APPENDIX A - Am 0002.pdf

PDF 534 KB Posted

Attached to
ADAL Fitness Center Schriever AFB, CO
Solicitation number
W9128F22R0053
Issued by

About this file

This document includes a room data sheet and details for a federal contract opportunity. The U.S. Army Corps of Engineers is soliciting proposals for a single-phase design-build project to construct an ADAL Fitness Center at Schriever Air Force Base in Colorado. The solicitation will close on May 12, 2022. This is an 8(a) small business set-aside. The magnitude of construction costs is estimated between $25-100 million. The room data sheet provides requirements for various rooms including finishes, HVAC, plumbing, electrical, telecommunications, audio/visual, security, fire protection, and other specifications. Interested contractors must register in the System for Award Management and have the applicable NAICS code included in their profile to be eligible to respond prior to the proposal submission deadline.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM DATA SHEET - TYPE I

BUILDING: ADAL Fitness Center

Room Number: 110 ,137 ,153 ,211

Room Name: Electrical Occupancy Per Area: See plan

Allocated Area: See plans

ARCHITECTURAL

Finishes:

Floor: Concrete Walls: Primed Gypsum Wallboard or Concrete Panels

Base: 4" Resilient Ceiling Height:

Ceiling: Exposed Structure Windows:

Doors: Room 153 - Exterior Hollow metal door and frame. Interior doors - Wood door and Hollow metal frame with Kick-plates on all doors

Millwork/ Casework:

Notes/Special Requirements:

INTERIORS

Workstation/Desks: See plan

Storage Requirements:

Notes/Special Requirements:

HVAC

Heating:

Required

Air Conditioning:

Required when not ventilated.

Ventilation:

Required

Heating Temperature: 55 °F Cooling Temperature:

Room Pressure: Air Changes: - Exhaust: Required

Notes/Special Requirements:

Provide independent HVAC zone and associated thermostat.

PLUMBING

Fixtures:

Notes/Special Requirements: Provide floor drain when air conditioned and cooling coil is within room.

ELECTRICAL

Power: Provide one receptacle for maintenance.

Lighting:

Notes/Special Requirements:

TELECOMMUNICATIONS

Telephone: Required LAN: Required IPTV: Not Required

Notes/Special Requirements:

Data: Provide data cable(s)/outlet(s) for any electrical networked equipment.

Telephone: Provide 1 NIPR Voice cable/outlet within space.

IPTV: None required.

WiFi: Provide WiFi coverage for the entire space.

AUDIO/VISUAL & SECURITY

Equipment: Refer to specification 01 86 29 for audiovisual and security CLIN requirements.

Notes/Special Requirements:

Public Address(PA): Provide speaker coverage for the entire space.

Audio/Visual: None required.

CCTV: None required.

ACS: Provide infrastructure/rough-ins for all doors to be monitored by the access control system (ACS). Emer-gency Call/Alarm: None required.

ACOUSTICAL

Perimeter STC:

Notes/Special Requirements:

EQUIPMENT

Equipment (GFGI) Equipment (CFCI):

Other:

Notes/Special Requirements:

FIRE PROTECTION

System: Fire Suppression Fire Detection Notification

Requirements: Wet-pipe sprinkler system Combined fire alarm/mass notification system

Notes/Special Requirements:

Provide system per UFC 4-470-02 Chapter 3, "Fire Protection and Life Safety." Comply with stated and cross-referenced requirements for fire protection, life safety, and mass notification systems.

OTHER COMMENTS

Notes/Special Requirements:

ROOM DATA SHEET - TYPE EE

BUILDING: ADAL Fitness Center

Room Number: 107

Room Name: Existing Mechanical Room to Remain unless noted otherwise Occupancy Per Area: See plan

Allocated Area: See plans

ARCHITECTURAL

Finishes:

Floor: Walls:

Base: Ceiling Height:

Ceiling: Windows:

Doors:

Millwork/ Casework:

Notes/Special Requirements:

INTERIORS

Workstation/Desks:

Storage Requirements:

Notes/Special Requirements:

HVAC

Heating: Required Air Conditioning: Not Required Ventilation: Required Heating Temperature: 55 °F Cooling Temperature:

Room Pressure: Air Changes: - Exhaust: Required

Notes/Special Requirements: Provide new ventilation and heating system/equipment for room. Provide independent HVAC zone and associated thermostat.

PLUMBING

Fixtures: Provide floor drains and sinks for new equipment layout. Provide interior and exterior hose bibbs.

Notes/Special Requirements:

ELECTRICAL

Power:

Lighting:

Notes/Special Requirements:

TELECOMMUNICATIONS

Telephone: Required LAN: Required IPTV: Not Required

Notes/Special Requirements:

Data: Provide NIPR Data cables/outlets for any mechanical networked equipment.

Telephone: Provide 1 NIPR Voice cable/outlet within space.

IPTV: None required.

WiFi: Provide WiFi coverage for the entire space.

AUDIO/VISUAL & SECURITY

Equipment: Refer to specification 01 86 29 for audiovisual and security CLIN requirements.

Notes/Special Requirements:

Public Address(PA): Provide speaker coverage for the entire space.

Audio/Visual: None required.

CCTV: None required.

ACS: Provide infrastructure/rough-ins for all exterior doors to be monitored by the access control system (ACS).

Emergency Call/Alarm: None required.

ACOUSTICAL

Perimeter STC:

Notes/Special Requirements:

EQUIPMENT

Equipment (GFGI) Equipment (CFCI):

Other:

Notes/Special Requirements:

FIRE PROTECTION

System: Fire Suppression Fire Detection Notification

Requirements:

Notes/Special Requirements:

Provide system per UFC 4-470-02 Chapter 3, "Fire Protection and Life Safety." Comply with stated and cross-referenced requirements for fire protection, life safety, and mass notification systems.

OTHER COMMENTS

Notes/Special Requirements:

File details come from the government source that posted it. Updated .