Revised Bid Schedule in Excel Format.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Oahe IDCC Road Maintenance 2026
Solicitation number
W9128F26BA019
Issued by

About this file

This is a Revised Bid Schedule in Excel format for the Oahe IDCC Road Maintenance 2026 solicitation (W9128F26BA019) issued by the Department of the Army Corps of Engineers Engineering District Omaha. The bid schedule covers a four-year period consisting of a base year (2026-2027), Year 2 (2027-2028), Year 3 (2028-2029), and Year 4 (8 months), with bidders required to provide unit prices and extended amounts for each line item across all contract periods.

The scope of work encompasses comprehensive road maintenance and infrastructure services organized into twelve major categories: Earthwork (estimated quantities ranging from 100-500 cubic yards); Aggregate Materials including gravel surfacing, base course, and fine aggregate in both stockpiled and supplied-in-place configurations (1,000 tons each); Concrete Work covering pavement at varying thicknesses (4", 6", 8"), curbing options, and rebar (100-1,000 linear feet); Crack Sealing for both asphalt and concrete surfaces (20,000 and 500 linear feet respectively); Asphalt Seal and Fog Coats treatments (10,000 square yards); Hot Mix Asphalt paving and overlay services (400 tons); Asphalt Pothole Repair at varying depths (400 square feet); Pavement Markings including shoulder striping, centerline striping, and parking area markings; Seed and Sodding services (300 square yards each); Cold Milling of bituminous pavements at varying depths (2,500 square yards each); Geotextile Fabric installation (100 square yards); and Storm Drainage Utilities including CMP culvert installation at various sizes and depths (30 linear feet each). The bid schedule requires pricing in a standardized Excel format, with a bid due date extended to July 9, 2026, per Amendment 0001.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE BASE YEAR (2026-2027)BID SCHEDULE YEAR 2 (2027-2028)BID SCHEDULE YEAR 3 (2028-2029)BID SCHEDULE YEAR 4 (8 MONTHS)
Item NoDescriptionEstimated QtyUnitUnit PriceAmountItem NoDescriptionEstimated QtyUnitUnit PriceAmountItem NoDescriptionEstimated QtyUnitUnit PriceAmountItem NoDescriptionEstimated QtyUnitUnit PriceAmount
0001Earthwork * (31 00 00)00013Earthwork * (31 00 00)00025Earthwork * (31 00 00)00037Earthwork * (31 00 00)
0001a100-499 CY100CY$ - 0$ - 000013a100-499 CY100CY$ - 0$ - 000025a100-499 CY100CY$ - 0$ - 000037a100-499 CY100CY$ - 0$ - 0
0001bOver 500 CY500CY$ - 0$ - 000013bOver 500 CY500CY$ - 0$ - 000025bOver 500 CY500CY$ - 0$ - 000037bOver 500 CY500CY$ - 0$ - 0
0002Aggregate Material (32 11 23)00014Aggregate Material (32 11 23)00026Aggregate Material (32 11 23)00038Aggregate Material (32 11 23)
0002aGravel Surfacing (Stockpiled)1,000TON$ - 0$ - 000014aGravel Surfacing (Stockpiled)1,000TON$ - 0$ - 000026aGravel Surfacing (Stockpiled)1,000TON$ - 0$ - 000038aGravel Surfacing (Stockpiled)1,000TON$ - 0$ - 0
0002bAggregate Base Course (Stockpiled)1,000TON$ - 0$ - 000014bAggregate Base Course (Stockpiled)1,000TON$ - 0$ - 000026bAggregate Base Course (Stockpiled)1,000TON$ - 0$ - 000038bAggregate Base Course (Stockpiled)1,000TON$ - 0$ - 0
0002cFine Aggregate (Stockpiled)1,000TON$ - 0$ - 000014cFine Aggregate (Stockpiled)1,000TON$ - 0$ - 000026cFine Aggregate (Stockpiled)1,000TON$ - 0$ - 000038cFine Aggregate (Stockpiled)1,000TON$ - 0$ - 0
0002dGravel Surfacing (Supplied-In-Place)1,000TON$ - 0$ - 000014dGravel Surfacing (Supplied-In-Place)1,000TON$ - 0$ - 000026dGravel Surfacing (Supplied-In-Place)1,000TON$ - 0$ - 000038dGravel Surfacing (Supplied-In-Place)1,000TON$ - 0$ - 0
0002eAggregate Base Course (Supplied-In-Place)1,000TON$ - 0$ - 000014eAggregate Base Course (Supplied-In-Place)1,000TON$ - 0$ - 000026eAggregate Base Course (Supplied-In-Place)1,000TON$ - 0$ - 000038eAggregate Base Course (Supplied-In-Place)1,000TON$ - 0$ - 0
0002fFine Aggregate (Supplied-In-Place)1,000TON$ - 0$ - 000014fFine Aggregate (Supplied-In-Place)1,000TON$ - 0$ - 000026fFine Aggregate (Supplied-In-Place)1,000TON$ - 0$ - 000038fFine Aggregate (Supplied-In-Place)1,000TON$ - 0$ - 0
0002gCrushing Asphalt Mix Material500TON$ - 0$ - 000014gCrushing Asphalt Mix Material500TON$ - 0$ - 000026gCrushing Asphalt Mix Material500TON$ - 0$ - 000038gCrushing Asphalt Mix Material500TON$ - 0$ - 0
0003Concrete Work (32 16 13)00015Concrete Work (32 16 13)00027Concrete Work (32 16 13)00039Concrete Work (32 16 13)
0003aPavement 4” thick800SQ FT$ - 0$ - 000015aPavement 4” thick800SQ FT$ - 0$ - 000027aPavement 4” thick800SQ FT$ - 0$ - 000039aPavement 4” thick800SQ FT$ - 0$ - 0
0003bPavement 6” thick800SQ FT$ - 0$ - 000015bPavement 6” thick800SQ FT$ - 0$ - 000027bPavement 6” thick800SQ FT$ - 0$ - 000039bPavement 6” thick800SQ FT$ - 0$ - 0
0003cPavement 8” thick800SQ FT$ - 0$ - 000015cPavement 8” thick800SQ FT$ - 0$ - 000027cPavement 8” thick800SQ FT$ - 0$ - 000039cPavement 8” thick800SQ FT$ - 0$ - 0
0003dStraight Curb100FT$ - 0$ - 000015dStraight Curb100FT$ - 0$ - 000027dStraight Curb100FT$ - 0$ - 000039dStraight Curb100FT$ - 0$ - 0
0003eCurb & Gutter (Cast)100FT$ - 0$ - 000015eCurb & Gutter (Cast)100FT$ - 0$ - 000027eCurb & Gutter (Cast)100FT$ - 0$ - 000039eCurb & Gutter (Cast)100FT$ - 0$ - 0
0003fCurb & Gutter (Slip Form)1,000FT$ - 0$ - 000015fCurb & Gutter (Slip Form)1,000FT$ - 0$ - 000027fCurb & Gutter (Slip Form)1,000FT$ - 0$ - 000039fCurb & Gutter (Slip Form)1,000FT$ - 0$ - 0
0003gRebar (#3 or #4)100LB$ - 0$ - 000015gRebar (#3 or #4)100LB$ - 0$ - 000027gRebar (#3 or #4)100LB$ - 0$ - 000039gRebar (#3 or #4)100LB$ - 0$ - 0
0004Crack Sealing (32 01 17.16)00016Crack Sealing (32 01 17.16)00028Crack Sealing (32 01 17.16)00040Crack Sealing (32 01 17.16)
0004aAsphalt20,000FT$ - 0$ - 000016aAsphalt20,000FT$ - 0$ - 000028aAsphalt20,000FT$ - 0$ - 000040aAsphalt20,000FT$ - 0$ - 0
0004bConcrete500FT$ - 0$ - 000016bConcrete500FT$ - 0$ - 000028bConcrete500FT$ - 0$ - 000040bConcrete500FT$ - 0$ - 0
0005Asphalt Seal & Fog Coats (31 12 36.13)00017Asphalt Seal & Fog Coats (31 12 36.13)00029Asphalt Seal & Fog Coats (31 12 36.13)00041Asphalt Seal & Fog Coats (31 12 36.13)
0005aAsphalt Surface Treatment10,000SQ YD$ - 0$ - 000017aAsphalt Surface Treatment10,000SQ YD$ - 0$ - 000029aAsphalt Surface Treatment10,000SQ YD$ - 0$ - 000041aAsphalt Surface Treatment10,000SQ YD$ - 0$ - 0
0005bFlush Seal10,000SQ YD$ - 0$ - 000017bFlush Seal10,000SQ YD$ - 0$ - 000029bFlush Seal10,000SQ YD$ - 0$ - 000041bFlush Seal10,000SQ YD$ - 0$ - 0
0005cFog Seal10,000SQ YD$ - 0$ - 000017cFog Seal10,000SQ YD$ - 0$ - 000029cFog Seal10,000SQ YD$ - 0$ - 000041cFog Seal10,000SQ YD$ - 0$ - 0
0006Hot Mix Asphalt (32 12 16)00018Hot Mix Asphalt (32 12 16)00030Hot Mix Asphalt (32 12 16)00042Hot Mix Asphalt (32 12 16)
0006aPave Gravel Surface400TON$ - 0$ - 000018aPave Gravel Surface400TON$ - 0$ - 000030aPave Gravel Surface400TON$ - 0$ - 000042aPave Gravel Surface400TON$ - 0$ - 0
0006bOverlay Paved Surface400TON$ - 0$ - 000018bOverlay Paved Surface400TON$ - 0$ - 000030bOverlay Paved Surface400TON$ - 0$ - 000042bOverlay Paved Surface400TON$ - 0$ - 0
0007Asphalt Pothole Repair (32 12 16)00019Asphalt Pothole Repair (32 12 16)00031Asphalt Pothole Repair (32 12 16)00043Asphalt Pothole Repair (32 12 16)
0007aAsphalt Patch ≤ 2” depth400SQ FT$ - 0$ - 000019aAsphalt Patch ≤ 2” depth400SQ FT$ - 0$ - 000031aAsphalt Patch ≤ 2” depth400SQ FT$ - 0$ - 000043aAsphalt Patch ≤ 2” depth400SQ FT$ - 0$ - 0
0007bAsphalt Patch 2” ≥ 4” depth400SQ FT$ - 0$ - 000019bAsphalt Patch 2” ≥ 4” depth400SQ FT$ - 0$ - 000031bAsphalt Patch 2” ≥ 4” depth400SQ FT$ - 0$ - 000043bAsphalt Patch 2” ≥ 4” depth400SQ FT$ - 0$ - 0
0008Pavement Markings (32 17 24.00 10)00020Pavement Markings (32 17 24.00 10)00032Pavement Markings (32 17 24.00 10)00044Pavement Markings (32 17 24.00 10)
0008aShoulder Striping10,000FT$ - 0$ - 000020aShoulder Striping10,000FT$ - 0$ - 000032aShoulder Striping10,000FT$ - 0$ - 000044aShoulder Striping10,000FT$ - 0$ - 0
0008bCenterline Striping5,000FT$ - 0$ - 000020bCenterline Striping5,000FT$ - 0$ - 000032bCenterline Striping5,000FT$ - 0$ - 000044bCenterline Striping5,000FT$ - 0$ - 0
0008cParking Area Striping300FT$ - 0$ - 000020cParking Area Striping300FT$ - 0$ - 000032cParking Area Striping300FT$ - 0$ - 000044cParking Area Striping300FT$ - 0$ - 0
0008dStop Line Striping (12”)20FT$ - 0$ - 000020dStop Line Striping (12”)20FT$ - 0$ - 000032dStop Line Striping (12”)20FT$ - 0$ - 000044dStop Line Striping (12”)20FT$ - 0$ - 0
0008eHandicap & Misc. Symbols2EA$ - 0$ - 000020eHandicap & Misc. Symbols2EA$ - 0$ - 000032eHandicap & Misc. Symbols2EA$ - 0$ - 000044eHandicap & Misc. Symbols2EA$ - 0$ - 0
0009Seed & Sodding (32 92 19)00021Seed & Sodding (32 92 19)00033Seed & Sodding (32 92 19)00045Seed & Sodding (32 92 19)
0009aSeeding300SQ YD$ - 0$ - 000021aSeeding300SQ YD$ - 0$ - 000033aSeeding300SQ YD$ - 0$ - 000045aSeeding300SQ YD$ - 0$ - 0
0009bSodding300SQ YD$ - 0$ - 000021bSodding300SQ YD$ - 0$ - 000033bSodding300SQ YD$ - 0$ - 000045bSodding300SQ YD$ - 0$ - 0
0009cErosion Blanket300SQ YD$ - 0$ - 000021cErosion Blanket300SQ YD$ - 0$ - 000033cErosion Blanket300SQ YD$ - 0$ - 000045cErosion Blanket300SQ YD$ - 0$ - 0
0010Cold Milling Bituminous Pavements (32 01 16.17)00022Cold Milling Bituminous Pavements (32 01 16.17)00034Cold Milling Bituminous Pavements (32 01 16.17)00046Cold Milling Bituminous Pavements (32 01 16.17)
0010aAsphalt Milling (≤2”)2,500SQ YD$ - 0$ - 000022aAsphalt Milling (≤2”)2,500SQ YD$ - 0$ - 000034aAsphalt Milling (≤2”)2,500SQ YD$ - 0$ - 000046aAsphalt Milling (≤2”)2,500SQ YD$ - 0$ - 0
0010bAsphalt Milling (>2”- 4”)2,500SQ YD$ - 0$ - 000022bAsphalt Milling (>2”- 4”)2,500SQ YD$ - 0$ - 000034bAsphalt Milling (>2”- 4”)2,500SQ YD$ - 0$ - 000046bAsphalt Milling (>2”- 4”)2,500SQ YD$ - 0$ - 0
0010cFull Depth Reclamation2,500SQ YD$ - 0$ - 000022cFull Depth Reclamation2,500SQ YD$ - 0$ - 000034cFull Depth Reclamation2,500SQ YD$ - 0$ - 000046cFull Depth Reclamation2,500SQ YD$ - 0$ - 0
0011Geotextile Fabric (31 05 19)00023Geotextile Fabric (31 05 19)00035Geotextile Fabric (31 05 19)00047Geotextile Fabric (31 05 19)
0011aSupplied in Place100SQ YD$ - 0$ - 000023aSupplied in Place100SQ YD$ - 0$ - 000035aSupplied in Place100SQ YD$ - 0$ - 000047aSupplied in Place100SQ YD$ - 0$ - 0
0012Storm Drainage Utilities (33 40 00)00024Storm Drainage Utilities (33 40 00)00036Storm Drainage Utilities (33 40 00)00048Storm Drainage Utilities (33 40 00)
0012a18” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000024a18” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000036a18” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000048a18” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 0
0012b18” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000024b18” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000036b18” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000048b18” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 0
0012c24” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000024c24” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000036c24” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 000048c24” CMP Culvert (0’-5’ Depth)30FT$ - 0$ - 0
0012d24” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000024d24” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000036d24” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 000048d24” CMP Culvert (5’-10’ Depth)30FT$ - 0$ - 0
0012e18” CMP Culvert Flared End2EA$ - 0$ - 000024e18” CMP Culvert Flared End2EA$ - 0$ - 000036e18” CMP Culvert Flared End2EA$ - 0$ - 000048e18” CMP Culvert Flared End2EA$ - 0$ - 0
0012f24” CMP Culvert Flared End2EA$ - 0$ - 000024f24” CMP Culvert Flared End2EA$ - 0$ - 000036f24” CMP Culvert Flared End2EA$ - 0$ - 000048f24” CMP Culvert Flared End2EA$ - 0$ - 0

TOTAL BASE YEAR AMOUNT $ TOTAL YEAR 2 AMOUNT $ TOTAL YEAR 3 AMOUNT $ TOTAL YEAR 4 (8-months) AMOUNT $

TOTAL BASE + YEAR 2 + YEAR 3 + YEAR 4 AMOUNT $

File details come from the government source that posted it. Updated .