This federal solicitation requests proposals for a single-phase design-build project for an ADAL Fitness Center located at Schriever Air Force Base in Colorado. Key details include that the solicitation will close on May 12, 2022. This opportunity is open only to 8(a) small businesses. The magnitude of construction costs is estimated between $25-100 million. The solicitation documents will be posted to SAM.gov. Questions must be submitted via the Bidder Inquiry system at ProjNet by the specified due date. The contracting agency is the Department of the Army Corps of Engineers Omaha District.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
{ADAL Fitness Center, Schriever AFB, CO} {GLEN 04-3013}
SECTION 01 86 29
COMMUNICATIONS REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
Publications, codes, specifications and standards shall be used as the basis for the project design and shall include, but not be limited to the following. Publications and codes that imply recommendations shall be taken to be mandatory. Where there are conflicting criteria, the requirements of this RFP take precedence.
The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
U.S. AIR FORCE (USAF)
AF 91-501 Air Force Consolidated Occupational Safety Standard
AFGM 2017-32-01 Air Force Guidance Memorandum, Civil Engineer Control Systems Cybersecurity
AFI 10-2501 Air Force Emergency Management Program Planning and Operations
AFI 16-1404 Air Force Information Security Program
AFI 16-1406 Air Force Industrial Security Program
AFI 31-101_IC2 Integrated Defense
AFI 32-1065 Grounding Systems
AFI 33-210 Certification and Accreditation (C&A) Program
AFI 64-101 Cable Television on Air Force Bases
AFMAN 32-1084 Facility Requirements
AFMAN 33-221 Communications Security: Protected Distribution Systems (PDS)
ETL 01-18 Fire Protection Engineering - Electronic Equipment Installations
ETL 02-12 Communications and Information System Criteria for Air Force Facilities
SECTION 01 86 29 Page 1
ETL 11-10 Electrical Manhole Design Consideration
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 318M Building Code Requirements for Structural Concrete (ACI 318M-14) and Commentary (ACI
318RM-14)
AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL (ASTM)
ASTM B1 Standard Specification for Hard-Drawn Copper Wire
ASTM B8 Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM C139 Standard Specification for Concrete Masonry Units for Construction of Catch Basins and Manholes
ASTM C309 Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C478 Standard Specification for Precast Reinforced Concrete Manhole Sections
ASTM C857 Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures
ASTM C990 Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM D709 Laminated Thermosetting Materials
ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM F512 Smooth-Wall Poly (Vinyl Chloride) (PVC) Conduit and Fittings for Underground Installation
ASTM F2160 Standard Specification for Solid Wall High Density Polyethylene (HDPE) Conduit Based on Controlled Outside Diameter (OD)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
SECTION 01 86 29 Page 2
SCHRIEVER AIR FORCE BASE CRITERIA
IFS (Oct 2019) Schriever AFB Installation Facilities Standards
SAFBI17-201 (5 Apr 2021) Schriever Air Force Base Instruction 17-201 - C4 Systems Configuration Management
SAFB Design Guide (May 2021) Schriever AFB Installation Design Guide
BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL (BICSI)
TDMM (2020) Telecommunications Distribution Methods Manual, 14th Edition, Volumes I &
II
U.S. DEPARTMENT OF DEFENSE (DOD)
DoDi 8500.01 Cybersecurity
DoDi 8510.01 Risk Management Framework (RMF) for DoD Information Technology (IT)
DODM 5200.01-V1 (Volume 1) DoD Information Security Program: Overview, Classification, and Declassification
DODM 5200.01-V2 (Volume 2) DoD Information Security Program: Marking of Classified Information
DODM 5200.01-V3 (Volume 3) DoD Information Security Program: Protection of Classified Information
DoD Manual 5200.1-R Information Security Program
FED-STD 795 Uniform Federal Accessibility Standards
MIL-HDBK 232 (1987; Rev A; Notice 1 1988; Notice 2 2000; Notice 3 2014) Red/Black Engineering
- Installation Guidelines
MIL-HDBK-411B Power and the Environment for Sensitive DOD Electronic Equipment
MIL-HDBK-419 Grounding, Bonding, and Shielding for Electronic Equipments and Facilities Volumes 1 of 2 Basic Theory
MIL-STD-188-124 (1998; Rev B; Notice 2 1998; Notice 3 2000; Notice 4 2013) Grounding, Bonding and Shielding for Common Long Haul/Tactical Communications Systems, Including Ground Based Communications - Electronics Facilities and Equipments
UFC 1-200-01 (2019; Change 1, 2020) DoD Building Code
SECTION 01 86 29 Page 3
UFC 1-200-02 (2020) High Performance and Sustainable Building Requirements
UFC 3-501-01 (2015; Change 1, 2019) Electrical Engineering
UFC 3-520-01 (2015; Change 1, 2019) Interior Electrical Systems
UFC 3-520-05 (2015; Change 2, 2020) Stationary and Mission Batteries
UFC 3-540-01 (2014; Change 2, 2019) Engine-Driven Generator Systems for Prime and Standby Power Applications
UFC 3-550-01 (2016; Change 3, 2019) Exterior Electrical Power Distribution
UFC 3-560-01 (2017; Change 2, 2019) Electrical Safety, O&M
UFC 3-575-01 (2012) Lightning and Static Electricity Protection Systems
UFC 3-580-01 (2016; Change 1, 2016) Telecommunications Interior Infrastructure Planning and Design
UFC 3-600-01 (2016; Change 6, 2021) Fire Protection Engineering for Facilities
UFC 4-010-06 (2016; Change 1, 2017) Cybersecurity of Facility-Related Control Systems
UFC 4-021-01 (2008; Change 1, 2010) Design and O&M:
Mass Notification Systems
UFC 4-021-02 (2013; Change 1, 2019) Electronic Security Systems
UFC 4-740-02 (2019; Change 1, 2019) Fitness Centers
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
EIA/CIA-310-E Cabinets, Racks, Panels, and Associated Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 1100 Recommended Practice for Powering and Grounding Electronic Equipment - IEEE
SECTION 01 86 29 Page 4
Emerald Book
IEEE C2 National Electrical Safety Code
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ICEA S-87-640 Optical Fiber Outside Plant Communications Cable; 6th Edition
ICEA S-98-688 Broadband Twisted Pair Telecommunication Cable, Aircore, Polyolefin Insulated, Copper Conductors Technical Requirements
