

X

Supp;y air hydrocarbon filtration

X

Pure, small mol gas manifolds, CO alarm hard-wired outside chemical fume hood

View windows from personnel corridor/card reader

X

X

D3. POSTMORTEM / HUMAN PERFORMANCE LAB

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 128

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

HCW

PW

EW

CW

CS

AIR

VAC

AIR

VAC

6A

HE

AIR

N2

HE

AIR

N2

HE

AIR

N2

HE

AIR

N2

12 12

AIR

VAC

N2

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

VOLATILE ANALYSIS

D3.04A

Amendment No. 0004

Appendix H Page 129

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air Changes/Hour Min.

100% Make-up Air

Recirculated Air

Air Pressure Positive

Air Pressure Negative

Humidity

50% ± 20%

Uncontrolled

HOODS (indicate quantity and size)

Chemical Fume Hood

Radioisotope Hood

Laminar Flow Hood

Biological Safety Cabinet

Snorkel

Canopy Hood

Low Slotted Exhaust

LABORATORY EQUIPMENT

Vibration Sensitive

Light Sensitive

Vibration Producing

Heat Producing

Noise Producing

Overhead Service

REMARKS:

KEY PLAN:

PLUMBING

Laboratory Gas (LG)

Laboratory Vacuum (LV)

Laboratory Air (LA)

Compressed Air, 100 psi (A)

Hot Water (HW)

Cold Water (CW)

Pure Water Type III (0.05 MOhm)

Chilled Water (CHW S/R)

Steam/Condensate Return

Carbon Dioxide (C02)

Nitrogen Gas (N2)

Helium (He)

Hydrogen (H)

Oxygen (O2)

Floor Drain (FD)

Floor Sink (FS)

Safety Shower (SS)

Drench Hose (DH)

ELECTRICAL

110V, 20A, 1 Phase

208V, 30A, 1 Phase

208V, 30A, 3 Phase

480V, 100A, 3 Phase

Isolated Ground Outlet

Emergency Power

Phone

Data - Wired

LIGHTING

"In Use" Light

Task Lighting

Lighting Level

100 fc at bench/desk

60 fc at bench/desk

Dimmable

Zoned Lighting

CHEMICALS

Bases

Acids

Solvents

Radioisotopes

Carcinogens/Regulated

Chemical Waste Storage

Biological Storage

Radioisotope Storage

Chemical Storage

ARCHITECTURAL

Floor

VCT (ESD/CR)

VCT

Sheet Vinyl

Epoxy

Carpet

Sealed Concrete

Partitions

GWB, Epoxy Paint

GWB, Paint

Other

Base

Integral w/floor

Ceiling

Open

Acoustic Tile

Gyp Board, Height

Doors

3'-6" x 8'

3' x 8'

Uneven

Vision Panel

Natural Daylight

LABORATORY CASEWORK

ROOM NAME:

SECTION:

CONTACT:

PHONE:

FAX:

E-MAIL:

ROOM ID:

Standard

Eyewash (EW)

Darkenable

Sink

Data - Wireless

Benchtop Material

Casework Material

68°F-75°F ± 2°F (VAR)

Other

Other

Pure Water Type II (1.0 MOhm)

Pure Water Type I (18 MOhm)

Other

Other

Other

Other

Other

Other

Other

Other

Other

UPS Power

Emergency Operation

100% Uptime

Reduced Capability

N/A

Other

DIVISION:

4'-0" x 8'

X

X

X

X

X

X

X

This space is designated for automated immunoassay screening of samples using TDX analyzers

X

X

X

X

X

X

X

X

1X

6X

X

X

X

X

X

Lab standard

X

X

X

EIA ROOM

D3.05

D. FORENSIC TOXICOLOGY

X

X

Epoxy

Steel

X

Supp;y air hydrocarbon filtration

X

View windows from personnel corridor/card reader

X

X

D3. POSTMORTEM / HUMAN PERFORMANCE LAB

Space Requirements

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

Amendment No. 0004

Appendix H Page 130

HCW

PW

EW

OUTLETS @ 24" O.C. IN

2 CHANNEL ELEC.

RACEWAY, TYP.

@ PERIMETER WALLS

ONE SPECIALTY OUTLET

PER 15' OF BENCH TYP.

MIN (1) PER LAB

6A

6A

VAC

AIR

N2

VAC

AIR

N2

CW

CS

AIR

VAC

N2

4'0 8' 16'

ELECTRICAL LEGEND

Duplex Outlet (110 V)

Quadruplex Outlet (110 V)

Specialty Outlet

Communication Outlet

Emergency PowerEP

Uninterruptable PowerUP

PLUMBING LEGEND

AIR Compressed Air CG Cylinder Gas CO2 Carbon Dioxide CHW Chilled Water CW Cold Water EW Eye Wash/Drench Hose FD Floor Drain FS Floor Sink G Gas HCW Hot & Cold Water N2 Nitrogen PW Pure Water VAC Vacuum AR Argon DI Distilled HE Helium CS Cup Sink

FURNISHINGS / EQUIPMENT

1. Chemical Fume Hood

2. Biological Safety Cabinet, UAFI

3. Radioisotope Hood

4. Laminar Flow Cabinet, UAFI

5. Snorkel Exhaust 6A. Fixed Lab Bench 30"Deep (standing height)

7. Fixed Lab Bench (sitting height)

8. Mobile Lab Bench (variable height), UAFI

9. Desk / Write-Up Station, UAFI

10. Wall Cabinet

11. Adjustable Shelves

12. Tall Storage Cabinet

13. Flammable Storage Cabinet

14. Equipment Space

16. Cup Sink

17. Scullery Sink

18. Cylinder Bracket

19. Safety Shower / Eyewash

20. Overhead Service Carrier

21. Pipe Drop Enclosure

22. Glasswasher

23. Autoclave

24. Icemaker, UAFI

25. White Markerboard, UAFI

26. Hook Strip

27. Laboratory Table, UAFI

28. Freezer, UAFI

29. Refrigerator, UAFI

30. PCR Hood, UAFI

15. Laboratory Sink

UAFI : User Agency Furnished and Installed

31. Bone Sanding Hood, UAFI

32. Metro Shelving 5'w x 8'h

6B. Fixed Lab Bench 24"Deep (standing height)

Space Diagram

This diagram is conceptual and is provided only to indicate required furnishings equipment, and general room proportions. The actual room design may change.

NAME

ROOM NUMBER

Amendment No. 0003AFMES Facility at Dover AFB 07.16025.02

EIA ROOM

D3.05A

Amendment No. 0004

Appendix H Page 131

8 hours/day

14 hours/day

24 hours/day

Hours of Operation

8 hours/day

14 hours/day

24 hours/day

MECHANICAL

Temperature

72°F ± 2°F (SET)

15 Air Changes/Hour Min.

10Air Changes/Hour Min.

6 Air…