09B0020AMND8specs.PDF
PDF 11 MB Posted
- Attached to
- Joint SATCOM Engineering Center, C4ISR Campus, Aberdeen Proving Ground, Harford County, MD
- Solicitation number
- W912BU09B0020
About this file
Amendment No. 0008 - Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09b0020Amend9.pdf | ||
| 09b0020amend8dwgs.pdf | ||
| 09b0020amend7specs.pdf | ||
| 09B0020AMEND7DWGS.pdf | ||
| 09b0020Amnd6dwgs.pdf | ||
| 09b0020amnd6spec.pdf | ||
| AMEND5.pdf | ||
| 09b0020amend4.pdf | ||
| 09b0020amnd4dwgs.pdf | ||
| Amnd0003.pdf | ||
| Amendment0002.pdf | ||
| Amnd1dwgs.pdf | ||
| Amnd1.pdf | ||
| 09B0020-DWGS.pdf | ||
| 09B0020-SPECS-VOL1.PDF | ||
| INSTRUCTIONS.pdf | ||
| RFI Example.xls | XLS spreadsheet | |
| 09B0020-SPECS-VOL2.PDF |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: DENISE DETITTA
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADEPHIA PA 19107-3390
JSEC
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THIS AMENDMENT DOES NOT EXTEND THE AUGUST 26, 2009 BID OPENING DATE.
CONTINUED ON NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-09-B-0020
X 9B. DATED (SEE ITEM 11)
07-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) Joint SATCOM Engineering Center, C4ISR Campus, Aberdeen Proving Ground, Harford County, MD
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
2. AMENDMENT/MODIFICATION NO.
10A. MOD. OF CONTRACT/ORDER NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Aug-2009
CODE
4. REQUISITION/PURCHASE REQ. NO.
CODE
US ARMY ENGINEER DIS RICT, PHILADELPHIAT
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU E5CTCDMD7. ADMINISTERED BY (If other than item 6)
CODE FACILITY CODE
EMAIL:TEL:
Amendment No. 0008 Invitation for Bid No.
W912BU-09-B-0020
THIS PAGE LEFT INTENTIONALLY BLANK FOR DUPLEX PRINTING
14. DESCRIPTION OF AMENDMENT (continued)
(a) Requests For Information With Responses: RFIs with responses, annotated Amendment No. 0008 are attached to this amendment.
(b) SPECIFICATIONS:
(1) Special Contract Requirements: Please delete page 00 80 00-i in its entirety and substitute revised page 00 80 00-i annotated Amendment No. 0008, attached hereto.
(2) Section 00 80 30: Please insert new Section 00 80 30, Subsurface Exploration Data annotated Amendment No. 0008, attached hereto.
(3) Please delete the Project Table of Contents in its entirety and substitute the revised Project Table of Contents annotated Amendment No. 0008, attached hereto.
(3)Section 01 33 00: Please delete Section 01 33 00 pages 13 through 98 in their entirety and substitute revised pages 01 33 00-13 through 01 33 00-97 annotated Amendment No. 0008, attached hereto.
(4) Please delete Section 32 31 13 CHAINLINK FENCE AND GATES in its entirety.
(5) Please delete the following sections in their entirety and substitute the revised sections of the same numbers, annotated Amendment No. 0008, attached hereto.
02 41 00 DEMOLITION
02 82 14 ASBESTOS HAZARD CONTROL ACTIVITIES
07 21 16 MINERAL FIBER BLANKET INSULATION
08 11 13 STEEL DOORS AND FRAMES
10 44 16 FIRE EXTINGUISHERS
32 31 00 PERIMETER FENCE AND RAILINGS
(c) CONTRACT DRAWINGS:
(1) Please delete the following drawings and replace with revised drawings of the same number with latest revision date of 12 August 2009, attached hereto:
G-1 B-202 B-203 B-204 E-304 E-906
(2) Sheet ES 101: Please make the following pen and ink change to add the following to the end of existing Note 3: FIRE PROTECTION PIPING
INCLUDES ALL WATER SERVICE PROVIDING FIRE PROTECTION TO THE BUILDING
INCLUDING THE 10 AND 12 INCH MAINS.
Amendment No 0008
IFB W912BU-09-B-0020
(d) Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0008. Failure to acknowledge all amendments may be cause for rejection of the bid.
Amendment No 0008
Discipline Sheet/Spec Comment Official
Civil Utilities
Para 3.4.1 Spec Section 26 42 14
Para 3.4.1 of Spec Section 26 42 14 indicates that buried insulated flanges are to be coated with a paper joint cover that is filled with hot coal tar. Can heat shrink sleeves or a cold applied petrolatum tape system be an acceptable coating alternatives inlieu of the hot coal tar? Bid according to IFB
Electrical
ES-101,
Note 1
Note indicates existing 35KV switch that is not located at this site. Will switch be in place prior to project start? Also, please provide make and model for existing 35KV switch for required 140Amp fuses.
Addressed by Amendment No 0006
Electrical E-105
There are two locations shown for Panel"RP-12". One is shown in Room T.03 and the other is Room T.01. Which is the correct location? What should the one that is missed labeled be called?
Addressed in Amendment No. 0004
Electrical E-104 & E-
Both Panel "DPU-3" and "UPS3" appears in two locations. In room S.02 (SSL UPS) and Room T.02(TSL UPS). Which location is correct?
Addressed in Amendment No. 0004
Electrical E-105
This sheet indicates "PP-*" at two locations, one at room OT.02 and the other at room T.02. Clarify what panels are required at these locations.
Addressed in Amendment No. 0004
Architectura l A-601
PC1 and PC 2 - The finish schedule specifies small aggregate exposure. Can you define "small" in terms of a measurment? Does this mean the small fines of the concrete to give a salt and pepper look or grinding further and exposing small portions of the course aggregate?
Yes, Bid according to
IFB
Electrical 00 80 15
Please clarify which wage rate,heavy construction or building construction projects, should be used for this project.
Addressed in Amendment No 0006
Mechanical 230800 Item 1.8
The Commissioning Specialist did not develop the commissioning specifications and incorporate them into the construction documents in accordance with LEED NC 2.2 EA Pr 1 scope item 2. Will the project still be able to achieve EA Pr 1 compliance? Yes. Bid per
IFB.