ICEA S-99-689 Broadband Twisted Pair Telecommunication Cable Filled, Polyolefin Insulated, Copper Conductors Technical Requirements
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 (2017) Architectural Barriers Act (ABA) Accessibility Guidelines
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C62.61 Gas Tube Surge Arresters on Wire Line Telephone Circuits
ANSI C80.1 American National Standard for Electrical Rigid Steel Conduit (ERSC)
ANSI C80.3 American National Standard for Electrical Metallic Tubing (EMT)
ANSI/BICSI N1-2019 Installation Practices for Telecommunications and ICT Cabling and Related Cabling Infrastructure
ANSI/NEMA OS 1 Sheet-Steel Outlet Boxes, Device Boxes, Covers, and Box Supports
ANSI/NEMA OS 2 Nonmetallic Outlet Boxes, Device Boxes, Covers, and Box Supports
ANSI/NEMA WC 66 Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs
NEMA FB 1 Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable
NEMA TC 2 Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NEMA TC 3 Standard for Polyvinyl Chloride (PVC)
SECTION 01 86 29 Page 5
Fittings for Use With Rigid PVC Conduit and Tubing
NEMA TC 6 & 8 Standard for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installations
NEMA TC 9 Standard for Fittings for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installation
NEMA VE 1 Standard for Metal Cable Tray Systems
NEMA VE 2 Cable Tray Installation Guidelines
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020) National Electrical Code
NFPA 75 Standard for the Protection of Information Technology Equipment
NFPA 780 Standard for the Installation of Lightning Protection Systems
NATIONAL SECURITY TELECOMMUNICATIONS AND INFORMATION SYSTEMS
SECURITY (NSTISS)
CNSSAM TEMPEST/1-13 RED/BLACK Installation Guidance
CNSSI 7003 Protected Distribution Systems (PDS)
NSTISSAM TEMPEST/2-95 RED/BLACK Installation Guidance
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
OSHA CFR 29 Part 1910.268 Telecommunications
SOCIETY OF CABLE TELECOMMUNICATIONS ENGINEERS (SCTE)
ANSI/SCTE 77 Specification for Underground Enclosure Integrity
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA/EIA-455-C General requirements for standard test procedures for optical fibers, cables, transducers, sensors, connecting and terminating devices, and other fiber optic components
TIA-455-46A FOTP-46 Spectral Attenuation Measurement for Long-Length, Graded-Index Optical Fibers
TIA-455-78-C FOTP-78 Optical Fibres - Part 1-40:
Measurement Methods and Test Procedures - Attenuation
SECTION 01 86 29 Page 6
TIA-455-107-A FOTP-107 Determination of Component Reflectance or Link/System Return Loss using a Loss Test Set
TIA-472D000 Sectional Specification (Adopted ANSI/ICEA S-87-640-2006) Standard for Optical Fiber Outside Plant Communications Cable
TIA/EIA-492AAAA-B Detail Specification for 62.5-µm Core Diameter/125-µm Cladding Diameter Class Ia Graded-Index Multimode Optical Fibers
TIA/EIA-492-CAAA Detail Specification for Class IVa Dispersion-Unshifted Single-Mode Optical Fibers
TIA-526-7-A Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant, Adoption of IEC 61280-4-2 Edition 2:
Fibre-Optic Communications Subsystem Test Procedures - Part 4-2: Installed Cable Plant - Single-Mode Attenuation and Optical Return Loss Measurement
TIA-526-14-C Optical Power Loss Measurement of Installed Multimode Fiber Cable Plant;
Modification of IEC 61280-4-1 edition 2, Fiber-Optic Communications Subsystem Test Procedures- Part 4-1: Installed Cable Plant-Multimode Attenuation Measurement
TIA-568.0-E Generic Telecommunications Cabling for Customer Premises
TIA-568.2-D Balanced Twisted-Pair Telecommunications Cabling and Components Standards
TIA-568.1-E Commercial Building Telecommunications Infrastructure Standard
TIA-568.3-D Optical Fiber Cabling and Components Standard
TIA-568.4-D Broadband Coaxial Cabling and Components Standard
TIA-569-E Telecommunications Pathways and Spaces
TIA-570-D Residential Telecommunications Infrastructure Standard
TIA-590-A Standard for Physical Location and Protection of Below Ground Fiber Optic Cable Plant
TIA-598-D Optical Fiber Cable Color Coding
TIA-606-C Administration Standard for the Telecommunications Infrastructure
SECTION 01 86 29 Page 7
TIA-607-D Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
TIA-758-B Customer-Owned Outside Plant Telecommunications Infrastructure Standard
TIA-1152-A Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling
UNDERWRITERS LABORATORIES (UL)
UL 5 Surface Metal Raceways and Fittings
UL 5A Nonmetallic Surface Raceways and Fittings
UL 5B Standard for Strut-Type Channel Raceways and Fittings
UL 5C Standard for Surface Raceways and Fittings for Use with Data, Signal, and Control Circuits
UL 6 Electrical Rigid Metal Conduit-Steel
UL 83 Thermoplastic-Insulated Wires and Cables
UL 444 Communications Cables
UL 497 Protectors for Paired-Conductor Communication Circuits
UL 497A Secondary Protectors for Communication Circuits
UL 497B Standard for Protectors for Data Communications and Fire-Alarm Circuits
UL 497C Standard for Protectors for Coaxial Communications Circuits
UL 510 Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
UL 514A Metallic Outlet Boxes
UL 514B Conduit, Tubing and Cable Fittings
UL 514C Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers
UL 514D Cover Plates for Flush-Mounted Wiring Devices
UL 651 Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings
SECTION 01 86 29 Page 8
UL 651A Type EB and A Rigid PVC Conduit and HDPE Conduit
UL 797 Electric Metallic Tubing - Steel
UL 870 Standard for Wireways, Auxiliary Gutters, and Associated Fittings
UL 884 Standard for Underfloor Raceways and Fittings
UL 969 Standard for Marking and Labeling Systems
UL 1242 Standard for Electrical Intermediate Metal Conduit - Steel
UL 1655 Standard for Community-Antenna Television Cables
UL 1660 Liquid-Tight Flexible Nonmetallic Conduit
UL 1666 Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts
UL 1681 Standard for Wiring Device Configurations
UL 2017 General-Purpose Signaling Devices and Systems
UL 2239 Hardware for the Support of Conduit, Tubing, and Cable
UL 2416 Standard for Audio/Video, Information and Communication Technology Equipment Cabinet, Enclosure and Rack Systems
UL 2556 Safety Wire and Cable Test Methods
1.2 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568.2-D, TIA-568.3-D, TIA-606-C, and IEEE 100 and herein.
