OSS-SERE_ARCH_AMENDMENT 0002.pdf
PDF 705 KB Posted
- Attached to
- OSS/SERE Ops Facility, Offutt AFB, NE Federal contract opportunity
- Solicitation number
- W9128F22R0047
About this file
This document summarizes a federal design-build solicitation for the construction of an Operations Support Squadron facility at Offutt Air Force Base in Nebraska. The selected contractor will construct an approximately 50,000 square foot single story facility for approximately $25-100 million. The facility will include multiple warehouse storage spaces with high and low density storage, classrooms, a vehicle wash bay, shipping and receiving areas, and a customer service area. The construction scope also includes site preparation, utility infrastructure, and parking. Responses are due by August 30, 2022, and the selected contractor will deliver the project using a design-build project delivery method. The soliciting agency is the Department of the Army Corps of Engineers Omaha District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F22R0047 0002_OSS-SERE_SF1442_Specs.pdf | ||
| Demo-and-Site-Prep--OF71--Storm_Sewer_and_Detention--CU200-205.pdf | ||
| Am_0002.pdf | ||
| PHASE I ENVIRONMENTAL SITE ASSESSMENT.pdf | ||
| LF012 Soil Map_1993.pdf | ||
| Am_0001.pdf | ||
| Attachment_02_61_13_Basewide Active Restoration Sites.pdf | ||
| Attachment_02_61_13_LF012 Groundwater Plume Map.pdf | ||
| Am_0001_Dwgs.pdf | ||
| W9128F22R0047 P0001_OSS-SERE_SF1442_Specs.pdf | ||
| OSS SERE Site Visit Sign In.pdf | ||
| W9128F22R0047_OSS-SERE_SF1442_Specs.pdf | ||
| DRAWINGS OSS SERE RTA RFP 20220830 Revised.pdf | ||
| W9128F-22-R-0047_OF70_Specs.PDF |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EV
COM
EV
PB
W
W
T
W
W
W
W
W
PB
E
PB
S
S
D
D CB MW
D C
CB
D
T
MW
M
MM
T
CB
T
CB
C
C CB
W
MW
MW
MW
CI
MM
6"
BUTLER BOULEVARD
W
G
G
T
T
M
M
M
CB
MM
36"
72"
EXISTING BUILDING 594
BUILD
IN
G 56
BUILDING
S
S S
970.0
975.0
980.0
0.
0.
965.0 970.0
975.0
980.0
0.
5.
0.
970.0
975.0
980.0
967.0
968.0
967.0
968.0
7.
7.
7.
963.0
965.0
963.0
964.0
966.0
966.0
967.0
966.096 6.0
DW
201+00
202+00 203+00 204+00 205+00 206+00 207+00
PT
: 2
+5
1.
PCC PAVING
PCC
SIDEWALK
20' WIDE COMPACTED ASPHALT
MILLINGS PAVED FIRE LANE
AIR COOLED CHILLER
PAD. ELV 975.00
TRANSFORMER PAD AS
REQUIRED. ELV 975.00
RELOCATED PERIMETER
FENCE (BY OTHERS)
PERIMETER FENCING
TRASH AND RECYCLING
ENCLOSURE
0.
BOC ELV: 965.39'BUTLER BOULEVARD
HMA
PAVING
PROVIDE MINIMUM 36
PARKING STALLS INCLUDING
ABA PARKING AS REQUIRED
PCC CURB
AND GUTTER
ABA PARKING
AS REQUIRED
8.
HMA
PAVING
ABA ACCESSIBLE
RAMP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
O
FF
U
TT
A
IR
F O
R C
E
BA
SE
, N
EB
R
AS
KA
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N
EB
R
AS
KA
A
U G
U
ST
SC
H
EM
A
TI
C
D
ES
IG
N
(3 5%
) P H
A
SE
(F
IN
A L)
-N O
T
FO
R C
O N
ST
R
U C
TI
O
N
O
SS
/S
ER
E/
AF
E
SG
BP
AE
C
O M
T
EC
H N
IC
AL
S
ER
VI
C
ES
, I
N C
B R
IA
R
G
AT
E
PK
W Y
C O
LO
R
AD
O
S
PR
IN
G
S, C
O
ID
-2
SC
H
EM
AT
IC
D
ES
IG
N (3
5% ) D
ES
IG
N P
H
AS
E (D
R
AF
T)
/0 9/
/0 1/
/1
6/
SC
H
EM
AT
IC
D
ES
IG
N
(3 5%
) D
ES
IG
N
P H
AS
E
(F
IN
AL
SC
H
EM
AT
IC
D
ES
IG
N (3
5% ) P
H
AS
E (R
EA
D
Y
TO
A D
VE
R
TI
SE
W
F-
-R
-0
/3
0/
SC
H
EM
AT
IC
D
ES
IG
N
(3 5%
) P H
AS
E
(R
EA
D Y
TO
A
D
VE
R
TI
SE
R
ES
U
BM
IT
TA
L
CS1000
SI
TE
P
LA
N
SI
TE
L
AY
O U
T
SCALE: 1" = 30'-0" 15'30' 0 30'
SITE PLAN/SITE LAYOUT
N
A. DEMOLITION AND SITE PREPARATION OFFUTT
FLOOD RECOVERY (FY19 & FY20) (OF71)
RESPONSIBLE FOR RELOCATION OF THE
PERIMETER FENCE WEST OF THE OSS/SERE
FACILITY.
B. ALL SIDEWALKS SHALL BE ABA COMPLIANT.
C. DB CONTRACTOR WILL NEED TO DESIGN
GRADING AND DRAINAGE TO MEET FACILITY
REQUIREMENTS. CONTOURS SHOW THE
SURCHARGE PROVIDED BY OF71. DB
CONTRACTOR MAY USE SURCHARGE FOR
FILL AND FINAL GRADING OF THE SITE.
GENERAL NOTES:
D . O
LO
U
G H
LI
N
N . B
AA
S
D . H
U G
H
ES
D . H
U G
H
ES
LEGEND:
PCC PAVING
HMA PAVING
COMPACTED ASPHALT MILLINGS
PCC SIDEWALK
BOLLARDS
LIGHT FIXTURE
PLAN
NORTH
AD
D
EN
D U
M N
O . 1
/3
0/
AD
D
EN
D
U M
N O
. 2
/1 2/
DW
CHEMICAL
OFFICE
104B
CUSTOMER
SERVICE
FLIGHTLINE
STORAGE
AFE
FLIGHTLINE
OPS
ACCA
WAREHOUSE
SERE
EQUIPMENT
STORAGE
WASH BAY
120A
EXT EQUIP
WORK
AREA
120B
ELEC
120G
LOGISTICS
OFFICE
109A
SERE CC
SERE QA
VEST
BREAK
ROOM
AFE
INSTRUCTOR
OFFICE
121A
MECH
ELEC
SHOWER
120F
SHOWER
120E
UNISEX RR
120D
UNISEX RR
120C
VEST
AFE CC
OFFICE
AFE QA
OFFICE
TRAINING
108A
TRAINING
108B
COMM
ELEC
SR/FL
OFFICE
ELEC
113A FL OFFICE
113B
AFE
FLIGHTLINE
EQUIPMENT
MEN'S
RESTROOM
COMPRESSOR
JANITOR
WOMEN'S
RESTROOM
CLASS
ROOM
LOGISTICS /
SUPPLY
CHEMICAL
SHOP
CHEMICAL
STORAGE
104A
CORRIDOR
VEST
TV02
1/16" = 1'-0"1
LEVEL 1 OVERALL FURNITURE PLAN
FURNITURE SCHEDULE
TYPE DESCRIPTION COMMENTS
CB01 CAFE CHAIR
CG01 GUEST CHAIR
CL01 LOUNGE CHAIR
CT01 TASK CHAIR
FL01 FREE STANDING FLAME LOCKER
SU01 MODULAR BASE AND OVERHEAD
CABINETS
BASE CABINET - 60" X 28" X 60" HT. WITH DRAWERS,
OVERHEAD CABINET - 60" X 28" X 30" WITH DOORS,
MOUNTED ONTOP OF BASE CABINET
SU02 HEAVY DUTY HIGH DENSITY MOBILE
STORAGE
72" X 36" X 84" HT. UNITS, 3 INTERNAL ADJ SHELVES,
POWERED OPERATION TO STORE (500) PELICAN
CASES AT 20" x 30" x 18"H, AND (20) BOXES AND (50)
LIFE RAFTS
SU03 HEAVY DUTY STORAGE RACK 72" X 36" X 84" HT., 5 SHELVES TO STORE (1600)
PELICAN CASES AT 20" X 30" X 18"H
SU04 HEAVY DUTY STORAGE RACK
SU05 HEAVY DUTY STORAGE RACK
SU06 HEAVY DUTY STORAGE RACK 96" X 36" X 84" HT., 5 SHELVES TO STORE LIFE
PRESERVERS AND OXYGEN MASKS
SU07 HEAVY DUTY STORAGE RACK 96" X 36" X 84" HT., 3 SHELVES TO STORE (70) A3 BAGS
AT 36" X 24" X 36"H
SU08 HEAVY DUTY STORAGE RACK
SU09 PALLET RACKING WITH WIRE DECKING
TB01 SQUARE TABLE 42"
TS01 TRAINING TABLE 72" X 24"
TS02 HEAVY DUTY WORK BENCH, WITH WOOD
TOP AND LOWERW SHELF
72" X 36" UNITS, MAX HT. TOP OF COUNTER AT 34".
PROVIDE LOWER SHELF
TS03 HEAVY DUTY WORK BENCH, WITH WOOD
TOP
96" X 36" UNITS, MAX HT. TOP OF COUNTER AT 34".
ATTACH TABLES TO CREATE LARGE 16'-0" X 36'-0"
TABLE
TS04 HEAVY DUTY TABLE WORKBENCH 120" X 30" UNITS, MAX HT. TOP OF COUNTER AT 34"
TS05 HEAVY DUTY TABLE WORKBENCH 72" X 30" UNITS, MAX. HT. TOP OF COUNTER AT 34"
WB01 WORKBENCH 96" X 30"
WB02 WORK BENCH 72" X 30" WITH DRAWERS
WS01 L-SHAPED DESK 6'-0" X 6'-0"
WS02 L-SHAPED DESK 6'-0" X 8'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
N B
Y
I-1100
L E
V E
L
O V
E R
A L L F
U R
N
IT
U R
E P
L A
N
S C
H E
M A
T
IC
D E
S
IG
N
P
H A
S E
R
E A
D Y
T O
A D
V E
R T
IS
E
O
F F
U T
T A
IR
F
O R
C E
B A
S E
N
E B
R A
S K
A O
M A
H A
D
IS
T
R
IC
T C
A P
IT
O
L A
V E
O M
A H
A N
E B
R A
S K
A
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C B
R
IA
R G
A T
E P
K W
Y C
O L O
R A
D O
S P
R
IN
G S
C
O
M B
R E
N N
A N
/P B
R O
W N
E W
E N
T L
IN
G M
M O
H A
M M
E D
A L I
S R
E
IS
H
M F
E R
G U
S O
N
A
U G
U S
T
W F
-2 -R
-0
O S
S /S
E R
E /A
F E
S G
B P
S C
H E
M A
T
IC
D E
S
IG
N
P H
A S
E
R E
A D
Y T
O A
D V
E R
T
IS
E
N O
T F
O R
C O
N S
T R
U C
T
IO
N
PLAN NORTH
0 16'8' 32'
AREA1
AREA 2
KEY PLAN
EQUIPMENT SCHEDULE
TYPE Description Comments
E-CM COFFEE MAKER CFCI
E-CR LASER PRINTER / COPIER / SCANNER GFGI
E-DR DRYER CFCI
E-FL FORK LIFT GFGI
E-ISU INTERNAL STORAGE UNIT GFGI
E-MS MOBILE STAIR CFCI
E-MW MICROWAVE CFCI
E-PC PELICAN CASE GFGI
E-RF REFRIGERATOR CFCI
E-RF2 UNDER COUNTER REFRIGERATOR CFCI
E-SC STORAGE CONTAINER GFGI
E-TN 15'0" X 15'-0" TENT GFGI
E-WA WASHER CFCI
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
NOTE: FURNITURE DESIGN AND SPECIFICATIONS BY CONTRACTOR, FURNITURE TO BE CONTRACTOR
FURNISHED, CONTRACTOR INSTALLED
S
C H
E M
A T
IC
D
E S
IG
N
D
E S
IG
N
P H
A S
E
D R
A F
T
/0
/2
S
C H
E M
A T
IC
D
E S
IG
N
D
E S
IG
N
P H
A S
E
F
IN
A L
/0
/2
S
C H
E M
A T
IC
D
E S
IG
N
P H
A S
E
R E
A D
Y T
O A
D V
E R
T
IS
E
/1
/2
S
C H
E M
A T
IC
D
E S
IG
N
P H
A S
E
R E
A D
Y T
O A
D V
E R
T
IS
E
R E
S U
B M
IT
T
A L
/3
/2
A
D D
E N
D U
M N
O
/3
/2
A
D D
E N
D U
M N
O
/1
/2
AV SCHEDULE
Mark DESCRIPTION Comments CZ01 Credenza rack to house audiovisual equipment. CFCI
PO01 Podium input location with gooseness microphone and laptop connection. Ceiling speaker system with amplifier and signal processing. Touch panel controller. Video switching and distribution system.
CFCI
TV01 TV01-50" Wall- mounted flat panel display.HDMI input plate connected to display
CFCI
TV02 98" wall mounted flat panel displays CFCI
| Sheets |
| I-1100 - LEVEL 1 OVERALL FURNITURE PLAN |