This is a Request for Information (RFI) document containing four clarifying questions and answers regarding tank inspection and maintenance work at Eielson AFB, Alaska. The document establishes that the Installation will be responsible for three key tasks: cleaning tank 59 and opening the manway for internal inspection, setting the legs, and cleaning the tank for entry if it needs to be emptied. Additionally, it specifies that water used for hydrostatic testing must be removed for disposal rather than left onsite.
The questions appear to be part of a larger solicitation (W9128F25Q0019) for API Internal Inspection at Eielson AFB on FAC 6381 and API External Inspection on FACs 6380 and 1317, being managed by the US Army Corps of Engineers Omaha District. These clarifications help define the division of responsibilities between the contractor and the installation for specific aspects of the tank inspection work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1.pdf | ||
| SAM Solicitation W9128FQ0019 EIE Tank Inspection.pdf | ||
| Attachment E - API Internal Inspection Telecon Briefing Template.docx | DOCX document | |
| Attachment G - Return To Service Letter.docx | DOCX document | |
| SAM Solicitation W9128FQ0019 EIE Tank Inspection.pdf | ||
| Attachment F - API Internal Inspection Template.docx | DOCX document | |
| Attachment B - Fuel Storage Tank LIst.pdf | ||
| SP-POL-CMP-INSPECT-FY25-EIE-52.212-1 addendum.pdf | ||
| EIE Tank 6381 (Tank 59) Final Report (W911KB-15-D-0001-0003).pdf | ||
| Attachment I - API External Inspection Template.docx | DOCX document | |
| EIE Tank 61 Final API 653 Inspection Report (W911KB-15-D-0001-0003).pdf | ||
| Attachment C - Tank Data Sheet.pdf | ||
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| SP-POL-CMP-INSPECT-FY25-EIE-CLIN Bid Schedule.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 2
1. Who would be responsible for cleaning tank 59 and opening the manway for the internal tank inspection? Installation
2. Who is responsible for setting the legs? Installation
3. If tank is to be emptied, who is responsible for cleaning tank for entry? Installation
4. Will the water used for hydrostatic testing need to be removed for disposal or left onsite? removed for disposal