1.3 Coordination of Communications Criteria
All communications criteria provided in this section shall be coordinated with all other sections of the RFP. The locations of all equipment indicated in the communications requirements are approximate. Contractor shall coordinate the final number/locations of all equipment with the Contracting Officer. Contractor shall meet the requirements of the Architectural Barriers Act (ABA) Accessibility Guidelines, 36 CFR 1191, and Uniform Federal Accessibility Standards (UFAS) requirements.
1.4 Designer and Installer Requirements
All voice and data communications design shall be performed by a BICSI Registered Communications Distribution Designer (RCDD). The communications
SECTION 01 86 29 Page 9 media (Telephone cables, LAN cables, and fiber optic cables) shall be installed by BICSI certified technicians and installers. The structured cabling system shall be certified by the manufacturer with the longest warranty available.
The installers assigned to the installation of the telecommunications system or any of its components shall be regularly and professionally engaged in the business of the application, installation, and testing of the specified telecommunications systems and equipment. Key personnel;
i.e., supervisors and lead installers assigned to the installation of this system or any of its components shall be BICSI Registered Cabling Installers.
Submit documentation of current BICSI certification for each of the key personnel.
1.5 Scope and Standards
All work shall meet or exceed Schriever AFB Standards:
1. Schriever AFB Instruction 17-201 (SAFBI17-201)-April 5, 2021
2. Schriever AFB Installation Facility Standards (IFS)-October 23, 2019
3. Schriever AFB Installation Design Guide (SAFB Design Guide)-May 2021
All work shall meet or exceed the requirements of UFC 4-740-02.
Building telecommunications cabling systems (BCS) shall conform to applicable criteria. This project includes inside plant telecommunications scope for the new Fitness Center addition and renovation.
The building telecommunication cable system within the new facility addition shall be served from Telecom 210 and the renovated existing facility shall be served from the Elec/Comm 119.
Design and construction shall meet or exceed the requirements set forth in the following standards, as applicable.
This project includes protecting the existing telecommunication services into the building. The telecommunication services enter Elec/Comm 119 from the south. The project must also protect existing telecommunication cable between the Elec/Comm 119 and the current Indoor Running Track (IRT) building. The cable routes from Comm 119 to the northwest corner of the IRT building before entering. This cable supports the existing security cameras and equipment within the IRT and must remain operational until the IRT building is demolished, and at this point the existing cable shall be removed. The existing telecommunication service to Building 122 shall be protected until Building 122 can be demolished. The contractor shall notify 50th SCS prior to demolition of the IRT or Building 122, to coordinate telecommunication equipment removal. The existing telecommunication service to Building T135 shall be protected until Building T135 can be demolished.
The contractor shall notify 50th SCS prior to demolition of the Building T135, to coordinate telecommunication equipment removal.
Design and construction shall follow all applicable U.S. Air Force criteria, including the following:
AFGM 2017-32-01, AF 91-501, AFGM 2017-32-01, AFI 10-2501, AFI 16-1404,
AFI 16-1406, AFI 31-101_IC2, AFI 32-1065, AFI 33-210, AFI 64-101,
AFMAN 32-1084, AFMAN 33-221, ETL 01-18, and ETL 11-10. References to ETL 11-1 are superseded by AFGM 2017-32-01. References to ETL 02-12 are superseded by UFC 3-580-01.
SECTION 01 86 29 Page 10
Design and construction shall follow all applicable American Concrete Institute criteria, including the following:
ACI 318M.
Design and construction shall follow all applicable American Society for Testing and Materials International criteria, including the following:
ASTM B1, ASTM B8, ASTM C139, ASTM C309, ASTM C478, ASTM C857, ASTM C990,
ASTM D709, ASTM D1557, ASTM F512, and ASTM F2160.
Design and construction shall follow all applicable U.S. Army Corps of Engineers criteria, including the following:
EM 385-1-1.
Design and construction shall follow all applicable Schriever Air Force Base criteria, including the following:
SAFBI17-201, SAFB Design Guide, and SAFB IFS
Design and construction shall follow all applicable Building Industry Consulting Service International criteria, including the following:
ANSI/BICSI N1-2019 and TDMM.
