This document package includes government design drawings and a solicitation for a fitness center project at Schriever Air Force Base in Colorado. The Army Corps of Engineers is soliciting proposals for a single-phase design-build project with a construction cost estimate between $25-100 million. The solicitation will close on 12 May 2022 and is open only to 8(a) small businesses. The package includes first and second floor plans, a demolition plan, and a site utility plan. Offerors must register in the System for Award Management and include NAICS code 236220 in their profile. A mandatory site visit will be scheduled; inquiries must be submitted through ProjNet. The selected contractor will be responsible for designing and building the new ADAL Fitness Center in accordance with provided concept drawings and requirements stated in the solicitation.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

O

JE

C

T D

IR

EC

TO

R

Y:

SH

FI

LE

N

AM

E:

O M

AH

A

D

IS

TR

IC

T

ST

R

EE

T

AD

D R

ES

S

C

IT

Y, S

TA

TE

Z

IP

KE

N

N

ET

H H

AH

N

A R

C H

IT

EC

TS

S

5T

H S

T O

M

AH

A, N

E

C

JL

ER

V

M

TK

A

PR

W

F-

-R

-0

GOVERNMENT - PROVIDED CONCEPTUAL DESIGN DRAWINGS DO NOT RELIEVE

THE OFFEROR OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT

NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITIES CRITERIA

(UFC) AND ALL OTHER APPLICABLE CRITERIA.

AD

AL

F

IT

N

ES

S C

EN

TE

R (F

Y

FI

N

AL

R

TA

S

U

BM

IT

TA

L

- 2

JU

LY

SC

H

R

IE

VE

R

A

IR

F O

R C

E

BA

SE

, C

O

LO

R

AD

O

PR

O

JE

C

T N

O

PN

G

LE

N

4-

C-102

U

TI

LI

TY

P

LA

N

SITE UTILITY PLAN KEYNOTES:

1. CONSTRUCT HOT TAP CONNECTION WITH VALVE TO EXISTING 8"

WATER LINE.

2. CONSTRUCT 8" WATER MAIN.

3. CONSTRUCT WATER LINE. CONTRACTOR TO SIZE LINE TO MEET THE

FIRE PROTECTION WATER REQUIREMENTS OF UFC 3-230-01 AND UFC

3-600-01.

4. CONSTRUCT POST INDICATOR VALVE.

5. CONSTRUCT FIRE HYDRANT AND VALVE ASSEMBLY.

6. NOT USED.

7. CONNECT TO EXISTING WATER LINE.

8. CONSTRUCT STORM SEWER LINE.

9. CONSTRUCT STORM SEWER CURB INLET.

10. CONSTRUCT STORM SEWER AREA INLET.

11. CONSTRUCT STORM SEWER MANHOLE.

12. CONSTRUCT RIP-RAP.

13. CONSTRUCT SANITARY SEWER LINE.

14. CONSTRUCT SANITARY SEWER MANHOLE.

15. CONNECT TO EXISTING SANITARY SEWER MANHOLE. OPEN TRENCHING

ALLOWED FOR THIS WORK.

16. RELOCATED EXISTING TRANSFORMER ON NEW PAD WITH BOLLARDS.

17. TRANSFORMER AND PAD. COORDINATE WITH ELECTRICAL DOR FOR

CONTINUATION.

LEGEND:

RIP-RAP

C -1

U

TI

LI

TY

P

LA

N

AM

EN

D

M

EN

T

/2 6/

AM

EN

D

M

EN

T

/2 9/

A A

B B

C C

D D

E E

F

F

3 3

GOVERNMENT - PROVIDED CONCEPTUAL DESIGN DRAWINGS DO NOT RELIEVE

THE OFFEROR OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT

NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITIES CRITERIA

(UFC) AND ALL OTHER APPLICABLE CRITERIA.

ANY DIMENSIONAL CHANGES (GREATER THAN +/-6") TO THE PROPOSED

BUILDING FLOOR PLAN (TO INCLUDE WALLS, GLAZING, DOORS, ETC) MUST BE

IDENTIFIED TO, AND INDIVIDUALLY APPROVED BY THE GOVERNMENT.

DEMOLITION KEY NOTES

1 REMOVE AND SAVE SANDSTONE/CONCRETE PANELS AND

METAL BUILDING PANELS AT PORTION OF EXISTING BUILDING

TO BE COVERED WITH NEW BUILDING ADDITION. DISCUSS

DISPOSITION OF REMOVED MATERIALS WITH GOVERNMENT.

RETURN DESIRED ITEMS TO GOVERNMENT.

2 REMOVE QUARRY TILE FLOORING AND BASE IN THIS AREA.

3 REMOVE PORTIONS OF EXISTING PRECAST CONCRETE

BEARING WALLS IN THIS AREA AS REQUIRED TO

ACCOMMODATE NEW FLOOR PLAN LAYOUT SHOWN ON

NEW FLOOR PLAN SHEETS. PERFORM NON-DESTRUCTIVE

ELECTRONIC SCAN OF EXISTING WALL PANELS TO

DETERMINE EXISTING STEEL REINFORCING LOCATIONS PRIOR

TO SAWCUT/REMOVAL PROCESSES.

4 REMOVE GLASS WALL/DOOR/FRAME ASSEMBLY. REMOVE

STEEL TUBE/CHANNEL POSTS AND HEADER. REMOVE STUD

WALL SYSTEM ABOVE HEADER, FULL HEIGHT.

5 REMOVE METAL STUD/PLYWOOD MEZZANINE FLOOR SYSTEM

AT THIS 'X' AREA COMPLETE.

6 REMOVE CHILLER.

7 REMOVE WORKSTATIONS THIS ROOM.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-1

AD102

F

IR

S T

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

A D

A L F

IT

N

E S

S C

E N

T E

R

F Y

O M

A H

A D

IS

T

R

IC

T S

T R

E E

T A

D D

R E

S S

C

IT

Y S

T A

T E

Z

IP

K E

N N

E T

H H

A H

N A

R C

H

IT

E C

T S

S

T

H S

T O

M A

H A

N

E

D e s ig n e r

A u th o r

C h e c k e r

A

P R

W F

-2 -R

-0

S H

P R

O J E

C T

D

IR

E C

T O

R Y

F

IL

E N

A M

E

F

IN

A L

R T

A S

U B

M

IT

T A

L

J U

L Y

S C

H R

IE

V

E R

A

IR

F O

R C

E B

A S

E C

O L O

R A

D O

P R

O J E

C T

N O

G

L E

N

-3

S H

A

D .D

W G

3/32" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

ITEMS SHOWN BOLD OR

DASHED TO BE REMOVED

ITEMS SHOWN BOLD OR

DASHED TO BE REMOVED

N

0 4' 8' 16' 24'

A

B

KEY PLAN

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/2

/2

GOVERNMENT WILL PERFORM EQUIPMENT MOVES

FROM GYMNASIUM AND OTHER SPACES AS NEEDED

FOR THE CONTRACTOR TO PERFORM THE WORK OF

THIS CONTRACT. COORDINATION WILL NEED TO

OCCUR BETWEEN CONTRACTOR AND GOVERNMENT

RE: ADVANCE NOTICE OF WHEN EQUIPMENT MOVES

WILL BE NEEDED.

NOTE:

1 2 3 4 5

A A

B B

C C

D D

E E

F

F

GYMNASIUM

119A

STORAGE

ELECT./

COMM.

MECH.

FITNESS

ASSESSMENT

TESTING

OFFICE

STOR./

LAUNDRY

118A

TOILET

STOR.

LOBBY

CORR.

DV

MEN

VEST.

MEN

MEN

SHOWERS

MECH.

MEN

LOCKERS

DV

WOMEN

ELECT.

CORR.

JAN.

WOMEN

WOMEN

LOCKERS

WOMEN

SHOWERS

MECH.

STOR./

LAUNDRY

CORR.

A-200

1 / A-1021 / A-102

AHU-1

AHU-3

SERVICE

LIFT

P.

10 TYP.

10 TYP.

10 TYP.

10 TYP.

ACCESSIBLE

LOCKERS

ACCESSIBLE

LOCKERS

ACCESSIBLE

LOCKERS

W.

W.

D.

ICE

GOVERNMENT - PROVIDED CONCEPTUAL DESIGN DRAWINGS DO NOT RELIEVE

THE OFFEROR OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT

NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITIES CRITERIA

(UFC) AND ALL OTHER APPLICABLE CRITERIA.

ANY DIMENSIONAL CHANGES (GREATER THAN +/-6") TO THE PROPOSED

BUILDING FLOOR PLAN (TO INCLUDE WALLS, GLAZING, DOORS, ETC) MUST BE

IDENTIFIED TO, AND INDIVIDUALLY APPROVED BY THE GOVERNMENT.

ARCHITECTURAL KEY NOTES

1 ELEVATOR SHALL HAVE MIN. 4000 LB. CAPACITY WITH

MIN. 4'-0" W. x 8'-0" H. DOORS

2 WALL MONITOR BRACKET UNDER THIS CONTRACT;

MONITOR UNDER O&M BID OPTION

3 PROVIDE AUTOMATIC OPERATOR AT THIS PAIR OF DOORS

4 LOCKERS; SEE FFE PACKAGE

5 AED CABINET; AED UNDER FFE PACKAGE

6 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS

7 42" HIGH STEEL PIPE GUARDRAIL ANGLED INWARD

5 DEGREES (TOWARDS OPEN GYM/FITNESS AREA)

8 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE AND UPPER CABINETS

9 BANK TRACK CORNERS MAX. OF 1" PER FOOT

10 LOCKERS AND BENCH; SEE FFE PACKAGE.

11 EXISTING LOUVER TO REMAIN. COVER INSIDE FACE WITH

GALV. SHEET METAL COVER PLATE AND MIN. 2" THICK

POLYISOCYANURATE RIGID INSULATION. PAINT EXTERIOR

LOUVER TO MATCH EXISTING METAL WALL PANELS.

12 42" HIGH CAST IN PLACE CONCRETE OR CMU WALL

13 PROVIDE MAGNETIC HOLD-OPEN DEVICES ON THESE DOORS

TIED INTO FIRE ALARM SYSTEM.

14 VERTICAL 42" HIGH STEEL PIPE GUARDRAIL

15 OPENING FROM 4'-0" TO 9'-0" A.F.F.

16 7'-0" HIGH CAST IN PLACE CONCRETE OR CMU WALL

17 REUSED EXISTING TOE BARS; OBTAIN FROM GOVERNMENT

AND INSTALL ONTO EXISTING CONCRETE FLOOR SLAB

18 MOTORIZED ROLL-UP DIVIDER CURTAIN

19 RETRACTABLE BASKETBALL NET/GOAL ASSEMBLY

(MOTORIZED)

20 RETRACTABLE BLEACHER ASSEMBLIES (MOTORIZED)

21 VOLLEYBALL POST SLEEVES AND COVER PLATES

22 SCOREBOARD

23 LADDER TO ROOF HATCH

24 STEEL TRELLIS FEATURE

25 36" H. 2-PIPE RAILING

26 ALL-GLASS WALL AND DOOR ASSEMBLY

27 EXISTING BUILDING NUMBER SIGN TO REMAIN.

28 NEW DOOR/FRAME ASSEMBLY TO BE INSTALLED IN EXISTING

EXTERIOR WALL. SAWCUT AND REMOVE EXISTING

PRECAST CONCRETE PANEL/METAL WALL PANEL SYSTEM AS

REQUIRED FOR NEW DOOR/FRAME ASSEMBLY. PROVIDE

STRUCTURAL ACCOMMODATIONS TO RE-SUPPORT PRECAST

CONCRETE PANEL SYSTEM AS REQUIRED.

29 REMOVE EXISTING VISION GLAZING AT THIS WINDOW.

REPLACE WITH SPANDREL GLASS.

30 PROVIDE MULTI-SLIDE FIXED DROP DOWN LADDER UP TO

EXISTING ROOF HATCH ABOVE. LADDER SHALL EXTEND

FROM 9'-0" A.F.F. TO EXISTING ROOF HATCH

APPROX. 23'-0" A.F.F.

31 SOLID SURFACE GROOMING COUNTER WITH MIRROR ABOVE

32 EXISTING RELOCATED CUSTOM SHELVING SHOWN DASHED

IN THIS ROOM

33 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS AND 6 UNDER THE

COUNTER CUBBIES

34 SOLID SURFACE COUNTERTOP WITH KNEE SPACE BELOW

35 SCORER'S TABLE

36 PROVIDE ROLLER SHADES AT THIS WINDOW

37 RELOCATED EXISTING BLOOD PRESSURE MACHINE

38 PROVIDE 6 MONITOR LOCATIONS THIS ROOM; LOCATIONS TO

BE DETERMINED. BRACKETS UNDER THIS CONTRACT;

MONITORS UNDER O&M BID OPTION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-1

A-101

F

IR

S T

F L O

O R

P L A

N

A R

E A

A

A D

A L F

IT

N

E S

S C

E N

T E

R

F Y

O M

A H

A D

IS

T

R

IC

T S

T R

E E

T A

D D

R E

S S

C

IT

Y S

T A

T E

Z

IP

K E

N N

E T

H H

A H

N A

R C

H

IT

E C

T S

S

T

H S

T O

M A

H A

N

E

D e s ig n e r

A u th o r

C h e c k e r

A

P R

W F

-2 -R

-0

S H

P R

O J E

C T

D

IR

E C

T O

R Y

F

IL

E N

A M

E

F

IN

A L

R T

A S

U B

M

IT

T A

L

J U

L Y

S C

H R

IE

V

E R

A

IR

F O

R C

E B

A S

E C

O L O

R A

D O

P R

O J E

C T

N O

G

L E

N

-3

S H

A

-1 .D

W G

3/32" = 1'-0"

FIRST FLOOR PLAN - AREA A

N

0 4' 8' 16' 24'

A

B

KEY PLAN

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/2

/2

UP

1 2 3 4 5 6

F F

FITNESS

AREA

RACQUETBALL

COURT

E01

ELEV.

LOBBY

CONTROL

COUNTER

S01

STAIR

STOR.

ELECT.

TOILET

TOILET

TOILET

VEST.

VENDING

EDGE OF TRACK ABOVE

A-300

A-300

UP

S03

STAIR

GYMNASIUM

STOR.

GROUP

EXERCISE

ROOM

CORR.

GROUP

EXERCISE

ROOM

STOR.

GYMNASIUM

1 / A-101 1 / A-101

UP

MECH.

M U

S T

B E

0'

-0 " C

LE

A

R

MUST BE 20'-0" CLEAR

19 19

19 19

TACKWALL

FU

LL

-W

ID

TH

W

A

LL

M U

R A

L

CHILLER

TRANSFORMER

21 2121

JAN.

ELECT.

S02

STAIR

CORR.

CORR.

ELEV.

EQUIP.

A-300

A-300

A-300

A-300

A-300

A-300

GOVERNMENT - PROVIDED CONCEPTUAL DESIGN DRAWINGS DO NOT RELIEVE

THE OFFEROR OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT

NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITIES CRITERIA

(UFC) AND ALL OTHER APPLICABLE CRITERIA.

ANY DIMENSIONAL CHANGES (GREATER THAN +/-6") TO THE PROPOSED

BUILDING FLOOR PLAN (TO INCLUDE WALLS, GLAZING, DOORS, ETC) MUST BE

IDENTIFIED TO, AND INDIVIDUALLY APPROVED BY THE GOVERNMENT.

ARCHITECTURAL KEY NOTES

1 ELEVATOR SHALL HAVE MIN. 4000 LB. CAPACITY WITH

MIN. 4'-0" W. x 8'-0" H. DOORS

2 WALL MONITOR BRACKET UNDER THIS CONTRACT;

MONITOR UNDER O&M BID OPTION

3 PROVIDE AUTOMATIC OPERATOR AT THIS PAIR OF DOORS

4 LOCKERS; SEE FFE PACKAGE

5 AED CABINET; AED UNDER FFE PACKAGE

6 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS

7 42" HIGH STEEL PIPE GUARDRAIL ANGLED INWARD

5 DEGREES (TOWARDS OPEN GYM/FITNESS AREA)

8 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE AND UPPER CABINETS

9 BANK TRACK CORNERS MAX. OF 1" PER FOOT

10 LOCKERS AND BENCH; SEE FFE PACKAGE.

11 EXISTING LOUVER TO REMAIN. COVER INSIDE FACE WITH

GALV. SHEET METAL COVER PLATE AND MIN. 2" THICK

POLYISOCYANURATE RIGID INSULATION. PAINT EXTERIOR

LOUVER TO MATCH EXISTING METAL WALL PANELS.

12 42" HIGH CAST IN PLACE CONCRETE OR CMU WALL

13 PROVIDE MAGNETIC HOLD-OPEN DEVICES ON THESE DOORS

TIED INTO FIRE ALARM SYSTEM.

14 VERTICAL 42" HIGH STEEL PIPE GUARDRAIL

15 OPENING FROM 4'-0" TO 9'-0" A.F.F.

16 7'-0" HIGH CAST IN PLACE CONCRETE OR CMU WALL

17 REUSED EXISTING TOE BARS; OBTAIN FROM GOVERNMENT

AND INSTALL ONTO EXISTING CONCRETE FLOOR SLAB

18 MOTORIZED ROLL-UP DIVIDER CURTAIN

19 RETRACTABLE BASKETBALL NET/GOAL ASSEMBLY

(MOTORIZED)

20 RETRACTABLE BLEACHER ASSEMBLIES (MOTORIZED)

21 VOLLEYBALL POST SLEEVES AND COVER PLATES

22 SCOREBOARD

23 LADDER TO ROOF HATCH

24 STEEL TRELLIS FEATURE

25 36" H. 2-PIPE RAILING

26 ALL-GLASS WALL AND DOOR ASSEMBLY

27 EXISTING BUILDING NUMBER SIGN TO REMAIN.

28 NEW DOOR/FRAME ASSEMBLY TO BE INSTALLED IN EXISTING

EXTERIOR WALL. SAWCUT AND REMOVE EXISTING

PRECAST CONCRETE PANEL/METAL WALL PANEL SYSTEM AS

REQUIRED FOR NEW DOOR/FRAME ASSEMBLY. PROVIDE

STRUCTURAL ACCOMMODATIONS TO RE-SUPPORT PRECAST

CONCRETE PANEL SYSTEM AS REQUIRED.

29 REMOVE EXISTING VISION GLAZING AT THIS WINDOW.

REPLACE WITH SPANDREL GLASS.

30 PROVIDE MULTI-SLIDE FIXED DROP DOWN LADDER UP TO

EXISTING ROOF HATCH ABOVE. LADDER SHALL EXTEND

FROM 9'-0" A.F.F. TO EXISTING ROOF HATCH

APPROX. 23'-0" A.F.F.

31 SOLID SURFACE GROOMING COUNTER WITH MIRROR ABOVE

32 EXISTING RELOCATED CUSTOM SHELVING SHOWN DASHED

IN THIS ROOM

33 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS AND 6 UNDER THE

COUNTER CUBBIES

34 SOLID SURFACE COUNTERTOP WITH KNEE SPACE BELOW

35 SCORER'S TABLE

36 PROVIDE ROLLER SHADES AT THIS WINDOW

37 RELOCATED EXISTING BLOOD PRESSURE MACHINE

38 PROVIDE 6 MONITOR LOCATIONS THIS ROOM; LOCATIONS TO

BE DETERMINED. BRACKETS UNDER THIS CONTRACT;

MONITORS UNDER O&M BID OPTION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-1

A-102

F

IR

S T

F L O

O R

P L A

N

A R

E A

B

A D

A L F

IT

N

E S

S C

E N

T E

R

F Y

O M

A H

A D

IS

T

R

IC

T S

T R

E E

T A

D D

R E

S S

C

IT

Y S

T A

T E

Z

IP

K E

N N

E T

H H

A H

N A

R C

H

IT

E C

T S

S

T

H S

T O

M A

H A

N

E

D e s ig n e r

A u th o r

C h e c k e r

A

P R

W F

-2 -R

-0

S H

P R

O J E

C T

D

IR

E C

T O

R Y

F

IL

E N

A M

E

F

IN

A L

R T

A S

U B

M

IT

T A

L

J U

L Y

S C

H R

IE

V

E R

A

IR

F O

R C

E B

A S

E C

O L O

R A

D O

P R

O J E

C T

N O

G

L E

N

-3

S H

A

-1 .D

W G

3/32" = 1'-0"

FIRST FLOOR PLAN - AREA B

A

B

KEY PLAN

N

0 4' 8' 16' 24'

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/2

/2

DN

1 2 3 4 5 6

F

F

E01

ELEV. 146

RACQUETBALL

COURT

S01

STAIR

AHU-6 AHU-5

UPPER FITNESS AREA

A-300

A-300

DN

S03

STAIR

DN

LID

19 19

19 19

AHU-4

INDOOR

TRACK

ELECT.

COMM.

CONFERENCE/

CLASSROOM

BREAK

SUPPORT

STAFF202

DIRECTOR

PROGRAM

MANAGER

CORR.

NURSING

TOILET

INDOOR TRACK

LOBBY

CORR.

S02

STAIR

GOVERNMENT - PROVIDED CONCEPTUAL DESIGN DRAWINGS DO NOT RELIEVE

THE OFFEROR OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT

NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITIES CRITERIA

(UFC) AND ALL OTHER APPLICABLE CRITERIA.

ANY DIMENSIONAL CHANGES (GREATER THAN +/-6") TO THE PROPOSED

BUILDING FLOOR PLAN (TO INCLUDE WALLS, GLAZING, DOORS, ETC) MUST BE

IDENTIFIED TO, AND INDIVIDUALLY APPROVED BY THE GOVERNMENT.

ARCHITECTURAL KEY NOTES

1 ELEVATOR SHALL HAVE MIN. 4000 LB. CAPACITY WITH

MIN. 4'-0" W. x 8'-0" H. DOORS

2 WALL MONITOR BRACKET UNDER THIS CONTRACT;

MONITOR UNDER O&M BID OPTION

3 PROVIDE AUTOMATIC OPERATOR AT THIS PAIR OF DOORS

4 LOCKERS; SEE FFE PACKAGE

5 AED CABINET; AED UNDER FFE PACKAGE

6 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS

7 42" HIGH STEEL PIPE GUARDRAIL ANGLED INWARD

5 DEGREES (TOWARDS OPEN GYM/FITNESS AREA)

8 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE AND UPPER CABINETS

9 BANK TRACK CORNERS MAX. OF 1" PER FOOT

10 LOCKERS AND BENCH; SEE FFE PACKAGE.

11 EXISTING LOUVER TO REMAIN. COVER INSIDE FACE WITH

GALV. SHEET METAL COVER PLATE AND MIN. 2" THICK

POLYISOCYANURATE RIGID INSULATION. PAINT EXTERIOR

LOUVER TO MATCH EXISTING METAL WALL PANELS.

12 42" HIGH CAST IN PLACE CONCRETE OR CMU WALL

13 PROVIDE MAGNETIC HOLD-OPEN DEVICES ON THESE DOORS

TIED INTO FIRE ALARM SYSTEM.

14 VERTICAL 42" HIGH STEEL PIPE GUARDRAIL

15 OPENING FROM 4'-0" TO 9'-0" A.F.F.

16 7'-0" HIGH CAST IN PLACE CONCRETE OR CMU WALL

17 REUSED EXISTING TOE BARS; OBTAIN FROM GOVERNMENT

AND INSTALL ONTO EXISTING CONCRETE FLOOR SLAB

18 MOTORIZED ROLL-UP DIVIDER CURTAIN

19 RETRACTABLE BASKETBALL NET/GOAL ASSEMBLY

(MOTORIZED)

20 RETRACTABLE BLEACHER ASSEMBLIES (MOTORIZED)

21 VOLLEYBALL POST SLEEVES AND COVER PLATES

22 SCOREBOARD

23 LADDER TO ROOF HATCH

24 STEEL TRELLIS FEATURE

25 36" H. 2-PIPE RAILING

26 ALL-GLASS WALL AND DOOR ASSEMBLY

27 EXISTING BUILDING NUMBER SIGN TO REMAIN.

28 NEW DOOR/FRAME ASSEMBLY TO BE INSTALLED IN EXISTING

EXTERIOR WALL. SAWCUT AND REMOVE EXISTING

PRECAST CONCRETE PANEL/METAL WALL PANEL SYSTEM AS

REQUIRED FOR NEW DOOR/FRAME ASSEMBLY. PROVIDE

STRUCTURAL ACCOMMODATIONS TO RE-SUPPORT PRECAST

CONCRETE PANEL SYSTEM AS REQUIRED.

29 REMOVE EXISTING VISION GLAZING AT THIS WINDOW.

REPLACE WITH SPANDREL GLASS.

30 PROVIDE MULTI-SLIDE FIXED DROP DOWN LADDER UP TO

EXISTING ROOF HATCH ABOVE. LADDER SHALL EXTEND

FROM 9'-0" A.F.F. TO EXISTING ROOF HATCH

APPROX. 23'-0" A.F.F.

31 SOLID SURFACE GROOMING COUNTER WITH MIRROR ABOVE

32 EXISTING RELOCATED CUSTOM SHELVING SHOWN DASHED

IN THIS ROOM

33 ARCHITECTURAL CASEWORK; SOLID SURFACE COUNTERTOP

WITH PLASTIC-LAMINATE BASE CABINETS AND 6 UNDER THE

COUNTER CUBBIES

34 SOLID SURFACE COUNTERTOP WITH KNEE SPACE BELOW

35 SCORER'S TABLE

36 PROVIDE ROLLER SHADES AT THIS WINDOW

37 RELOCATED EXISTING BLOOD PRESSURE MACHINE

38 PROVIDE 6 MONITOR LOCATIONS THIS ROOM; LOCATIONS TO

BE DETERMINED. BRACKETS UNDER THIS CONTRACT;

MONITORS UNDER O&M BID OPTION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

-1

A-112

S E

C O

N D

F L O

O R

P L A

N

A R

E A

B

A D

A L F

IT

N

E S

S C

E N

T E

R

F Y

O M

A H

A D

IS

T

R

IC

T S

T R

E E

T A

D D

R E

S S

C

IT

Y S

T A

T E

Z

IP

K E

N N

E T

H H

A H

N A

R C

H

IT

E C

T S

S

T

H S

T O

M A

H A

N

E

D e s ig n e r

A u th o r

C h e c k e r

A

P R

W F

-2 -R

-0

S H

P R

O J E

C T

D

IR

E C

T O

R Y

F

IL

E N

A M

E

F

IN

A L

R T

A S

U B

M

IT

T A

L

J U

L Y

S C

H R

IE

V

E R

A

IR

F O

R C

E B

A S

E C

O L O

R A

D O

P R

O J E

C T

N O

G

L E

N

-3

S H

A

-1 .D

W G

3/32" = 1'-0"

SECOND FLOOR PLAN - AREA B

N

0 4' 8' 16' 24'

A

B

KEY PLAN

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/2

/2

08-SH54_C-102
12-SH54_AD102
Sheets
A-101 - FIRST FLOOR PLAN - AREA A
A-102 - FIRST FLOOR PLAN - AREA B
A-112 - SECOND FLOOR PLAN - AREA B
AD102 - FIRST FLOOR DEMOLITION PLAN
14-SH54_A-101
Sheets
A-101 - FIRST FLOOR PLAN - AREA A
A-102 - FIRST FLOOR PLAN - AREA B
A-112 - SECOND FLOOR PLAN - AREA B
AD102 - FIRST FLOOR DEMOLITION PLAN
15-SH54_A-102
Sheets
A-101 - FIRST FLOOR PLAN - AREA A
A-102 - FIRST FLOOR PLAN - AREA B
A-112 - SECOND FLOOR PLAN - AREA B
AD102 - FIRST FLOOR DEMOLITION PLAN
16-SH54_A-112
Sheets
A-101 - FIRST FLOOR PLAN - AREA A
A-102 - FIRST FLOOR PLAN - AREA B
A-112 - SECOND FLOOR PLAN - AREA B
AD102 - FIRST FLOOR DEMOLITION PLAN