00 10 00 - Bid Schedule-Revised 6July2026.docx

DOCX document 203 KB Posted

Attached to
Oahe IDCC Road Maintenance 2026
Solicitation number
W9128F26BA019
Issued by

About this file

This is a Bid Schedule for road maintenance services at Oahe IDCC for the Department of the Army Corps of Engineers Omaha District under solicitation W9128F26BA019. The schedule covers a basic year plus two option years with unit-priced line items requiring individual pricing for all items across twelve major work categories. Work categories include earthwork (100-499 cubic yards and over 500 cubic yards), aggregate materials (gravel surfacing, base course, and fine aggregate in both stockpiled and supplied-in-place configurations), concrete work (pavement at various thicknesses, curbing, and rebar), crack sealing for asphalt and concrete, asphalt seal and fog coats, hot mix asphalt paving, asphalt pothole repair, pavement markings (striping and symbols), seed and sodding with erosion blanket, cold milling bituminous pavements at varying depths, geotextile fabric, and storm drainage utilities (18-inch and 24-inch CMP culverts at various depths with flared ends). Contractors must submit unit prices for all line items to ensure proper evaluation; bid extensions will be verified by the Government, with unit prices taking precedence over extensions in case of discrepancies. The bid schedule was revised on July 6, 2026, with the bid due date extended to July 9, 2026 per Amendment 0001. Submission format may be either Excel or Word format for the bid schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE BASIC YEAR

ItemEstimatedUnit
No.DescriptionQuantity UnitPriceAmount
0001.Earthwork * (31 00 00)
0001a.100-499 CY100CY.$ $
0001b.Over 500 CY500 CY.$ $
0002.Aggregate Material (32 11 23)
0002a.Gravel Surfacing (Stockpiled)1,000TON$ $
0002b.Aggregate Base Course1,000TON $ $
(Stockpiled)
0002c.Fine Aggregate (Stockpiled)1,000TON $ $
0002d.Gravel Surfacing1,000TON$ $
(Supplied-In-Place)
0002e.Aggregate Base Course1,000TON $ $
(Supplied-In-Place)
0002f.Fine Aggregate1,000TON $ ____________ $__________
(Supplied-In-Place)
0002g.Crushing Asphalt Mix Material 500TON $_____________ $__________

(Stockpiled)

0003.Concrete Work (32 16 13)
0003a.Pavement 4” thick800SQ.FT. $ $
0003b.Pavement 6” thick800SQ.FT. $ $
0003c.Pavement 8” thick800SQ.FT. $ $ 0003d.Straight Curb100FT.$ $
0003e.Curb & Gutter (Cast)100FT.$ $
0003f.Curb & Gutter (Slip Form)1,000FT.$ $
0003g.Rebar (#3 or #4)100LB. $ $
0004.Crack Sealing (32 01 17.16)
0004a.Asphalt20,000FT.$ $
0004b.Concrete500FT.$ $
0005.Asphalt Seal & Fog Coats (31 12 36.13)
0005a.Asphalt Surface Treatment10,000SQ.YD. $ $
0005b.Flush Seal10,000 SQ.YD. $ $
0005c.Fog Seal10,000 SQ.YD. $ $
0006.Hot Mix Asphalt (32 12 16)
0006a.Pave Gravel Surface400 TON$ $
0006b.Overlay Paved Surface400TON$ $
0007.Asphalt Pothole Repair (32 12 16)
0007a.Asphalt Patch ≤ 2” depth400 SQ.FT.$ $
0007b.Asphalt Patch 2” ≥ 4” depth400 SQ.FT. $ $
0008.Pavement Markings (32 17 24.00 10)
0008a.Shoulder Striping10,000FT. $ $
0008b.Centerline Striping5,000FT.$ $
0008c.Parking Area Striping300FT. $ $
0008d.Stop Line Striping (12”)20FT. $ $
0008e.Handicap & Misc. Symbols2EA. $ $
0009.Seed & Sodding (32 92 19)
0009a.Seeding300SQ.YD.$ $
0009b.Sodding300SQ.YD.$ $
0009c.Erosion Blanket300SQ.YD.$ $
00010.Cold Milling Bituminous Pavements (32 01 16.17)
00010a.Asphalt Milling (≤2”)2,500SQ.YD.$ $
00010b.Asphalt Milling (>2”- 4”)2,500 SQ.YD. $ $
00010c.Full Depth Reclamation2,500SQ. YD.$ $
00011.Geotextile Fabric (31 05 19)
00011a.Supplied in Place100SQ.YD.$ $
00012.Storm Drainage Utilities (33 40 00)
00012a.18” CMP Culvert (0’-5’ Depth)30FT.$ $
00012b.18” CMP Culvert (5’-10’ Depth)30FT.$ $
00012c.24” CMP Culvert (0’-5’ Depth)30FT.$ $
00012d.24” CMP Culvert (5’-10’ Depth)30FT.$ $
00012e.18” CMP Culvert Flared End2EACH$ $
00012f.24” CMP Culvert Flared End2EACH$ $