Design and construction shall follow all applicable U.S. Department of Defense criteria, including the following:
DoDi 8500.01, DoDi 8510.01, DODM 5200.01-V1, DODM 5200.01-V2, DODM 5200.01-V3, DoD Manual 5200.1-R, FED-STD 795, MIL-HDBK 232, MIL-HDBK-411B, MIL-HDBK-419, MIL-STD-188-124, UFC 1-200-01, UFC 1-200-02, UFC 3-501-01, UFC 3-520-01, UFC 3-520-05, UFC 3-540-01, UFC 3-550-01, UFC 3-560-01, UFC 3-575-01, UFC 3-580-01, UFC 3-600-01, UFC 4-010-06, UFC 4-021-01, UFC 4-021-02, and UFC 4-740-02.
Design and construction shall follow all applicable Electronic Industries Alliance criteria, including the following:
EIA/CIA-310-E
Design and construction shall follow all applicable Institute of Electrical and Electronics Engineer criteria, including the following:
IEEE 81, IEEE 100, IEEE 1100, and IEEE C2.
Design and construction shall follow all applicable Insulated Cable Engineers Association criteria, including the following:
ICEA S-87-640, ICEA S-98-688, and ICEA S-99-689.
Design and construction shall follow all applicable International Code Council criteria, including the following:
ICC IBC.
Design and construction shall follow all applicable U.S. National Archives and Records Administration criteria, including the following:
SECTION 01 86 29 Page 11
36 CFR 1191
Design and construction shall follow all applicable National Electrical Manufacturers Association criteria, including the following:
ANSI C80.1, ANSI C80.3, ANSI/NEMA OS 1, ANSI/NEMA OS 2, ANSI/NEMA WC 66,
NEMA FB 1, NEMA TC 2, NEMA TC 3, NEMA TC 6 & 8, NEMA TC 9, NEMA VE 1, and
NEMA VE 2.
Design and construction shall follow all applicable National Fire Protection Association criteria, including the following:
NFPA 70, NFPA 75, and NFPA 780.
Design and construction shall follow all applicable National Security Telecommunications and Information Systems Security criteria, including the following:
CNSSI 7003 and CNSSAM TEMPEST/1-13. Where references to NSTISSAM TEMPEST/2-95 exist, these requirements are superseded by
CNSSAM TEMPEST/1-13.
Design and construction shall follow all applicable Occupational Safety and Health Administration criteria, including the following:
OSHA CFR 29 Part 1910.268.
Design and construction shall follow all applicable Society of Cable Telecommunications Engineers criteria, including the following:
ANSI/SCTE 77.
Design and construction shall follow all applicable Telecommunications Industry Association criteria, including the following:
TIA/EIA-455-C, TIA-455-46A, TIA-455-78-C, TIA-455-107-A, TIA-472D000,
TIA/EIA-492AAAA-B, TIA/EIA-492-CAAA, TIA-526-14-C, TIA-568.2-D, TIA-568.3-D,
TIA-568.4-D, TIA-568.0-E, TIA-568.1-E, TIA-568.3-D, TIA-569-E, TIA-570-D,
TIA-590-A, TIA-598-D, TIA-606-C, TIA-607-D, TIA-758-B, and TIA-1152-A.
Design and construction shall follow all applicable Underwriters Laboratories criteria, including the following:
UL 5, UL 5A, UL 5B, UL 5C, UL 6, UL 83, UL 444, UL 497, UL 497A, UL 497B,
UL 497C, UL 510, UL 514A, UL 514B, UL 514C, UL 514D, UL 651, UL 651A, UL 797,
UL 870, UL 884, UL 969, UL 1242, UL 1655, UL 1660, UL 1666, UL 1681, UL 2017,
UL 2239, UL 2416, and UL 2556.
Design and construction shall follow all applicable U.S. Green Building Council criteria, including the following:
In addition to this specification, refer to the Room Data Sheets for requirements specific to individual spaces and space types.
All equipment shall be rated for an elevation of 6200 feet above sea level or derated for such elevation.
"Level I" provisions shall be provided with regard to CNSSAM TEMPEST/1-13.
SECTION 01 86 29 Page 12
A survey of existing conditions, including location of underground utilities shall be provided, and incorporated prior to submitting the 100% design.
Contractor shall repair any cuts made to existing road, sidewalk, and parking lot surfaces that are to remain in place after construction.
Repair shall match existing road, sidewalk, and parking lot cross section, respectively.
Except as explicitly indicated, wireless and plug-and-play controls shall not be used.
Poles, masts, and support stands shall be rated for minimum 110 MPH winds.
The facility threat level shall be considered to be "Moderate".
Note: References to "B###" indicate "Building ###".
1.6 INTERIOR BUILDING REQUIREMENTS
Comply with requirements of this specification, IFS, UFC 3-580-01, and ETL 02-12. The hierarchy for BCS shall be as listed in the previous sentence, with the first standard given the highest priority.
1.6.1 Interior Communications Cabling Systems
An acceptable BCS encompasses, but is not limited to, copper and fiber optic (FO) entrance cable, termination equipment, copper and fiber backbone cable, copper and fiber horizontal distribution cable, workstation outlets and lockable outlet enclosures, racks, cabinets, cable management, patch panels, cable tray, cable ladder, conduits, grounding, and labeling.
The design shall form a complete voice and data communications system, including, but not limited to: wires, terminations, raceway, cable tray, cabinets/racks, outlets, etc. All wiring shall be tested; sample testing shall not be permitted. Design and installation shall be provided by BICSI (Building Industry Consulting Services International) certified personnel.
Proof of certification must be provided. The installed structured cable system shall be certified by the manufacturer and installer to perform at EIA/TIA standards for Category 6 performance for a period of not less than 15 years. The contractor shall provide the required warranty to support the system certification. An RCDD shall be on site at all times during the installation.
All termination equipment, devices, and cabling shall be category 6 and/or fiber, shielded as required.