Mechanical
230800 Item 1.3.2;
013329
LEED
Scorecard
230800 page 2 item 1.3.2 indicates that Contractor shall provide documentation that Cx work meets LEED EA Credit 3, Enhanced Cx. However, this is not possible due to hiring CxA after design process is completed, and this credit is marked as “No” in the LEED NC 2.2 checklist of specification section 013329.
Please clarify.
Addressed in Amendment No. 0007
Mechanical 230800 Item 3.3
Indicates the entire TAB report shall be included in the final Commissioning Report. This is not normal practice and the TAB report can be very large. Can the TAB Verification Report be included while the full TAB report is left as a separate document?
Bid per the requirements of 23 08 00 para 3.3
Mechanical 230800 Item 1.3.2
Items states that "Formal LEED certification is not required. It also states "Provide documentation for as many LEED credits as possible to support LEED silver certification of the project". Please clarify whether or not project is pursuing LEED certification and why LEED credit documentation is required if project is not seeking LEED certification?
be LEED certifiable.
Actual certification is an option via amendment.
We are
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION
WITH RESPONSES
Amendment No. 0008
IFB W912 BU-09-B-0020
Toilet Accessories & Partitions
10 21 13 and A601
Spec Section 10 21 13 Toilet Compartments, galvanized steel sheet is specified for the material on this project. On drawing A601 Interior Finish Material Legend under Toilet Partitions Solid Plastic Partitions from Scranton Products are called out. Please clarify which material you require.
Addressed in Amendment No 0007
Corner Guards
10 26 13 and A601
Spec Section 10 26 13 Wall and Corner Guards calls for the corner guards to be stainless steel (pg. 3, 2.2 Corner Guards). On drawing A601 Interior Finish Material Legend calls for the Corner guards to be Construction Specialties SM- 20 & SM-20M which are vinyl. Please clarify which material you require.
Addressed in Amendment No 0007
Material to be Salvaged
Spec Section 01 11 00 1.5
Identify any materials or equipment that are to be salvaged.
Addressed in Amendment No. 0007
Site & Antennae Fdn
S-02, SB
601, CU 101
The precast trench drain detail on SB 601 is specifically referenced to 4 trench drains on S-02. But there are numerous other trench drains shown on S-02 ans CU 101. Is the SB 601 detail to be used for all of them? If not, please clarify detail for the others.. Also, the locations and quantity of trench drains on S 02 and CU 1010 do not agree. Which drawing is to be used? To help clarify, confirm # of locations.
Addressed in Amendment No. 0007
Civil - Demolition
02 82 14 Asbestos Hazardous
Are "Individual Data Elements" - "Table 1" pages 33-86 pat of the contract?
Addressed in Amendment No 0008
Architectura l
07 22 00 Roof & Deck Insulation
What is required vapor / moisture barrier at metal deck under roofing system?
Paragraph 3.2 contradicts product specified in paragraph 2.3 Moisture Control.
Specification was revised in Amendment
Architectura l
Detail 9 on Drawing A- 505 &
Is added PVC strip as shown in detail 9 required for ridge at crickets and main roof? Yes. Bid per
IFB
Architectura l
Spec 08 11 13 Steel Doors - Amendment
Where are door openings requiring STC 35 & 43 rating outlined in specs para.
1.3.1 shown in drawings?
Addressed in Amendment No 0008, Section 08 11
Architectura l
Spec 08 11 13 Steel Doors -
Where are performance levels 1, 2, & 3 in paragraph 2.2.2 shown in drawings?
Addressed in Amendment No 0008, ELECTRIC
AL GENERAL
SINGLE-LINE DRAWINGS ARE NOT COORDINATED WITH ARRANGEMENT
DRAWINGS .
Addressed in Amendment No 0004
ELECTRIC
AL E-102
ROOM A.01 SHOWS PANEL LP-4 AND ON DRW E-105 ROOM T.02.
Addressed in Amendment No 0004
ELECTRIC
AL E-103
ROOM CS.07 SHOWS PANEL TP-B6. WHERE IS THIS FED FROM? Addressed in Amendment
ELECTRIC
AL E-103
ROOM CS.02 SHOWS PANEL RP-4 AND ON DRW E-105 ROOM T.08
Addressed in Amendment No 0004
ELECTRIC
AL E-104
ROOM S.01 SHOWS PANEL CP-7 2 TIMES.
Addressed in Amendment No 0004
ELECTRIC
AL E-104
ROOM S.02 SHOWS PANEL DPU-3 AND ON DRW E-105 ROOM T.02 Amendment No 0004
ELECTRIC
AL E-104
ROOM S.02 SHOWS UPS3 AND ON DRW E-105 ROOM T.02. Amendment No 0004
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION
WITH RESPONSES
Amendment No. 0008
ELECTRIC
AL E-105
ROOM T.08 SHOWS PANEL LP-7. WHERE IS THIS FED FROM?
Addressed in Amendment No 0004
ELECTRIC
AL E-105
ROOM T.02 SHOWS PANEL PP-8 AND AGAIN IN ROOM SU.18
Addressed in Amendment No 0004
ELECTRIC
AL E-105
ROOM T.03 SHOWS PANEL RP-12 AND AGAIN IN ROOM T.01
Addressed in Amendment No 0004
ELECTRIC
AL E-501
WHERE IS PP-3, UPS 2, PC-1, PC-2 & DPU-2? NOT SHOWN ON
ARRANGEMENT DRAWINGS,
located on drawing E-
104. PC-1 is
ELECTRIC
AL E-501
WHERE IS TUX3, TUX4, TUX5, TUX6, TUX7, TU3? NOT SHOWN ON
ARRANGEMENT DRAWINGS
TU-X4,5,6
and 7, and TU-3 are located
ELECTRIC
AL E-501
WHERE IS RU-3, RU-X4, RU-X5, RU-X6, RU-X7? NOT SHOWN ON
ARRANGEMENT DRAWINGS
ndment 4 E- 105 shows that RU-3 is located in
ELECTRIC
AL E-502
WHERE IS MDP-2, RP-1, LP-3, RP-X5, RP-X6? NOT SHOWN ON
ARRANGEMENT DRAWINGS
located on drawing E- 102, the inset
ELECTRIC
AL E-502
WHERE IS TRX5 AND TRX6? NOT SHOWN ON ARRANGEMENT
DRAWINGS.
TR X5,and 6 are located outside of the
ELECTRIC
AL ES-101
SHOWS TYPE "Y" AND "Z" FIXTURE TYPES. PLEASE SPECIFY, THEY ARE
NOT ON THE FIXTURE SCHEDULE.
Light fixtures Y & Z are detailed on sheet ES-
Architectura l A503-10
Replace metal windowsills with Siltech Solid Surface Windowsills Bid According to the IFB
Architectura l A604-H
Replace metal windowsills with Siltech Solid Surface Windowsills Bid According to the IFB
Electrical E-302 & E-
General Note 5 on E-302 states that metal floor stands located in SSL and CSL labs are to be bonded to the ground plane. E-701 only refers to the ground plane in SSL not CSL. Provide details of ground plane in CSL.
Addressed in Amendment No 0004
Electrical E-900 Series
AIC ratings are missing from panels RP4-RP12, RP14, and TP1B. Also AIC rating are missing for panels shown on sheet E-914. Provide AIC ratings for these panels.
Addressed in Amendment No 0004 and
Electrical E-913
Panel PP-9B Main Circuit Breaker information is missing in the panel schedule.
Provide breaker size.
g to IFB. PP-9B is a feed-thru PP-9A and will not need
Electrical E-303
The latest E-303 drawing is the SSL Lab Euipotential Plane Grounding System.
The original E-303 was the roof lightning protection plan. The roof lightning protection plan has been deleted from the bid documents. Has roof lightining protection been deleted from the project? Is not, re-issue a roof lightning protection plan.
Addressed in Amendment No. 0008.
Refer to E- 304.
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION
WITH RESPONSES
Amendment No. 0008
Electrical E-303
A "braided" conductor is not typically used for copper mesh ground planes. We recommend a mesh formed of 2-inch wide x 26 gauge flat copper strap or a mesh formed of #6 AWG solid copper wire. Please clarify type of copper mesh required. Bid according to the IFB
Electrical E-900 Series
AIC ratings are missing from panels RP4-RP12, RP14, and TP1B. Also AIC rating are missing for panels shown on sheet E-914. Provide AIC ratings for these panels.
Refer to Amendments 0004 and
Civil Utilities
Dwg ES- 101, Answer to RFI #127 in Amend #7, Dwg CU-101
In RFI #127 we asked for clarification on the number of anodes to be installed.
The answer to RFI 127 in Amend #7 referred us to Note 3 on Dwg ES-101, which reads "PROVIDE CATHODIC PROTECTION FOR NEW UNDERGROUND METALLIC FIRE PROTECTION AND GAS PIPING". Dwg CU-101 identifies 10" & 12" Water pipes (W) that loop around the new building, but only a single 8" Fire pipe (F) is shown along the north side of the building.
Amend #4 indicated that all water mains are to be ductile iron. Are the 10" & 12" Water pipes (W) that loop around the new building considered "Fire Protection" piping? Is cathodic protection of the 10" & 12" Water pipes (W) that loop around the new building and the single 8" Fire pipe (F) required or is cathodic protection only required for the single 8" Fire pipe that is identified on Dwg CU-101?
Addressed in Amendment No 0008 by pen and ink change to note
Civil Utilities
Para 3.4.1 Spec Section 26 42 14
Para 3.4.1 of Spec Section 26 42 14 indicates that buried insulated flanges are to be coated with a paper joint cover that is filled with hot coal tar. Can heat shrink sleeves or a cold applied petrolatum tape system be an acceptable coating alternatives inlieu of the hot coal tar? Bid per the
IFB.
Mechanical 230800
Commissioning questions 149 through 151 were listed in Amendment 7, but not answered. Please state the answers.
Amendment No 0008 RFIS wtih responses
Mechanical 011100, 230800
Summary of Work Item 1.1.1 indicates Option 1 is the effort required to take the project from LEED Silver Certifiable, to LEED Silver Certified. However, the scope of 230800 is HVAC and HVAC controls, whereas LEED EA Pr 1 minimum scope includes HVAC and controls, domestic water heating systems, controls of lighting and daylighting, and renewable energy systems. Please state whether or not the additional items in EA Pr1 must be included in Option 1?
Yes. Option 1 is the effort required to take the project from the project from LEED Silver Certifiable to
Mechanical 230800
Commissioning questions 149 through 151 were listed in Amendment 7, but not answered. Please state the answers.
Refer to Amendment No 008, RFI responses
General, Mechanical
011100, 230800
Summary of Work Item 1.1.1 indicates Option 1 is the effort required to take the project from LEED Silver Certifiable, to LEED Silver Certified. However, the scope of 230800 is HVAC and HVAC controls, whereas LEED EA Pr 1 minimum scope includes HVAC and controls, domestic water heating systems, controls of lighting and daylighting, and renewable energy systems. Please state whether or not the additional items in EA Pr1 must be included in Option 1?
Yes. Option 1 is the effort required to take the project from the project from LEED Silver Certifiable to
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION
WITH RESPONSES
Amendment No. 0008
Site 33 40 00
Utility trench backfill - will the excavated material be considered as suitable final backfill material?
Final backfill material must meet requirements
Site B-201 - B-
The soil boring elevations do not match the existing elevations on the grading plan? Which is correct?
Addressed in Amendment No 0008
Site 31 00 00 Is there any specific criteria for working within the railroad ROW?
No. The railroad will be inactive for duration of
Specialties 10/21/2013
Specifications for toilet compartments call for painted metal; however the finish schedule on A-601 indicates solid plastic. Please clarify.
Addressed in Amendment No. 0007
Equipment 32 31 15
Part 2 of the specifications for Vehicle Gate Operating System, para. 2.3 calls for telephone entry system. Are both entry gates to have the telephone system or is one gate entry and one an exit? Please clarify Yes. Bid per
IFB
Civil 32 31 13 This spec section is for Chain Link fences and gates. Where are chain link fences and gates required to be installed on this project? �
Address in Amendment No 0008
Architectura l
Addendum #7 Item
Addendum #6 changed the finish of doors V.01A, V.02A, L.01A, & C.05A to aluminum, anodized. Addendum #7 has changed doors V.01A, V.02A, and L.01A back to metal insulated. Is this a mistake? Would door C.05A be metal also?�
Doors indicated are to be anodized aluminum as per Amendment No 0006.
Drawings and
Special Constructio n 13 34 19 para. 2.3.4/a,b of the specifications for Pre-Engineered Structural Framing has blanks that need to be filled in. Please provide this information.�
The pre-engineered framing system manufacturer
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION
WITH RESPONSES
Amendment No. 0008
This page was intentionally left blank for duplex printing.
00 80 00 – i
TABLE OF CONTENTS
SPECIAL CONTRACT REQUIREMENTS
00 80 00 SPECIAL CLAUSES
00 80 05 CONTRACT ADMINISTRATION
00 80 15 WAGE RATES
00 80 25 REGIONS FOR THE CONSTRUCTION EQUIPMENT OWNERSHIP AND
OPERATING EXPENSE SCHEDULE
00 80 30 SUBSURFACE EXPLORATION DATA REPORT
00 80 40 HAZARDOUS MATERIALS INVESTIGATION FINAL REPORT
Section 00 80 30 Page 1
Section 00 80 30 Page 2
Section 00 80 30 Page 3
Section 00 80 30 Page 4
Section 00 80 30 Page 5
Section 00 80 30 Page 6
Section 00 80 30 Page 7
Section 00 80 30 Page 8
Section 00 80 30 Page 9
Section 00 80 30 Page 10
Section 00 80 30 Page 11
Section 00 80 30 Page 12
Section 00 80 30 Page 13
Section 00 80 30 Page 14
Section 00 80 30 Page 15
Section 00 80 30 Page 16
Section 00 80 30 Page 17
Section 00 80 30 Page 18
Section 00 80 30 Page 19
Section 00 80 30 Page 20
Section 00 80 30 Page 21
Section 00 80 30 Page 22
Section 00 80 30 Page 23
Section 00 80 30 Page 24
Section 00 80 30 Page 25
Section 00 80 30 Page 26
Water at 11.6 feet after 24 hours Water at 12 feet upon completion Water encountered at 14.5 feet while drilling
Cave-in depth at 18.5 feet after 24 hours
Cave-in depth at 32 feet upon completion
2-5-7 -5
3-2-3 -4
1-4-6 -5
3-5-8 -11
4-6-9 -10
3-6-6 -6
2-5-7 -8
4-5-8 -6
2-2-3 -4
7-8-6 -5
2-2-5 -5
2-2-4 -4
3-4-5 -8
4-5-6 -6
4-4-5 -4
3-3-5 -6
9-7-7 -10
6-7-8 -10
8-8-9 -10
3-4-5 -8
3-3-3 -7
2-2-4 -5
1-2-3 -3
3-4-7 -8
1-1-2 -3
8 inches surficial soil Moist, brown, medium dense, Sandy SILT with gravel
(FILL)
Moist, gray and brown, medium stiff, silty lean CLAY, trace roots (FILL)
Moist, brown, medium dense, Clayey SAND with gravel, trace roots (FILL)
Moist, gray, medium dense, Clayey fine SAND, trace roots (FILL) Wet, gray, medium dense, fine SAND (SP)
Wet, brown, loose, fine SAND (SP), some clay, trace roots
Wet, gray, loose, fine SAND (SP), trace clay
Wet, gray, loose, fine SAND (SP-SM) with some silt
Wet, gray, medium dense, fine SAND (SP)
Moist to wet, dark-brown, stiff, Silty CLAY (OL) with organics
Wet, gray and brown, loose, fine SAND (SP) with organics
Wet, gray, medium stiff, Silty lean CLAY (CL-ML) with some organics Wet, gray, medium dense, fine SAND (SP) with some organics Wet, gray, very loose, fine SAND (SP), trace organics Bottom of boring at 50 feet
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
50.0
0.8 2.0
10.0
13.0 14.5
17.0
20.0
22.0
32.0
34.5
39.0
44.5 46.0
48.0
50.0
Report No.: 02/25/09 Jacobs
REMARKS
Elev:Boring No.:
Started:
(1 of 1) 5/19/09
BORING LOG
Location:
Completed:3.25" OD HSA 5/19/09
Project:
Type of Boring:
K68-039G
Elevation N Value (blows/ ft)
Date:
Sample Depth (feet)
* Sample Blows
DESCRIPTION OF MATERIALS
(Classification)
Total Depth
Driller: Sean Foster 50.0'
JSEC,
Client:
JA-7 See JSEC boring location plan
Depth
*Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N.
B O
R
IN
G _L
O G
K
-0
G .G
PJ
F
R
.G D
T
/2 6/
Amendment No. 0008
Section 00 80 30 Page 27
Water encountered at 15 feet while drilling
Water at 19.5 feet upon completion
Cave-in depth at 26.5 feet
2-3-5 -8
4-3-4 -5
3-4-5 -7
4-4-5 -5
2-2-5 -7
5-8-8 -9
5-5-6 -7
3-6-9 -15
4-11-18 -13
7-8-3 -5
3-2-3 -5
3-5-8 -7
2-5-5 -6
3-4-10 -13
2-5-10 -10
7-8-7 -6
2-5-5 -5
3-3-5 -6
2-6-5 -6
WOH-3-7
-9
6-7-6 -8
3-2-2 -1
2-1-2 -2
2-7-11 -11
3-5-10 -12
6 inches surficial soil Moist, brown and gray, loose, Sandy SILT with some clay and asphalt (FILL) Moist, brown and gray, loose, Sandy SILT with some clay (FILL)
Very moist, brown, loose, Sandy SILT (FILL)
Moist, gray and brown to yellow-brown, medium stiff to very stiff, Silty CLAY (FILL)
Moist, dark-brown, stiff, Silty CLAY (CL-ML)
Very moist to wet, brown, medium dense, fine to medium SAND (SP) Wet, brown, medium dense, SAND (SP) with gravel
Very moist, gray, medium stiff to stiff, sandy lean
CLAY (CL)
Wet, gray, medium dense, fine SAND (SP)
Very moist, brown, silty lean CLAY with organics
(OL)
Very moist to wet, gray, medium dense, fine SAND (SP) with organics
Wet, gray, medium dense, fine SAND (SP)
Wet, gray, loose, Sandy SILT (ML) with organics
Wet, gray and brown, very stiff, silty CLAY with organics (OL)
Bottom of boring at 50 feet
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
50.0
0.5 2.0
6.0
8.0
12.0
14.0
16.0
20.0
26.0
31.5
36.0
40.0
42.0
46.0
50.0
Report No.: 02/25/09 Jacobs
REMARKS
Elev:Boring No.:
Started:
(1 of 1) 5/20/09
BORING LOG
Location:
Completed:3.25" OD HSA 5/19/09
Project:
Type of Boring:
K68-039G
Elevation N Value (blows/ ft)
Date:
Sample Depth (feet)
* Sample Blows
DESCRIPTION OF MATERIALS
(Classification)
Total Depth
Driller: Sean Foster 50.0'
JSEC,
Client:
JB-5 See JSEC boring location plan
Depth
*Number of blows required for a 140 lb hammer dropping 30" to drive 2" O.D., 1.375" I.D. sampler a total of 18 inches in three 6" increments. The sum of the second and third increments of penetration is termed the standard penetration resistance, N.