TOTAL BASIC YEAR AMOUNT $

BIDDING SCHEDULE OPTION YEAR 1

ItemEstimatedUnit
No.DescriptionQuantity UnitPriceAmount
00013.Earthwork * (31 00 00)
00013a.100-499 CY100CY.$ $
00013b.Over 500 CY500 CY.$ $
00014.Aggregate Material (32 11 23)
00014a.Gravel Surfacing (Stockpiled)1,000TON$ $
00014b.Aggregate Base Course1,000TON $ $
(Stockpiled)
00014c.Fine Aggregate (Stockpiled)1,000TON $ $
00014d.Gravel Surfacing1,000TON$ $
(Supplied-In-Place)
00014e.Aggregate Base Course1,000TON $ $
(Supplied-In-Place)
00014f.Fine Aggregate1,000TON $ $
(Supplied-In-Place)
0014g.Crushing Asphalt Mix Material 500TON $_____________ $__________

(Stockpiled)

00015.Concrete Work (32 16 13)
00015a.Pavement 4” thick800SQ.FT. $ $
00015b.Pavement 6” thick800SQ.FT. $ $
00015c.Pavement 8” thick800SQ.FT. $ $ 00015d.Straight Curb100FT.$ $
00015e.Curb & Gutter (Cast)100FT.$ $
00015f.Curb & Gutter (Slip Form)1,000FT.$ $
00015g.Rebar (#3 or #4)100LB. $ $
00016.Crack Sealing (32 01 17.16)
00016a.Asphalt20,000FT.$ $
00016b.Concrete500FT.$ $
00017.Asphalt Seal & Fog Coats (31 12 36.13)
00017a.Asphalt Surface Treatment10,000SQ.YD. $ $
00017b.Flush Seal10,000 SQ.YD. $ $
00017c.Fog Seal10,000 SQ.YD. $ $
00018.Hot Mix Asphalt (32 12 16)
00018a.Pave Gravel Surface400 TON$ $
00018b.Overlay Paved Surface400TON$ $
00019.Asphalt Pothole Repair (32 12 16)
00019a.Asphalt Patch ≤ 2” depth400 SQ.FT.$ $
00019b.Asphalt Patch 2” ≥ 4” depth400 SQ.FT. $ $
00020.Pavement Markings (32 17 24.00 10)
00020a.Shoulder Striping10,000FT. $ $
00020b.Centerline Striping5,000FT.$ $
00020c.Parking Area Striping300FT. $ $
00020d.Stop Line Striping (12”)20FT. $ $
00020e.Handicap & Misc. Symbols2EA. $ $
00021.Seed & Sodding (32 92 19)
00021a.Seeding300SQ.YD.$ $
00021b.Sodding300SQ.YD.$ $
00021c.Erosion Blanket300SQ.YD.$ $
00022.Cold Milling Bituminous Pavements (32 01 16.17)
00022a.Asphalt Milling (≤2”)2,500SQ.YD.$ $
00022b.Asphalt Milling (>2”- 4”)2,500 SQ.YD. $ $
00022c.Full Depth Reclamation2,500SQ. YD.$ $
00023.Geotextile Fabric (31 05 19)
00023a.Supplied in Place100SQ.YD.$ $
00024.Storm Drainage Utilities (33 40 00)
00024a.18” CMP Culvert (0’-5’ Depth)30FT.$ $
00024b.18” CMP Culvert (5’-10’ Depth)30FT.$ $
00024c.24” CMP Culvert (0’-5’ Depth)30FT.$ $
00024d.24” CMP Culvert (5’-10’ Depth)30FT.$ $
00024e.18” CMP Culvert Flared End2EACH$ $
00024f.24” CMP Culvert Flared End2EACH$ $

TOTAL OPTION YEAR 1 AMOUNT $

BIDDING SCHEDULE OPTION YEAR 2

ItemEstimatedUnit
No.DescriptionQuantity UnitPriceAmount
00025.Earthwork * (31 00 00)
00025a.100-499 CY100CY.$ $
00025b.Over 500 CY500 CY.$ $
00026.Aggregate Material (32 11 23)
00026a.Gravel Surfacing (Stockpiled)1,000TON$ $
00026b.Aggregate Base Course1,000TON $ $
(Stockpiled)
00026c.Fine Aggregate (Stockpiled)1,000TON $ $
00026d.Gravel Surfacing1,000TON$ $
(Supplied-In-Place)
00026e.Aggregate Base Course1,000TON $ $
(Supplied-In-Place)
00026f.Fine Aggregate1,000TON $ $
(Supplied-In-Place)
00026g.Crushing Asphalt Mix Material 500TON $_____________ $__________

(Stockpiled)

00027.Concrete Work (32 16 13)
00027a.Pavement 4” thick800SQ.FT. $ $
00027b.Pavement 6” thick800SQ.FT. $ $
00027c.Pavement 8” thick800SQ.FT. $ $ 00027d.Straight Curb100FT.$ $
00027e.Curb & Gutter (Cast)100FT.$ $
00027f.Curb & Gutter (Slip Form)1,000FT.$ $
00027g.Rebar (#3 or #4)100LB. $ $
00028.Crack Sealing (32 01 17.16)
00028a.Asphalt20,000FT.$ $
00028b.Concrete500FT.$ $
00029.Asphalt Seal & Fog Coats (31 12 36.13)
00029a.Asphalt Surface Treatment10,000SQ.YD. $ $
00029b.Flush Seal10,000 SQ.YD. $ $
00029c.Fog Seal10,000 SQ.YD. $ $
00030.Hot Mix Asphalt (32 12 16)
00030a.Pave Gravel Surface400 TON$ $
00030b.Overlay Paved Surface400TON$ $
00031.Asphalt Pothole Repair (32 12 16)
00031a.Asphalt Patch ≤ 2” depth400 SQ.FT.$ $
00031b.Asphalt Patch 2” ≥ 4” depth400 SQ.FT. $ $
00032.Pavement Markings (32 17 24.00 10)
00032a.Shoulder Striping10,000FT. $ $
00032b.Centerline Striping5,000FT.$ $
00032c.Parking Area Striping300FT. $ $
00032d.Stop Line Striping (12”)20FT. $ $
00032e.Handicap & Misc. Symbols2EA. $ $
00033.Seed & Sodding (32 92 19)
00033a.Seeding300SQ.YD.$ $
00033b.Sodding300SQ.YD.$ $
00033c.Erosion Blanket300SQ.YD.$ $
00034.Cold Milling Bituminous Pavements (32 01 16.17)
00034a.Asphalt Milling (≤2”)2,500SQ.YD.$ $
00034b.Asphalt Milling (>2”- 4”)2,500 SQ.YD. $ $
00034c.Full Depth Reclamation2,500SQ. YD.$ $
00035.Geotextile Fabric (31 05 19)
00035a.Supplied in Place100SQ.YD.$ $
00036.Storm Drainage Utilities (33 40 00)
00036a.18” CMP Culvert (0’-5’ Depth)30FT.$ $
00036b.18” CMP Culvert (5’-10’ Depth)30FT.$ $
00036c.24” CMP Culvert (0’-5’ Depth)30FT.$ $
00036d.24” CMP Culvert (5’-10’ Depth)30FT.$ $
00036e.18” CMP Culvert Flared End2EACH$ $
00036f.24” CMP Culvert Flared End2EACH$ $

TOTAL OPTION YEAR 2 AMOUNT $

TOTAL BASIC + OPTION YEAR 1 + OPTION YEAR 2 AMOUNT $

Notes:

1. Quantities for unit priced items are estimated only and the representative unit price will prevail in the event of an overrun or under run subject to Contract Clauses (Section 00700) Clause “Variation in Estimated Quantities”.

2. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.

3. A modification to a bid which provides for a single adjustment to the total amount bid should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the amount of the adjustment will be divided by the number of items in the Basic Year Bid Schedule or Option Year Bid Schedule, whichever one applies, and distributed equally among each Item.

4. * Refers to the number of the specification section for referencing technical and measurement and payment information for the various bid items.