This document is a Request for Proposal (RFP) for the construction of a consolidated MilStar Satellite Communications (SATCOM) station at Offutt Air Force Base in Nebraska. The estimated value of the construction is between $25-100 million. The Army Corps of Engineers is seeking a firm-fixed price contract for site work, utilities installation, and construction of buildings and infrastructure to specifications provided. The response deadline is January 17, 2023, and award is anticipated within 360 days. Pricing will be evaluated for reasonableness based on the CLIN schedule in the RFP. The solicitation is unrestricted with no set-asides. Evaluation will be based on past performance, project management plan, technical approach, key personnel, and small business participation with a goal of 20% of total contract value.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. CLIN 0010 OPTION revised as CLIN 0003 base for Government Property Installation.
2. Added clauses on section 00 72 00.
3. Revision to CLIN Notes, SECTION 00 21 00; SECTION 00 22 00; and 00 72 00. Fire Alarm Panel / Generators updates.
4. Revised Design draw ings and specifications IAW SECTIONS 01 57 20.00 10; 13 49 20.00 10; 26 32 15.00; 26 33 53; 28 10 05. (provided under separate attachments)
5. See Fire Alarm And Generator Justif ication and Approval information.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 34
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F22R0028
X 9B. DATED (SEE ITEM 11)
21-Oct-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Dec-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F22R0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
CLIN 0001
The CLIN extended description has changed from:
All work to construct a consolidated MilStar Satellite Communications Station for Offutt Air Force Base, NE. This will include Electronic Security System (ESS) infrastructure and both Uninterruptible Power Supply (UPS) Maintenance Bypass Cabinets. Excluding item(s) listed below. This will exclude the work provided in CLINs 0002- 0008. See Note 2. FFP
To:
All work to construct a consolidated MilStar Satellite Communications Station for Offutt Air Force Base, NE. This will include Electronic Security System (ESS) infrastructure and both Uninterruptible Power Supply (UPS) Maintenance Bypass Cabinets. Excluding item(s) listed below. This will exclude the work provided in CLINs 0002- 0009. See Note 2. FFP
CLIN 0002
The CLIN extended description has changed from:
Milstar Site Work to Five-Foot Building LineEntire work to construct site work to the five-foot building line. FFP
Milstar Site Work to Five-Foot Building Line Entire work to construct site work to the five-foot building line. This includes a special joint occupancy on the "Antennae Area" as defined in Section 01 32 52.02 24 “PHASING, GENERAL AND SPECIAL SECURITY PROVISIONS and on drawings CS100, CS101, and CS102. The joint occupancy shall be no later than 450 days after Notice to Proceed.FFP
CLIN 0003
This CLIN has been renumbered to CLIN 0004.
CLIN 0004
This CLIN has been renumbered to CLIN 0005.
CLIN 0005
This CLIN has been renumbered to CLIN 0006.
CLIN 0006
This CLIN has been renumbered to CLIN 0007.
CLIN 0007
This CLIN has been renumbered to CLIN 0008.
CLIN 0008
This CLIN has been renumbered to CLIN 0009.
CLIN 0009
This CLIN has been renumbered to CLIN 0010.
CLIN 0010
This CLIN has been renumbered to CLIN 0003.
The CLIN extended description has changed from:
Entire work to procure and install the Uninterruptible Power Supply (UPS) system. Excluding the UPS Maintenance Bypass Cabinets, which is included in CLIN 0001.FFP (O&M-funded)
Entire work to install the Uninterruptible Power Supply (UPS) system, including the battery monitoring system.
The UPS and batter monitoring system will be Government Furnished and Contractor Installed (GFCI). The contractor will also commission all installed systems. Exclude the UPS Maintenance Bypass Cabinets, which is included in CLIN 0001. FFP
The option status has changed from Option to No Status.
The following have been added by full text:
AM_0004 RFP PACKAGE CONST INST
Solicitation No. W9128F22R0028 Date of Issue: 21 OCT 2022
Date of Receiving Proposals: 17 JAN 2023 SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of SATCOM-MILSTAR CAMPUS AT OFFUTT AFB, NEBRASKA
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly). This amendment also reissues the entire division 00 specifications package.
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “[*Am- [2]]”(underlining of added text and/or strikeout of deleted text).
Pages or Sections Deleted Pages or Sections Substituted or Added
01 57 20.00 10 01 57 20.00 10* 13 49 20.00 10 13 49 20.00 10* 26 32 15.00 26 32 15.00* 26 33 53 26 33 53* 28 10 05 28 10 05*
b. Drawings (Reissued). The following drawings are revised with latest revision date indicated on each sheet and reissued with this amendment.
(1) Sheet CS100, SITE PLAN - OVERALL
(2) Sheet CS101, PARTIAL SITE PLAN – AREA 1
(3) Sheet CS102, PARTIAL SITE PLAN – AREA 2
(4) Sheet E-704, PANELBOARD SCHEDULES AREA A
(5) Sheet E-705, PANELBOARD SCHEDULES AREAS B AND C
(6) Sheet EP122, PARTIAL POWER PLAN FIRST FLOOR AREA B
(7) Sheet G-002b, SHEET INDEX VOLUME II
(8) Sheet S-401, ENLARGED PLANS
(9) Sheet S-402, ENLARGED PLANS
(10) Sheet TY001, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE SYMBOLS
AND GENERAL NOTES
(11) Sheet TY101, ELECTRONIC SECUIRTY SYSTEM INFRASTRUCTURE PLAN SITE
(12) Sheet TY120, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN FIRST FLOOR -
OVERALL
(13) Sheet TY121, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN FIRST FLOOR –
AREA A
(14) Sheet TY122, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN FIRST FLOOR –
AREA B
(15) Sheet TY123, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN
FIRST FLOOR – AREA C
(16) Sheet TY124, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN – AREA B
(17) Sheet TY401, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE PLAN
ENLARGED PLANS
(18) Sheet TY501, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE DETAILS
(19) Sheet TY502, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE DETAILS
(20) Sheet TY503, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE DETAILS
(21) Sheet TY601, ELECTRONIC SECURITY SYSTEM INFRASTRUCTURE ONELINE DIAGRAM
(22) Sheet X-005, HEMP PENTRATION SCHEDULE ELECTRICAL
(23) Sheet X-400, INTERIOR ELEVATIONS HEMP WALLS
(24) Sheet X-402, ENLARGED PLANS AND INTERIOR ELEVATIONS HEMP VESTIBULES
(25) Sheet X-525, SIGNAL FILTER PENETRATION CONFIGURATION
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. See section 00 22 00 for how to submit electronic proposals.
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 17 JAN 2023, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.a. above Dwgs. listed in 1.b. above U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
The following have been modified:
CLIN PRICING SCHEDULE
CLIN NOTES
NOTES:
1. Bid prices must be entered for all items of the schedule. Total amounts submitted without bid prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump-sum) prices and the total amount, the lump-sum prices will be considered the bid.
2. All costs associated with this work will be paid by the Contractor directly to OPPD. The Government will release funds to the Contractor to pay OPPD costs as installation occurs up to the total amount of $775,000 for Item 0009 as associated with electrical connections made by OPPD, except for any additional costs incurred as a direct result of Contractor negligence, which will not be reimbursed.
Remainder of electrical site work will be constructed by the Contractor under Item 0001 and 0002.
3. Removal of rock within the limit of drilled piers will be paid for at the contract unit price for "Removal of Rock" per linear foot, for all diameters of pier installed. Rock excavation is defined as any hard dense material that cannot be removed with pier drilling equipment having the specified capacity and could only be removed by hand, air tools, blasting, or other specialized methods.
4. Removal of obstructions other than rock within the limits of the piers which cannot be removed using standard drilling equipment with the specified capacity will be paid for at the contract unit price per linear foot for "Removal of Obstructions" for all diameters of pier installed.
5. Options – Government reserves the right to any of the award options within 360 days after contract award
SECTION 00 21 00 - INSTRUCTIONS
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
00 21 00
1. OVERVIEW
This subjective tradeoff solicitation for the construction of the consolidated MILSTAR Satellite Communications (SATCOM) Station at Offutt Air Force Base, Omaha, NE. The selected contractor will deliver this project using a Design-Bid-Build (DBB) project delivery method. This requires the contractor to provide the government with a complete facility and warranty based on the solicitation requirements and subsequent contract award documents.
The estimated magnitude of construction cost of this project is between $25,000,000 and $100,000,000.
The Government intends to award a contract without conducting discussions in accordance with (IAW) FAR 52.215-1. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-compliant for failure to follow this format and may be rejected from further consideration.
All offerors must register in the System for Award Management (SAM.gov) prior to the submission of a proposal.
2. WHO MAY SUBMIT
This solicitation is Unrestricted – Full and Open Competition
All Offerors, including joint ventures, must be registered in the System for Award Management (SAM).
There will be no public opening. All proposals submitted will become, upon receipt, the property of the U.S.
Government and will not be returned. After evaluation of proposals, the original will be retained for the official contract file. Electronic copies of the awardees’ proposal will be submitted to the Field and Area Offices in support of their contract administration functions.
3. GENERAL REQUIREMENTS
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements.
4. BIDDER INQUIRY
Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/. All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date in order for inquiries to be given consideration or actions taken prior to the receipt of offers. All timely questions and approved answers will be made available through ProjNet.
The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. In the event the Bidder Inquiry method is unavailable and issue resolution is unsuccessful, inquiries may be submitted via email to the Contract Specialist listed below. Inquiries considered proprietary by the prospective vendor may also be submitted via email.
Contract Specialist – Primary POC: Gloria “Nancy” Garside Gloria.Garside@usace.army.mil Contracting Officer – Constance Ellard Constanct.R.Ellard@usace.army.mil To submit and review Bidder Inquiries, prospective offerors will need to use the Bidder Inquiry Key and instructions listed below. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question has been processed by the Government technical team.
Solicitation Number is: W9128F22R0028 Bidder Inquiry Key is: 8BW85H-ZEP7FB A. Registration for ProjNet Bidder Inquiry Access
If you are already registered, go to (b) Entering Bidder Inquiries in ProjNet Bidder Inquiry System below. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
1. Identify the Agency: This should be marked as USACE.
2. Key: Enter the Bidder Inquiry Key listed above.
3. Email: Enter the email address you would like to use for communication.
4. Click Continue
5. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone.
7. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
8. Click Add User.
9. Once this is completed you are now registered within ProjNet and are currently logged into the system.
B. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
1. Identify the Agency: This should be marked as USACE.
2. Key: Enter the Bidder Inquiry Key listed above.
3. Email: Enter the email address you used to register previously in ProjNet.
4. Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
5. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
6. Follow online screen instructions to enter specific bidder inquiries for the project.
Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
5. PLAN HOLDERS LIST
For viewing a list of interested vendors (i.e. Plan Holders List) and receiving notifications or email of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login.
If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on "Add me to Interested Vendors" for the solicitation.
6. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION, AND CONTRACT AWARD
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
See Section 00 22 00, SUPPLEMENTARY INSTRUCTIONS, PROPOSAL SUBMISSION, AND
EVALUATION.
FEDERAL, STATE AND LOCAL TAXES
It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes.
See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL TAXES.
Subcontracting plans are required to be approved prior to Contract Award. The approved subcontracting plan (to include goals) will become a material part of the contract.
Failing to Submit an Acceptable Subcontracting Plan. An apparent successful offeror failing to submit a subcontracting plan which demonstrates a reasonable effort to meet the goals listed above or provide an explanation why lesser goals are proposed (upon request), will be considered as non-responsive and not considered eligible for award of the contract.
Questions or Assistance Needed in Developing Subcontracting Plan. For any questions or assistance needed in developing the subcontracting plan, contact the Contract Specialist or District's Deputy for Small Business (See paragraph: OFFEROR'S QUESTIONS AND COMMENTS. Please contact the Contract Specialist listed or the District's Deputy for Small Business your inquiries to 402-995-2919).
7. FORMAT SIZE OF SUBMISSIONS
All portions (other than an organization chart, Gantt charts or drawings (if provided)) shall be in 8-1/2" x 11" format.
8. PROPOSAL SUBMITTAL INSTRUCTIONS
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically via email directly to:
Gloria “Nancy” Garside: Gloria.Garside@usace.army.mil
Constance Ellard: Constance.R.Ellard@usace.army.mil All submissions shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as “SEPARATE” single files. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission. Offerors are encouraged to send both files in the same email, if possible.