B O
R
IN
G _L
O G
K
-0
G .G
PJ
F
R
.G D
T
/2 6/
Amendment No. 0008
Section 00 80 30 Page 28
Section 00 80 30 Page 29
Section 00 80 30 Page 30
Section 00 80 30 Page 31
Section 00 80 30 Page 32
Section 00 80 30 Page 33
Section 00 80 30 Page 34
Section 00 80 30 Page 35
Section 00 80 30 Page 36
Section 00 80 30 Page 37
Section 00 80 30 Page 38
Section 00 80 30 Page 39
Section 00 80 30 Page 40
Section 00 80 30 Page 41
Section 00 80 30 Page 42
Section 00 80 30 Page 43
Section 00 80 30 Page 44
Section 00 80 30 Page 45
Section 00 80 30 Page 46
Section 00 80 30 Page 47
Section 00 80 30 Page 48
Section 00 80 30 Page 49
Section 00 80 30 Page 50
Section 00 80 30 Page 51
Section 00 80 30 Page 52
Section 00 80 30 Page 53
Section 00 80 30 Page 54
Section 00 80 30 Page 55
Section 00 80 30 Page 56
Section 00 80 30 Page 57
Section 00 80 30 Page 58
Section 00 80 30 Page 59
Section 00 80 30 Page 60
Section 00 80 30 Page 61
Section 00 80 30 Page 62
Section 00 80 30 Page 63
Section 00 80 30 Page 64
Section 00 80 30 Page 65
Section 00 80 30 Page 66
Section 00 80 30 Page 67
Section 00 80 30 Page 68
Section 00 80 30 Page 69
Section 00 80 30 Page 70
Section 00 80 30 Page 71
Section 00 80 30 Page 72
Section 00 80 30 Page 73
Section 00 80 30 Page 74
Section 00 80 30 Page 75
Section 00 80 30 Page 76
Section 00 80 30 Page 77
Section 00 80 30 Page 78
Section 00 80 30 Page 79
Section 00 80 30 Page 80
Section 00 80 30 Page 81
Section 00 80 30 Page 82
Section 00 80 30 Page 83
Section 00 80 30 Page 84
Section 00 80 30 Page 85
Section 00 80 30 Page 86
Section 00 80 30 Page 87
Section 00 80 30 Page 88
Section 00 80 30 Page 89
Section 00 80 30 Page 90
Section 00 80 30 Page 91
Section 00 80 30 Page 92
Section 00 80 30 Page 93
Section 00 80 30 Page 94
Section 00 80 30 Page 95
Section 00 80 30 Page 96
Section 00 80 30 Page 97
Section 00 80 30 Page 98
Section 00 80 30 Page 99
Section 00 80 30 Page 100
Section 00 80 30 Page 101
Section 00 80 30 Page 102
Section 00 80 30 Page 103
Section 00 80 30 Page 104
Section 00 80 30 Page 105
Section 00 80 30 Page 106
Section 00 80 30 Page 107
Section 00 80 30 Page 108
Section 00 80 30 Page 109
Section 00 80 30 Page 110
Section 00 80 30 Page 111
Section 00 80 30 Page 112
Section 00 80 30 Page 113
Section 00 80 30 Page 114
Section 00 80 30 Page 115
Section 00 80 30 Page 116
Section 00 80 30 Page 117
Section 00 80 30 Page 118
Section 00 80 30 Page 119
Section 00 80 30 Page 120
Section 00 80 30 Page 121
Section 00 80 30 Page 122
Section 00 80 30 Page 123
Section 00 80 30 Page 124
Section 00 80 30 Page 125
Section 00 80 30 Page 126
Section 00 80 30 Page 127
Section 00 80 30 Page 128
Section 00 80 30 Page 129
Section 00 80 30 Page 130
Section 00 80 30 Page 131
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01 PROJECT SCHEDULE
01 32 33 CONSTRUCTION PHOTOGRAPHY
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 53 EMPLOYEE IDENTIFICATION AND ABERDEEN ACCESS REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01 CONTRACTOR QUALITY CONTROL
01 45 05 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION/SITE MANAGEMENT
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT AND SAFETY SIGNS
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 14 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 11 13 CONCRETE FORMWORK
03 15 13 EXPANSION JOINTS AND CONTRACTION JOINTS
03 20 01 CONCRETE REINFORCEMENT
03 31 00 CAST-IN-PLACE CONCRETE
03 62 16 METALLIC NON-SHRINK GROUTING
DIVISION 04 - MASONRY
04 21 13 MASONRY
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 21 13 DEEP LONGSPAN STEEL JOIST FRAMING
05 21 16 LONGSPAN STEEL JOIST FRAMING
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 42 13 METAL WALL PANELS
07 54 19 POLYVINYL CHLORIDE (PVC) ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 44 10 CURTAIN WALL AND GLAZED ASSEMBLIES
08 45 10 POLYCARBONATE WALL PANEL SYSTEM
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPET
09 69 13 RIGID GRID ACCESS FLOORING
09 77 00 WOOD VENEER WALL CLADDING SYSTEM
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 21 13 TOILET COMPARTMENTS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 WALK-OFF GRILLE
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 PRE-ENGINEERED STRUCTURAL FRAMING SYSTEM
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48 VIBRATION CONTROLS FOR PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF HVAC SYSTEMS
23 09 23 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 31 13 METAL DUCTS
23 36 00 AIR TERMINAL UNITS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLS
23 37 23 HVAC GRAVITY VENTILATORS
23 64 10 WATER CHILLER SYSTEM, WITH FREE COOLING CAPABILITY
23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS
23 81 47 GROUND-LOOP HEAT PUMP SYSTEMS
23 82 00 ELECTRIC INFRARED HEATERS
23 83 00 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 12 19 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 32 33 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 41 01 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 10 PAVEMENT DRAINAGE LAYER (RDM)
32 11 23 DENSE GRADED AGGREGATE BASE COURSE (DGA)
32 12 17 BITUMINOUS PAVING - MARYLAND (SUPERPAVE)
32 13 13 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALKS, CURBS, AND CURBS AND GUTTERS
32 16 15 CONCRETE BLOCK PAVEMENTS
32 31 00 PERIMETER FENCE AND RAILINGS
32 31 15 VEHICLE GATE OPERATOR SYSTEMS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 11 WATER MAINS
33 30 30 GRAVITY SANITARY SEWER AND HOUSE CONNECTIONS
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE SYSTEM
33 70 02 UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM,
UNDERGROUND
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 15 JIB CRANE
-- End of Project Table of Contents --
S U
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
S
D -0
P re co ns tru ct io n S ub m itt al s G
C O
R P ay ro ll B as ic
R ec or ds
S ta te m en ts o f C om pl ia nc e
G C
O R
A ffi rm at iv e
A ct io n
C om pl ia nc e
P la n
S
D -0
P re co ns tru ct io n S ub m itt al s 3.
