Revised Bid Schedule in Excel Format.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Oahe IDCC Road Maintenance 2026
- Solicitation number
- W9128F26BA019
About this file
This is a Revised Bid Schedule in Excel format for the Oahe IDCC Road Maintenance 2026 solicitation (W9128F26BA019) issued by the Department of the Army Corps of Engineers Engineering District Omaha. The bid schedule covers a four-year period consisting of a base year (2026-2027), Year 2 (2027-2028), Year 3 (2028-2029), and Year 4 (8 months), with bidders required to provide unit prices and extended amounts for each line item across all contract periods.
The scope of work encompasses comprehensive road maintenance and infrastructure services organized into twelve major categories: Earthwork (estimated quantities ranging from 100-500 cubic yards); Aggregate Materials including gravel surfacing, base course, and fine aggregate in both stockpiled and supplied-in-place configurations (1,000 tons each); Concrete Work covering pavement at varying thicknesses (4", 6", 8"), curbing options, and rebar (100-1,000 linear feet); Crack Sealing for both asphalt and concrete surfaces (20,000 and 500 linear feet respectively); Asphalt Seal and Fog Coats treatments (10,000 square yards); Hot Mix Asphalt paving and overlay services (400 tons); Asphalt Pothole Repair at varying depths (400 square feet); Pavement Markings including shoulder striping, centerline striping, and parking area markings; Seed and Sodding services (300 square yards each); Cold Milling of bituminous pavements at varying depths (2,500 square yards each); Geotextile Fabric installation (100 square yards); and Storm Drainage Utilities including CMP culvert installation at various sizes and depths (30 linear feet each). The bid schedule requires pricing in a standardized Excel format, with a bid due date extended to July 9, 2026, per Amendment 0001.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE BASE YEAR (2026-2027) | BID SCHEDULE YEAR 2 (2027-2028) | BID SCHEDULE YEAR 3 (2028-2029) | BID SCHEDULE YEAR 4 (8 MONTHS) | ||||||||||||||||||||
| Item No | Description | Estimated Qty | Unit | Unit Price | Amount | Item No | Description | Estimated Qty | Unit | Unit Price | Amount | Item No | Description | Estimated Qty | Unit | Unit Price | Amount | Item No | Description | Estimated Qty | Unit | Unit Price | Amount |
| 0001 | Earthwork * (31 00 00) | 00013 | Earthwork * (31 00 00) | 00025 | Earthwork * (31 00 00) | 00037 | Earthwork * (31 00 00) | ||||||||||||||||
| 0001a | 100-499 CY | 100 | CY | $ - 0 | $ - 0 | 00013a | 100-499 CY | 100 | CY | $ - 0 | $ - 0 | 00025a | 100-499 CY | 100 | CY | $ - 0 | $ - 0 | 00037a | 100-499 CY | 100 | CY | $ - 0 | $ - 0 |
| 0001b | Over 500 CY | 500 | CY | $ - 0 | $ - 0 | 00013b | Over 500 CY | 500 | CY | $ - 0 | $ - 0 | 00025b | Over 500 CY | 500 | CY | $ - 0 | $ - 0 | 00037b | Over 500 CY | 500 | CY | $ - 0 | $ - 0 |
| 0002 | Aggregate Material (32 11 23) | 00014 | Aggregate Material (32 11 23) | 00026 | Aggregate Material (32 11 23) | 00038 | Aggregate Material (32 11 23) | ||||||||||||||||
| 0002a | Gravel Surfacing (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00014a | Gravel Surfacing (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00026a | Gravel Surfacing (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00038a | Gravel Surfacing (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002b | Aggregate Base Course (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00014b | Aggregate Base Course (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00026b | Aggregate Base Course (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00038b | Aggregate Base Course (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002c | Fine Aggregate (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00014c | Fine Aggregate (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00026c | Fine Aggregate (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 | 00038c | Fine Aggregate (Stockpiled) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002d | Gravel Surfacing (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00014d | Gravel Surfacing (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00026d | Gravel Surfacing (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00038d | Gravel Surfacing (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002e | Aggregate Base Course (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00014e | Aggregate Base Course (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00026e | Aggregate Base Course (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00038e | Aggregate Base Course (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002f | Fine Aggregate (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00014f | Fine Aggregate (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00026f | Fine Aggregate (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 | 00038f | Fine Aggregate (Supplied-In-Place) | 1,000 | TON | $ - 0 | $ - 0 |
| 0002g | Crushing Asphalt Mix Material | 500 | TON | $ - 0 | $ - 0 | 00014g | Crushing Asphalt Mix Material | 500 | TON | $ - 0 | $ - 0 | 00026g | Crushing Asphalt Mix Material | 500 | TON | $ - 0 | $ - 0 | 00038g | Crushing Asphalt Mix Material | 500 | TON | $ - 0 | $ - 0 |
| 0003 | Concrete Work (32 16 13) | 00015 | Concrete Work (32 16 13) | 00027 | Concrete Work (32 16 13) | 00039 | Concrete Work (32 16 13) | ||||||||||||||||
| 0003a | Pavement 4” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00015a | Pavement 4” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00027a | Pavement 4” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00039a | Pavement 4” thick | 800 | SQ FT | $ - 0 | $ - 0 |
| 0003b | Pavement 6” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00015b | Pavement 6” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00027b | Pavement 6” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00039b | Pavement 6” thick | 800 | SQ FT | $ - 0 | $ - 0 |
| 0003c | Pavement 8” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00015c | Pavement 8” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00027c | Pavement 8” thick | 800 | SQ FT | $ - 0 | $ - 0 | 00039c | Pavement 8” thick | 800 | SQ FT | $ - 0 | $ - 0 |
| 0003d | Straight Curb | 100 | FT | $ - 0 | $ - 0 | 00015d | Straight Curb | 100 | FT | $ - 0 | $ - 0 | 00027d | Straight Curb | 100 | FT | $ - 0 | $ - 0 | 00039d | Straight Curb | 100 | FT | $ - 0 | $ - 0 |
| 0003e | Curb & Gutter (Cast) | 100 | FT | $ - 0 | $ - 0 | 00015e | Curb & Gutter (Cast) | 100 | FT | $ - 0 | $ - 0 | 00027e | Curb & Gutter (Cast) | 100 | FT | $ - 0 | $ - 0 | 00039e | Curb & Gutter (Cast) | 100 | FT | $ - 0 | $ - 0 |
| 0003f | Curb & Gutter (Slip Form) | 1,000 | FT | $ - 0 | $ - 0 | 00015f | Curb & Gutter (Slip Form) | 1,000 | FT | $ - 0 | $ - 0 | 00027f | Curb & Gutter (Slip Form) | 1,000 | FT | $ - 0 | $ - 0 | 00039f | Curb & Gutter (Slip Form) | 1,000 | FT | $ - 0 | $ - 0 |
| 0003g | Rebar (#3 or #4) | 100 | LB | $ - 0 | $ - 0 | 00015g | Rebar (#3 or #4) | 100 | LB | $ - 0 | $ - 0 | 00027g | Rebar (#3 or #4) | 100 | LB | $ - 0 | $ - 0 | 00039g | Rebar (#3 or #4) | 100 | LB | $ - 0 | $ - 0 |
| 0004 | Crack Sealing (32 01 17.16) | 00016 | Crack Sealing (32 01 17.16) | 00028 | Crack Sealing (32 01 17.16) | 00040 | Crack Sealing (32 01 17.16) | ||||||||||||||||
| 0004a | Asphalt | 20,000 | FT | $ - 0 | $ - 0 | 00016a | Asphalt | 20,000 | FT | $ - 0 | $ - 0 | 00028a | Asphalt | 20,000 | FT | $ - 0 | $ - 0 | 00040a | Asphalt | 20,000 | FT | $ - 0 | $ - 0 |
| 0004b | Concrete | 500 | FT | $ - 0 | $ - 0 | 00016b | Concrete | 500 | FT | $ - 0 | $ - 0 | 00028b | Concrete | 500 | FT | $ - 0 | $ - 0 | 00040b | Concrete | 500 | FT | $ - 0 | $ - 0 |
| 0005 | Asphalt Seal & Fog Coats (31 12 36.13) | 00017 | Asphalt Seal & Fog Coats (31 12 36.13) | 00029 | Asphalt Seal & Fog Coats (31 12 36.13) | 00041 | Asphalt Seal & Fog Coats (31 12 36.13) | ||||||||||||||||
| 0005a | Asphalt Surface Treatment | 10,000 | SQ YD | $ - 0 | $ - 0 | 00017a | Asphalt Surface Treatment | 10,000 | SQ YD | $ - 0 | $ - 0 | 00029a | Asphalt Surface Treatment | 10,000 | SQ YD | $ - 0 | $ - 0 | 00041a | Asphalt Surface Treatment | 10,000 | SQ YD | $ - 0 | $ - 0 |
| 0005b | Flush Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00017b | Flush Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00029b | Flush Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00041b | Flush Seal | 10,000 | SQ YD | $ - 0 | $ - 0 |
| 0005c | Fog Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00017c | Fog Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00029c | Fog Seal | 10,000 | SQ YD | $ - 0 | $ - 0 | 00041c | Fog Seal | 10,000 | SQ YD | $ - 0 | $ - 0 |
| 0006 | Hot Mix Asphalt (32 12 16) | 00018 | Hot Mix Asphalt (32 12 16) | 00030 | Hot Mix Asphalt (32 12 16) | 00042 | Hot Mix Asphalt (32 12 16) | ||||||||||||||||
| 0006a | Pave Gravel Surface | 400 | TON | $ - 0 | $ - 0 | 00018a | Pave Gravel Surface | 400 | TON | $ - 0 | $ - 0 | 00030a | Pave Gravel Surface | 400 | TON | $ - 0 | $ - 0 | 00042a | Pave Gravel Surface | 400 | TON | $ - 0 | $ - 0 |
| 0006b | Overlay Paved Surface | 400 | TON | $ - 0 | $ - 0 | 00018b | Overlay Paved Surface | 400 | TON | $ - 0 | $ - 0 | 00030b | Overlay Paved Surface | 400 | TON | $ - 0 | $ - 0 | 00042b | Overlay Paved Surface | 400 | TON | $ - 0 | $ - 0 |
| 0007 | Asphalt Pothole Repair (32 12 16) | 00019 | Asphalt Pothole Repair (32 12 16) | 00031 | Asphalt Pothole Repair (32 12 16) | 00043 | Asphalt Pothole Repair (32 12 16) | ||||||||||||||||
| 0007a | Asphalt Patch ≤ 2” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00019a | Asphalt Patch ≤ 2” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00031a | Asphalt Patch ≤ 2” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00043a | Asphalt Patch ≤ 2” depth | 400 | SQ FT | $ - 0 | $ - 0 |
| 0007b | Asphalt Patch 2” ≥ 4” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00019b | Asphalt Patch 2” ≥ 4” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00031b | Asphalt Patch 2” ≥ 4” depth | 400 | SQ FT | $ - 0 | $ - 0 | 00043b | Asphalt Patch 2” ≥ 4” depth | 400 | SQ FT | $ - 0 | $ - 0 |
| 0008 | Pavement Markings (32 17 24.00 10) | 00020 | Pavement Markings (32 17 24.00 10) | 00032 | Pavement Markings (32 17 24.00 10) | 00044 | Pavement Markings (32 17 24.00 10) | ||||||||||||||||
| 0008a | Shoulder Striping | 10,000 | FT | $ - 0 | $ - 0 | 00020a | Shoulder Striping | 10,000 | FT | $ - 0 | $ - 0 | 00032a | Shoulder Striping | 10,000 | FT | $ - 0 | $ - 0 | 00044a | Shoulder Striping | 10,000 | FT | $ - 0 | $ - 0 |
| 0008b | Centerline Striping | 5,000 | FT | $ - 0 | $ - 0 | 00020b | Centerline Striping | 5,000 | FT | $ - 0 | $ - 0 | 00032b | Centerline Striping | 5,000 | FT | $ - 0 | $ - 0 | 00044b | Centerline Striping | 5,000 | FT | $ - 0 | $ - 0 |
| 0008c | Parking Area Striping | 300 | FT | $ - 0 | $ - 0 | 00020c | Parking Area Striping | 300 | FT | $ - 0 | $ - 0 | 00032c | Parking Area Striping | 300 | FT | $ - 0 | $ - 0 | 00044c | Parking Area Striping | 300 | FT | $ - 0 | $ - 0 |
| 0008d | Stop Line Striping (12”) | 20 | FT | $ - 0 | $ - 0 | 00020d | Stop Line Striping (12”) | 20 | FT | $ - 0 | $ - 0 | 00032d | Stop Line Striping (12”) | 20 | FT | $ - 0 | $ - 0 | 00044d | Stop Line Striping (12”) | 20 | FT | $ - 0 | $ - 0 |
| 0008e | Handicap & Misc. Symbols | 2 | EA | $ - 0 | $ - 0 | 00020e | Handicap & Misc. Symbols | 2 | EA | $ - 0 | $ - 0 | 00032e | Handicap & Misc. Symbols | 2 | EA | $ - 0 | $ - 0 | 00044e | Handicap & Misc. Symbols | 2 | EA | $ - 0 | $ - 0 |
| 0009 | Seed & Sodding (32 92 19) | 00021 | Seed & Sodding (32 92 19) | 00033 | Seed & Sodding (32 92 19) | 00045 | Seed & Sodding (32 92 19) | ||||||||||||||||
| 0009a | Seeding | 300 | SQ YD | $ - 0 | $ - 0 | 00021a | Seeding | 300 | SQ YD | $ - 0 | $ - 0 | 00033a | Seeding | 300 | SQ YD | $ - 0 | $ - 0 | 00045a | Seeding | 300 | SQ YD | $ - 0 | $ - 0 |
| 0009b | Sodding | 300 | SQ YD | $ - 0 | $ - 0 | 00021b | Sodding | 300 | SQ YD | $ - 0 | $ - 0 | 00033b | Sodding | 300 | SQ YD | $ - 0 | $ - 0 | 00045b | Sodding | 300 | SQ YD | $ - 0 | $ - 0 |
| 0009c | Erosion Blanket | 300 | SQ YD | $ - 0 | $ - 0 | 00021c | Erosion Blanket | 300 | SQ YD | $ - 0 | $ - 0 | 00033c | Erosion Blanket | 300 | SQ YD | $ - 0 | $ - 0 | 00045c | Erosion Blanket | 300 | SQ YD | $ - 0 | $ - 0 |
| 0010 | Cold Milling Bituminous Pavements (32 01 16.17) | 00022 | Cold Milling Bituminous Pavements (32 01 16.17) | 00034 | Cold Milling Bituminous Pavements (32 01 16.17) | 00046 | Cold Milling Bituminous Pavements (32 01 16.17) | ||||||||||||||||
| 0010a | Asphalt Milling (≤2”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00022a | Asphalt Milling (≤2”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00034a | Asphalt Milling (≤2”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00046a | Asphalt Milling (≤2”) | 2,500 | SQ YD | $ - 0 | $ - 0 |
| 0010b | Asphalt Milling (>2”- 4”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00022b | Asphalt Milling (>2”- 4”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00034b | Asphalt Milling (>2”- 4”) | 2,500 | SQ YD | $ - 0 | $ - 0 | 00046b | Asphalt Milling (>2”- 4”) | 2,500 | SQ YD | $ - 0 | $ - 0 |
| 0010c | Full Depth Reclamation | 2,500 | SQ YD | $ - 0 | $ - 0 | 00022c | Full Depth Reclamation | 2,500 | SQ YD | $ - 0 | $ - 0 | 00034c | Full Depth Reclamation | 2,500 | SQ YD | $ - 0 | $ - 0 | 00046c | Full Depth Reclamation | 2,500 | SQ YD | $ - 0 | $ - 0 |
| 0011 | Geotextile Fabric (31 05 19) | 00023 | Geotextile Fabric (31 05 19) | 00035 | Geotextile Fabric (31 05 19) | 00047 | Geotextile Fabric (31 05 19) | ||||||||||||||||
| 0011a | Supplied in Place | 100 | SQ YD | $ - 0 | $ - 0 | 00023a | Supplied in Place | 100 | SQ YD | $ - 0 | $ - 0 | 00035a | Supplied in Place | 100 | SQ YD | $ - 0 | $ - 0 | 00047a | Supplied in Place | 100 | SQ YD | $ - 0 | $ - 0 |
| 0012 | Storm Drainage Utilities (33 40 00) | 00024 | Storm Drainage Utilities (33 40 00) | 00036 | Storm Drainage Utilities (33 40 00) | 00048 | Storm Drainage Utilities (33 40 00) | ||||||||||||||||
| 0012a | 18” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00024a | 18” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00036a | 18” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00048a | 18” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 |
| 0012b | 18” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00024b | 18” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00036b | 18” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00048b | 18” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 |
| 0012c | 24” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00024c | 24” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00036c | 24” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00048c | 24” CMP Culvert (0’-5’ Depth) | 30 | FT | $ - 0 | $ - 0 |
| 0012d | 24” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00024d | 24” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00036d | 24” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 | 00048d | 24” CMP Culvert (5’-10’ Depth) | 30 | FT | $ - 0 | $ - 0 |
| 0012e | 18” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00024e | 18” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00036e | 18” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00048e | 18” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 |
| 0012f | 24” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00024f | 24” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00036f | 24” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 | 00048f | 24” CMP Culvert Flared End | 2 | EA | $ - 0 | $ - 0 |
TOTAL BASE YEAR AMOUNT $ TOTAL YEAR 2 AMOUNT $ TOTAL YEAR 3 AMOUNT $ TOTAL YEAR 4 (8-months) AMOUNT $
TOTAL BASE + YEAR 2 + YEAR 3 + YEAR 4 AMOUNT $