Grand Forks - Seymour Johnson - Grissom GEN Approval Memo - 10 Mar 23.pdf
PDF 213 KB Posted
- Attached to
- DRP Formal Training Unit Bldg. 631
- Solicitation number
- W9128F23R0018
About this file
This memorandum approves the selection of a single generator manufacturer for three Air Force installations: Grand Forks AFB, Seymour Johnson AFB, and Grissom ARB. Cummins generators will be standardized at all three locations. The approval is valid for five years, after which the installations must conduct another analysis to confirm the single manufacturer decision or select a new manufacturer if needed. Any questions should be directed to the listed Air Force Civil Engineer Center points of contact.
This solicitation seeks proposals for the construction of DRP Formal Training Unit Building 631 with a project cost between $25-100 million. Offerors must be registered in the System for Award Management to be eligible for award. Proposals are due by December 30, 2022 and the solicitation is unrestricted. Interested parties can access the full solicitation containing additional requirements on SAM.gov. Inquiries shall be submitted through the Bidder Inquiry system in ProjNet. The soliciting agency is the Department of the Army Corps of Engineers Omaha District.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE CIVIL ENGINEER CENTER
TYNDALL AIR FORCE BASE FLORIDA
10 Mar 23
MEMORANDUM FOR RECORD
FROM: AFCEC/CO
139 Barnes Drive, STE 1 Tyndall AFB, FL 32403-5319
SUBJECT: Generator Standardization, Single Manufacturer Selection
1. This memorandum serves as AFCEC/CO’s official communication approving the selection of a single manufacturer for generators respective to the following installation(s):
Installation: Unit: Manufacturer:
Grand Forks AFB, ND
Seymour Johnson AFB, NC Grissom ARB, IN
319 CES
4 CES
434 CES
Cummins Cummins Cummins
2. The comprehensive inventory analysis is to be repeated after five years from the date of this memorandum. The purpose of this secondary analysis is to document the installation’s progress in standardizing generators, consider any changes in the decision facts, and confirm no external factors exist that may drive a reconsideration of the approved single manufacturer. Should the BCE determine that a change in single manufacturer is required, a new Memorandum of Request (MOR) and analysis will be accomplished.
3. Please direct any questions and/or concerns regarding implementation of this guidance to my POC, Bryan Muller, DSN 523-6291, bryan.muller.1@us.af.mil or to the AFCEC Reachback Center at AFCEC.RBC@us.af.mil.
JEFFREY R. KLEIN, Lt Col, USAF Deputy Director, Operations mailto:bryan.muller.1@us.af.mil mailto:AFCEC.RBC@us.af.mil
| 2023-03-10T07:47:44-0500 | |
| KLEIN.JEFFREY.ROBERT.1266032575 |
File details come from the government source that posted it. Updated .