G
C O
R P ro je ct S ch ed ul e
S D
-0
P re co ns tru ct io n
S ub m itt al s
G C
O R
P ho to gr ap hy
P la n G
C O
R P re -C on st ru ct io n
P ho to gr ap hs
S D
-0
C er tif ic at es
G C
O R
C on st ru ct io n P ho to gr ap hs G
C O
R P os t-C on st ru ct io n
P ho to gr ap hs
S D
-0
P re co ns tru ct io n
S ub m itt al s
1.
G C
O R
S ub m itt al re gi st er
S
D -0
P re co ns tru ct io n S ub m itt al s 1.
G
C O
R
LE
E D
Im pl em en ta tio n P la n
S D
-1
C lo se ou t S ub m itt al s
1.
G C
O R
LE
E
D D oc um en ta tio n
N ot eb oo k
S
D -0
P re co ns tru ct io n S ub m itt al s G
D O
Q ua lif ic at io ns o f S af et y
P er so nn el 1.
G
A A cc id en t P re ve nt io n P la n
(A P
P
1.
G A
A ct iv ity
H az ar d
A na ly si s (A
H A
1.
7.
G A
C ra ne C rit ic al L ift P la n
1.
6.
1.
G A
C ra ne O pe ra to rs
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 13
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
S D
-0
Te st
R ep or ts
1.
FI
O
R ep or ts
1.
.1
FI
O A cc id en t R ep or ts 1.
.3
FI
O
O S
H A
L og
FI
O
M on th ly
R ec or d of W or k-
R el at ed
In ju rie s/
Ill ne ss es
E xp os ur e
1.
.5
FI
O M on th ly E xp os ur e
R ep or ts
1.
.6
FI
O C ra ne
R ep or ts
FI
O
G as
P ro te ct io n
S D
-0
C er tif ic at es
1.
FI
O
C on fin ed
S pa ce E nt ry
P er m it
1.
FI
O
H ot w or k pe rm it
FI
O
Li ce ns e
C er tif ic at es
1.
.7
FI
O C er tif ic at e of
C om pl ia nc e
S D
-0
P re co ns tru ct io n
S ub m itt al s
G C
O R
Te m po ra ry F ac ili tie s
S ite
P la n G
C O
R D us t C on tro l P la n
S
D -0
P re co ns tru ct io n S ub m itt al s 1.
G
C O
R E nv iro nm en ta l P ro te ct io n P la n
S D
-0
P re co ns tru ct io n
S ub m itt al s
1.
3.
FI
O S to rm
W at er P ol lu tio n
P re ve nt io n
P la n 1.
3.
FI
O
S to rm W at er
N ot ic e of In te nt
S D
-0
Te st
R ep or ts
FI
O
S to rm W at er
In sp ec tio n R ep or ts fo r G en er al
P er m it
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 14
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
1.
FI
O
E ro si on a nd
S ed im en t C on tro ls
S D
-0
C er tif ic at es
2.
1.
FI
O M ill C er tif ic at e or
A ffi da vi t
S
D -0
P re co ns tru ct io n S ub m itt al s 1.
G
C O
R W as te
M an ag em en t P la n
S D
-1
C lo se ou t S ub m itt al s
1.
FI
O
R ec or ds
S D
-0
P ro du ct
D at a 1.
3.
FI
O
A s-
B ui lt R ec or d of
E qu ip m en t an d
M at er ia ls 1.
7.
FI
O
W ar ra nt y M an ag em en t P la n 1.
7.
FI
O
W ar ra nt y Ta gs
FI
O Fi na l C le an in g
1.
FI
O
S pa re P ar ts
D at a S
D -0
M an uf ac tu re r’s
In st ru ct io ns
1.
FI
O
P re ve nt at iv e M ai nt en an ce 1.
FI
O C on di tio n
M on ito rin g (P re di ct iv e Te st in
g) 1.
FI
O In sp ec tio n
1.
7.
FI
O In st ru ct io ns S
D -1
O pe ra tio n an d
M ai nt en an ce
D at a 1.
FI
O O pe ra tio n an d
M ai nt en an ce
M an ua ls
S D
-1
C lo se ou t S ub m itt al s
1.
3.
FI
O R ec or d D ra w in gs
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 15
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
1.
G C er tif ic at io n of E
P A
D es ig na te d
Ite m s 1.
G
Fo rm
D D
1.
G C he ck lis t f or F or m
D D
S D
-0
P re co ns tru ct io n
S ub m itt al s
1.
6.
G
E xi st in g C on di tio ns
S D
-0
C er tif ic at es
1.
G D em ol iti on
P la n 1.
4.
G N ot ifi ca tio ns S
D -1
C lo se ou t S ub m itt al s 1.
4.
FI
O
R ec ei pt s
S
D -0
P ro du ct D at a
3.
G D
O O n-si te H az ar do us
W as te M an ag em en t 3.