A record of all communication wiring installed by this contract shall be provided in a Windows based cable management software along with a hard copy of the printout. A licensed copy of the cable management software shall be provided. Labeling shall be done per the requirements below.
Coordination with 50th SW Cyber Security Offices shall be performed to ensure compliance with Cybersecurity Guidance for ICS Procurements and Upgrades.
SECTION 01 86 29 Page 13
1.6.2 Testing
Design, install, label, and test all telecommunications systems in accordance with the requirements of this specification, SAFBI17-201, SAFB Design Guide,UFC 3-580-01, ETL 02-12, ANSI/TIA/EIA 568, 569, and 606 standards, and Building Industry Consulting Services International (BICSI) standards. A BICSI Registered Communications Distribution Designer (RCDD) with at least 2 yrs related experience shall develop and stamp telecommunications design, and prepare the test plan.
1.6.3 End to End Test
Perform a comprehensive end to end test of all circuits to include all copper and fiber optic cables upon completion of the BCS and prior to acceptance of the facility. Provide adequate advanced notification to the COR to allow COR and Installation personnel attendance. The BCS circuits include but are not limited to all termination equipment, copper and fiber backbone cable, copper horizontal distribution cable, and workstation outlets. Test in accordance with ANSI/EIA/TIA 568 standards. Use test instrumentation that meets or exceeds the standard. Submit the official test report to include test procedures, parameters tested, values, discrepancies, and corrective actions in electronic format. Test and accomplish all necessary corrective actions to ensure that the government receives a fully-operational, standards-based, code-compliant telecommunications system.
1.6.4 Cable Types
This facility shall be pre-wired for voice and datacommunication systems.
Horizontal cabling shall be Category-6 unshielded twisted pair (UTP) copper cable. All cables shall be Plenum rated. All cables shall be new and meet or exceed the fire prevention requirements of NFPA 70, NFPA 75, and NFPA 780 as applicable to telecommunication wire and cable. All cables shall have a minimum of 25 feet of slack.
1.6.5 Riser/Backbone Cable
For data, minimum 12-strand SMFO and 25 pair Copper Cat5 backbone cables shall also be routed from the existing Elec/Comm 119 to the new Telecom Room 210. All fiber optic cables shall be installed in innerduct. All fiber optic cables terminate in rack-mount patch panels. All single-mode fiber cables shall be OS2 rated, 9-micron and meet the specifications of TIA-568.3-D. Fiber Optic cables shall utilize non-mechanical LC style connectors.
All backbone cabling shall be routed in conduit when traveling between telecom rooms. Provide (2) 4" conduit between the telecom rooms.
Reference SAFBI17-201, SAFB Base Design Guide, and UFC 3-580-01 for additional riser/backbone cable and sizing requirements.
1.6.6 Networks
The networks within this facility are as follows (network: jack/jacket color, cable type):
(a) Classification: UNCLASSIFIED Unclass Data: Black, Cat 6 UTP.
SECTION 01 86 29 Page 14
Security Camera: Black, Cat 6 UTP.
(b) Classification: FOUO.
NIPR Data: Blue, Cat6 UTP.
NIPR Voice: Blue, Cat6 UTP.
The contractor shall confirm the network types, cable types, jack/jacket colors, and any special keying (including those whose properties are identified above) and/or identify the requirements for "Unidentified" characteristics of the above networks with 50th SW and the Fitness Center.
Some networks may utilize a "thin client" architecture where servers are located in the telecommunications rooms, while other networks utilize traditional desktop workstation processing with switches and patch panels in the telecommunications rooms. Contractor shall coordinate with Schriever to identify which networks utilize "thin client" architecture. The telecommunications rooms in the bridging documents have been sized assuming all networks utilize workstation processing and switches/patch panels in the telecommunications rooms. "Thin client" systems will likely require additional rack/cabinet space, which will require additional telecommunications room space than the sizes identified in the bridging documents.
Communications distribution systems (conduit, cable tray, outlet boxes) and racks/cabinets may be shared within the same network classification.
1.6.7 Telephone/Data Cables
Copper cables for voice and data serving administrative areas shall be 24 AWG, 4 pair, TIA-568.2-D Category-6, unshielded twisted pair (UTP), plenum rated, solid copper station cable. Fiber cables for data connections to racks from source(s) shall be SMFO and shall be terminated in accordance with TIA-568.3-D. Fiber optic cabling shall have no metallic members. All cables including patch cords shall be tested meeting TIA-1152-A, for Category 6 performance. Extrapolation from a lower frequency is not allowed. The installation acceptance test shall be a "channel test" and includes all patch connections and cables. Testing shall be accomplished with a Cat 6, Level III compliant tester. One cable shall be dedicated to one jack. Daisy chaining is not be permitted.
1.6.8 Components
All passive components of the communications distribution system, such as patch panels, interconnection cabling, patch cords, wire manager, termination backboards, communication racks/cabinets, outlet boxes and raceway systems, jacks, and connectors shall be included. Provide one horizontal wire manager for each patch panel installed and minimum two vertical wire manager for each equipment cabinet installed.
The cabinets shall be provided with standard 19-inch rails. The equipment depth for all cabinets shall be assumed to be 42 inches to accommodate GFGI equipment. Use this depth to account for UFC 3-580-01 clearance requirements. Cabinets shall be minimum 30 inches wide and provided with cooling fans per UFC 3-580-01.
All networks of shall be provided with lockable cabinets.
All riser cabling and horizontal cabling in walls, modules, patch panels, conduit, and cable tray to complete this facility shall be Contractor
SECTION 01 86 29 Page 15 furnished and installed. The Contractor shall install all copper cable, fiber-optic cable, and the associated hardware from telecommunications rooms to the data/communications faceplates to meet the specifications found in ANSI TIA/568-D and as defined in this document. All cabling infrastructure shall be installed and terminated to Government-approved patch panels with strain relief bars. Copper patch panels shall have 110 style termination blocks on the rear of the patch panel. Provide enough patch panels for 25% spare capacity. All CAT6 patch panels shall be able to support 10 Gbps signaling. For audio visual cabling, all horizontal fiber-optic patch panels shall support LC connectors.
Active electronic components such as computers, hubs, routers, telephone instruments, and other electronic LAN and communications equipment will be provided by government unless otherwise stated.
1.7 Telecommunications Outlets (TO)
All administrative spaces within the building shall be provided with the number of outlets as indicated in the Room Data Sheets. Number of outlets identified in the Room Data Sheets are minimum quantities; provide one NIPR drop (one data, one voice) for each 48 square feet of net office space, and private offices shall be provided with minimum two (2) NIPR drops on opposite walls.
The standard telecommunications outlet for administration spaces consists of four 8-pin/8-position Cat6 modular USOC RJ-45 jacks mounted in a single faceplate (one jack for telephone and one for data use) co-located with 120-VAC, 60-Hz general-purpose electrical receptacles. Refer to Section 01 86 26 Electrical Requirements, UFC 3-580-01, SAFB Design Guide,and SAFBI17-201 for additional information.
Provide at least one spare port in each outlet unless otherwise indicated.
Wall phone drops shall be singular port/connector. For electrical, UPS, mechanical, and telecommunications rooms provide a single phone outlet located on the wall for phones that can be mounted on lugs. Mount wall phone TO at 48" above finished floor to outlet. Wire all telephone voice and data jacks from jack locations back to floor mounted voice and data racks in telecommunications room serving their area. Provide a wall phone TO in each entrance vestibule.
The TO shall be provided with a cover plate over the entire face plate.
Label all jacks on the face plate. Labeling shall include the network type. Provide device box and minimum 1" conduit from the box to the required location. The conduit shall terminate at the cable tray, telecommunications room, or rack/cabinet as appropriate. The end of the conduit shall be equipped with an insulated bushing.
Each wall mounted TO shall be mounted 18" above finished floor to the top of the box, unless indicated otherwise. TO outlets shall match electrical receptacle height. All telephone/data outlet locations shall be coordinated with the interior design package to include the furniture layout.
TOs shall be sized per UFC 3-580-01.
Maintain TEMPEST separation requirements per CNSSAM TEMPEST/1-13. All telecommunication outlet face plates shall match electrical outlet coloring.
Displays (such as monitors and projectors) need not meet TEMPEST separation requirements and may be shared via KVM switch across networks.
SECTION 01 86 29 Page 16
All voice and data cables shall be routed to the appropriate communications room.
All communications outlets located on STC 45 and 50 rated walls shall be surface mounted unless noted otherwise. All other outlets mounted on non-STC rated walls shall be flush mounted.
Data outlets shall be provided to accommodate GF/GI equipment such as copiers, fax machines, printers, etc. in locations identified on the Room Data Sheets. Separate printers shall be accounted for for each network;
printers shall not be shared between networks, even networks within the same classification. The Contractor shall coordinate with the user to determine which network the GF/GI equipment shall be connected to. The location of all outlets intended to serve GF/GI equipment such as copiers, fax machines, printers, etc. shall accommodate the minimum separation of 3-foot between connected equipment of different classifications per
CNSSAM TEMPEST/1-13.
Coordinate mounting heights and locations for all classification level workstation outlets with CTTA.
Final communications requirements shall be coordinated with Schriever.
Reference SAFBI17-201, SAFB Design Guide, and UFC 3-580-01 for additional requirements.
1.8 INTERIOR PATHWAYS AND SPACES
New pathways shall be designed, furnished, and installed in accordance with TIA-568.1-E, TIA-569-E, UFC 3-580-01, SAFB Design Guide and SAFBI17-201, and they shall be labeled in accordance with TIA-606-C, UFC 3-580-01, SAFB Design Guide, and SAFBI17-201. Where applicable, all information system spaces and pathways shall comply with the requirements of CNSSAM TEMPEST/1-13, CNSSI 7003, and MIL-HDBK 232. Unless otherwise specified, all information system pathways must be metallic and bonded to the SRGS. All pathways shall allow for the installation of cables without violating the minimum bend radius required by TIA-568.3-D. New pathways shall accommodate the size and quantity of cables to be used while not exceeding the maximum, 40-percent fill rate allowed by TIA-569-E and while allowing for a 50 percent size increase for future expansion. See UFC 3-580-01 for additional fill requirements. The stricter criteria shall govern. In the case of conduits or sealed ducts, additional empty pathways may be installed to satisfy this expansion requirement.
Cable runs and outlet location for modular furniture shall be coordinated with the requirements located in section 01 84 00 Interior Design Requirements.
Electrically bond all pathway sections (conduit and cable tray) together to provide a continuous metallic path in accordance with MIL-STD-188-124 and MIL-HDBK-419. Where applicable, all information system spaces and pathways shall comply with the requirements of CNSSAM TEMPEST/1-13, CNSSI 7003, MIL-HDBK 232, SAFBI17-201, SAFB Design Guide, and IFS.
Each different network class (Unclassified and FOUO) shall be provided with separate raceway (cable tray,conduit, wireway, etc.), including inside communications rooms and in distribution to and within systems furniture.
Additional separate raceway shall be provided within classes when identified.
SECTION 01 86 29 Page 17
All conduits located at STC 45 and 50 rated walls shall be surface mounted unless noted otherwise. All other non-STC rated walls shall have concealed conduits.
Cables routed through underground conduits (typically serving floor boxes) shall be wet rated. If the cables to be installed are not also plenum rated, the underground conduits shall be routed all the way to the telecom rooms and shall not utilize plenum-located cable tray; pull strings shall be provided for such applications in addition to cable media.
Reference SAFBI17-201, SAFB Design Guide, and UFC 3-580-01 for additional requirements.
1.8.1 Black (Unclassified/Confidential) Pathways
Black communications pathways are for cables that carry unclassified or classified data that has been encrypted. Use of the Black cable tray system for any non-communications system (e.g., access control, alarms, etc.) shall be coordinated with Schriever; requirements of Paragraphs "CCTV System" and "Card Reader Keyless Access Control System(s) (ACS)" stipulate these systems are to be provided with infrastructure independent of other networks. All fiber placed in cable pathways shall be protected inside a split, plenum rated inner duct tube.
Separate "Black" pathways shall be provided for "Unclassified" and "FOUO" networks and shall be identified appropriately at 10-foot intervals.
1.8.2 Cable Tray
All distribution of cable throughout the building shall be via conduit and cable tray. The cable tray shall be a welded wire type tray a minimum of 12" (w) x 4" (d). Cable tray within the communications rooms shall be ladder type. Cable tray that passes through mechanical spaces or that transitions between floors shall be totally enclosed type with removable covers.
Provide 12 inches of clearance above cable trays for future access.
Contractor must coordinate with other disciplines to insure clearances can be achieved.
All cable tray in communications rooms shall be ladder type. Cable tray for Unclassified/FOUO networks outside communications rooms shall be solid bottom when located below the ceiling or in exposed spaces; cable tray for Unclassified/FOUO networks outside communications rooms may be basket type when located above the ceiling. Size cable trays per UFC 3-580-01.
All cables shall be in minimum 1" conduit between the cable tray and outlet locations.
All cable trays shall be color coded to indicate classification: black for Unclassified/FOUO (to include classified data that has been encrypted).
Reference SAFBI17-201, SAFB Design Guide, and UFC 3-580-01 for additional requirements.
1.8.3 Labeling
Terminations shall be labeled and color-coded in accordance with
SECTION 01 86 29 Page 18
CNSSAM TEMPEST/1-13, ETL 02-12, UFC 3-580-01, SAFBI17-201, SAFB Design Guide, and TIA-606-C. All interior communication wiring systems shall have the cabling labeled with a unique alphanumeric number at beginning and end termination points of the cable. The alphanumeric number shall also be placed by the jack on the device plate.
1.8.4 Communication Terminal Backboard
Provide a 3/4" (19mm), 4 by 8 feet, grade AC, fire-rated plywood backboards placed on all walls in telecommunications rooms to be used for communications equipment. The plywood telephone backboard shall be painted with 2 coats of white fire retardant paint. The equipment layout in the telecommunications rooms shall be approved by Schriever AFB. Reference SAFBI17-201, SAFB Design Guide, and UFC 3-580-01 for additional requirements.
1.8.5 Equipment/Enclosure Cabinets
For rack-mounted installations in a telecommunications room/closet, provide 84"H x 30"W x 42"D cabinet racks with lockable/removable sides, lockable hinged front and back doors. Cabinets shall accommodate minimum 1500lbs of installed equipment and shall be equipped with integral fans. Standard 19" equipment rails.
(a) The enclosures shall be floor mounted.
(b) The cabinet shall have standard ANSI/EIA-310-C mounting holes having a full 45U on front and back of rails.
(c) The cabinet shall be steel with a black finish and utilize black grommets for unused cable openings. Each cabinet shall have vertical cable management. Retainers which can be hinged left or right and be located in any position along the channel. The cabinet shall have mounting holes and a ground lug for #6-gauge ground cable provided.
(d) The cabinet shall have 10 outlet (4 ft) power strip, lockable vented front door, lockable vented rear door, solid sides, tops and bottoms, equipment shelves (provide 3 per rack ), ventilation openings, ventilation fan at the top of the unit, and vertical and horizontal wire management and blank plates. Insulated bushings for present and future cabling shall be provided at the cable entry points.
(e) At a minimum, provide the quantity of cabinets that are indicated on the Room Data Sheets.
Reference SAFBI17-201, SAFB Design Guide, and UFC 3-580-01 for additional requirements.
1.8.6 Installation and Terminations
Terminate twisted pair cable in accordance with TIA-568.1-E, TIA-568.2-D and wiring configuration as specified. Terminate fiber optic cables in accordance with TIA-568.3-D.
(a) Cables shall be "home run" to the nearest TR hosting a given network and supported by conduit, cable tray, and ladder rack. The use of J-Hooks shall not be allowed.
SECTION 01 86 29 Page 19
(b) No horizontal copper cable length shall exceed 295 feet. Telecom rooms shall be appropriately spaced to accommodate this request. This is the maximum length identified in SAFBI17-201, SAFB Design Guide and UFC 3-580-01, for locations and quantities of telecom rooms and routing pathways.
(c) Install signal wire to projectors from the ceiling down the wall into a dedicated outlet for use by a computer and/or run into a cable tray and back to the telecommunications room.
(d) The wiring configuration shall be T568B.
(e) FOUO data drops at desktop locations will consist of one data, one phone, and two spare. The top and left outlet space shall be phone jacks, the top and right outlet shall be data jacks.
(f) Floor mounted communications and power boxes shall be the “in-use” type, allowing for the cover to be closed after a plug has been inserted.
(g) Power and Black communications shall be routed through separate raceways in the systems furniture, in accordance with CNSSAM TEMPEST/1-13 requirements. Power and communications shall be routed through the wall to systems furniture, where possible. If wall connections to power and communications are not possible, power and communications shall be routed through the power poles to the systems furniture.
(h) Networks of different classifications (Unclassified and FOUO) shall not share a common outlet box and shall be separated as required by
CNSSAM TEMPEST/1-13.
1.9 Certification
Any information system that is installed shall be RMF certified by the designated approving authority as determined by the installation.
All control systems must be planned, designed, acquired, and executed in accordance with DoDi 8500.01, DoDi 8510.01, AFGM 2017-32-01,and as required by individual Service Implementation Policy.
Cybersecurity shall be implemented in compliance with FISMA (Federal Information Security Modernization Act) and NIST (National Institute of Standards and Technology) Framework for Improving Critical Infrastructure Cybersecurity and associated NIST 800 series document in addition to UFC 4-010-06.
1.10 Telecommunications Rooms
1.10.1 TER
1.10.1.1 Telecommunications Room
Communication closet sizes must be no smaller than identified in UFC 3-580-01, SAFB Design Guide, and SAFBI17-201 unless written permission is obtained from Schriever AFB for a deviation.
SECTION 01 86 29 Page 20
1.11 Grounding and Bonding Conductors
1.11.1 Grounding and Bonding Conductors
Provide grounding and bonding conductors in accordance with TIA-607-D, IEEE C2, and NFPA 70. Solid bare copper wire meeting the requirements of ASTM B1 for sizes No. 8 AWG and smaller and stranded bare copper wire meeting the requirements of ASTM B8, for sizes No. 6 AWG and larger.
Insulated conductors shall have 600-volt, Type TW insulation meeting the requirements of UL 83.
1.12 Conduit
Provide conduit as specified in Section 01 86 26 ELECTRICAL REQUIREMENTS.
1.13 Audio/Visual and Video Teleconference Systems
Contract base bid shall provide full design and infrastructure only. System design shall be performed by a professional AV system designer. An itemized equipment list shall be provided for the AV system. Routing, equipment and device infrastructure (such as conduit, equipment racks and junction boxes, respectively), shall be considered part of the base bid. Contractor shall install the necessary conduit, electrical power and data wiring to support the installation of the AV system. All empty infrastructure shall be provided with pull strings/ropes.
The purchase and installation of equipment for a complete and fully functional AV system are part of the A/V O&M Bid option to the contract, including cabling and programming. Systems shall be provided in accordance to UFC 4-740-02. Contractor shall coordinate with Schriever AFB and Fitness Center for applicable AV system requirements.
Sound reinforcement shall be designed to provide even sound distribution.
Locations of AV ceiling devices shall be coordinated with other ceiling devices prior to installation.
Speech amplification shall be designed to provide adequate pickup of voices for all locations as indicated.
Sound system design shall include digital signal processing for performing equalization, controlling feedback and tuning the system.
The video system shall be designed so that images can be clearly viewed and are free from static or digital artifacts.
Displays shall be sized accordingly for the intended use (level of required detail) as well as take into account the distance and position of the audience members.
Projectors shall be specified according to appropriate brightness, contrast ratio and resolution based on the system conditions and the room requirements. Lens type shall be determined based on the throw distance and to provide adequate image fill of the screen.
Minimum video resolution for the design shall be at a minimum 4K60, 4096 x 2160.
Video input and output signals shall be HDMI or HDBaseT and support 4K60.
SECTION 01 86 29 Page 21
Video system shall be designed so that it is HDCP compliant.
Control system design shall include capability to operate the equipment within a designated system. Control functions shall include powering the system on/off, individual component control (including but not limited to control of screens, projectors, media players, tuners, etc.), source selection for system inputs, output content selection for displays and level control of audio components.
All control panels shall be 10.1" touch screens, with minimum resolution of 1080 x 800 pixels.
1.13.1 Conference Room Audio/Visual and VTC Systems
Conference/Classroom systems shall be designed to support video presentation and sound reinforcement.
The conference room video systems shall have one display. Each room shall be provided with a video switch capable of displaying selected source content to the display. Video source requirements shall be coordinated with the government during design, but shall at a minimum include a PC, HDMI at the wall and floor box, and tuner (for IPTV).
Audio reinforcement will be provided for playback of source content with room volume control.
One push button control panel shall be provided to allow for control.
Equipment shall be located in the telecom rack.
1.13.2 Fitness Area
The Fitness Area shall be designed to support video presentation and sound reinforcement.
The video system shall include flat-panel displays to support IPTV. Final quantity and location to be determined by the sports fitness center designer and the installation fitness program manager.
Audio reinforcement will be provided throughout the space for full coverage of Fitness Area. Audio source shall include a media player with tuner.
Control panel shall be provided to allow for control of audio and video source equipment, as well as room volume control at the control counter.
Equipment shall be located in the telecom rack.
1.13.3 Group Exercise
Group Exercise shall be designed to support video presentation, sound reinforcement, speech amplification.
The classroom video systems shall have up to three (3) flat-panel displays and be provided with a video distribution amp capable of displaying selected source content to all of the displays. Video source requirements shall be coordinated with the government during design, but shall at a minimum include a PC, HDMI at the wall and tuner (for CATV).
Audio reinforcement will be provided for playback of source content with
SECTION 01 86 29 Page 22 room volume control and speech amplification. Audio sources shall include a media player with tuner, bluetooth connection, audio input jack for phone/mp3 player and wireless over the ear microphone for speech amplification. Recessed ceiling speakers to be provided with 100-watt minimum output rating.
One (1) wall mounted control panel shall be provided to allow for control of audio and video source equipment, as well as room volume control of the system.
Equipment shall be located in the portable AV rack to be installed within the group exercise room.
1.13.4 Break Room
Break Room system shall be designed to support IPTV.
The video system shall have one (1) flat-panel display with IPTV connectivity.
1.13.5 Director's Office
Director's Office system shall be designed to support IPTV.
The video system shall have one (1) flat-panel display with IPTV connectivity.
1.13.6 Program Manager's Office
Program Manager's office system shall be designed to support IPTV.
The video system shall have one (1) flat-panel display with IPTV connectivity.
1.13.7 Locker Rooms
Locker rooms shall be designed to…