W9128F22R0047_OSS-SERE_SF1442_Specs.pdf

PDF 1 MB Posted

Attached to
OSS/SERE Ops Facility, Offutt AFB, NE Federal contract opportunity
Solicitation number
W9128F22R0047
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document outlines a federal solicitation for the construction of an Operations Support Squadron facility at Offutt Air Force Base in Nebraska. The selected contractor will deliver the approximately 50,000 square foot single-story facility using a design-build project delivery method. The facility is required to include multiple warehouse storage spaces, classrooms, a vehicle wash bay, shipping and receiving areas, and a customer service area. Site preparations, utility infrastructure, and parking construction are also included in the scope of work. The magnitude of construction costs is estimated between $25 million and $100 million. Offerors must submit proposals by the specified due date. The award is a firm fixed-price contract to be issued by the U.S. Army Corps of Engineers.

View the file

Other files for this federal contract opportunity

Other files attached to OSS/SERE Ops Facility, Offutt AFB, NE, newest first.
File Type Posted
Demo-and-Site-Prep--OF71--Storm_Sewer_and_Detention--CU200-205.pdf PDF
OSS-SERE_ARCH_AMENDMENT 0002.pdf PDF
W9128F22R0047 0002_OSS-SERE_SF1442_Specs.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
Attachment_02_61_13_Basewide Active Restoration Sites.pdf PDF
Am_0001_Dwgs.pdf PDF
W9128F22R0047 P0001_OSS-SERE_SF1442_Specs.pdf PDF
PHASE I ENVIRONMENTAL SITE ASSESSMENT.pdf PDF
LF012 Soil Map_1993.pdf PDF
Attachment_02_61_13_LF012 Groundwater Plume Map.pdf PDF
OSS SERE Site Visit Sign In.pdf PDF
W9128F-22-R-0047_OF70_Specs.PDF PDF
DRAWINGS OSS SERE RTA RFP 20220830 Revised.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The offeror hereby agrees to do all w ork described in the documents entitled:

OSS AFE/SERE OPS Facility SGBP212903 (FY20) Offutt Air Force Base, NE

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00 AND SECTION 00 45 00.

THIS SOLICITATION IS RESTRICTED 100% TO SMALL BUSINESS INTEREST.

SHAWN A ADKINS

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Aug-2022

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F22R0047 56

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F22R0047

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Design OSS/SERE Facility

FFP

Entire work complete to design OSS/SERE Facility at Offutt AFB FOB: Destination

PSC CD: Y1GZ

NET AMT

0002 1 Job Construct OSS/SERE Facility

FFP

Entire work complete to construct OSS/SERE Facility at Offutt AFB excluding items listed below

0003 1 Job Site Work - Five Foot Building Line

FFP

Entire work complete to construct site work to the five-foot building line.

0004 1 Job OPPD Contract for Electrical

FFP

Entire work complete to contract with OPPD for Construction of Electrical Site Work as shown on the project drawings. All Offerors shall place $250,000 as the price for this line item. See Note 3 below.

0005 1 Job

OPTION FF&E

FFP

Entire work to procure and install Furniture, Fixtures & Equipment (FF&E) (O&M-funded)

0006 1 Job OPTION Install Audio/Visual Equipment

FFP

Entire work complete to procure and install Audio/Visual (A/V) Equipment (O&M-funded)

SUPPLEMENTAL PRICE BREAKDOWN

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

Entire work complete to design OSS/SERE Facility at Offutt AFB

Job

XXX

Entire work complete to construct OSS/SERE Facility at Offutt AFB excluding items listed below.

0003 Entire work complete to construct site work to the five-foot building line.

1 Job XXX $_____________________

Entire work complete to contract with OPPD for Construction of Electrical Site Work as shown on the project drawings. All Offerors shall place $250,000 as the price for this line item.

See Note 3 below.

$XXX, XXX

TOTAL BASIC AMOUNT $________________________

OPTION ITEMS

[Option]

Entire work to procure and install Furniture, Fixtures & Equipment (FF&E) (O&M-funded)

[Option]

Entire work complete to procure and install Audio/Visual (A/V) Equipment (O&M-funded)

TOTAL AMOUNT (BASIC PLUS OPTIONS) $________________________

OFFEROR'S NAME: ____________________________

NOTES:

1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The

Government reserves the right to exercise Option Items No. 0005 & 0006 within 14 months after issuance of Notice to Proceed. Abbreviations: Operations & Maintenance (O&M).

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump-sum) prices and the total amount, the lump-sum prices will be considered the price submitted.

3. All costs associated with this work will be paid by the Contractor directly to OPPD. The Government will release funds to the Contractor to pay OPPD costs as installation occurs up to the total amount listed in Item 0004 as associated with electrical connections made by OPPD, except for any additional costs incurred as a direct result of Contractor negligence, which will not be reimbursed. Remainder of electrical site work will be constructed by the Contractor under Item 0002 and 0003.

Section 00 21 00 - Instructions

INSTRUCTION TO OFFERORS

Section 00 21 00 - Instructions

1. OVERVIEW

Proposal instructions for the subjective tradeoff solicitation for the construction of the Operations Support Squadron - Aircrew Flight Equipment/ Survival Evasion Resistance Escape (OSS AFE/SERE) at Offutt Air Force Base, Omaha, NE. The selected contractor will deliver this project using a design build (DB) project delivery method. This requires the contractor to provide the government with a design, complete facility and warranty based on the solicitation requirements and subsequent contract award documents.

The magnitude of the construction cost for this project is between $25,000,000 and $100,000,000.

The Government intends to award a contract without conducting discussions in accordance with (IAW) FAR 52.215-1. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein.

Proposals may be determined non-compliant for failure to follow this format and may be rejected from further consideration.

All offerors must register in the System for Award Management (Sam.gov) prior to the submission of a proposal.

2. PROPOSAL SUBMITTAL INSTRUCTIONS

Proposals must be presented in the following order and format:

Volume I - Required Submittal Items (Not Rated)

Location Description Descending Order of Importance

TAB A SF1442 and Acknowledgement of Amendments Not Rated

TAB B Representations & Certifications Not Rated

TAB C JV Agreement or Teaming Agreement (if applicable). Not Rated

Volume I – Technical Evaluation Factors

Descending Order of Importance

TAB D Factor 1 – Past Performance 1st Most Important Factor

TAB E Factor 2 – Project Management Plan 2nd Most Important Factor

TAB F Factor 3 – Key Personnel 3rd Most Important Factor

Volume II - Required Submittal Items (Not Rated)

TAB A SF1442 and Acknowledgement of Amendments

TAB B

See table below for “Vol II – Non-Technical Evaluation Factors”

TAB C Any new JV Agreement or Teaming Agreement (if applicable).

Volume II – Non-Technical Evaluation Factors

Location Volume II Factors Descending Order of Importance

TAB B Factor 4 – Section 00 10 00, Pricing Schedule All technical factors, when combined, are approximately equal to price

Offeror’s must submit proposals on an SF 1442. All submissions must be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed above shall be submitted as “SEPARATE” single files. Offerors may submit via email, to:

1. MAJ Brandon Wagner, Contract Specialist, Brandon.C.Wagner@usace.army.mil

2. Glenda Canty, Contracting Officer, Glenda.A.Canty@usace.army.mil

For proposals that are too large for email, offerors may contact the two personnel listed above and request a DoD SAFE file transfer drop off request. This request does not constitute the submission of an offer, it does not absolve the offeror the responsibility of a timely submission, nor does it extend the submission deadline. Offerors are responsible to ensure that the Government has the offeror’s complete proposal no later than the submission deadline.

For the purposes of determining whether the proposal was received "late" in accordance with FAR 15.208, the time and date the file(s) are received by the USACE Outlook Server or submission time for DoD SAFE will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal.

Page limitations for each factor are identified within the instructions, where applicable. Title sheets, tables of contents, dividers, and blank pages are not included in the page limitations and will not be counted as such. A one-page cover letter or title sheet is recommended as the first page of each file identifying your firm’s name, the file’s title, and identifying any applicable contractor team arrangements. Any extraneous information or cover letters that provide additional information about your firm that is not requested by this solicitation will not be reviewed or evaluated.

Pages for each factor should be separately and sequentially numbered (i.e.: the first page submitted for evaluation for each factor should be “1”). All text shall be at least 10 pt. font and legible. All text shall be typed and single-spaced. Each page shall be 8-1/2” x 11” (organizational chart, risk assessment and project schedule are the only documents that may be submitted on an 11” x 17”). Margins should be no less than 1” (right, left, top, and bottom).

Pages that exceed the page limitations for any factor will not be reviewed and the information contained on those pages will not be considered for evaluation. Page limitations are per factor (i.e.: an Offeror may not reduce the page count for one factor to submit additional pages for another factor).

Offerors shall include a cover sheet in Volume I and Volume II as required by FAR 52.215-1 (c) and (2).

This provision, entitled “Instructions to offerors – Competitive Acquisition,” is included in full text in Section 00 21 00 of the solicitation. The cover sheet must provide the following information:

1. Solicitation Number

2. Name, address, telephone number, and email address

3. Statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item as reflected on the proposal schedule attached to the SF1442. (Note: Failure to agree with all terms, conditions, and provisions in the solicitation may result in the offeror’s proposal being rejected as non-compliant)

4. Names, titles, telephone numbers, and email addresses of person(s) authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation.

5. Name, title, and signature of person authorized to sign the proposal and any contract that may result from that proposal

6. Acknowledgement that your company’s record in the System for Award Management website is current per FAR Clause 52.204-13, System for Award Management Maintenance. (This clause is in Section 00 72 00 of this RFP)

Following the proposal cover sheet, Volume I shall be organized into the following tabbed sections:

VOL I, TAB A. Standard Form (SF1442), and Acknowledgement of Amendments. The offeror must complete and execute the SF1442 with an original signature by an official authorized to bind the company in accordance with requirements in FAR 4.102. Include with the offeror’s name and address in BLOCK 14 of the SF1442, the offeror’s Unique Entity Identifier (UEI), Commercial and Government Entity (CAGE), and Tax Identification numbers. Offerors shall acknowledge all amendments to the solicitation in Block 19. If the offeror fails to acknowledge all amendments, the proposal (Volumes I and II) will be considered as non-compliant and shall not be evaluated further.

VOL I, TAB B: REPRESENTATIONS & CERTIFICATIONS

Offerors shall present their completed electronic Representation and Certifications from the SAM.gov website. If the offeror’s representations and certifications are not current in the System for Award Management (Sam.gov), then the offeror must include Section 00 45 00, Certifications/Representations including the Representation & Certifications cover page in their proposal.

VOL I, TAB C: JOINT VENTURE (JV) or TEAMING ARRANGEMENTS (if applicable)

8.3.3. Integrity and Validity of All Contractor Team Arrangements

The Contracting Officer will recognize the integrity and validity of contractor team arrangements; provided that the arrangements are identified, and company relationships are fully disclosed and validation of formal agreements and relationships (i.e., Mentor-Protégé agreements, Joint Ventures, partnerships, etc.)

are provided in the offer and submitted with the proposal responding to the solicitation. Nothing in the solicitation authorizes contractor team arrangements in violation of antitrust statutes or limits the Government’s rights to:

a. Require consent to subcontracts (see FAR Subpart 44.2);

b. Determine, based on the stated contractor team arrangement, the responsibilities of the Prime Contractor (see FAR Subpart 9.1).

c. Provide to the Prime Contractor data rights owned or controlled by the government.

d. Pursue its policies on competitive contracting, subcontracting, and component breakout initial production or an any other time.

e. Hold the Prime Contractor fully responsible for contract performance, regardless of team arrangement between the Prime Contractor and its subcontractors.

8.3.2. Joint Venture Team Arrangements (Including Mentor-Protégés).

No contract may be awarded to a Joint Venture/Mentor-Protégé that is not registered in the System for Award Management (SAM) database. The Joint Venture/Mentor-Protégé must have its own registered UEI number. Any Joint Venture/Mentor-Protégé agreement that is required to be approved by the Small Business Administration (SBA) shall be approved in accordance with the applicable Code of Federal Regulations (CFR). If the applicable requirements are not met prior to the due date for proposals, the proposal will be rendered unawardable.

a. In the title sheet/cover letter of your proposal, provide the complete names, addresses, and phone number of the firms comprising the Joint Venture/Mentor-Protégé.

b. A copy of the Joint Venture/Mentor-Protégé agreement.

c. Signature requirements: SF 1442, SOLICITATION, OFFER, AND AWARD, Block 20, requires that the name and title of a person authorized to sign the offer for the Joint Venture/Mentor-Protégé be provided. In the case of a Joint Venture/Mentor-Protégé, subject Standard Form shall be signed by the principal representative of the Joint Venture/ Mentor-Protégé (or the alternate principal representative, if the principal representative is unavailable).

d. In addition to the requirements stated above, and to assure a single point of contact for resolution of contractual matters and payments, the Offeror shall submit a certificate signed by each participant in the Joint Venture containing the following statement:

“The parties hereto expressly understand and agree as follows:

1. (Name, title, and company) is the principal representative of the Joint Venture. As such, all communications regarding the administration of the contract and the performance of the work thereunder may be directed to him or her. In the absence of (same name, title, and company), (enter name, title, and company of alternate) is the alternate principal representative of the Joint Venture/Mentor-Protégé. These individuals have authority to sign on behalf of the Joint Venture/Mentor-Protégé.

2. Direction, approvals, required notices, and all other communications from the Government to the Joint Venture/Mentor-Protégé, including transmittal of payments by the Government, shall be directed to (enter name, title, and company of principal), principal representative of the Joint Venture/Mentor-Protégé.”

NOTE: Provide telephone numbers and email addresses for the points of contact listed in the above statement.

Teaming Arrangements OTHER than joint venture or mentor/protégé:

All offerors that have a teaming arrangement, other than JV or mentor/protégé shall submit the following information in the Required Documents file:

1. A listing of each team arrangement member’s corporate name (no abbreviations), address, point of contact, phone number, UEI Number, and CAGE Code.

2. A copy of the signed team arrangement agreement or binding letter of commitment between each team member. All team arrangement agreements and letters of commitment shall:

2.1. Clearly identify the expected relationship, role and responsibility between the firms, Prime Contractor, and of the subcontractor or other entity (type and proportion of work to be performed).

2.2. Be signed by the appropriate individual(s) of each company.

VOL I, TAB D: PAST PERFORMANCE

Submission Requirements: Page limitations: no more than a one (1) page narrative per project; no more than one (1) page per project to present photographs or images (no text other than image titles shall be included on that page); and no page limitations on official past performance records such as Past Performance Questionnaires (PPQs) and/or CPARS; and no more than a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted projects.

CONSTRUCTION PROJECT EXAMPLES: The Offeror should submit three (3) projects similar in project size, scope, and complexity to this project that were performed by the Prime Offeror. All project examples shall demonstrate experience on similar building and site improvement projects of $20M or greater value.

Projects whose contract award was less than $20M will not be considered for evaluation. In addition to the three (3) project examples, the Offeror may submit a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted project examples. Any information presented beyond any of the page limits will not be evaluated.

Additionally, at least one project submitted shall demonstrate experience constructing a new facility of at least 20,000 square feet.

Each project example submitted shall meet the following criteria:

1. The project shall have been awarded to the Offeror (either singly or one of the participants in a JV named on the SF1442 for this solicitation). The company shall have been the Prime Contractor for the past project, either singly or as a member of the Joint Venture to which it was awarded.

2. The project shall be complete within 7 years from the date the offers are due.

The table below provides example scenarios based on the requirements above:

Scenario Examples Project Examples Qualify for Evaluation for Factor 1 (if all other requirements are met)

1 Past project was awarded to Company X only. Company X is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032.

Yes

2 Company Y has formed a JV with Company Z (forming Company “YZ”). Past project was awarded to Company Y only. Company YZ is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032.

Yes

3 Company Y has formed a JV with Company Z (forming Company “YZ”). Past project was awarded to JV Company YZ. Company YZ is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032.

Yes

4 Past Project was awarded to Company “AY,” a JV composed of Company A (not Prime Offeror for RFP W9128F21R0032) and Company Y. Company Y has formed a JV with Company Z (forming Company “YZ”). JV Company YZ is proposing as a Prime Contractor and has signed the SF 1442 for W9128F21R0032.

Yes

5 Company Y has formed a JV with Company Z (forming Company “YZ”).

Company YZ is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032. Company Y performed work on the past project, but was not the Prime Contractor for the past project (either singly or as a member of a JV).

No

6 Company X is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032. Company X will use Company R as a teaming member/subcontractor but Company R is not part of a JV with Company X for W9128F21R0032. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not Company X (singly or as a member of a JV).

7 Company Y has formed a JV with Company Z (forming Company “YZ”).

Company YZ is proposing as a Prime Contractor for W9128F21R0032 and has signed the SF 1442 for W9128F21R0032. Company YZ will use Company R as a teaming member/subcontractor but Company R is not part of the JV. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not to Companies Y or Z (singly or as a member of a JV).

Project information per project example Should CLEARLY include:

Summaries for each project submitted to include the name and contact information (address, telephone, and email) of the customer and one alternate, neither of which can be individual not affiliated with your firm. These individuals must be familiar with your firm’s experience on the project and can verify the experience cited.

Original contract award amount and final construction cost.

Location of project.

Original contract completion date and actual completion date (Month/Year).

Identify the contract type (e.g.: construction project or design-build project).

Percentage (%) performed by the Prime Offeror.

Percentage (%) and type of subcontracted work.

CPARS record or a complete PPQ shall be submitted for each project submitted under this factor.

Do not include extraneous information that is not requested.

The Government reserves the right to contact any persons who may be knowledgeable about the project or projects (this is not limited to contracts identified by the Offeror) submitted in an Offeror’s proposal. In addition, the Government may review and take into consideration other sources of information pertinent to the evaluation of the Offeror’s Past Performance, including both the previous experience projects and other similar projects performed by the Offeror. Other sources may include, but are not limited to, Past Performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE and UEI numbers of team members (partnership, Joint Venture, teaming arrangement, or parent firm/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of ensuring detailed, current, accurate and complete Past Performance information rests with the Offeror.

Obtaining Past Performance Records:

Past performance records may be obtainable by Offerors using one of the following methods:

(1) Accessing Past Performance information directly from Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/ for CCASS completed before 27 June 2014 and for merged CPARS completed after 1 July 2014. CPARS is an electronic repository of performance information collected by all the major federal performance reporting systems and can be accessed at the aforementioned website.

All Department of Defense (DoD) employees (military and civilian), including DoD Contractors that are working on site (military/government facilities) or contractors working offsite using Government Furnished Equipment (GFE) are required to use certificates from DoD Public Key Infrastructure (PKI) to access CPARS. If the contractor doesn't work on site or with GFE they are encouraged to obtain and use a certificate from an External Certificate Authority (ECA). For DoD users, the use of PKI Login is Mandatory.

Federal and Contractor users can use the PKI login category if they have PKI.

External Certificate Authorities (ECAs) and Interim External Certificate Authorities (IECAs) provide digital certificates to the DoD's private industry partners, contractors using their own equipment or working in non-government facilities, allied partners, and other agencies.

Additional information about the PKI certificate can be found at:

https://www.cpars.gov/sysreq.htm#collapseSysDoc1

The Offeror will also need a UEI number and Marketing Partner Identification Number (MPIN) to log onto CPARS. The MPIN number was selected by whoever registered your company in the System for Award Management (SAM) Registry at https://sam.gov/. If you do not know your MPIN number, you will need to contact the SAM help desk by emailing them from the email link on the SAM webpage. Please be aware that they will only release the MPIN number to the person who originally registered your company.

Additional instructions on locating your MPIN is in the Frequently Asked Questions (FAQs) section under the Help tab.

or -

(2) Past Performance Questionnaires (PPQs) may be used to provide or supplement a firm’s past performance with other than U.S. Governmental clients. A PPQ form is attached to this solicitation for convenience (see Attachment 1). Contact your client point of contact (POC) for the project you need a past performance record and request the POC to complete the PPQ. The PPQ included in this solicitation is provided for the Offeror to submit to the client for each project the Offeror may need a past performance record for to meet the requirements in this synopsis. Ensure correct phone numbers and email addresses are provided for the client POC. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). It is the Offeror’s responsibility to follow-up with client POCs to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, MA Brandon Wagner, Contract Specialist, Brandon.C.Wagner@usace.army.mil, prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information.

VOL I, TAB E: PROJECT MANAGEMENT PLAN

Submission Requirements (The page limit for this factor is fifteen (15) pages total including organizational approach, technical approach, proposed duration, and schedule).

Provide a narrative that describes the Offeror’s Project Management approach to executing the contract pursuant to the following requirements. Clearly and concisely describe the organizational, technical, and risk management approaches to project management and execution, proposed contract duration, and summary schedule.

Organizational Approach. List and describe key subcontractors, their roles and responsibilities, how they will be utilized, and any contractual arrangements that have been established to this point. Clearly describe any teaming or joint venture arrangements, including a clear description of each entity’s roles and responsibilities on the project. Identify the work (including %) which will be self-performed by the Prime Contractor. The Offeror shall document unequivocal teaming arrangements with its lead entity(ies) and key subcontractors. Describe the proposed management structure for the team, describing how the construction process and the authorities and the delegations of authority within the team will be managed.

Include an Organizational Chart, including the proposed quality control group(s). Include key personnel in the organization chart. Clearly illustrate key positions, names of the personnel, their firm affiliations, job locations and their job/position title within the organization (see specification 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and 01 45 00.00 10 QUALITY CONTROL).

Technical Approach for Construction. Describe the technical approach to construction of the facility.

Include any considerations to the project which will increase efficiencies in the schedule or increased quality.

Risk Management. In a table format, submit a list of risks specific to this project. Identify the degree of risk, impact of the risk (e.g., schedule, cost, safety, etc.), whether it’s within or outside the Offeror’s control, and a brief statement on options to mitigate each risk.

Summary Schedule. Provide a schedule on your plan to complete all work based on an arbitrary estimated, non-binding, Notice to Proceed date of 01 December 2022. Provide a summary schedule or diagrams separately in an appendix to the TAB. Clearly label the summary schedule under the TAB. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10: Project Schedule. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration. Give attention to the following features:

1. Show the overall construction phase for the facility, the sitework and the utilities. Include any long lead items and any fast-tracking starts. It isn’t necessary to show the detailed breakdown construction by trades.

2. Show schedule line items for environmental permits, notifications, and utility connection permits.

3. Show turnover of facility. The duration to complete the facility and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.

4. Show as-built submissions (See section 01 78 39.00 24 AS-BUILT DRAWINGS).

5. Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, or weather). Indicate the anticipated overall critical path on the schedule.

VOL I, TAB F: KEY PERSONNEL

Submission Requirements: The page limit for this factor is two (2) pages per resume for a total of no more than six (6) pages.

Submit resumes for the following key personnel. If more than two (2) pages are submitted per resume, only the first two (2) pages will be evaluated. Each resume should demonstrate experience and expertise on similar projects in the same roles as proposed for this solicitation.

- Project Manager responsible for the overall project: The project manager should have five (5) or more years of experience as a project manager, managing similar projects to this solicitation.

- Contractor Quality Control (CQC) System Manager(s): CQC System Manager should have five

(5) years of experience as a Quality Control Manager on similar projects to this solicitation. CQC System Manager shall comply with personnel requirements listed in Section 01 45 00.00 10.

- General Superintendent: The superintendent should have five (5) years of experience as superintendent managing multiple trades and subcontractors.

Each resume should include the following information:

- Proposed role/title for this solicitation

- Recent relevant projects: information shall include the project name, type of contract, role on project, prime contractor, owner, dollar amount, date of start and completion of the project, date of start and completion of role referenced, and brief scope of each project listed.

- Resume shall demonstrate the 5 years of experience without gaps. If there are gaps in the work history, provide enough past history to positively identify the required minimum experience.

VOLUME II

Volume II consists of all information required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15.408 and the requirements set forth below. The Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the price schedule, SF1442 and continuation sheets. Proposals may be determined non-compliant and rejected from further consideration for failure to follow the following format and provide all the items listed below.

Following the proposal cover sheet, Volume II shall be organized into the following tabbed sections:

VOL II, TAB B – PRICING SCHEDULE

The proposed price for this project shall be in the form of the Proposal/Price Schedule provided in this solicitation. Offerors may not modify the price schedule wording or format. As this is a Firm Fixed Price Contract, price proposals will not be considered which provide for subsequent increases in price. No qualified price proposal of any type will be accepted; therefor, all offers containing such qualifications will be considered unacceptable. If the offeror does not comply with all requirements of the proposal forms, the proposal may be considered non-compliant and eliminated from consideration.

Supplemental Price Breakdown. After Volume II submission and if deemed necessary to analyze cost/price elements of the price proposals, the Government may request a price breakdown of the Contract Line Items in an Excel format. The Government will provide details on where and how to send the breakdown. If requested, this information will not be needed sooner than three working days after the proposal submission due date.

Bond Ability: Submit information showing offeror's bond ability in the amount of the proposal. Include the name, address, and telephone number of the prime contractor's bonding agent. No formal bond is requested at this time.

Tax Information

FEDERAL, STATE AND LOCAL TAXES

It is the Contractor's responsibility to investigate applicable federal, state and local taxes and any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE AND LOCAL

TAXES.

NEBRASKA SALES AND USE TAX

Offerors shall exclude Nebraska sales and use tax from the proposal price under Nebraska Department of Revenue Form 17G (provided herein for reference). The Nebraska Department of Revenue Form 17G is only provided as a reference during the solicitation phase for proposal purposes only and shall not be completed by the offeror during the solicitation phase. Only the successful offeror shall complete the Nebraska Department of Revenue Form 17G at time of award. The Contracting Officer will then provide a completed Nebraska Department of Revenue Form 17G to the successful Offeror after award.

Upon receipt of the final signed form, the Contractor is responsible for complying with the instructions on Nebraska Department of Revenue Form 17G for use in securing exemption from state taxes on the purchase of building materials. The original form will be retained by the Contractor and a copy provided to the Contracting Officer.

BIDDER INQUIRY

Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment.

Bidders must use the Bidder Inquiry Key and instructions below to submit and review inquiry items. A bidder who enters a comment/question will receive an acknowledgment of their comment /question by e-mail, followed by an answer to the comment/question after the government has processed it.

The government will make available all timely questions and approved answers in ProjNet. The Solicitation Number is: W9128F22R0047 Project Name: Offutt Flood Recovery - OSS AFE/SERE Ops Facility The Bidder Inquiry Key is: 6PX56W-W272P7

(a) Registration for ProjNet Bidder Inquiry Access

(1) From the ProjNet home page listed above, click on Quick Add on the upper right side of the screen.

(2) Select USACE for the Agency.

(3) Enter the Bidder Inquiry Key above.

(4) Enter the primary e-mail address to use for communication for.

(5) Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will open saying that a user account was not found and will ask you to create one using the provided form.

(6) Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Bidders will use the answer to the Secret Question from this point on to access the ProjNet system.

(7) Click Add User. Once completed, ProjNet registration is complete, and the bidder islogged into the system.

(b) Entering Bidder Inquiries in ProjNet Bidder Inquiry System

(1) For future access to ProjNet, bidders will not receive a password by e-mail. Bidders will utilize the Secret Question and Secret Answer to log in.

(2) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

(3) Select USACE for the Agency.

(4) Enter the Bidder Inquiry Key above.

(5) Enter the primary e-mail address used to register.

(6) Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will then open asking you to enter the answer to your Secret Question.

(7) Enter your Secret Answer and click Login. Once complete, the bidder is logged into the system.

(8) Follow online screen instructions to enter specific bidder inquiries for the project.

(c) Bidders are requested to review the plans and specifications in their entirety and review the

Bidder. Inquiry System for answers to questions prior to submitting a new inquiry.

(d) The call center operate weekdays from 8 am to 5 pm Central Standard Time Zone (Chicago). The telephone number for the call center is 800-428-HELP.

ATTACHMENT 1 - PAST PERFORMANCE QUESTIONNAIRE (FORM PPQ-0)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Company Name: CAGE Code:

Address: UEI Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Company Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE CONTRACTOR. THE CONTRACTOR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE CONTRACTOR. HOWEVER,

QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE

CONTRACTOR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO

VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner.

A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified.

Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive nor negative.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

JUL 2021

52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.232-18 Availability Of Funds APR 1984 52.236-22 Design within Funding Limitations APR 1984 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.215-7005 Evaluation Factor for Employing or Subcontracting With

Members of the Selected Reserve

OCT 2008

252.215-7008 Only One Offer JUL 2019 252.215-7009 Proposal Adequacy Checklist JAN 2014 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

JAN 2018

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from District Counsel, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Scheduled Tours for Participants. Pre-bid site visit must be arranged in advance for access to Offutt AFB, Nebraska. Site visit will occur on 13 SEP 2022 at 10:00 a.m. CDT.

The bidders wishing access to the Base for the site visit must be vetted by Base Security prior to the site visit.

Therefore, all participants must provide the following information to the Site Visit POC by COB on 09 SEP 2022:

a. Name of Contractor

b. Legal Name (Last, First, MI),

c. Gender

d. Date of Birth (DOB)

e. Citizenship (country)

f. State-issued identification meeting REAL ID Card Act of 2005 (e.g.: driver's license number and state/State

FNV Passport number or Immigration ID number).

Note: Any site visit requests submitted after 09 SEP 2022 cannot be accepted. The attendee will be denied access to the Base and will be unable to attend the site visit.

Site Visit…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .