APPENDIX A - Am 0002.pdf
PDF 534 KB Posted
- Attached to
- ADAL Fitness Center Schriever AFB, CO
- Solicitation number
- W9128F22R0053
About this file
This document includes a room data sheet and details for a federal contract opportunity. The U.S. Army Corps of Engineers is soliciting proposals for a single-phase design-build project to construct an ADAL Fitness Center at Schriever Air Force Base in Colorado. The solicitation will close on May 12, 2022. This is an 8(a) small business set-aside. The magnitude of construction costs is estimated between $25-100 million. The room data sheet provides requirements for various rooms including finishes, HVAC, plumbing, electrical, telecommunications, audio/visual, security, fire protection, and other specifications. Interested contractors must register in the System for Award Management and have the applicable NAICS code included in their profile to be eligible to respond prior to the proposal submission deadline.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM DATA SHEET - TYPE I
BUILDING: ADAL Fitness Center
Room Number: 110 ,137 ,153 ,211
Room Name: Electrical Occupancy Per Area: See plan
Allocated Area: See plans
ARCHITECTURAL
Finishes:
Floor: Concrete Walls: Primed Gypsum Wallboard or Concrete Panels
Base: 4" Resilient Ceiling Height:
Ceiling: Exposed Structure Windows:
Doors: Room 153 - Exterior Hollow metal door and frame. Interior doors - Wood door and Hollow metal frame with Kick-plates on all doors
Millwork/ Casework:
Notes/Special Requirements:
INTERIORS
Workstation/Desks: See plan
Storage Requirements:
Notes/Special Requirements:
HVAC
Heating:
Required
Air Conditioning:
Required when not ventilated.
Ventilation:
Required
Heating Temperature: 55 °F Cooling Temperature:
Room Pressure: Air Changes: - Exhaust: Required
Notes/Special Requirements:
Provide independent HVAC zone and associated thermostat.
PLUMBING
Fixtures:
Notes/Special Requirements: Provide floor drain when air conditioned and cooling coil is within room.
ELECTRICAL
Power: Provide one receptacle for maintenance.
Lighting:
Notes/Special Requirements:
TELECOMMUNICATIONS
Telephone: Required LAN: Required IPTV: Not Required
Notes/Special Requirements:
Data: Provide data cable(s)/outlet(s) for any electrical networked equipment.
Telephone: Provide 1 NIPR Voice cable/outlet within space.
IPTV: None required.
WiFi: Provide WiFi coverage for the entire space.
AUDIO/VISUAL & SECURITY
Equipment: Refer to specification 01 86 29 for audiovisual and security CLIN requirements.
Notes/Special Requirements:
Public Address(PA): Provide speaker coverage for the entire space.
Audio/Visual: None required.
CCTV: None required.
ACS: Provide infrastructure/rough-ins for all doors to be monitored by the access control system (ACS). Emer-gency Call/Alarm: None required.
ACOUSTICAL
Perimeter STC:
Notes/Special Requirements:
EQUIPMENT
Equipment (GFGI) Equipment (CFCI):
Other:
Notes/Special Requirements:
FIRE PROTECTION
System: Fire Suppression Fire Detection Notification
Requirements: Wet-pipe sprinkler system Combined fire alarm/mass notification system
Notes/Special Requirements:
Provide system per UFC 4-470-02 Chapter 3, "Fire Protection and Life Safety." Comply with stated and cross-referenced requirements for fire protection, life safety, and mass notification systems.
OTHER COMMENTS
Notes/Special Requirements:
ROOM DATA SHEET - TYPE EE
BUILDING: ADAL Fitness Center
Room Number: 107
Room Name: Existing Mechanical Room to Remain unless noted otherwise Occupancy Per Area: See plan
Allocated Area: See plans
ARCHITECTURAL
Finishes:
Floor: Walls:
Base: Ceiling Height:
Ceiling: Windows:
Doors:
Millwork/ Casework:
Notes/Special Requirements:
INTERIORS
Workstation/Desks:
Storage Requirements:
Notes/Special Requirements:
HVAC
Heating: Required Air Conditioning: Not Required Ventilation: Required Heating Temperature: 55 °F Cooling Temperature:
Room Pressure: Air Changes: - Exhaust: Required
Notes/Special Requirements: Provide new ventilation and heating system/equipment for room. Provide independent HVAC zone and associated thermostat.
PLUMBING
Fixtures: Provide floor drains and sinks for new equipment layout. Provide interior and exterior hose bibbs.
Notes/Special Requirements:
ELECTRICAL
Power:
Lighting:
Notes/Special Requirements:
TELECOMMUNICATIONS
Telephone: Required LAN: Required IPTV: Not Required
Notes/Special Requirements:
Data: Provide NIPR Data cables/outlets for any mechanical networked equipment.
Telephone: Provide 1 NIPR Voice cable/outlet within space.
IPTV: None required.
WiFi: Provide WiFi coverage for the entire space.
AUDIO/VISUAL & SECURITY
Equipment: Refer to specification 01 86 29 for audiovisual and security CLIN requirements.
Notes/Special Requirements:
Public Address(PA): Provide speaker coverage for the entire space.
Audio/Visual: None required.
CCTV: None required.
ACS: Provide infrastructure/rough-ins for all exterior doors to be monitored by the access control system (ACS).
Emergency Call/Alarm: None required.
ACOUSTICAL
Perimeter STC:
Notes/Special Requirements:
EQUIPMENT
Equipment (GFGI) Equipment (CFCI):
Other:
Notes/Special Requirements:
FIRE PROTECTION
System: Fire Suppression Fire Detection Notification
Requirements:
Notes/Special Requirements:
Provide system per UFC 4-470-02 Chapter 3, "Fire Protection and Life Safety." Comply with stated and cross-referenced requirements for fire protection, life safety, and mass notification systems.
OTHER COMMENTS
Notes/Special Requirements:
File details come from the government source that posted it. Updated .