This document provides details for a federal construction solicitation. The solicitation seeks a contractor to construct an approximately 50,000 square foot Operations Support Squadron - Aircrew Flight Equipment/Survival Evasion Resistance Escape facility at Offutt Air Force Base in Nebraska. The single story facility will include multiple warehouse storage spaces, classrooms, a vehicle wash bay, shipping and receiving areas, and a customer service area. Site preparations, utility infrastructure, and parking construction are also required. The selected contractor will deliver the project using a design-build project delivery method. The construction cost is estimated to be between $25 million and $100 million. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Omaha.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F22R0047 0002_OSS-SERE_SF1442_Specs.pdf | ||
| OSS-SERE_ARCH_AMENDMENT 0002.pdf | ||
| Demo-and-Site-Prep--OF71--Storm_Sewer_and_Detention--CU200-205.pdf | ||
| Am_0002.pdf | ||
| PHASE I ENVIRONMENTAL SITE ASSESSMENT.pdf | ||
| LF012 Soil Map_1993.pdf | ||
| Am_0001_Dwgs.pdf | ||
| W9128F22R0047 P0001_OSS-SERE_SF1442_Specs.pdf | ||
| Am_0001.pdf | ||
| Attachment_02_61_13_LF012 Groundwater Plume Map.pdf | ||
| OSS SERE Site Visit Sign In.pdf | ||
| W9128F-22-R-0047_OF70_Specs.PDF | ||
| W9128F22R0047_OSS-SERE_SF1442_Specs.pdf | ||
| DRAWINGS OSS SERE RTA RFP 20220830 Revised.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O:\DCS\Projects\ENV\60634638_MidwestORC\900_CAD_GIS\920_929_GIS_Graphics\Offutt\figures\annual\fy2021\fig1-2.mxd [2/18/2022 10:19:05 AM]
Bellevue Drain
Base Lake
Papillion Creek
Northern Plume
Southern Plume
SD041
SS040
OT018
ZZ294
LF013
LF042
FT003
LF012
DP044
CY21 Annual Report
Figure 1-2
Drawn By:
DPG
Site Location Offutt AFB, Nebraska
Offutt AFB
Elkhorn Comm.
Locator Map
Legend
Surface Water Drainage
Site Boundary
Benzene 5 µg/L (2020) cis-1,2-DCE 70 µg/L (2020)
TCE 5 µg/L (2020)
Vinyl Chloride 2 µg/L (2020)
Installation Boundary
¹ 0 2,000 4,0001,000 Feet
Project Number:
60634638
SD035
DCE = dichloroethene TCE = trichloroethene µg/L = micrograms per liter
Notes:
1) The horizontal datum used for this drawing is NAD83/HARN95. The vertical datum is NGVD29.
File details come from the government source that posted it. Updated .