For proposals that are too large for email, offerors may contact the two personnel listed above and request a DoD SAFE file transfer drop off request. This request does not constitute the submission of an offer, it does not absolve the offeror the responsibility of a timely submission, nor does it extend the submission deadline. Offerors are responsible to ensure that the Government has the offeror’s complete proposal no later than the submission deadline.
For the purposes of determining whether the proposal was received "late" in accordance with FAR 15.208, the time and date the file(s) are received by the USACE Outlook Server or submission time for DoD SAFE will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal.
Page limitations for each factor are identified within the instructions, where applicable. Title sheets, tables of contents, dividers, and blank pages are not included in the page limitations and will not be counted as such. A one-page cover letter or title sheet is recommended as the first page of each file identifying your firm’s name, the file’s title, and identifying any applicable contractor team arrangements as defined in Volume II, Tab C. Any extraneous information or cover letters that provide additional information about your firm that is not requested by this solicitation will not be reviewed or evaluated.
Pages for each factor should be separately and sequentially numbered (i.e.: the first page submitted for evaluation for each factor should be “1”). All text shall be at least 10 pt. font and legible. All text shall be typed and single-spaced. Each page shall be 8-1/2” x 11” (organizational chart, risk assessment and project schedule are the only documents that may be submitted on an 11” x 17”). Margins should be no less than 1” (right, left, top, and bottom).
Pages that exceed the page limitations for any factor will not be reviewed and the information contained on those pages will not be considered for evaluation. Page limitations are per factor (i.e.: an Offeror may not reduce the page count for one factor to submit additional pages for another factor).
a. Proposal Submittals Each submittal must contain Volume 1 and Volume 2 files named and structured as outlined below. Note the company name may be abbreviated.
i. Volume 1: Technical Proposal and Past Performance Information FILE NAME: W9128F22R0028_Company Name_Volume_1_Technical_Proposal
Proposals must be presented in the following order and format:
Table 1: Volume I Evaluation Factors
Location Description
TAB A Factor 1 – Past Performance and Experience
TAB B
Factor 2 – Project Management Plan, Technical Approach, and Summary Schedule
TAB C Factor 3 – Key Personnel
TAB D Factor 4 – Small Business Participation Plan
8.1.2. Volume 2: Price Proposal, Cost Information and Representations, Certifications, and Other Statements of Offerors
FILE NAME: W9128F22R0028_Company Name_Volume_2_Price_Proposal
CONTENTS:
Table 2: Volume II Required Submittal Item
Location Description
TAB A SF1442 and Acknowledgement of Amendments
TAB B Representations & Certifications
TAB C Joint Venture or Teaming Arrangement (if applicable).
TAB D Factor 5 – Pricing Schedule
TAB E Evidence of Bondability
9. Late Submissions For the purposes of determining whether the proposal was received “late”, in accordance with FAR 15.208, the date and time the file(s) are received via email by the Contract Specialist(s) will be the time and date the Government received the proposal.
10. SUBMISSION DEADLINE
Electronic proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
11. PROPOSAL CRITERIA
Offerors shall submit a proposal that meets or exceeds the minimum requirements of these Specifications through the replacement, modification or refurbishment of components identified in 00 10 00, PRICING SCHEDULE, of this solicitation.
Following the proposal cover sheet, Volume I shall be organized into the following tabbed sections:
VOL 1, TAB A: PAST PERFORMANCE AND EXPERIENCE
Submission Requirements: Page limitations: no more than a one (1) page narrative per project; no more than one
(1) page per project to present photographs or images (no text other than an image title shall be included on that page); and no page limitations on official past performance records such as PPQs and/or CPARS; and no more than a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted projects.
CONSTRUCTION PROJECT EXAMPLES: The Offeror should submit three (3) projects similar in project size, scope, and complexity to this project that were performed by the Prime Offeror. One of the three project examples shall demonstrate experience on the construction of a High Altitude Electromagnetic Pulse (HEMP) facility that is at least 6,000 SF. The HEMP experience can be performed by the Prime Offeror, JV, or committed sub-contractor.
The other two projects shall demonstrate experience on the construction of large commercial or military buildings that are at least 15,000 SF and construction cost of $50M or greater value. Projects whose contract award was less than $50M shall not be considered for evaluation. In addition to the three (3) project examples, the Offeror may submit a one (1) page narrative to describe any past teaming experience between current team members as it relates to any or all submitted project examples. Any information presented beyond any of the page limits will not be evaluated.
Each project example submitted shall meet the following criteria:
1. The project shall have been awarded to the Offeror (either singly or one of the participants in a JV named on the SF1442 for this solicitation). The company shall have been the Prime Contractor for the past project, either singly or as a member of the Joint Venture to which it was awarded.
2. The project shall be complete within 10 years from the date the offers are due.
The table below provides example scenarios based on the requirements above:
Scenario Examples Project Examples Qualify for Evaluation for Factor 1 (if all other requirements are met)
1 Past project was awarded to Company X only. Company X is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028.
Yes
2 Company Y has formed a JV with Company Z (forming Company “YZ”).
Past project was awarded to Company Y only. Company YZ is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028.
Yes
3 Company Y has formed a JV with Company Z (forming Company “YZ”).
Past project was awarded to JV Company YZ. Company YZ is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028.
Yes
4 Past Project was awarded to Company “AY,” a JV composed of Company A (not Prime Offeror for RFP W9128F22R0028) and Company Y. Company Y has formed a JV with Company Z (forming Company “YZ”). JV Company YZ is proposing as a Prime Contractor and has signed the SF 1442 for W9128F22R0028.
Yes
5 Company Y has formed a JV with Company Z (forming Company “YZ”).
Company YZ is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028. Company Y performed work on the past project, but was not the Prime Contractor for the past project (either singly or as a member of a JV).
Yes*
6 Company X is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028. Company X will use Company R as a teaming member/subcontractor but Company R is not part of a JV with Company X for W9128F22R0028. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not Company X (singly or as a member of a JV).
7 Company Y has formed a JV with Company Z (forming Company “YZ”).
Company YZ is proposing as a Prime Contractor for W9128F22R0028 and has signed the SF 1442 for W9128F22R0028. Company YZ will use
Company R as a teaming member/subcontractor but Company R is not part of the JV. The past project was awarded to Company R as a Prime Contractor (singly or as a member of a JV), but not to Companies Y or Z (singly or as a member of a JV).
* For items 5, 6 and 7 of this chart, Yes, if subcontractor experience is submitted for consideration as part of the proposal, the offeror should include a commitment signed by offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, subcontractor references will not be evaluated or considered. Affiliate companies, sister companies, teaming arrangements, joint venture agreement, etc., will be considered provided that sufficient documentation is included in the proposal. The primary offering entity must demonstrate that the affiliate will perform significant and critical aspects of the contract if awarded. Documentation includes a copy of the signed arrangement such as documented affiliation, a copy of the teaming agreement, or a copy of the joint venture agreement.
Project information per project example should CLEARLY include:
Summaries for each project submitted to include the name, address, telephone and email of a representative of the owner (as well as one alternate individual not affiliated with your firm) familiar with your firm’s experience on the project that can verify the experience cited;
Original contract award amount and final construction cost;
Location of project;
Original contract completion date and actual completion date (Month/Year);
Identify if the project was a construction project or a design-build project;
Percentage (%) performed by the Prime Offeror; and Percentage (%) and type of work subcontracted out.
CPARS record or a complete PPQ shall be submitted for each project submitted under this factor.
Do not include extraneous information that is not requested.
The Government reserves the right to contact any persons who may be knowledgeable about the project or projects (this is not limited to contracts identified by the Offeror) submitted in an Offeror’s proposal. In addition, the Government may review and take into consideration other sources of information pertinent to the evaluation of the Offeror’s Past Performance, including both the previous experience projects and other similar projects performed by the Offeror. Other sources may include, but are not limited to, Past Performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all Commercial and Government Entity (CAGE)/DUNS numbers of team members (partnership, Joint Venture, teaming arrangement, or parent firm/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
If subcontractor experience is submitted for consideration as part of the proposal, the offeror should include a commitment signed by offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, subcontractor references will not be evaluated or considered.
While the Government may elect to consider data from other sources, the burden of ensuring detailed, current, accurate and complete Past Performance and Experience information rests with the Offeror. The past performance information required in this solicitation shall be provided by the Offeror. Proposals that do not contain the information requested risk rejection or less favorable performance rating by the Government.
Obtaining Past Performance Records:
Past performance records may be obtainable by Offerors using one of the following methods:
(1) Accessing Past Performance information directly from Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/ for CCASS completed before 27 June 2014 and for merged CPARS completed after 1 July 2014. CPARS is an electronic repository of performance information collected by all the major federal performance reporting systems and can be accessed at the aforementioned website.
All Department of Defense (DoD) employees (military and civilian), including DoD Contractors that are working on site (military/government facilities) or contractors working offsite using Government Furnished Equipment (GFE) are required to use certificates from DoD Public Key Infrastructure (PKI) to access CPARS. If the contractor doesn't work on site or with GFE they are encouraged to obtain and use a certificate from an External Certificate Authority (ECA). For DoD users, the use of PKI Login is Mandatory. Federal and Contractor users can use the PKI login category if they have PKI.
External Certificate Authorities (ECAs) and Interim External Certificate Authorities (IECAs) provide digital certificates to the DoD's private industry partners, contractors using their own equipment or working in non-government facilities, allied partners, and other agencies.
Additional information about the PKI certificate can be found at:
https://www.cpars.gov/sysreq.htm#collapseSysDoc1
The Offeror will also need a DUNS number and Marketing Partner Identification Number (MPIN) to log onto CPARS. The MPIN number was selected by whoever registered your company in the System for Award Management (SAM) Registry at https://sam.gov/. If you do not know your MPIN number, you will need to contact the SAM help desk by emailing them from the email link on the SAM webpage. Please be aware that they will only release the MPIN number to the person who originally registered your company. Additional instructions on locating your MPIN is in the Frequently Asked Questions (FAQs) section under the Help tab.
or -
(2) Past Performance Questionnaires (PPQs) may be used to provide or supplement a firm’s past performance with other than U.S. Governmental clients. A PPQ form is attached to this solicitation for convenience (see Attachment 1). Contact your client point of contact (POC) for the project you need a past performance record and request the POC to complete the PPQ. The PPQ included in this solicitation is provided for the Offeror to submit to the client for each project the Offeror may need a past performance record for to meet the requirements in this synopsis. Ensure correct phone numbers and email addresses are provided for the client POC. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). It is the Offeror’s responsibility to follow-up with client POCs to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Gloria “Nancy” Garside, Contract Specialist, Gloria.Garside@usace.army.mil, and Constance Ellard, Contracting Officer, Constance.R.Ellard@usace.army.mil, prior to proposal closing date.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information.
VOL I, Tab B: PROJECT MANAGEMENT PLAN, TECHNICAL APPROACH, AND SUMMARY
SCHEDULE
Submission Requirements (The page limit for this factor is fifteen (15) pages total including organizational approach, technical approach, proposed duration, and schedule).
Provide a narrative that describes the Offeror’s Project Management approach to executing the contract pursuant to the following requirements. Clearly and concisely describe the organizational, technical, and risk management approaches to project management and execution, proposed contract duration, and summary schedule.
Organizational Approach. List and describe key subcontractors, their roles and responsibilities, how they will be utilized, and any contractual arrangements that have been established to this point. Clearly describe any teaming or joint venture arrangements, including a clear description of each entity’s roles and responsibilities on the project. Identify the work (including %) which will be self-performed by the Prime Contractor. The Offeror shall document unequivocal teaming arrangements with its lead entity(ies) and key subcontractors. Describe the proposed management structure for the team, describing how the construction process and the authorities and the delegations of authority within the team will be managed. Include an Organizational Chart, including the proposed quality control group(s). Include key personnel in the organization chart. Clearly illustrate key positions, names of the personnel, their firm affiliations, job locations and their job/position title within the organization (see specification 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and 01 45 00.00 10
QUALITY CONTROL).
Technical Approach for Construction. Describe the technical approach to construction of the facility and the HEMP structure. Provide a complete narrative of the approach to the HEMP construction. Include any considerations to the project which will increase efficiencies in the schedule or increased quality. This approach should also include site security and access management procedures.
Risk Assessment. In spreadsheet format, submit a list of risks specific to this project. Identify the degree of risk, impact of the risk (schedule, cost, safety, etc.), whether it’s within or outside the Offeror’s control, and a brief statement on how to mitigate the risk(s).
Summary Schedule. Provide a schedule on your plan to complete all work based on an arbitrary estimated, non-binding, Notice to Proceed date of 31 March 2023. Provide a summary schedule or diagrams separately in an appendix to the TAB. Clearly label the summary schedule under the TAB. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10: Project Schedule. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration. Give attention to the following features:
1. Show the overall construction phase for the facility, the sitework and the utilities. Include any long lead items and any fast-tracking starts. It isn’t necessary to show the detailed breakdown construction by trades.
2. Show schedule line items for environmental permits, notifications, and utility connection permits.
3. Show turnover of facility. The duration to complete the facility and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.
4. Show as-built submissions (See section 01 78 39.00 24 AS-BUILT DRAWINGS).
5. Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, or weather). Indicate the anticipated overall critical path on the schedule.
VOL I, Tab C: KEY PERSONNEL
Submission Requirements: The page limit for this factor is two (2) pages per resume for a total of no more than six (6) pages.
Submit resumes for the following key personnel. If more than two (2) pages are submitted per resume, only the first two (2) pages will be evaluated. Each resume should demonstrate experience and expertise in the same roles as proposed for this solicitation.
- Project Manager responsible for the overall project: The project manager should have five (5) or more years of experience as a project manager, managing construction of large commercial or military buildings.
- Contractor Quality Control (CQC) System Manager(s): CQC System Manager should have 10 years of experience as a Quality Control Manager on construction of large commercial or military buildings. CQC System Manager shall comply with personnel requirements listed in Section 01 45 00.00 10.
- General Superintendent: The superintendent should have ten (10) years’ experience as superintendent managing multiple trades and subcontractors.
Each resume should include the following information:
- Proposed role/title for this solicitation
- Recent relevant projects: information should include the project name, role on project, prime contractor, owner, dollar amount, date of start and completion of role referenced, and brief scope of each project listed.
VOL I, Tab D: SMALL BUSINESS PARTICIPATION PLAN
Submission Requirements: There is no page limitation for Small Business Participation Plan/ Commitment Document) This factor requires all Offerors (both large and small businesses), regardless of size status to address their planned small business usage for this project. All Offerors are required to provide a Small Business Participation Commitment Document (SBPCD). All offerers, including small businesses, must provide a Small Business Participation Plan and the evaluated small business requirements will be incorporated into the resultant contract. It should address their corporate approach and methodology for acquiring, soliciting and using small businesses in the performance of this contract. All documentation for this factor should address the Offeror's commitments to providing subcontracting opportunities, as well as evidence of planned and /or continued outreach efforts to encourage and use small businesses. This SBPCD should include a breakdown of small business subcategories to be used as shown on the chart in (d) below.
Separate from the Small Business Participation Plan (Factor 4) required by all offerors, a Subcontracting Plan will ONLY be required from the Apparent Successful Offeror if the firm is an Other Than Small Business (OTSB) -meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003. The Apparent Successful OTSB must submit an acceptable subcontracting plan to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. Please do not submit a Subcontracting Plan for Factor 4.
The SBPCD should demonstrate commitment to all federally designated categories of small business: Small Businesses (SBs), Veteran-Owned Small Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) HUBZone Small Businesses (HUB), Small Disadvantaged Businesses (SDBs), Woman- Owned Small Business (WOSBs), and when applicable, Historically Black Colleges/Universities/Minority Institutions (HBCU/MIs). Offeror’s are reminded of the eSRS submission requirements prescribed in FAR
19.704 and FAR 52.219-9.
Offerors should propose the level of participation of small businesses (as a small business prime, joint venture, teaming arrangement, and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area. The SBPCD should identify all categories for participation as part of the Offeror's team. This should include a general description of the type of work, product or service anticipated to be supplied via a small business concern.
A specific format is not required, however, items stated below (a) through (f) shall be provided as a minimum.
(a) Provide a Narrative addressing the corporate approach and methodology for acquiring, soliciting and using small businesses in the performance of this contract. The Narrative should address the Offeror's commitment to providing subcontracting opportunities, as well as evidence of planned and /or continued outreach efforts to encourage and use small businesses. The Narrative should provide detailed supporting documentation regarding the individual commitment expressed in percentages for evaluators to determine the goals stated are realistic.
(b) Check the applicable size and categories for the PRIME Offeror for this procurement – Check all applicable boxes:
{___} Large Prime
- or - {___} Small Business Prime; also categorized as a:
{___} Small Disadvantaged Business (SDB) {___} Woman-Owned Small Business (WOSB) {___} Historically Underutilized Zone (HUB Zone) Small Business {___} Veteran Owned Small Business (VOSB) {___} Service Disabled Veteran Owned Small Business (SDVOSB)
(c) Submit the total percentages of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime, joint venture, teaming arrangement, and subcontractors). Percentages are based on Total Contract Value. For this project, the minimum small business participation goal should be 20% of the Total Contract Value performed by the Small Business Community.
Total Percentage planned for Large Business(es): = __________% Total Percentage planned for Small Business(es): = __________% (Small Business Prime Contractors – Include yourselves in the above percentage.)
For example: If you are a Small Business Prime Contractor and will be doing 40% of the work and you will be subcontracting another 20% of the Total Contract Value to other small business firms, then your Total Percentage planned for Small Business will equal 60%.
(d) Indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
For example: Firm A (WOSB and SDVOSB) performing 2%; and Firm B (SDB, HubZ and WOSB) performing 3%. Results equate to: SB 5%; SDB 3%; HubZone 3%; WOSB 5%; SDVOSB 2%;
VOSB 2%;). SDVOSBs are also VOSBs automatically; however, VOSBs are not automatically SDVOSBs.
Small Business _________% Small Disadvantaged Business _________% HUB Zone Small Business _________% Woman Owned Small Business _________% Service-Disabled Veteran-Owned SB _________% Veteran-Owned Small Business _________%
(e) Identify the Prime Offeror and type of service/supply that the Prime Offeror will provide. Then list each of the intended subcontractors and principal supplies/services to be provided by that subcontractor. Provide the Commercial and Government Entity (CAGE) code for the Prime and each intended subcontractor. Also, provide the anticipated NAICS codes(s) that the Prime Offeror believes best describes the product or services being acquired by its subcontracts with each intended subcontractor. Small business Primes and small business subcontractors that qualify as small businesses in multiple small business categories should be listed in each applicable small business category.
Firm Name CAGE Code
NAICS
code
Type of Service
Prime Offeror
Large Business
Small Business
SDB
WOSB
HUBZone
VOSB
SDVOSB
Note: Pursuant to Sections 8(d) of the Small Business Act, a business is considered small for Government procurements if it does not exceed the size standard for the NAICS code that the prime contractor believes best describes the product or services being acquired. In other words, the size of the prime’s suppliers is determined by the applicable NAICS code of their joint venture, teaming partner, or subcontract, which may or may not be the same NAICS code as the one for your prime contract with the Government.
(f) Describe the extent of commitment to use small businesses (e.g., what types of commitments, if any, are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.) Provide documentation regarding commitments to small business for this effort. Copies of such agreements should be provided as part of your small business participation plan and will not count against the page limitation for this volume.
(g) Include a summary with small business participation data for the projects submitted under Factor 1, Past Performance and Experience. At a minimum, include total small business participation as a percentage of the Total Contract Value, and the CPARS or PPQ rating received for small business participation (as applicable).
VOLUME II
Volume II consists of all information required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15.408 and the requirements set forth below. The Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the price schedule, SF1442 and continuation sheets. Proposals may be determined non-compliant and rejected from further consideration for failure to follow the following format and provide all the items listed below.
Offerors shall include a cover sheet in Volume II as required by FAR 52.215-1 (c) and (2). This provision, entitled “Instructions to offerors – Competitive Acquisition,” is included in full text in Section 00 21 00 of the solicitation. The cover sheet must provide the following information:
1. Solicitation Number
2. Name, address, telephone, and facsimile numbers, and electronic email address
3. Statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item as reflected on the proposal…