About this file

Amendment Number 0001 - Description

View the file

Other files

File Type Posted
09b0020Amend9.pdf PDF
09B0020AMND8specs.PDF PDF
09b0020amend8dwgs.pdf PDF
09b0020amend7specs.pdf PDF
09B0020AMEND7DWGS.pdf PDF
09b0020Amnd6dwgs.pdf PDF
09b0020amnd6spec.pdf PDF
AMEND5.pdf PDF
09b0020amend4.pdf PDF
09b0020amnd4dwgs.pdf PDF
Amnd0003.pdf PDF
Amendment0002.pdf PDF
Amnd1dwgs.pdf PDF
09B0020-DWGS.pdf PDF
09B0020-SPECS-VOL1.PDF PDF
INSTRUCTIONS.pdf PDF
RFI Example.xls XLS spreadsheet
09B0020-SPECS-VOL2.PDF PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment does not extend the bid opening date of 4 August 2009 at 11:00 a.m. (EST)

Please indicate receipt of this Amendment on Standard Form 30 (AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT) as Amendment Number 0001. Failure to acknowledge all amendments may be cause for rejection of the bid.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V2.00

10A.

30-105-02

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: DENISE DETITTA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

US ARMY ENGINEER DISTRICT, PHILADELPHIA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

CODE

FACILITY CODE

0001 7/21/2009

W912BU-09-B-0020

7 JULY 2009

JOINT SATCOM ENGINEERING CENTER, C4ISR CAMPUS, ABERDEEN PROVING GROUND, MD

This page was intentionally left blank for duplex printing.

14. DESCRIPTION OF AMENDMENT (continued)

a. RFI’s with RESPONSES: RFI’s with responses annotated Amendment No. 0001 are attached to this amendment.

b. DRAWINGS

(1) Sheet A604 – Please delete Sheet A604 in its entirety and substitute revised Sheet A604, annotated amendment No. 0001 attached hereto.

(2) New Drawings – Please add the following new drawings, annotated amendment No.

0001 attached hereto: B-101, B-201, B-202, B-203, B-204, CP-101, CP-201, CP-301, CP-302, CP-303, CP-304, CP-501, CP-502, CP-503, TN-601, TS-101, TS-102, TY-501.

Amendment No. 0001

IFB W912BU-09-B-0020

RFI #

Dwg Sheet/Spec Section Comment Official Response

A-141

Is the overhead cantilevered jib crane to be included in the Contract? If so, a specifciation is needed. To be addressed by amendment.

2 605

Will the Small Business Sub-Contracting plan be required with our submittal o the lumpsum proposal? Or can it be submitted within 24-hours of the bid?

The subcontracting plan is requested with the bid.

Award cannot be made without an approved subcontracting plan.

A-604 The bottom of sheet A-604 has been cut-off. Please re-issue sheet A-604.

Addressed in Amendment No. 0001

Drawing G-

The List of Drawings shows Geotechnical Drawings B-101 through CP-503, but these are not included in the on-line documents. Please clarify. Addressed in Amendment

No. 0001

Drawing G-

The List of Drawings shows IT/Security Drawings TS-101, TS-102, TN-601 and TY-501, but these are not included in the on-line documents. Please clarify. Addressed in Amendment

No. 0001

13 34 19

Can a conventional structural steel framing system be employed for this project in lieu of a pre-engineered structural framing system?

No, Bid according to the IFB

G-1

Drawings TS-101, TS-102, TN-601, and TY-501 are listed on drawing G-1 but do not appear in the drawings document (i.e. "09B0020-DWGS.pdf")

Addressed in Amendment No. 0001

G-1

Drawings B-101, B-201, B-202, B-203, B-204, CP-101, CP-201, CP-301, CP- 302, CP-303, CP-304, CP-501, CP-502, and CP-503 are listed on drawing G- 1 but do not appear in the drawings document (i.e. "09B0020-DWGS.pdf")

Addressed in Amendment No. 0001

CS 101

Drawing Note 5 refers to Antennae Site Design package for remote Control Building. Also, no information is provided on the antennae foundations, the surrounding hardstand, underground conduit and ductbanks or details on the gas lines that serve the deicers. Please provide these details if this work is to be included in this contract. If it is not to be included, identify the limits of this contract and what is to be provided under seperate contract. To be addressed by amendment.

10 8440

Description: Please provide a finish for the metal. Specs list several finish types for the job. To be addressed by amendment.

11 84400

Are the polycarbonate wall panels to meet UFC 04-010-01 Anti-Terrorism Force Protection? To be addressed by amendment.

I would like to know whether or not there is a private MEP firm who helped out, and if so, which one.

No impact on bid preparation.

A-101 In the mail room, what equipment will be required to be included in our quote?No equipment, Bid according to the IFB

A-604

On Sheet A-604, The image that was released seems to be cut off and some of the details are unreadable.

Addressed in Amendment No. 0001

For Information Only Request For Information and Responses

Amendment No. 0001

RFI Responses - Page 1

The Geotechnical drawings seems to be missing from the set. Will these drawings be part of the proposal?

Addressed in Amendment No. 0001

CS-101

Note 5 on this sheet reference Antenna Site Design package for details of antenna foundation pads, control buildings, and all signal and electrical connections. This Antenna Site Design Package is not included in the bid documents downloaded from the Government's website. If the Contractor is responsible for these requirements, the proper information is required. To be addressed by amendment.

CS-101

The Site Layout Plan indicates a Solvent Storage Shed. Is this Shed part of the Contract? Is so, provide details and specification. To be addressed by amendment.

CS-101

Provide construction details for the concrete utility trenches indicated on this sheet. Does a concrete utility trench extend from the building to each antenna location or should we include just those trenches shown on this sheet? To be addressed by amendment.

3/A404

This elevation indicates dimensional lettering. Provide a specification for this lettering. Are there any other building signage requirements, interior or exterior, to be provided by the Contractor? To be addressed by amendment.

Sheets B-101 through B-204 are missing from the Government's website.

Addressed in Amendment No. 0001

Sheets CP-101 through CP-503 are missing from the Government's website.

Addressed in Amendment No. 0001

Sheets TS-101, TS-102, TN-601, and TY-501 are missing from the Government's website.

Addressed in Amendment No. 0001

Section 08 44 00

Since this project requires UFC 04-010-01,02 anti-terrorism force protection dated January 19, 2007 please advise if the polycarbonate wall panels need to meet this requirement as well. To be addressed by amendment.

08 81 00

This specification is not complete. More information is required to properly price the required insulated glass units for the aluminum curtainwall and strip windows. To be addressed by amendment.

08 51 13

Reference Page 16, 2.7.8.6; This paragraph references Section 09 06 90 Color Schedule. No such Color Schedule has been issued by the Government. What is the finish for the aluminum curtainwall/storefront/entrance framing systems? The Door & Opening Schedule reference anodized aluminum finish. To be addressed by amendment.

33 4/21/2013 Reference Page 10, 3.10; Provide Basis of Design for 4" thick stone veneer. To be addressed by amendment.

General

To allow for a more accurate excavation take-off will you release the Civil AutoCAD files that are associated with the Joint SATCOM Engineering Center?

AutoCAD files are not released until after award as indicated in the IFB.

For Information Only Request For Information and Responses

Amendment No. 0001

RFI Responses - Page 2

sf30.pdf
Amnd1desc
RFIAmnd1JSEC

File details come from the government source that posted it. Updated .