Grand Forks - FE Warren - Grissom FAP Approval Memo - 10 Mar 23.pdf

PDF 261 KB Posted

Attached to
DRP Formal Training Unit Bldg. 631
Solicitation number
W9128F23R0018
Issued by

About this file

This memorandum approves fire alarm panel manufacturers for three Air Force installations. Grand Forks AFB, FE Warren AFB, and Grissom ARB are authorized to select fire alarm panels from Monaco and Simplex/Johnson Controls. The installations must repeat an inventory analysis after five years to confirm standardization progress and consider any external factors requiring manufacturer changes. Questions regarding the guidance should be directed to the points of contact listed.

This solicitation seeks proposals for a DRP Formal Training Unit Building 631 project valued between $25-100 million. Offerors must register in SAM and include NAICS code 236220 in their profile. Proposals are due by December 30, 2022 with no stated award date. The solicitation and any amendments will be posted on SAM.gov. Inquiries shall be submitted through Bidder Inquiry in ProjNet. Proposals and questions shall be sent to the Contracting Specialist and Contracting Officer via email.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE CIVIL ENGINEER CENTER

TYNDALL AIR FORCE BASE FLORIDA

10 Mar 23

MEMORANDUM FOR RECORD

FROM: AFCEC/CO

139 Barnes Drive, STE 1 Tyndall AFB, FL 32403-5319

SUBJECT: Fire Alarm Panel Standardization, Up to 3 Manufacturer Brands can be selected

1. This memorandum serves as AFCEC/CO’s official communication, replacing prior 10 Aug 22 memo, and approves the selection of Fire Alarm Panels manufacturers respective to the following installation:

Installation: Unit: Manufacturers:

Grand Forks AFB, ND FE Warren AFB, WY

Grissom ARB, IN

319 CES

90 CES

434 CES

Monaco Monaco

Simplex/Johnson Controls

2. The comprehensive inventory analysis is to be repeated after five years from the date of this memorandum. The purpose of this secondary analysis is to document the installation’s progress in standardizing fire alarm panels, consider any changes in the decision facts, and confirm no external factors exist that may drive a reconsideration of the approved single manufacturer. Should the BCE determine that a change in the approved manufacturers is required, a new Memorandum of Request (MOR) and analysis will be accomplished.

3. Please direct any questions and/or concerns regarding implementation of this guidance to my POC, Bryan Muller, bryan.muller.1@ua.af.mil or to the AFCEC Reachback Center at AFCEC.RBC@us.af.mil.

JEFFREY R. KLEIN, Lt Col, USAF Deputy Director, Operations mailto:AFCEC.RBC@us.af.mil

2023-03-10T07:45:06-0500
KLEIN.JEFFREY.ROBERT.1266032575

File details come from the government source that posted it. Updated .