D3469200_INT_SID_RTA_221011.pdf
PDF 14 MB Posted
- Attached to
- Construct Consolidated MilStar Satellite Communications (SATCOM) Station OFFUTT AFB, NEBRASKA
- Solicitation number
- W9128F22R0028
About this file
This document provides details on a federal contract opportunity to construct a consolidated MilStar satellite communications station at Offutt Air Force Base in Nebraska. The solicitation number is W9128F22R0028 and is being issued by the Department of the Army Corps of Engineers Engineering District Omaha. The opportunity involves constructing a consolidated MilStar SATCOM station at Offutt AFB to replace existing infrastructure. Responses to the solicitation are due on unspecified dates. The agency and type of work required, as well as the location, are the key salient details provided in this document.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATCOM - MILSTAR Building
OFFUT AFB, Nebraska
Ready to Advertise Design Submittal
Structural Interior Design (SID) Package
Submitted: 11 OCTOBER 2022
U.S. Army Corps of Engineers Omaha District
Contract Number: W9128F-19-F-0010 Contract Task Order: W9128F-21-F-0044
PN OF59
Document Title
Client Name
Interior and Exterior Finishes
Structural Interior Design Package
Table of Contents
Section 1 Narrative of Interior Design Objectives
Section 2 Interior Design Finish Legend
Section 3 Structural Interior Design Interior Finish Selections
Section 4 Room Finish Schedule
Section 5 Interior Finish Floor plans
Section 6 Exterior Finish Legend
Section 7 Structural Interior Design Exterior Finish Selections
For additional information and questions please contact the Designer of Record:
Mickey Warriner, IIDA
Jacobs
Stifel Tower
501 N. Broadway
St. Louis, MO 63102
Phone: (314) 335-4459
Mickey.Warriner@jacobs.com
1. Narrative of Structural Interior Design Objectives
The SATCOM-MILSTAR facility has been designed to support and enhance the daily goals of the users while conforming to the requested scope, and project context.
This facility will have sustainable, durable, and lasting interior finishes as identified in the PCR, and from the kickoff meetings. Design and selection of the structural interior design package for the interior finishes will comply with UFC 1-200-01 model building codes, UFC1-120-01 Interior Signage requirements and UFC 3-120-
10 Interior Design requirements.
The administrative offices will have a professional, timeless, and functional corporate aesthetic with pointed locations for accents of color and enhancements of interior lighting to support the overall functionality of the building.
• Offices, classrooms/briefing rooms, and team room will have modular cart tile and resilient wall base for flooring with scuff resistant painted walls in a moderate light reflectance value. Acoustical wrapped fabric panels will be applied in large meeting spaces, acoustical ceiling tile panels will provide a clean ceiling plane aesthetic while also providing necessary sound attenuation to support STC acoustical requirements.
• Corridors, break areas and Mother’s room will have resilient floor tile with sound attenuation to support
STC acoustical requirements.
• resilient wall base and scuff resistant wall paint and acoustical ceiling tile
• panels.
• Break room millwork will have solid surface countertops, laminate base
• cabinets in a wood aesthetic to support the grounded feeling of being with
• nature. Base cabinetry will accommodate pot and pan storage since the
• break area will have an oven/stove, refrigerator, microwave, coffee machine
• and dishwasher Drawers will be designed to allow for flatware and cutlery
• as required for cooking basic items. Upper cabinets will provide added storage for
• plates and glasses, etc.
• Windows will have mesh shading material with a defined percentage of openness to perceive the exterior surroundings while in the down position.
• Meeting spaces will have a second room darkening layer to allow for key viewing of the room monitors on extra bright days.
• Classroom/briefing and team room spaces will have glass mounted magnetic large size marker board panels for versatility and ease of cleaning writable surfaces.
• Toilet rooms, locker room and janitor closets will have resinous flooring with integral wall base on the floors and one wet wall of porcelain tile up to ceiling, showers will have solid surface base, all paint will be semi-gloss and scrub able/washable with mildew resistant properties.
• Physical Fitness room will have recycled rubber flooring, resilient wall base and walls will be painted with semi-gloss scrub able/washable mildew resistant properties. One wall will have mirrors applied near the free weight rack area. Ceilings will be acoustical ceiling tile panels in the fitness area, that are mildew resistant, sag resistant and vinyl surfaced for cleanability.
• Support utility spaces will be painted with a resilient wall base applied and sealed concrete floors.
• Central corridor will have fabric wrapped panels mounted in front of the hardwall office area to help minimize sound around those rooms. A recessed wall channel picture rail will be installed along this area for mounting pictures via suspended cable hangers/clips.
The operations area will have eight workstations in the Ops workstation area. The flooring will have static dissipative resilient tile over a raised access floor. Walls will be painted, and acoustical ceiling tile panels will be in briefing, open office, and work room spaces. Glass magnetic writeable markerboards will be hung in the meeting and open office space for collaborative use and can be easily cleaned and maintained. The ceiling area in the remainder of the ops floor will be open to structure.
Furniture, Fixtures and Equipment (FF&E) Package
The SATCOM/MILSTAR facility is a 24/7 365 operating facility and with that information in mind, interior furnishings are selected based on their functionality, durability, adaptability, and versatility of each item. Furniture, Fixtures &
Equipment (FF&E) is funded separately from the construction contract as a bid option, FF&E will be procured by the end user based on specifications provided in the FF&E package. Infrastructure to support FF&E will be included in the construction contract. The General Contractor is responsible for all electrical connections from the FF&E to the building, systems furniture selected must have dedicated neutral branch wiring components, and all telecommunications installation.
Offices will have modular desking units with lower and upper storage capabilities.
Desk and workstation units will have adjustable height abilities from sitting to standing at the main worktop to promote better ergonomic functionality. Task seating will be selected for its ergonomic abilities and allow for multiple adjustments to support a variety of personnel types and sizes. Guest seating will be comfortable, durable, and timeless in it’s aesthetic. Storage tower will support file storage, coat storge and shelving within a lockable cabinet. Monitor arms and task lighting will be provided to allow for ease of adaptability within the office as the day’s light quality changes on the outside of the facility. LED task lighting will have motion sensors and allow for the ability to brighten or dim as required.
Break room will have laminated rectangular tables to accommodate a few members or all for versatility in use of space for impromptu meetings and collaboration.
Overall, the finishes, furnishings and equipment will be selected to support sustainable, maintainable, and durable selections that support the user’s needs, while providing a pleasing overall corporate professional aesthetic. Where possible, desks will be specified with adjustable height properties so that users can adapt and stand and work during portions of the day. Selections of finishes will be made with a nod to the geography of the local environments around and outside the base and state of Nebraska. Carpet patterns will mimic the big beautiful, clouded skies in pattern, flooring and resilient tile will reflect the geometric structure formations of communications dishes and the subtle forms of cracked earth and the peaks and valleys of Toadstool park. Paint selections are derived in two schemes a warm palette and a cool palette with paint selections that support the beautiful sunrises and sunsets across the plains within the surrounding landscapes. Countertops and cabinetry are selected with solid surface materials that will allow for timeless and durable materials.
2. Interior Design Finish Legend
FINISH SCHEDULE NOTES
1. ALL BRANDS, MANUFACTURERS' PRODUCTS, COLORS AND PATTERNS
BEING INDICATED ARE FOR REFERENCE PURPOSES ONLY. THE
REFERENCES USED ARE TO INDICATE THE PROJECT'S NEEDS AND ARE
NOT INTENDED TO LIMIT THE SELECTION OF OTHER MANUFACTURERS'
PRODUCTS MEETING THE SALIENT CHARACTERISTICS OR PERFORMANCE
REQUIREMENTS OF THE CITED MATERIAL OR EQUIPMENT.
2. ALL FINISHES TO BE INSTALLED AND/OR APPLIED IN ACCORDANCE WITH
THE MANUFACTURERS WRITTEN INSTRUCTIONS. REFER TO THE CID
PACKAGE FOR FINISH SAMPLES.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.
4. REFER TO SHEET A-600 FOR THE ROOM FINISH SCHEDULE.
5. EXPOSED HEMP SHIELD IS PAINTED PT-1.
6. ALL GUARD RAILS, ROOF ACCESS LADDERS, CEILING HATCHES TO MATCH
ADJACENT PAINTED WALL OR CEILING FINISH UNLESS OTHERWISE
NOTED..
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
I-601
F
IN
IS
H
S C
H E
D U
L E
F
IR
S T
F L
O O
R
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
M W
A R
R
IN
E R
J W
IS
E
K D
IC
K
E N
S
C .O
B E
IR
N
E
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
FINISH LEGEND
ITEM CODE DESCRIPTION MANUFACTURER MODEL COLOR SIZE NOTES
FLOORING
CPT-1 CARPET TILE -FIELD MILLIKEN SOUTHERN ANALOG / DOUBLE EXPOSURE DE617 VIGNETTE 20" X 20" CLASSROOM , MEETING ROOM CARPETING
CPT-2 CARPET TILE -OFFICES MILLIKEN SOUTHERN ANALOG / VIEWFINDER VF217 VIGNETTE 20" X 20" GENERAL CARPETING
CPT-3 CARPET TILE - ENTRANCE JJ INVISION ALTER EGO 1837 OPERATIVE 24" X 24" ENTRY FLOORING
CPT-4 CARPET TILE - STATIC DISSIPATIVE RAISED ACCESS FLOOR STATIC SMART PRESIDENT SERIES WASHINGTON 24" X 24" OPERATIONS WORKSTATIONS
EFC-1 EPOXY FLOOR COATING STONHARD STONTEC GLACIER PEAK NA TOILET ROOMS, LOCKER ROOM
ESD-1 ELECTROSTATIC DISSIPATIVE FLOOR TILE ROPPE ESD VINYL TILE ELECTRON 702 12" X 12", 24" X 24" SWITCH(12" X 12"),TELECOM CLOSET(12" X12", OPS FLOOR (24" X 24")
LVT-1 LUXURY VINYL TILE MILLIKEN LUMENOLOGY LIGHT WASH LLW265-189 LUCENT 9" x 40" x 3/16" MAIN CORRIDORS, WELLNESS ROOM (RANDOM INSTALLATION)
MAT-1 FLOOR MAT (FREESTANDING) AMERICAN FLOOR MATS WATERHOG ECO ELITE ENTRANCE MAT , BEVELED EDGING ASH GREY TBD BEST FIT FOR IDENTIFIED ENTRY VESTIBULES
RAF-1 RAISED ACCESS FLOORING TATE N/A N/A REFERENCE A-573 REFERENCE ARCHITECTURAL SPECIFICATIONS FOR SUBSTRATE AND SIZE
RF-1 RUBBER ATHLETIC FLOOR TILE TO MARKET ATMOSPHERE METROPOLIS SYNTHESIS SYNTHESIS TM701 BLUE MOON 38" X 38" PHYSICAL FITNESS
SC-1 SEALED CONCRETE SIKA SIKAGUARD - FINISH HIGH GLOSS 616 IMPERMEABLE EPOXY
PRIMER/SEALER CLEAR
NA CLEAN AND PREPARE EXISTING CONCRETE PER MANUFACTURERS RECOMMENDATIONS
TSF-1 TERRAZZO WHEELCHAIR SHOWER RECEPTOR FLOOR FIAT PRODUCTS HUNTINGTON TERRAZZO WHEELCHAIR SHOWER RECEPTOR W/RAMP 100 WHITE PORTLAND CEMENT WITH
WHITE CHIPS
36" X 36" SHOWERS - CONFIRM MEASUREMENT PRIOR TO ORDERING
BASE
EFB-1 EPOXY FLOOR COATING BASE STONHARD STONTEC GLACIER PEAK 4.5" TOILET ROOMS, LOCKER ROOM
RB-1 RUBBER BASE ALLSTATE RUBBER BIG SUR PROFILE A33 4.5" GENERAL WALL BASE WITH TOE AT RESILIENT AND NO TOE CARPET.
WALLS
AWP-1 ACOUSTICAL WALL PANEL FABRIC IMPACT ACOUSTIC FACET RELIEF PATTERN 712 SUCCULENT 70" x 94" x 1" MAIN CORRIDOR, DIRECT GLUE
AWP-2 FABRIC WRAPPED ACOUSTIC WALL PANEL ACOUSTICAL SOLUTIONS ALPHASORB FR701 ACOUSTIC PANEL 468 EUCALYTPUS 48" X 48" x 1" CLASSROOM
FRP-1 FIBER REINFORCED WALL PANEL CRANE VARITEX SANDSTONE TEXTURE (STA) COTTON WHITE 130 SATIN 48" X 96" CLASS A OPTION; 8' WAINSCOT AT JANITOR CLOSET
PHR-1 PICTURE HANGING RAIL- REVEAL CHANNEL FRY REGLET DRYWALL DRMH N/A NA AS INDICATED ON DRAWINGS
PT-1 PAINT - FIELD SHERWIN WILLIAMS N/A SW 7004 SNOWBOUND NA GENERAL FIELD PAINT, MATCH COLOR AS SIGNAGE TEXT FOR INTERIOR AND EXTERIOR SIGNS
PT-2 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 6493 EBB TIDE NA ACCENT PAINT
PT-3 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 9150 ENDLESS SEA NA ACCENT PAINT
PT-4 PAINT - DOOR FRAMES SHERWIN WILLIAMS N/A SW 7073 NETWORK GRAY NA INTERIOR DOOR FRAMES AND METAL DOOR PAINT, SHIPS LADDER
PT-5 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 9109 NATURAL LINEN NA ACCENT PAINT
PT-6 PAINT SHERWIN WILLIAMS N/A SW 7048 URBANE BRONZE NA MATCH COLOR AS THE BACKGROUND FOR EXTERIOR AND INTERIOR SIGNS
WP-1 SOLID SURFACE WALL PROTECTION LG HAUSYS-HI MACS SOLID SURFACE WALL PROTECTION FROSTINE W101 1/4" THICK MATERIAL WALL PROTECTION AT WATER COOLERS UP TO 8'-0"
WT-1 PORCELAIN WALL TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX 12"x 24" MERCURY 610010003001 2"X4" TOILET ROOM WET WALL, VERTICALLY INSTALLED 24"H WITH 2/3 STACK OFFSET (NO LIPPAGE)
WT-2 PORCELAIN WALL TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX MERCURY 2" X 2" MOSAIC MERCURY 610110000571 2"X2" TOILET ROOM SHOWER WALLS
WT-3 PORCELAIN MOSAIC TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX PEACOCK MOSAIC12" X 12" BRIGHT 610110000598 12 5/8" X 11 5/8" BREAKROOM BACKSPLASH
CEILINGS
ACP-1 ACOUSTICAL CEILING TILE ARMSTRONG OPTIMA TEGULAR WHITE 24"X24" 9/16:" SUPRAFINE T-GRID, GENERAL CEILING TILE
GYP-1 PAINTED GYP BOARD CEILING SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA
GYP-2 EPOXY PAINTED GYP BOARD CEILING SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA TOILET ROOMS, LOCKER ROOMS
OTS-1 OPEN TO STRUCTURE SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA STRUCTURE AND OVERHEAD EXPOSED CEILING SPACES
MISCELLANEOUS
A.04 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 8'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS
A.07 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 10'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS
A.08 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 6'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS
CG-1 CORNER GUARD CS ACROVYN TF SERIES 262 DRIFTWOOD 2" LEGS X 84" H AS INDICATED ON DRAWINGS
CP-1 CABINET PULL MOCKETT DROP EDGE CABINET PULL DP269B- MATTE BLACK 7 17/8" W X 1 3/8" D DOOR AND DRAWER PULL, SITS CENTERED OVER TOP OF DOOR/DRAWER TOP.
CPL-1 CELL PHONE LOCKER WITH ENCLOSURE SALSBURY INDUSTRIES CELL PHONE LOCKER 20 A DOORS MODEL 19158-20 ALUMINUM 30.5"W X 31"H X 9.25"D FREE STANDING ENCLOSURE #19954 - ALUMINUM
D-1 INTERIOR DOOR FINISH MASONITE ARCHITECTURAL WHITE BIRCH VENEER WITH ROTARY FINISH, CLEAR COAT CLEAR COAT VARIES WOOD INTERIOR DOORS ONLY
DTW-1 DOUBLE TIER LOCKER SCRANTON PRODUCTS HDPE MATERIAL MIDNIGHT NA LOCKER ROOM
GLZ WINDOW GLAZING N/A N/A N/A VARIES REFERENCE ARCHITECTURAL SPECIFICATIONS
GT-1 GROUT LATICRETE UNSANDED GROUT EPOXY GROUT NA 89 SMOKE GREY
LAD-1 SHIPS LADDER OKEEFE CUSTOM PAINTED STEEL NA REFER TO A-130 AND A-140 FOR MORE INFORMATION
LB-1 LOCKER BENCH SEAT SCRANTON PRODUCTS HDPE MATERIAL MIDNIGHT NA LOCKER ROOM
MR-1 MIRROR N/A N/A N/A NA TOILET ROOMS
MR-2 FULL HEIGHT WALL MIRROR N/A N/A NA PHYSICAL FITNESS ROOM 110
PL-1 PLASTIC LAMINATE WILSONART MAIZE WALNUT CROSSGRAIN Y0597-60 MATTE NA MILLWORK CABINETS FACE, DOORS WITH MATCHING EDGE TRIM.
PX.1 PIXEL MOSS SCANDANAVIAN SPACES ACOUSTICAL MOSS WALL ELEMENT MOSS GREEN 12" X 12" X 2.5" MATT PROVIDED BY OTHERS
SS-1 SOLID SURFACE MATERIAL LG HAUSYS-HI MACS SOLID SURFACE COUNTERTOP FROSTINE W101 1/2" X30" X 145" BREAK ROOM/WELLNESS ROOM COUNTERS/WINDOW SILLS
TR-1 PORCELAIN TILING TRIM SCHLUTER SYSTEMS SCHIENE - E 60 EB BRUSHED STAINLESS STEEL 304 MATCH TILE THICKNESS EPOXY FLOOR INTEGRAL WALL BASE AND PORCELAIN Wall TILE TRANSITION
TR-2 PORCELAIN TILING TRIM SCHLUTER SYSTEMS RONDEC RO 90 EB, PROVIDE COORDINATING ENDCAP BRUSHED STAINLESS STEEL 304 MATCH TILE THICKNESS PORCELAIN TILE WALL FINISH OUTSIDE CORNER REVEAL EDGE PROTECTION
TS-1 FLOORING TRANSITION STRIP TARKETT VINYL EDGE TRIM PIECE 1/8" TALL 001 PROFILE, 179 STEEL 90 DEG 1/8" H TRANSITION FOR CARPETING TO 5MM LVT FLOORING
TS-2 FLOORING TRANSITION STRIP TARKETT T-MOULDING 1/4" TO 1/8" 21 PLATINUM CE21A 1/4" TO 1/8", 120' L ROLL CLASS 1
WN-1 WINDOW TREATMENT - MESH ROLLER SHADE MECHOSHADE MECHO / 5% OPENESS ECOVEIL, GREY 0963 VARIES CLASSROOM, OFFICES AND WORKROOM
WN-2 WINDOW TREATMENT - ROOM DARKENING ROLLER SHADE MECHOSHADE CLASSIC BLACKOUT 0700 SERIES 0701 WHITE (OPAQUE) VARIES CLASSROOMS, MEETING ROOMS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
3. Structural Interior Design- Interior Finish Selections
NOTE: *** INDICATES ITEMS NOT AVAILABLE AT TIME OF DELIVERABLE DUE TO
SUPPLY CHAIN SHORTAGES. DUPLICATE SAMPLES ARE ONLY PROVIDED ONCE
AND LABELED WITH ALL LOCATIONS WHERE OCCUR.
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL Acoustic Wall Panel
MANUFACTURER Acoustical Solutions
MODEL
REMARKS Classroom 136
AWP-2 Wall
Alphasorb FR701 Panel, 468 Eucalyptus 48" x 48" x 1"
OTS-1*** Ceiling
Open to structure
Sherwin Williams
SW7007 Bright White
Structure painting
RF-1 Floor
Rubber Athletic Floor
To Market
GYP-2*** Ceiling
Epoxy Painted Gypsum Board Ceiling
Sherwin Williams
SW7007 Bright White
Toilet Rooms, Locker Rooms
GYP-1*** Ceiling
Painted Gypsum Board Ceiling
Sherwin Williams
SW7007 Bright White
ACP-1*** Ceiling
Acoustical Ceiling Tile
Armstrong
Optima Tegular, White, 24" x 24"
General Ceiling Tile 9/16" Suprafine T-grid, White rin
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
Atmosphere Metropolis Synthesis, Synthesis TM701 Blue Moon, 38" x 38"
Physical Fitness
RB-1 Wall Base
Rubber Base
Allstate Rubber
Big Sur Profile, A33
General Base wall base with toe at resilient and no toe at carpet.
AWP-1 Wall
Acoustical Wall Panel Fabric
Impact Acoustics USA
Facet Relief Pattern, 712 Succulent, 70" x 94" x 1"
Corridor
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
LVT-1 Floor
Luxury Vinyl Tile
Milliken
Lumenology Light Wash, LLW265-189 Lucent, 3/16" x 9” x 40”
Main Corridors and Wellness Room
ESD-1 Floor
Electrostatic Dissipative Tile
Roppe
ESD Vinyl Tile, Electron 702, 12" x 12", 24" x 24" (raised access flooring)
Switch and Telcom Rooms
EFC-1, EFB-1 Floor with 4.5" Integral Wall Base
Epoxy Floor Coating
Stonhard
StonTEC, Glacier Peak
Toilet Rooms, Locker Room
CPT-4 Floor
Static Dissipatove Carpet Tile - Raised access floor
Julie Industries, Inc - Static SmartPlus Tile Level 3
Presidential, Washington, 24" x 24"
Ops Workstations Flooring
CPT-3 Floor
Carpet Tile - Entrance
JJ Invision
Alter Ego, 1837 Operative, 24" x 24"
Entry flooring
CPT-2 Floor
Carpet Tile -Office
Milliken Floors, Southern Analog/Viewfinder
VF217 Vignette, 20" x 20"
Office Flooring
CPT-1 Floor
Carpet Tile - Field
Milliken Floors, Southern Analog/Double Exposure
DE617 Vignette, 20" x 20"
Classroom, Meeting Room Carpeting
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
Wall
Corner Guard
CS Specialties
Acrovyn Corner Guards, TF Series, 262 Driftwood
Locations as noted on drawings
CG-1
Wall
Paint
Sherwin-Williams
SW 7048 Urbane Bronze
Match color as the background for exterior and interior signs
FRP-1*** Wall
Fiber Reinforced Panel
Crane
Varietex Sandstone Texture (STA), Cotton White 130 Satin, 4'-0" x 8'-0"
Class A Option; 8' Wainscot at Janitor Closet
PT-6
Paint -Accent
Sherwin-Williams
SW 9109 Natural Linen
Accent Paint
PT-5 Wall
PT-4 Wall
Paint-Door Frames
Sherwin-Williams
SW 7073 Network Gray
Interior Door Frames and Metal door paint, ships ladders
PT-3 Wall
Paint -Accent
Sherwin-Williams
SW 9150 Endless Sea
Accent Paint
PT-2 Wall
Paint -Accent
Sherwin-Williams
SW 6493 Ebb Tide
Accent Paint
PT-1 Wall
Paint -Field
Sherwin-Williams
SW 7004 Snowbound
General Field Paint
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE Solid Surface Wall Protection
MATERIAL Solid Surface Wall Protection
MANUFACTURER LG Hausys Hi Macs
MODEL Frostine W101
REMARKS 1/4" thick Wall protection at the water cooler
SURFACE Locker Bench Seat
MATERIAL HDPE Material
MANUFACTURER Scranton Products
MODEL Tufftec Benches, Midnight
REMARKS Locker Room
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SS-1 Solid Surface Countertop
Solid Surface Material
LG Hausys Hi Macs
Frostine W101
Breakroom counter/ Wellness Room Counter/Window Sills, 1/2" Thickness
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
WT-1 Wall
Porcelain Wall Tile
Atlas Concorde USA
Reflex, Mercury,610010003001, 12" x 24", w/GT-1
Toilet Room Wet Wall, vertically installed 24"H with 2/3 stack offset so no lippage.
WT-2
WT-3
DTW-1***
Wall
Porcelain Wall Tile
Atlas Concorde USA
Reflex, Mercury Mosaic,610110000571 , 2" x 2"w/GT-1
Toilet Room Shower Walls
Wall
Porcelain Mosaic Tile
Atlas Concorde USA
Reflex, Peacock Mosaic, Bright, 610110000598 , 4.1" X 3.8" 12 5/8" X 11 5/8" Sheet w/GT-1
Breakroom Backsplash
Double Tier Lockers
HDPE Material
Scranton Products
LB-1***
WP-1
TSF-1*** Terrazzo Wheelchair Shower Receptor
Huntington Terrazzo, 101 White Portland Cement, w/White chips
Fiat Products
ADAWN3636
Toilet room Showers
Tufftec Lockers, Midnight
Locker Room
SURFACE Millwork, Base Cabinets, Front and Face
MATERIAL Plastic Laminate
MANUFACTURER Wilsonart
MODEL Maize Walnut Crossgrain, Y0597-60 Matte Finish
REMARKS Millwork Cabinets
SURFACE Interior Door Finish
MATERIAL White Birch Veneer, rotary finish
MANUFACTURER Masonite Architectural
FINISH Clear Coat
REMARKS Wood Interior Doors Only
SURFACE Cabinet Pull
MATERIAL Metal
MANUFACTURER Doug Mockett
MODEL DP269B - Matte Black
REMARKS Sits over top of door/drawer edge, centered on door/drawer center line.
SURFACE Window Treatment
MATERIAL Mesh Roller Shade
MANUFACTURER MechoShade
MODEL Mecho 5 % Openess, EcoVeil, Grey - 0963
REMARKS Classrooms
SURFACE Window Treatment
MATERIAL Room Darkening Roller Shade
MANUFACTURER MechoShade
MODEL 0700 Classic Blackout/Opaque/0701 White
REMARKS Classrooms
SURFACE Raised Access Flooring System
MATERIAL N/A
MANUFACTURER Tate
MODEL Reference A-573
REMARKS Refer to A-600 for material that will reside on the floor.
SURFACE Sealed Concrete
MATERIAL Sealer
MANUFACTURER Sika
MODEL Sikaguard - Finish High Gloss, 616 Impermeable Epoxy Primer/Sealer Clear
REMARKS Clean and Prepare Existing Concrete Per Manufacturer's Recommendations
SURFACE Cell Phone Locker with Enclosure
MATERIAL Freestanding Aluminum
MANUFACTURER Salsbury Industries
MODEL Cell Phone Locker 20 A Doors , 19158-20, 19954, 30.5"W X 31"H X 9.25"D
REMARKS Refer to Architectural for installation details.
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
PL-1
D-1
CP-1
WN-1
WN-2
RAF-1***
SC-1***
CPL-1***
SURFACE Window Glazing
MATERIAL Tempered Glass
MANUFACTURER N/A
MODEL N/A
REMARKS Reference Architectural Specifications
SURFACE Grout
MATERIAL Unsanded Grout
MANUFACTURER Laticrete
FINISH Epoxy Grout 89 Smoke Grey
REMARKS Used with WT-1-3
SURFACE Ships Ladder
MATERIAL Painted Steel
MANUFACTURER OKEEFE
MODEL N/A
REMARKS Refer to A-130 and A-140 for more information
SURFACE Floor Mat (Freestanding)
MATERIAL Waterhog, Nylon fiber mat with beveled edging
MANUFACTURER American Floor Mats
MODEL Ash Grey, Waterhog Eco Eliste Entrance Mat
REMARKS Reference architectural specifications
SURFACE Mirror
MATERIAL TBD
MANUFACTURER N/A
MODEL N/A
REMARKS Reference architectural specifications
SURFACE Full Height Wall Mirror
MATERIAL N/A
MANUFACTURER N/A
MODEL N/A
REMARKS Reference architectural specifications
SURFACE Pixel Moss
MATERIAL Acoustical Moss Wall Element
MANUFACTURER Scandanavian Spaces
MODEL Moss Green 12" x 12" x 2.5" Mat
REMARKS Provided in FFE Package, Install in Room 136 Ops Workstations
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
GLZ***
GT-1***
LAD-1***
MAT-1***
MR-1***
MR-2***
PX.1
SURFACE Porcelain Tiling Trim
MATERIAL Brushed Stainless Steel 304
MANUFACTURER Schluter Systems
MODEL SCHIENE - E 60 EB
REMARKS Epoxy floor integral wall base and Porcelain Wall tile transition
SURFACE Porcelain Tiling Trim
MATERIAL Brushed Stainless Steel 304
MANUFACTURER Schluter Systems
FINISH RONDEC RO 90 EB, provide coordinating end cap
REMARKS Porcelain Tile Wall Finish outside corner reveal edge protection
SURFACE Flooring Transition Strip
MATERIAL 90 Degree 1/8" W Vinyl Trim Strip
MANUFACTURER Tarkett
MODEL 001 Profile, 179 Steel
REMARKS Transition for Carpeting to 3/16" LVT Flooring
SURFACE Flooring Transition Strip
MATERIAL Rubber T-Moulding 1/4" to 1/8"
MANUFACTURER Tarkett
MODEL(S) 21 Platinum CE21A, 120 Ft. Lengths, Class 1
REMARKS
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN FINISH LEGEND
TR-1***
TR-2***
TS-1***
TS-2***
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
ACP-1***: Armstrong Optima Tegular, White GYP-2***: Epoxy Paint - Wet Areas - Sherwin Williams, SW 7007 Ceiling Bright White
GYP-1***: Sherwin Williams, SW 7007 Ceiling Bright White OTS-1***: Sherwin Williams, SW 7007 Ceiling Bright White
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
RF-1: To Market Synthesis TM701 Blue MoonRB-1: Allstate Rubber, Big Sur Profile, A33
AWP-1: Archisonic Impact Acoustic; Facet 24mm, 712 Succulent
AWP-2: Acoustical Solutions; Alphasorb FR701 Acoustic Panel; 468 Eucalyptus
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
CPT-2: Milliken, Southern Analog/Viewfinder, VF217
CPT-3: JJ Invision; Alter Ego: 1837 Operative
CPT-1: Milliken, Southern Analog/Double Exposure, DE617 Vignette
EFB-1/EFC-1: Stonhard Stontec; Glacier Park
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
LVT-1: Milliken Lumenology Light Wash, LLW265- 189 Lucent
ESD-1: Roppe ESD Vinyl Tile, Electron 702 CPT-4: Static SmartPlus Level 3, Style:
Presidential , Color: Washington
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
PT-1: Sherwin Williams, SW 7004 Snowbound
PT-2: Sherwin Williams, SW 6493 Ebb Tide PT-3: Sherwin Williams, SW 9150 Endless Sea
CG-1: CS Specialties, Acrovyn, 262 Driftwood
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
FRP-1***: Crane Varietex Sandstone Texture (STA), Cotton White 130 Satin
PT-6: Sherwin Williams, SW7048 Urbane Bronze
PT-4: Sherwin Williams, SW7073 Network Gray PT-5: Sherwin Williams, SW9109 Natural Linen
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
WT-1: Reflex, Mercury 11 3/4" x 23 5/8", 610010003005
WT-2: Atlas Concorde USA Reflex, Mercury Mosaic,610110000571 , 2" x 2"
WT-3: Reflex, Peacock Mosaic, Bright, 610110000598 , 4.1" X 3.8", 12 5/8" X 11 5/8" Sheet
TR-2: Schluter Systems
RONDEC RO 90 EB
Brushed Stainless Steel 304
TR-1: Schluter Systems SCHIENE - E 60 EBBrushed Stainless Steel 304
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
DTW-1: Scranton Products, Tufftec Double Tier Lockers; Tufftec Midnight
LB-1:Scranton Products, Tufftec Benches; Tufftec Midnight
WP-1: LX Hausys Hi Macs, Wall Panel, Frostine W101TSF-1: 100 Fiat Products, White Portland Cement w/White Chips
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
PL-1: Wilsonart, Maize Walnut Crossgrain, Y0597- 60 Matte Finish
D-1: Door Veneer Rotary Cut, White Birch, Clear Finish
SS-1: LX Hausys Hi Macs, Frostine W101
STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS
CP-1: Cabinet Pull - Doug Mockett, DP269B - Matte Black
WN-1: MechoShade, EcoVeil, Grey - 0963 WN-2: MechoShade, Classic Blackout 0701 White (Opaque)
4. Room Finish Schedule
GENERAL SHEET NOTES
1. REFER TO FLOOR PLANS FOR PARTITION TYPES.
2. REFER TO INTERIORS I-120 - IF123 FOR FINISH PLANS AND MATERIAL LEGEND.
3. PROVIDE "V" SHAPED CONTROL JOINTS IN GYPSUM BOARD ASSEMBLIES AT
30' - 0" O.C. MAXIMUM OR AS NOTED. COORDINATE LOCATIONS WITH
ARCHITECT PRIOR TO CONSTRUCTION.
4. PROVIDE FIRESTOPPING AT PERIMETERS AND PENETRATIONS OF FIRE
RATED GYPSUM BOARD ASSEMBLIES.
5. ALL FLOOR TRANSITIONS BETWEEN ROOMS TO OCCUR AT CENTERLINE OF
DOOR UNLESS OTHERWISE NOTED. REFER TO FINISH PLANS FOR
TRANSITION LOCATIONS. TRANSITIONS ARE NOT REQUIRED BETWEEN
MATERIALS OF SAME THICKNESS.
6. ALL WALLS TO BE PAINTED PT-1 UNLESS OTHERWISE NOTED. REFER TO
FINISH FLOOR PLAN, INTERIOR ELEVATIONS AND ROOM FINISH SHEET I-602
FOR ACCENT PAINT LOCATIONS. ALL WALLS TO HAVE EGGSHELL FINISH AS
TYPICAL UNLESS OTHERWISE NOTED.
7. ALL EXTERIOR WINDOWS TO RECEIVE WINDOW BLINDS WN-1, DOUBLE
ROLLER SHADES WITH ROOM DARKENING ARE NOTED IN ROOM FINISH
SCHEDULE.
8. PAINT ALL EXPOSED STEEL COLUMNS, BRACES, GIRTS, DECKS, AND
MISCELLANEOUS FRAMING STEEL TO MATCH ADJACENT WALLS UNLESS
OTHERWISE NOTED.
9. ALL MISCELLANEOUS PANELS, FIRE EXTINGUISHER CABINETS, EXPOSED
DUCTWORK, LOUVERS VENTILATION COVERS, AND ANY EQUIPMENT NOT
FACTORY FINISHED, INCLUDING BUT NOT LIMITED TO ASSOCIATED
HARDWARE MUST BE PAINTED TO MATCH ADJACENT SURFACE ON WHICH IT
OCCURS UNLESS OTHERWISE NOTED.
10. REFER TO CEILING PLAN DRAWINGS FOR CEILING FINISH INFORMATION.
11. REFER TO DRAWINGS A-572 FOR TYPICAL MOUNTING HEIGHTS OF
RESTROOM ACCESSORIES.
12. REFER TO DOOR SCHEDULE ON DRAWING A-610 FOR DOOR AND FRAME
FINISH INFORMATION.
13. ALL WALLS TO RECEIVE WALL BASE UNLESS OTHEWISE NOTED. PROVIDE
COVE BASE PROFILE AT ALL RESILIENT AND CONCRETE FLOORING AND
STRAIGHT BASE PROFILE AT ALL CARPET LOCATIONS.
14. INTERIOR DOOR FRAMES ARE PT-4 UNLESS OTHERWISE NOTED.
15. GUARDRAILS AND ROOF LADDERS ARE TO BE PAINTED TO MATCH ADJACENT
MATERIAL FINISH UNLESS OTHERWISE NOTED.
ROOM FINISH SCHEDULE REMARKS
1. CATWALK TO BE PRIMED STEEL WITH METAL GRATE WALKING SURFACE
2. DUAL ROLL (WN-2) WINDOW SHADE ROOM DARKENING/ (WN-1) TRADITIONAL
REQUIRED.
3. BLOCK WALLS FOR WALL MOUNTED GLASS MARKER BOARD (ZCLIP MOUNT)
PROVIDED BY OTHERS. REFER TO INTERIOR DRAWING A-410.
4. BLOCK WALL FOR AV MONITOR PROVIDED BY OTHERS, REFER TO INTERIOR
DRAWING A-410.
5. PROVIDE RECESSED PICTURE RAIL CHANNEL REFERENCE INTERIOR
ELEVATIONS FOR LOCATION.
6. PROVIDE SINGLE ROLL WINDOW SHADE WN-1 IN THIS ROOM.
7. CONCRETE FLOOR IS SEALED ONLY. CONCRETE WALLS ARE EXPOSED.
PAINT ALL EXPOSED STEEL INCLUDING THE HEMP SHIELD ON ALL 6 SIDES,
MATCH PT-1.
8. SHIPS LADDERS LAD-1 REFER TO A-430 FOR MORE INFORMATION.
9. CORRIDOR 101 PICTURE HANGING REVEAL REFERENCE C1/A570.
10. SOLID SURFACE (SS-1) INSET BEHIND WATER COOLER WALL TO WALL UP TO
8'-0" A.F.F.
ROOM FINISH SCHEDULE LEGEND
FLOORS
CONC CONCRETE
CPT CARPET
EFC EPOXY FLOOR
COVERING
ESD ELECTROSTATIC
DISCHARGE TILE
LVT LUXURY VINYL
FLOORING
RAF RAISED ACCESS
FLOORING
RF RUBBER ATHLETIC
FLOORING
SC SEALED CONCRETE
WALL / PARTITIONS
AWP ACOUSTICAL WALL
PANEL
CG CORNER GUARD
FRP FIBER REINFORCED
WALL PANEL
GLZ GLAZING
MR MIRROR
PT PAINT
WT WALL TILE
SS SOLID SURFACE
ROOM FINISH SCHEDULE
BASE
EFB EPOXY FLOOR BASE
NA NOT APPLICABLE
RB RESILIENT BASE
CEILINGS
ACG ACOUSTICAL CEILING
GRID
ACP ACOUSTICAL CEILING
PANEL
EXP EXPOSED TO ABOVE
GYP GYPSUM BOARD CEILNG
PAINT
NA NOT APPLICABLE
OTS OPEN TO STRUCTURE
RESILIENT TILE, AS SCHEDULED
DOOR CL IF APPLICABLE
CARPET TILE, AS
SCHEDULED
POWERHOLD - 5MM TO 3/16"
402003 (ETCHED ALUMINUM)
SEALED CONCRETE
DOOR CL IF
APPLICABLE
RESILIENT TILE, AS
SCHEDULED
POWERHOLD 7/64"
BEVEL CAP 402022
EPOXY FLOORING AS
SCHEDULED RUBBER FLOORING
AS SCHEDULED
DOOR CL IF APPLICABLE SCHLUTER SCHIENE AE
60 AS SCHEDULED
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
A-600
R O
O M
F
IN
IS
H
S C
H E
D U
L E
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
B B
Y E
R S
N B
O Y
E R
K D
IC
K
E N
S
R Y
A W
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
ROOM NO ROOM NAME
FLOOR BASE FINISH WALL FINISH CEILING
REMARKSMATERIAL FINISH NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST MATERIAL FINISH HEIGHT
100 ENTRANCE VESTIBULE CONC CPT-3 RB-1 RB-1 NA RB-1 GLZ / PT-5 PT-5 GLZ / PT-5 PT-5 ACG GYP-1 9' - 0"
101 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5 PT-2 / AWP-1/CG-1 PT-5 ACG ACP-1 9' - 0" 5,9,10
102 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6
103 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6
104 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6
105 CLASSROOM CONC CPT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 PT-1 PT-1 GLZ/PT-2 ACG ACP-1 9' - 0" 2,3,4
106 BREAK ROOM CONC LVT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 GLZ / PT-1 PT-5/WT-3,GT-1 PT-5 / WT-3,GT-1 ACG ACP-1 8' - 10" 4.6
107 VESTIBULE CONC CPT-3 RB-1 NA RB-1 NA PT-5 GLZ / PT-5 PT-5 GLZ / PT-5 ACG GYP-1 9' - 0"
110 PHYSICAL FITNESS CONC RF-1 RB-1 RB-1 RB-1 RB-1 PT-1 GLZ/PT-2 MR-2 / PT-1 PT-1 ACG ACP-1 8' - 10" 6
111 WOMEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 WT-1,2, GT-1 WT-1,2,GT-1 WT-1,2,GT-1 WT-1,2, GT-1 GYP GYP-1 8' - 0"
112 MEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 WT-1,2, GT-1 WT-1,2,GT-1 WT-1,GT-1 WT-1,2, GT-1 GYP GYP-1 8' - 0"
113 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5/CG-1 PT-5/CG-1 PT-2/CG-1 ACG ACP-1 9' - 0"
114 MEN'S CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 WT-1 WT-1 WT-1 PT-1 GYP GYP-1 8' - 0"
115 WOMEN'S CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 WT-1 WT-1 WT-1 PT-1 GYP GYP-1 8' - 0"
116 JANITORS CONC SC-1 RB-1 RB-1 RB-1 RB-1 FRP-1/PT-1 PT-1 PT-1 FRP-1/PT-1 EXP OTS-1 8' - 0"
117 WELLNESS ROOM CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 AWP-1 PT-1 ACG ACP-1 8' - 0"
118 LOCKERS CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-1 PT-1 PT-1 PT-1 GYP GYP-1 9' - 0"
120 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5/CG-1 PT-2/CG-1 PT-5 PT-5/CG-1 ACG ACP-1 9' - 0"
121 TELECOM CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
122 SECURITY CONC SC-1 RB RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
123 ELECTRICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
124 STORAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
125 STORAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
126 WORKROOM CONC CPT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 PT-1 PT-1 PT-2 ACG ACP-1 9' - 0" 2,3,4
127 GARAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
128 MECHANICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
130 VESTIBULE CONC MAT-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
131 CORRIDOR CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-5/CG-1 PT-5/CG-1 PT-5/CG-1 PT-5/CG-1 ACG ACP-1 9' - 0" 10
132 JANITOR CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 FRP-1 PT-1 PT-1 EXP OTS-1 8' - 0"
133 WOMEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 PT-1 WT-1,2,GT-1 PT-1 PT-1 GYP GYP-1 8' - 0"
134 MEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 PT-1 WT-1,2,GT-1 PT-1 PT-1 GYP GYP-1 8' - 0"
135 OPS FLOOR CONC/RAF ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1/CG-1 PT-1/CG-1 PT-1 PT-1 ACG ACP-1
136 CLASSROOM CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-3 AWP-2\PT-1 AWP-2\PT-1 PT-1 ACG ACP-1 9' - 0" 2,3,4
137 WORKROOM CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-3 PT-1 PT-1 PT-1 ACG ACP-1 9' - 0" 2,4,6
138 SUPPLY ROOM CONC/RAF SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACG ACP-1 9' - 0"
139 VESTIBULE CONC MAT-1 NA NA NA NA PT-1 PT-1 PT-1 PT-1 EXP OTS-1 10' - 0"
140 OPS FLOOR WORKSTATIONS CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5 PT-5 PT-5 ACG ACP-1 9' - 0" 4
141 MECHANICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
142 CHILLER CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
143 GENERATOR CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
144 BATTERIES / UPS CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
145 BATTERIES / UPS CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
146 ELECTRICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
147 SWITCH CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
148 SWITCH CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1
150 OBSERVATION SPACE CONC SC-1 NA NA NA NA PT-1 PT-1 PT-1 PT-1 EXP OTS-1 1,7,8
SCALE: 12" = 1'-0"A1
TRANSITION RESILIENT TILE TO CARPET
SCALE: 12" = 1'-0"A2
TRANSITION RESILENT TILE TO SEALED CONCRETE
SCALE: 12" = 1'-0"B1
TRANSITION EPOXY FLOORING TO RUBBER FLOORING
M A
R K
D E
S C
R
IP
T
IO
N D
A
5. Interior Finish Floor Plans
C.4 D.1 D.4 E.1 E.9 F.4 G.1 G.9
9.7 9.5
5.35.3
4.14.1
2.92.9
A B C D E F G H J
E.5
I-121
A1
I-122
A2
I-123
A2
PLAN
NORTH
T R
U E
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
SCALES: KEY PLAN:
B C
A
I-120
F
IN
IS
H
S
IG
N
A G
E P
L A
N F
IR
S
T F
L O
O R
O V
E R
A L L
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
M W
A R
R
IN
E R
J W
IS
E
K D
IC
K
E N
S
C .O
B E
IR
N
E
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
SCALE: 1/16" = 1'-0"A2
FINISH & SIGNAGE PLAN - FIRST FLOOR OVERALL
08 16 3241216
SCALE: 1/16"=1'-0"
M A
R K
D E
S C
R
IP
T
IO
N D
A
111 111 111
M A
T C
H L
IN
E
A
I-
M A
T C
H L
IN
E
A
I-
CPT-1
CPT-2
CPT-3
CPT-4
EFC-1
ESD-1
LVT-1
MAT-1
RF-1
SC-1
MECHANICAL
GARAGE
127 STORAGE
ELECTRICAL
CORRIDOR
TELECOM
SECURITY
STORAGE
WORKROOM
ENTRANCE
VESTIBULE
OFFICE
OFFICE
OFFICE
CLASSROOM
BREAK ROOM
CORRIOR
PHYSICAL
FITNESS
VESTIBULE
MEN'S
WOMEN'S
WOMEN'S
MEN'S
JANITORS
WELLNESS ROOM
LOCKERS
CORRIDOR
SC-1
S C
-1
P T
-2
S C
-1
P T
-3
P T
-3
P T
-3
P T
-2
P T
-5
PT-5
C P
T -1
C P
T -3
C P
T -2
L V
T -1
L V
T -1
C P
T -1
L V
T -1
CPT-3LVT-1
L V
T -1
R F
-1
C P
T -1
L V
T -1
L V
T -1
C P
T -2
C P
T -2
ESD-1
L V
T -1
E F
C -1
EFC-1
EFC-1
EFC-1
EFC-1
LVT-1
PT-2
SC-1
SC-1
SC-1
S C
-1
105105
105105105
S3S4S5
S6
S7 S8
S9
S10
S11
S12 S13 S14
S15
S16
S17 S18
S19
S20
S21
S23
S25
S26
S27
S28
S29
S30
S1
111111 118 118 118
L V
T -1
EQ EQ
S0
GENERAL SHEET NOTES
1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /
FINISHES
2. REFER TO I-601 FOR FINISH LEGEND
3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,
DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).
4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL
INFORMATION.
5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES
ONLY. DO NO APPLY BASE TO CMU WALLS
6. REFER TO A-600 FOR ROOM FINISH SCHEDULE
7. ALL WALLS PAINTED PT-1 UON, TYPICAL
8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT
ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL
9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,
TYPICAL
10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS
ARE PAINTED PT-4 UON.
SHEET KEYNOTES
FLOOR FINISH LEGEND
CARPET TILE-FIELD
CARPET TILE-OFFICES
CARPET TILE - ENTRANCE
CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS
FLOOR
EPOXY FLOOR COATING
ELECTROSTATIC DISSIPATIVE FLOOR TILE
LUXURY VINYL TILE (RANDOM INSTALLATION)
RUBBER ATHLETIC FLOOR TILE
SEALED CONCRETE
FLOOR MAT (FREESTANDING)
PLAN
NORTH
T R
U E
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
SCALES: KEY PLAN:
A
I-121
P A
R T
IA
L F
IN
IS
H
S
IG
N A
G E
P L A
N F
IR
S
T F
L O
O R
A R
E A
A
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
M W
A R
R
IN
E R
J W
IS
E
K D
IC
K
E N
S
C .O
B E
IR
N
E
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
SCALE: 1/8" = 1'-0"A1
PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA A
04 8 16268
SCALE: 1/8"=1'-0"
101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/
MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO
ARCHITECTURAL DETAIL B3/A-570.
105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO
ARCHITECTURAL DETAIL B3/A-570
111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.
113 INSTALL FULL HEIGHT MIRROR; REFER TO FINISH LEGEND ON SHEET I-601
118 FABRIC COVERED ACOUSTIC WALL PANELS AS SCHEDULED- AWP-1
M A
R K
D E
S C
R
IP
T
IO
N D
A
M A
T C
H L
IN
E
A
I-
M A
T C
H L
IN
E
A
I-
WOMEN'S
CORRIDOR
OPS FLOOR
WORKSTATIONS
MECHANICAL
CHILLER
BATTERIES / UPS
GENERATOR
VESTIBULE
OBSERVATION
SPACE
VESTIBULE
BATTERIES / UPS
ELECTRICAL
SWITCH
S C
-1 E
F C
-1
S C
-1 E
F C
-1 CPT-1
CPT-2
CPT-3
CPT-4
EFC-1
ESD-1
LVT-1
MAT-1
RF-1
SC-1
SC-1 EFC-1
SC-1 EFC-1
S C
-1 E
F C
-1
M A
T -1
E F
C -1
ESD-1
MAT-1 ESD-1
E F
C -1
M A
T -1
M A
T -1
S30
S32
S35
S36
S37
S38
S39 S40 S41
S42
S43
S44
S46
S47
S48
S49
111111
SWITCH
ESD-1
L V
T -1
S34
S S
-1
GENERAL SHEET NOTES
1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /
FINISHES
2. REFER TO I-601 FOR FINISH LEGEND
3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,
DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).
4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL
INFORMATION.
5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES
ONLY. DO NO APPLY BASE TO CMU WALLS
6. REFER TO A-600 FOR ROOM FINISH SCHEDULE
7. ALL WALLS PAINTED PT-1 UON, TYPICAL
8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT
ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL
9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,
TYPICAL
10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS
ARE PAINTED PT-4 UON.
SHEET KEYNOTES
FLOOR FINISH LEGEND
CARPET TILE-FIELD
CARPET TILE-OFFICES
CARPET TILE - ENTRANCE
CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS
FLOOR
EPOXY FLOOR COATING
ELECTROSTATIC DISSIPATIVE FLOOR TILE
LUXURY VINYL TILE (RANDOM INSTALLATION)
RUBBER ATHLETIC FLOOR TILE
SEALED CONCRETE
FLOOR MAT (FREESTANDING)
PLAN
NORTH
T R
U E
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
SCALES: KEY PLAN:
B
I-122
P A
R T
IA
L F
IN
IS
H
S
IG
N A
G E
P L A
N F
IR
S
T F
L O
O R
A R
E A
B
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
M W
A R
R
IN
E R
J W
IS
E
K D
IC
K
E N
S
C .O
B E
IR
N
E
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
SCALE: 1/8" = 1'-0"A2
PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA B
04 8 16268
SCALE: 1/8"=1'-0"
101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/
MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO
ARCHITECTURAL DETAIL B3/A-570.
105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO
ARCHITECTURAL DETAIL B3/A-570
111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.
113 INSTALL FULL HEIGHT MIRROR; REFER TO FINISH LEGEND ON SHEET I-601
118 FABRIC COVERED ACOUSTIC WALL PANELS AS SCHEDULED- AWP-1
M A
R K
D E
S C
R
IP
T
IO
N D
A
M A
T C
H L
IN
E
A
I-
M A
T C
H L
IN
E
A
I-
JANITOR
WOMEN'S
MEN'S
CLASSROOM
WORKROOM
SUPPLY ROOM
CORRIDOR
OPS FLOOR
OPS FLOOR
WORKSTATIONS
VESTIBULE
EFC-1EFC-1
M A
T -1
E F
C -1
CPT-4 ESD-1
EFC-1 ESD-1
C P
T -1
C P
T -1
S C
-1
MAT-1 ESD-1
SC-1EFC-1
EFC-1EFC-1
S44
S46
S47
S48
S49
S50
S51
S52 S53 120 120
CPT-1
CPT-2
CPT-3
CPT-4
EFC-1
ESD-1
LVT-1
MAT-1
RF-1
SC-1
ESD-1
L V
T -1
S34
S S
-1
H O
L D
GENERAL SHEET NOTES
1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /
FINISHES
2. REFER TO I-601 FOR FINISH LEGEND
3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,
DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).
4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL
INFORMATION.
5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES
ONLY. DO NO APPLY BASE TO CMU WALLS
6. REFER TO A-600 FOR ROOM FINISH SCHEDULE
7. ALL WALLS PAINTED PT-1 UON, TYPICAL
8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT
ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL
9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,
TYPICAL
10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS
ARE PAINTED PT-4 UON.
SHEET KEYNOTES
FLOOR FINISH LEGEND
CARPET TILE-FIELD
CARPET TILE-OFFICES
CARPET TILE - ENTRANCE
CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS
FLOOR
EPOXY FLOOR COATING
ELECTROSTATIC DISSIPATIVE FLOOR TILE
LUXURY VINYL TILE (RANDOM INSTALLATION)
RUBBER ATHLETIC FLOOR TILE
SEALED CONCRETE
FLOOR MAT (FREESTANDING)
PLAN
NORTH
T R
U E
N
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
SCALES: KEY PLAN:
C
I-123
P A
R T
IA
L F
IN
IS
H
S
IG
N A
G E
P L A
N F
IR
S
T F
L O
O R
A R
E A
C
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
M W
A R
R
IN
E R
J W
IS
E
K D
IC
K
E N
S
C .O
B E
IR
N
E
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
SCALE: 1/8" = 1'-0"A2
PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA C
04 8 16268
SCALE: 1/8"=1'-0"
101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/
MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO
ARCHITECTURAL DETAIL B3/A-570.
105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO
ARCHITECTURAL DETAIL B3/A-570
111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.
120 FABRIC WRAPPED ACOUSTIC WALL PANEL AS SCHEDULED; AWP-2
M A
R K
D E
S C
R
IP
T
IO
N D
A
6. Exterior Finish Legend
A-201
B1
A-202
A1
A-551
C2
A-201
A1
A-202
C2
A-201
A3
A-203
C2
A-551
C1
A-203
A1
EXTERIOR FINISH SCHEDULE
MANUFACTURER'S NAMES AND PRODUCT DESIGNATIONS ARE USED TO ESTABLISH A COLOR AND FINISH ONLY EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE IN THE
INDIVIDUAL SPECIFICATIONS SECTIONS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
SCALES:
A-200
E X
T E
R
IO
R E
L E
V A
T
IO
N S
O V
E R
A L L
O F
F U
T T
A
IR
F O
R C
E B
A S
E N
E B
R A
S K
A S
A T
C O
M
M
IL
S T
A R
F A
C
IL
IT
Y
P R
O J E
C T
N O
S
G B
P
O M
A H
A D
IS
T
R
IC
T C
A P
IT
A
L A
V E
S
T E
O M
A H
A N
E
N
O R
T H
B R
O A
D W
A Y
S T
L O
U
IS
M
IS
S
O U
R I
B B
Y E
R S
N B
O Y
E R
K D
IC
K
E N
S
R Y
A W
O
C T
O B
E R
W F
F
W F
D
READY TO ADVERTISE
SCALE: 1/16" = 1'-0"C1
NORTH ELEVATION - OVERALL
SCALE: 1/16" = 1'-0"B1
EAST ELEVATION - OVERALL
SCALE: 1/16" = 1'-0"B3
WEST ELEVATION - OVERALL
SCALE: 1/16" = 1'-0"A2
SOUTH ELEVATION - OVERALL
08 16 3241216
SCALE: 1/16"=1'-0"
ELEVATION
KEYED NOTE PRODUCT FINISH COLOR
40 DOWNSPOUT PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
41 SCUPPER PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
42 INSULATED PRECAST CONCRETE WITH THIN BRICK, COLOR A PREFINISHED ENDICOTT: COLOR - GOLDEN BUFF VELOUR
43 INSULATED PRECAST CONCRETE WITH THIN BRICK, COLOR B PREFINISHED ENDICOTT: COLOR - COPPERTONE VELOUR
44 PRECAST CONCRETE WALL PANEL JOINT PREFINISHED EMSEAL: COLOR CHARCOAL GRAY
45 METAL COPING PREFINISHED PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
46 OVERHEAD COILING DOOR PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
47 HOLLOW METAL DOOR AND FRAME PAINT MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
48 GLAZED ALUMINUM CURTAINWALL ASSEMBLY PREFINISHED YKK AP: COLOR - YS1N CLEAR ANODIZED PLUS
49 LOUVER PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
50 METAL COMPOSITE MATERIAL WALL, FASCIA AND SOFFIT ASSEMBLY PREFINISHED PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
51 GUARDRAIL RAILING PREFINISHED - -
52 WALL MOUNTED LIGHT FIXTURE PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC
53 CONCRETE FOUNDATION WALL PREFINISHED - -
54 EXPANSION JOINT PREFINISHED - -
M A
R K
D E
S C
R
IP
T
IO
N D
A
7. Structural Interior Design - Exterior Finish Selections
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL Expansion joint solution
MANUFACTURER Emseal
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS Paint finish to match the exterior metal panel color.
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
SURFACE
MATERIAL
MANUFACTURER
MODEL
REMARKS
Weathered Zinc
HOLLOW
METAL DOOR
AND FRAMES
Pac-Clad Petersen
Pac-Clad Petersen
CURTAIN WALL
ASSEMBLY
WALL, FASCIA,
SOFFIT
ASSEMBLY
Pac-Clad Petersen
PRECAST
CONCRETE
WITH BRICK
VENEER
Exterior Brick- COLOR A
Brick Veneer
Endicott
Golden Buff, Velour Finish
PRECAST
CONCRETE
WITH BRICK
VENEER
Exterior Brick- COLOR B
Brick Veneer
Endicott
Coppertone, Velour Finish
PRECAST WALL
PANEL
EXPANSION
JOINT
Expansion Joint between concrete wall panels
Charcoal Gray
METAL
CLADDING
Pac-Clad Petersen
Aluminum Downspouts, Scupper, Coping
Pac-Clad Petersen
Weathered Zinc Metallic
OFFUTT AIR FORCE BASE
STRUCTURAL INTERIOR DESIGN (SID) PACKAGE
STRUCTURAL INTERIOR DESIGN -EXTERIOR FINISH LEGEND
Pac-Clad Petersen
Weathered Zinc Metallic
YKK AP: Clear Annodized Plus Aluminum
Glazed Curtain Wall Assembly a
STRUCTURAL INTERIOR DESIGN - EXTERIOR FINISH SELECTIONS
Color A -Precast Concrete with Brick Veneer - Golden Buff, Velour Finish
Metal, Cladding, Wall, Fascia, Soffitt Assembly - Weathered Zinc Metallic and Exterior Doors Frame and Door Painted to Match
Glazed Curtain Wall Assembly- Clear Annodized Aluminum Plus
Color B - Precast Concrete with Brick Veneer - Coppertone, Velour Finish
| COVER SID_RTA |
| TABLE OF CONTENTS |
| SECTION 1 DESIGN NARRATIVE |
| DN-1 |
| DN - 2 |
| DN - 3 |
| SECTION 2 INTERIOR FINISH LEGEND |
| I-601 |
| SECTION 3 INTERIOR FINISH SELECTIONS |
| SID-1 |
| SID-2 |
| SID-3 |
| SID-4 |
| SID-5 |
| SID-6 |
| SID-7 |
| SID-8 |
| SID-9 |
| SID-10 |
| SID-11 |
| SID-12 |
| SID-13 |
| SID-14 |
| SID-15 |
| SID-16 |
| SID-17 |
| SECTION 4 ROOM FINISH SCHEDULE |
| A600- ROOM FINISH SCHEDULE |
| SECTION 5 INTERIOR FINISH PLANS |
| I-120 |
| I-121 |
| I-122 |
| I-123 |
| SECTION 6 EXTERIOR FINISH LEGEND |
| A200 |
| SECTION 7 EXTERIOR FINISH SELECTIONS |
| SID EX-1 |
| SID EX-2 |
File details come from the government source that posted it. Updated .