FI
O N ot ic es o f N on
-C om pl ia nc e an d
N ot ic es o f V io la tio n
S D
-0
Te st
R ep or ts
3.
G D
O R ec or dk ee pi ng
3.
FI
O
S pi ll R es po ns e
3.
G D
O E xc ep tio n
R ep or ts
2.
1.
FI
O P ac ka gi ng
N ot ifi ca tio ns
S D
-0
C er tif ic at es
1.
4.
FI
O C er tif ic at io n
3.
2.
FI
O S ec ur ity P la n
1.
4.
G
D O
Tr an sp or ta tio n an d D is po sa l
C oo rd in at or
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 16
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
1.
4.
G
D O
Tr ai ni ng
3.
2.
FI
O E
P A
O ff-
S ite
P ol ic y
3.
2.
FI
O C er tif ic at es o f D is po sa l 3.
2.
G D
O S hi pp in g
D oc um en ts a nd P ac ka gi ng s C er tif ic at io n
3.
G D
O W as te
M in im iz at io n
S
D -0
S ho p
D ra w in gs 1.
G
D O
D et ai le d D ra w in gs
S D
-0
P ro du ct
D at a 3.
.5
.1 G
D O
A sb es to s W as te
S hi pm en t R ec or ds 3.
.4
G D
O W ei gh t B ill s an d D el iv er y
Ti ck et s
2.
G D
O E nc ap su la nt s
1.
G D
O R es pi ra to ry P ro te ct io n P ro gr am 3.
G
D O
C le an up a nd
D is po sa l 1.
G
D O
Q ua lif ic at io ns 1.
FI
O Tr ai ni ng P ro gr am 1.
G
D O
Li ce ns es
, P er m its a nd
N ot ifi ca tio ns
S D
-0
Te st
R ep or ts
3.
G D
O E xp os ur e
A ss es sm en t a nd A ir M on ito rin g
1.
FI
O
Lo ca l E xh au st
S ys te m
S D
-0
C er tif ic at es
1.
FI
O
Lo ca l E xh au st
S ys te m
2.
G D
O E nc ap su la nt s
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 17
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
1.
FI
O
M ed ic al
S ur ve ill an ce
R eq ui re m en ts
S
D -0
P ro du ct D at a
2.
FI
O
Fo rm
M at er ia ls 2.
1.
FI
O
Fo rm
R el ea si ng A ge nt s
S
D -0
P ro du ct D at a
2.
FI
O
P re fo rm ed E xp an si on
J oi nt F ill er
2.
FI
O
S ea la nt
S D
-0
S am pl es
2.
2.
FI
O Lu br ic an t f or P re fo rm ed
C om pr es si on
S ea ls
FI
O N on -m et al lic M at er ia ls
S D
-0
C er tif ic at es
2.
FI
O
P re fo rm ed E xp an si on
J oi nt F ill er
2.
FI
O
S ea la nt
S D
-0
S ho p D ra w in gs
3.
G R ei nf or ce m en t S
D -0
C er tif ic at es 2.
FI
O R ei nf or ci ng S te el
S D
-0
P ro du ct
D at a 1.
G
D O
M ix tu re
P ro po rti on s
G D
O Fl oo r H ar de ne r
G D
O C on cr et e
P ol is hi ng S ys te m S
D -0
S am pl es 2.
3.
FI
O
S ur fa ce
R et ar de r S
D -0
Te st R ep or ts
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 18
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
3.
G D
O Te st in g an d In sp ec tio n fo r
C on tra ct or Q ua lit y C on tro l S
D -0
C er tif ic at es 1.
FI
O Q ua lif ic at io ns
S D
-0
P re co ns tru ct io n
S ub m itt al s
1.
FI
O
C on cr et e an d G ro ut in g
P la ce m en t a nd a n In sp ec tio n
P la n S
D -0
S am pl es 2.
FI
O A gg re ga te s 2.
FI
O E xp an si ve
A dm ix tu re s
S D
-0
Te st
R ep or ts
2.
FI
O
E xp an si on 2.
FI
O C om pr es si ve S tre ng th 2.
FI
O In sp ec tio n
R ep or ts
2.
FI
O
E xp an si ve G ro ut
2.
FI
O
P or tla nd
C em en t
S D
-0
C er tif ic at es
2.
FI
O
P or tla nd
C em en t
2.
FI
O
E xp an si ve A dm ix tu re s 2.
FI
O E xp an si ve
G ro ut 2.
FI
O A gg re ga te s
S
D -0
S ho p
D ra w in gs 1.
FI
O D et ai l D ra w in gs S
D -0
P ro du ct D at a
1.
1.
FI
O Lo ca l/R eg io na l M at er ia ls
S D
-0
S am pl es
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 19
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
2.
FI
O
E xp an si on J oi nt
M at er ia ls G
D O
S to ne It em s
2.
1.
FI
O C on cr et e
M as on ry
U ni t 1.
FI
O S am pl e P an el
S D
-0
Te st
R ep or ts
3.
FI
O
C al cu la tio ns
S D
-0
C er tif ic at es
2.
1.
FI
O C on cr et e
M as on ry
U ni t 2.
FI
O Jo in t R ei nf or ce m en t 2.
FI
O E xp an si on
J oi nt M at er ia ls
2.
FI
O
In su la tio n 2.
FI
O E xt er io r S he at hi ng
2.
8.
FI
O D ra in ag e
B oa rd
FI
O V ap or
B ar rie r
2.
FI
O
V en ee r A nc ho rs 2.
.2
FI
O
W el di ng
S D
-0
P ro du ct
D at a 1.
G
D O
W el di ng
P ro ce du re Q ua lif ic at io ns
1.
5.
G
D O
W el de r, W el di ng
O pe ra to r, an d Ta ck er
Q ua lif ic at io n 1.
5.
FI
O
In sp ec to r Q ua lif ic at io n 1.
5.
FI
O
P re vi ou s Q ua lif ic at io ns
1.
5.
FI
O P re -q ua lif ie d
P ro ce du re s
S D
-0
Te st
R ep or ts
3.
FI
O
Q ua lit y
C on tro l
3.
3.
FI
O N on de st ru ct iv e E xa m in at io n
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 20
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O F
P
A G
E S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
S D
-0
C er tif ic at es
1.
5.
FI
O C er tif ie d
W el di ng
P ro ce du re S pe ci fic at io ns
(W P
S
1.
5.
FI
O C er tif ie d
B ra zi ng
P ro ce du re S pe ci fic at io ns
(B P
S
1.
5.
FI
O C er tif ie d
P ro ce du re Q ua lif ic at io n
R ec or ds
(P Q
R
1.
5.
FI
O C er tif ie d
W el de r P er fo rm an ce Q ua lif ic at io ns
(W P
Q
1.
5.
FI
O C er tif ie d
B ra ze r P er fo rm an ce Q ua lif ic at io ns
(B P
Q
S D
-0
P re co ns tru ct io n
S ub m itt al s
1.
6.
FI
O W el de r q ua lif ic at io n 1.
6.
FI
O
M at er ia l S af et y
D at a S he et
S D
-0
S ho p D ra w in gs
G D ee p
Lo ng sp an
S te el J oi st
Fr am in g
S D
-0
Te st
R ep or ts
3.
FI
O
E re ct io n in sp ec tio n
3.
FI
O
W el di ng in sp ec tio ns S
D -0
C er tif ic at es 1.
6.
FI
O
A cc es so rie s
1.
6.
FI
O C er tif ic at io n of C om pl ia nc e
S
D -0
P re co ns tru ct io n S ub m itt al s 1.
6.
FI
O
W el de r q ua lif ic at io n
1.
6.
FI
O M at er ia l S af et y D at a
S he etSU B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 21
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O
F
P A
G E
S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
S D
-0
S ho p D ra w in gs
G Lo ng sp an S te el
J oi st F ra m in g
S D
-0
Te st
R ep or ts
3.
FI
O
E re ct io n in sp ec tio n
3.
FI
O
W el di ng in sp ec tio ns S
D -0
C er tif ic at es 1.
6.
FI
O
A cc es so rie s
1.
6.
FI
O C er tif ic at io n of C om pl ia nc e
S
D -0
P re co ns tru ct io n S ub m itt al s 1.
6.
FI
O
W el de r q ua lif ic at io n
1.
6.
FI
O M at er ia l S af et y D at a
S he et S
D -0
S ho p
D ra w in gs 1.
6.
G S te el jo is t f ra m in g S
D -0
Te st R ep or ts 3.
3.
FI
O
E re ct io n in sp ec tio n
3.
3.
FI
O W el di ng in sp ec tio ns
S D
-0
C er tif ic at es
2.
FI
O
A cc es so rie s
1.
6.
FI
O C er tif ic at io n of C om pl ia nc e
S
D -0
S ho p
D ra w in gs 1.
3.
FI
O
Fa br ic at io n
D ra w in gs 2.
3.
1.
FI
O M et al
F lo or D ec k
U ni ts 2.
3.
1.
FI
O M et al
F lo or D ec k
U ni ts 2.
3.
FI
O
M et al F lo or
D ec k U ni ts
2.
3.
4.
FI
O
C an t S tri ps 2.
3.
4.
FI
O R id ge a nd
V al le y
P la te s
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 22
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O
F
P A
G E
S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
2.
3.
4.
FI
O
M et al C lo su re S tri ps
S D
-0
P ro du ct
D at a 2.
FI
O A cc es so rie s 2.
3.
FI
O
D ec k U ni ts
2.
1.
3.
FI
O
G al va ni zi ng
R ep ai r P ai nt
2.
1.
FI
O G al va ni zi ng R ep ai r P ai nt 2.
1.
FI
O
Jo in t S ea la nt
M at er ia l 2.
2.
FI
O
M ec ha ni ca l F as te ne rs
2.
3.
1.
FI
O
M et al F lo or
D ec k U ni ts
2.
3.
1.
FI
O
M et al F lo or
D ec k U ni ts
2.
3.
FI
O M et al
F lo or D ec k
U ni ts 1.
3.
FI
O
P is to n
To ol
O pe ra to r 2.
3.
FI
O
R ep ai r P ai nt
FI
O
S ou nd A bs or bi ng
M at er ia l 1.
3.
FI
O
W el de r Q ua lif ic at io ns
1.
3.
FI
O W el di ng E qu ip m en t 1.
3.
FI
O
W el di ng
R od s an d A cc es so rie s S
D -0
S am pl es 2.
FI
O M et al
R oo f D ec k U ni ts
FI
O
Fl ex ib le
C lo su re
S tri ps 2.
FI
O A cc es so rie s S
D -0
D es ig n D at a
2.
3.
FI
O D ec k
U ni ts S
D -0
C er tif ic at es 1.
3.
FI
O
W el di ng
P ro ce du re s
1.
3.
4.
FI
O
Fi re
S af et y
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
A
C T
N O
TI
TL
E A
N D
L O
C A
TI
O
N C
O N
TR
A
C
TO
R
C O
N
TR
A C
TO
R
S
C H
E D
U
LE
D A
TE
S
C O
N
TR
A C
TO
R
A C
TI
O
N A
P P
R O
V
IN
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E
S C
R
IP
TI
O
N
IT
E
M S
U B
M
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S
U B
M
IT
A P
P R
O V
A L
N E
E D
E D
B Y
M A
TE
R
IA
L
N E
E D
E D
B Y
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
D A
TE
F
W D
TO
A
P P
R A
U
TH
D A
TE
R
C D
FR
O
M C
O N
TR
D A
TE
F
W D
TO
O
TH
E
R R
E V
IE
W
E R
D A
TE
R
C D
FR
O
M O
TH
R
E V
IE
W
E R
A C T I O N C O D E
D A
TE
O
F A
C
TI
O N
M A
IL
E
D
TO
C O
N
TR
D A
TE
R
C D
FR
M
A P
P R
A U
TH
R
E M
A R
K S
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r
Amendment No. 0008
Section 01 33 00 Page 23
B M
IT
TA
L
FO
R M
,J an
P R
E V
IO
U
S E
D
IT
IO
N
IS
O
B S
O
LE
TE
P
A G
E
O
F
P A
G E
S
Jo in t S A
TC
O
M E ng in ee rin g C en te r
1.
3.
4.
FI
O
W in d S to rm
R es is ta nc e
S D
-0
S ho p D ra w in gs
1.
6.
G
D O
Fr am in g
C om po ne nt s
S D
-0
P ro du ct
D at a 2.
FI
O st ud s,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .