D3469200_INT_SID_RTA_221011.pdf

PDF 14 MB Posted

Attached to
Construct Consolidated MilStar Satellite Communications (SATCOM) Station OFFUTT AFB, NEBRASKA
Solicitation number
W9128F22R0028
Issued by

About this file

This document provides details on a federal contract opportunity to construct a consolidated MilStar satellite communications station at Offutt Air Force Base in Nebraska. The solicitation number is W9128F22R0028 and is being issued by the Department of the Army Corps of Engineers Engineering District Omaha. The opportunity involves constructing a consolidated MilStar SATCOM station at Offutt AFB to replace existing infrastructure. Responses to the solicitation are due on unspecified dates. The agency and type of work required, as well as the location, are the key salient details provided in this document.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATCOM - MILSTAR Building

OFFUT AFB, Nebraska

Ready to Advertise Design Submittal

Structural Interior Design (SID) Package

Submitted: 11 OCTOBER 2022

U.S. Army Corps of Engineers Omaha District

Contract Number: W9128F-19-F-0010 Contract Task Order: W9128F-21-F-0044

PN OF59

Document Title

Client Name

Interior and Exterior Finishes

Structural Interior Design Package

Table of Contents

Section 1 Narrative of Interior Design Objectives

Section 2 Interior Design Finish Legend

Section 3 Structural Interior Design Interior Finish Selections

Section 4 Room Finish Schedule

Section 5 Interior Finish Floor plans

Section 6 Exterior Finish Legend

Section 7 Structural Interior Design Exterior Finish Selections

For additional information and questions please contact the Designer of Record:

Mickey Warriner, IIDA

Jacobs

Stifel Tower

501 N. Broadway

St. Louis, MO 63102

Phone: (314) 335-4459

Mickey.Warriner@jacobs.com

1. Narrative of Structural Interior Design Objectives

The SATCOM-MILSTAR facility has been designed to support and enhance the daily goals of the users while conforming to the requested scope, and project context.

This facility will have sustainable, durable, and lasting interior finishes as identified in the PCR, and from the kickoff meetings. Design and selection of the structural interior design package for the interior finishes will comply with UFC 1-200-01 model building codes, UFC1-120-01 Interior Signage requirements and UFC 3-120-

10 Interior Design requirements.

The administrative offices will have a professional, timeless, and functional corporate aesthetic with pointed locations for accents of color and enhancements of interior lighting to support the overall functionality of the building.

• Offices, classrooms/briefing rooms, and team room will have modular cart tile and resilient wall base for flooring with scuff resistant painted walls in a moderate light reflectance value. Acoustical wrapped fabric panels will be applied in large meeting spaces, acoustical ceiling tile panels will provide a clean ceiling plane aesthetic while also providing necessary sound attenuation to support STC acoustical requirements.

• Corridors, break areas and Mother’s room will have resilient floor tile with sound attenuation to support

STC acoustical requirements.

• resilient wall base and scuff resistant wall paint and acoustical ceiling tile

• panels.

• Break room millwork will have solid surface countertops, laminate base

• cabinets in a wood aesthetic to support the grounded feeling of being with

• nature. Base cabinetry will accommodate pot and pan storage since the

• break area will have an oven/stove, refrigerator, microwave, coffee machine

• and dishwasher Drawers will be designed to allow for flatware and cutlery

• as required for cooking basic items. Upper cabinets will provide added storage for

• plates and glasses, etc.

• Windows will have mesh shading material with a defined percentage of openness to perceive the exterior surroundings while in the down position.

• Meeting spaces will have a second room darkening layer to allow for key viewing of the room monitors on extra bright days.

• Classroom/briefing and team room spaces will have glass mounted magnetic large size marker board panels for versatility and ease of cleaning writable surfaces.

• Toilet rooms, locker room and janitor closets will have resinous flooring with integral wall base on the floors and one wet wall of porcelain tile up to ceiling, showers will have solid surface base, all paint will be semi-gloss and scrub able/washable with mildew resistant properties.

• Physical Fitness room will have recycled rubber flooring, resilient wall base and walls will be painted with semi-gloss scrub able/washable mildew resistant properties. One wall will have mirrors applied near the free weight rack area. Ceilings will be acoustical ceiling tile panels in the fitness area, that are mildew resistant, sag resistant and vinyl surfaced for cleanability.

• Support utility spaces will be painted with a resilient wall base applied and sealed concrete floors.

• Central corridor will have fabric wrapped panels mounted in front of the hardwall office area to help minimize sound around those rooms. A recessed wall channel picture rail will be installed along this area for mounting pictures via suspended cable hangers/clips.

The operations area will have eight workstations in the Ops workstation area. The flooring will have static dissipative resilient tile over a raised access floor. Walls will be painted, and acoustical ceiling tile panels will be in briefing, open office, and work room spaces. Glass magnetic writeable markerboards will be hung in the meeting and open office space for collaborative use and can be easily cleaned and maintained. The ceiling area in the remainder of the ops floor will be open to structure.

Furniture, Fixtures and Equipment (FF&E) Package

The SATCOM/MILSTAR facility is a 24/7 365 operating facility and with that information in mind, interior furnishings are selected based on their functionality, durability, adaptability, and versatility of each item. Furniture, Fixtures &

Equipment (FF&E) is funded separately from the construction contract as a bid option, FF&E will be procured by the end user based on specifications provided in the FF&E package. Infrastructure to support FF&E will be included in the construction contract. The General Contractor is responsible for all electrical connections from the FF&E to the building, systems furniture selected must have dedicated neutral branch wiring components, and all telecommunications installation.

Offices will have modular desking units with lower and upper storage capabilities.

Desk and workstation units will have adjustable height abilities from sitting to standing at the main worktop to promote better ergonomic functionality. Task seating will be selected for its ergonomic abilities and allow for multiple adjustments to support a variety of personnel types and sizes. Guest seating will be comfortable, durable, and timeless in it’s aesthetic. Storage tower will support file storage, coat storge and shelving within a lockable cabinet. Monitor arms and task lighting will be provided to allow for ease of adaptability within the office as the day’s light quality changes on the outside of the facility. LED task lighting will have motion sensors and allow for the ability to brighten or dim as required.

Break room will have laminated rectangular tables to accommodate a few members or all for versatility in use of space for impromptu meetings and collaboration.

Overall, the finishes, furnishings and equipment will be selected to support sustainable, maintainable, and durable selections that support the user’s needs, while providing a pleasing overall corporate professional aesthetic. Where possible, desks will be specified with adjustable height properties so that users can adapt and stand and work during portions of the day. Selections of finishes will be made with a nod to the geography of the local environments around and outside the base and state of Nebraska. Carpet patterns will mimic the big beautiful, clouded skies in pattern, flooring and resilient tile will reflect the geometric structure formations of communications dishes and the subtle forms of cracked earth and the peaks and valleys of Toadstool park. Paint selections are derived in two schemes a warm palette and a cool palette with paint selections that support the beautiful sunrises and sunsets across the plains within the surrounding landscapes. Countertops and cabinetry are selected with solid surface materials that will allow for timeless and durable materials.

2. Interior Design Finish Legend

FINISH SCHEDULE NOTES

1. ALL BRANDS, MANUFACTURERS' PRODUCTS, COLORS AND PATTERNS

BEING INDICATED ARE FOR REFERENCE PURPOSES ONLY. THE

REFERENCES USED ARE TO INDICATE THE PROJECT'S NEEDS AND ARE

NOT INTENDED TO LIMIT THE SELECTION OF OTHER MANUFACTURERS'

PRODUCTS MEETING THE SALIENT CHARACTERISTICS OR PERFORMANCE

REQUIREMENTS OF THE CITED MATERIAL OR EQUIPMENT.

2. ALL FINISHES TO BE INSTALLED AND/OR APPLIED IN ACCORDANCE WITH

THE MANUFACTURERS WRITTEN INSTRUCTIONS. REFER TO THE CID

PACKAGE FOR FINISH SAMPLES.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.

4. REFER TO SHEET A-600 FOR THE ROOM FINISH SCHEDULE.

5. EXPOSED HEMP SHIELD IS PAINTED PT-1.

6. ALL GUARD RAILS, ROOF ACCESS LADDERS, CEILING HATCHES TO MATCH

ADJACENT PAINTED WALL OR CEILING FINISH UNLESS OTHERWISE

NOTED..

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

I-601

F

IN

IS

H

S C

H E

D U

L E

F

IR

S T

F L

O O

R

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

M W

A R

R

IN

E R

J W

IS

E

K D

IC

K

E N

S

C .O

B E

IR

N

E

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

FINISH LEGEND

ITEM CODE DESCRIPTION MANUFACTURER MODEL COLOR SIZE NOTES

FLOORING

CPT-1 CARPET TILE -FIELD MILLIKEN SOUTHERN ANALOG / DOUBLE EXPOSURE DE617 VIGNETTE 20" X 20" CLASSROOM , MEETING ROOM CARPETING

CPT-2 CARPET TILE -OFFICES MILLIKEN SOUTHERN ANALOG / VIEWFINDER VF217 VIGNETTE 20" X 20" GENERAL CARPETING

CPT-3 CARPET TILE - ENTRANCE JJ INVISION ALTER EGO 1837 OPERATIVE 24" X 24" ENTRY FLOORING

CPT-4 CARPET TILE - STATIC DISSIPATIVE RAISED ACCESS FLOOR STATIC SMART PRESIDENT SERIES WASHINGTON 24" X 24" OPERATIONS WORKSTATIONS

EFC-1 EPOXY FLOOR COATING STONHARD STONTEC GLACIER PEAK NA TOILET ROOMS, LOCKER ROOM

ESD-1 ELECTROSTATIC DISSIPATIVE FLOOR TILE ROPPE ESD VINYL TILE ELECTRON 702 12" X 12", 24" X 24" SWITCH(12" X 12"),TELECOM CLOSET(12" X12", OPS FLOOR (24" X 24")

LVT-1 LUXURY VINYL TILE MILLIKEN LUMENOLOGY LIGHT WASH LLW265-189 LUCENT 9" x 40" x 3/16" MAIN CORRIDORS, WELLNESS ROOM (RANDOM INSTALLATION)

MAT-1 FLOOR MAT (FREESTANDING) AMERICAN FLOOR MATS WATERHOG ECO ELITE ENTRANCE MAT , BEVELED EDGING ASH GREY TBD BEST FIT FOR IDENTIFIED ENTRY VESTIBULES

RAF-1 RAISED ACCESS FLOORING TATE N/A N/A REFERENCE A-573 REFERENCE ARCHITECTURAL SPECIFICATIONS FOR SUBSTRATE AND SIZE

RF-1 RUBBER ATHLETIC FLOOR TILE TO MARKET ATMOSPHERE METROPOLIS SYNTHESIS SYNTHESIS TM701 BLUE MOON 38" X 38" PHYSICAL FITNESS

SC-1 SEALED CONCRETE SIKA SIKAGUARD - FINISH HIGH GLOSS 616 IMPERMEABLE EPOXY

PRIMER/SEALER CLEAR

NA CLEAN AND PREPARE EXISTING CONCRETE PER MANUFACTURERS RECOMMENDATIONS

TSF-1 TERRAZZO WHEELCHAIR SHOWER RECEPTOR FLOOR FIAT PRODUCTS HUNTINGTON TERRAZZO WHEELCHAIR SHOWER RECEPTOR W/RAMP 100 WHITE PORTLAND CEMENT WITH

WHITE CHIPS

36" X 36" SHOWERS - CONFIRM MEASUREMENT PRIOR TO ORDERING

BASE

EFB-1 EPOXY FLOOR COATING BASE STONHARD STONTEC GLACIER PEAK 4.5" TOILET ROOMS, LOCKER ROOM

RB-1 RUBBER BASE ALLSTATE RUBBER BIG SUR PROFILE A33 4.5" GENERAL WALL BASE WITH TOE AT RESILIENT AND NO TOE CARPET.

WALLS

AWP-1 ACOUSTICAL WALL PANEL FABRIC IMPACT ACOUSTIC FACET RELIEF PATTERN 712 SUCCULENT 70" x 94" x 1" MAIN CORRIDOR, DIRECT GLUE

AWP-2 FABRIC WRAPPED ACOUSTIC WALL PANEL ACOUSTICAL SOLUTIONS ALPHASORB FR701 ACOUSTIC PANEL 468 EUCALYTPUS 48" X 48" x 1" CLASSROOM

FRP-1 FIBER REINFORCED WALL PANEL CRANE VARITEX SANDSTONE TEXTURE (STA) COTTON WHITE 130 SATIN 48" X 96" CLASS A OPTION; 8' WAINSCOT AT JANITOR CLOSET

PHR-1 PICTURE HANGING RAIL- REVEAL CHANNEL FRY REGLET DRYWALL DRMH N/A NA AS INDICATED ON DRAWINGS

PT-1 PAINT - FIELD SHERWIN WILLIAMS N/A SW 7004 SNOWBOUND NA GENERAL FIELD PAINT, MATCH COLOR AS SIGNAGE TEXT FOR INTERIOR AND EXTERIOR SIGNS

PT-2 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 6493 EBB TIDE NA ACCENT PAINT

PT-3 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 9150 ENDLESS SEA NA ACCENT PAINT

PT-4 PAINT - DOOR FRAMES SHERWIN WILLIAMS N/A SW 7073 NETWORK GRAY NA INTERIOR DOOR FRAMES AND METAL DOOR PAINT, SHIPS LADDER

PT-5 PAINT- ACCENT SHERWIN WILLIAMS N/A SW 9109 NATURAL LINEN NA ACCENT PAINT

PT-6 PAINT SHERWIN WILLIAMS N/A SW 7048 URBANE BRONZE NA MATCH COLOR AS THE BACKGROUND FOR EXTERIOR AND INTERIOR SIGNS

WP-1 SOLID SURFACE WALL PROTECTION LG HAUSYS-HI MACS SOLID SURFACE WALL PROTECTION FROSTINE W101 1/4" THICK MATERIAL WALL PROTECTION AT WATER COOLERS UP TO 8'-0"

WT-1 PORCELAIN WALL TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX 12"x 24" MERCURY 610010003001 2"X4" TOILET ROOM WET WALL, VERTICALLY INSTALLED 24"H WITH 2/3 STACK OFFSET (NO LIPPAGE)

WT-2 PORCELAIN WALL TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX MERCURY 2" X 2" MOSAIC MERCURY 610110000571 2"X2" TOILET ROOM SHOWER WALLS

WT-3 PORCELAIN MOSAIC TILE ATLAS CONCORDE USA ATLAS CONCORDE USA REFLEX PEACOCK MOSAIC12" X 12" BRIGHT 610110000598 12 5/8" X 11 5/8" BREAKROOM BACKSPLASH

CEILINGS

ACP-1 ACOUSTICAL CEILING TILE ARMSTRONG OPTIMA TEGULAR WHITE 24"X24" 9/16:" SUPRAFINE T-GRID, GENERAL CEILING TILE

GYP-1 PAINTED GYP BOARD CEILING SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA

GYP-2 EPOXY PAINTED GYP BOARD CEILING SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA TOILET ROOMS, LOCKER ROOMS

OTS-1 OPEN TO STRUCTURE SHERWIN WILLIAMS N/A SW7007 BRIGHT WHITE NA STRUCTURE AND OVERHEAD EXPOSED CEILING SPACES

MISCELLANEOUS

A.04 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 8'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS

A.07 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 10'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS

A.08 MAGNETIC GLASS BOARD 6MM CLARIDGE N/A N/A 4'-0" X 6'-0" FOR INFORMATION ONLY, PROVIDE BLOCKING, GLASS BOARDS PROVIDED BY OTHERS

CG-1 CORNER GUARD CS ACROVYN TF SERIES 262 DRIFTWOOD 2" LEGS X 84" H AS INDICATED ON DRAWINGS

CP-1 CABINET PULL MOCKETT DROP EDGE CABINET PULL DP269B- MATTE BLACK 7 17/8" W X 1 3/8" D DOOR AND DRAWER PULL, SITS CENTERED OVER TOP OF DOOR/DRAWER TOP.

CPL-1 CELL PHONE LOCKER WITH ENCLOSURE SALSBURY INDUSTRIES CELL PHONE LOCKER 20 A DOORS MODEL 19158-20 ALUMINUM 30.5"W X 31"H X 9.25"D FREE STANDING ENCLOSURE #19954 - ALUMINUM

D-1 INTERIOR DOOR FINISH MASONITE ARCHITECTURAL WHITE BIRCH VENEER WITH ROTARY FINISH, CLEAR COAT CLEAR COAT VARIES WOOD INTERIOR DOORS ONLY

DTW-1 DOUBLE TIER LOCKER SCRANTON PRODUCTS HDPE MATERIAL MIDNIGHT NA LOCKER ROOM

GLZ WINDOW GLAZING N/A N/A N/A VARIES REFERENCE ARCHITECTURAL SPECIFICATIONS

GT-1 GROUT LATICRETE UNSANDED GROUT EPOXY GROUT NA 89 SMOKE GREY

LAD-1 SHIPS LADDER OKEEFE CUSTOM PAINTED STEEL NA REFER TO A-130 AND A-140 FOR MORE INFORMATION

LB-1 LOCKER BENCH SEAT SCRANTON PRODUCTS HDPE MATERIAL MIDNIGHT NA LOCKER ROOM

MR-1 MIRROR N/A N/A N/A NA TOILET ROOMS

MR-2 FULL HEIGHT WALL MIRROR N/A N/A NA PHYSICAL FITNESS ROOM 110

PL-1 PLASTIC LAMINATE WILSONART MAIZE WALNUT CROSSGRAIN Y0597-60 MATTE NA MILLWORK CABINETS FACE, DOORS WITH MATCHING EDGE TRIM.

PX.1 PIXEL MOSS SCANDANAVIAN SPACES ACOUSTICAL MOSS WALL ELEMENT MOSS GREEN 12" X 12" X 2.5" MATT PROVIDED BY OTHERS

SS-1 SOLID SURFACE MATERIAL LG HAUSYS-HI MACS SOLID SURFACE COUNTERTOP FROSTINE W101 1/2" X30" X 145" BREAK ROOM/WELLNESS ROOM COUNTERS/WINDOW SILLS

TR-1 PORCELAIN TILING TRIM SCHLUTER SYSTEMS SCHIENE - E 60 EB BRUSHED STAINLESS STEEL 304 MATCH TILE THICKNESS EPOXY FLOOR INTEGRAL WALL BASE AND PORCELAIN Wall TILE TRANSITION

TR-2 PORCELAIN TILING TRIM SCHLUTER SYSTEMS RONDEC RO 90 EB, PROVIDE COORDINATING ENDCAP BRUSHED STAINLESS STEEL 304 MATCH TILE THICKNESS PORCELAIN TILE WALL FINISH OUTSIDE CORNER REVEAL EDGE PROTECTION

TS-1 FLOORING TRANSITION STRIP TARKETT VINYL EDGE TRIM PIECE 1/8" TALL 001 PROFILE, 179 STEEL 90 DEG 1/8" H TRANSITION FOR CARPETING TO 5MM LVT FLOORING

TS-2 FLOORING TRANSITION STRIP TARKETT T-MOULDING 1/4" TO 1/8" 21 PLATINUM CE21A 1/4" TO 1/8", 120' L ROLL CLASS 1

WN-1 WINDOW TREATMENT - MESH ROLLER SHADE MECHOSHADE MECHO / 5% OPENESS ECOVEIL, GREY 0963 VARIES CLASSROOM, OFFICES AND WORKROOM

WN-2 WINDOW TREATMENT - ROOM DARKENING ROLLER SHADE MECHOSHADE CLASSIC BLACKOUT 0700 SERIES 0701 WHITE (OPAQUE) VARIES CLASSROOMS, MEETING ROOMS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

3. Structural Interior Design- Interior Finish Selections

NOTE: *** INDICATES ITEMS NOT AVAILABLE AT TIME OF DELIVERABLE DUE TO

SUPPLY CHAIN SHORTAGES. DUPLICATE SAMPLES ARE ONLY PROVIDED ONCE

AND LABELED WITH ALL LOCATIONS WHERE OCCUR.

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL Acoustic Wall Panel

MANUFACTURER Acoustical Solutions

MODEL

REMARKS Classroom 136

AWP-2 Wall

Alphasorb FR701 Panel, 468 Eucalyptus 48" x 48" x 1"

OTS-1*** Ceiling

Open to structure

Sherwin Williams

SW7007 Bright White

Structure painting

RF-1 Floor

Rubber Athletic Floor

To Market

GYP-2*** Ceiling

Epoxy Painted Gypsum Board Ceiling

Sherwin Williams

SW7007 Bright White

Toilet Rooms, Locker Rooms

GYP-1*** Ceiling

Painted Gypsum Board Ceiling

Sherwin Williams

SW7007 Bright White

ACP-1*** Ceiling

Acoustical Ceiling Tile

Armstrong

Optima Tegular, White, 24" x 24"

General Ceiling Tile 9/16" Suprafine T-grid, White rin

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

Atmosphere Metropolis Synthesis, Synthesis TM701 Blue Moon, 38" x 38"

Physical Fitness

RB-1 Wall Base

Rubber Base

Allstate Rubber

Big Sur Profile, A33

General Base wall base with toe at resilient and no toe at carpet.

AWP-1 Wall

Acoustical Wall Panel Fabric

Impact Acoustics USA

Facet Relief Pattern, 712 Succulent, 70" x 94" x 1"

Corridor

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

LVT-1 Floor

Luxury Vinyl Tile

Milliken

Lumenology Light Wash, LLW265-189 Lucent, 3/16" x 9” x 40”

Main Corridors and Wellness Room

ESD-1 Floor

Electrostatic Dissipative Tile

Roppe

ESD Vinyl Tile, Electron 702, 12" x 12", 24" x 24" (raised access flooring)

Switch and Telcom Rooms

EFC-1, EFB-1 Floor with 4.5" Integral Wall Base

Epoxy Floor Coating

Stonhard

StonTEC, Glacier Peak

Toilet Rooms, Locker Room

CPT-4 Floor

Static Dissipatove Carpet Tile - Raised access floor

Julie Industries, Inc - Static SmartPlus Tile Level 3

Presidential, Washington, 24" x 24"

Ops Workstations Flooring

CPT-3 Floor

Carpet Tile - Entrance

JJ Invision

Alter Ego, 1837 Operative, 24" x 24"

Entry flooring

CPT-2 Floor

Carpet Tile -Office

Milliken Floors, Southern Analog/Viewfinder

VF217 Vignette, 20" x 20"

Office Flooring

CPT-1 Floor

Carpet Tile - Field

Milliken Floors, Southern Analog/Double Exposure

DE617 Vignette, 20" x 20"

Classroom, Meeting Room Carpeting

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

Wall

Corner Guard

CS Specialties

Acrovyn Corner Guards, TF Series, 262 Driftwood

Locations as noted on drawings

CG-1

Wall

Paint

Sherwin-Williams

SW 7048 Urbane Bronze

Match color as the background for exterior and interior signs

FRP-1*** Wall

Fiber Reinforced Panel

Crane

Varietex Sandstone Texture (STA), Cotton White 130 Satin, 4'-0" x 8'-0"

Class A Option; 8' Wainscot at Janitor Closet

PT-6

Paint -Accent

Sherwin-Williams

SW 9109 Natural Linen

Accent Paint

PT-5 Wall

PT-4 Wall

Paint-Door Frames

Sherwin-Williams

SW 7073 Network Gray

Interior Door Frames and Metal door paint, ships ladders

PT-3 Wall

Paint -Accent

Sherwin-Williams

SW 9150 Endless Sea

Accent Paint

PT-2 Wall

Paint -Accent

Sherwin-Williams

SW 6493 Ebb Tide

Accent Paint

PT-1 Wall

Paint -Field

Sherwin-Williams

SW 7004 Snowbound

General Field Paint

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE Solid Surface Wall Protection

MATERIAL Solid Surface Wall Protection

MANUFACTURER LG Hausys Hi Macs

MODEL Frostine W101

REMARKS 1/4" thick Wall protection at the water cooler

SURFACE Locker Bench Seat

MATERIAL HDPE Material

MANUFACTURER Scranton Products

MODEL Tufftec Benches, Midnight

REMARKS Locker Room

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SS-1 Solid Surface Countertop

Solid Surface Material

LG Hausys Hi Macs

Frostine W101

Breakroom counter/ Wellness Room Counter/Window Sills, 1/2" Thickness

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

WT-1 Wall

Porcelain Wall Tile

Atlas Concorde USA

Reflex, Mercury,610010003001, 12" x 24", w/GT-1

Toilet Room Wet Wall, vertically installed 24"H with 2/3 stack offset so no lippage.

WT-2

WT-3

DTW-1***

Wall

Porcelain Wall Tile

Atlas Concorde USA

Reflex, Mercury Mosaic,610110000571 , 2" x 2"w/GT-1

Toilet Room Shower Walls

Wall

Porcelain Mosaic Tile

Atlas Concorde USA

Reflex, Peacock Mosaic, Bright, 610110000598 , 4.1" X 3.8" 12 5/8" X 11 5/8" Sheet w/GT-1

Breakroom Backsplash

Double Tier Lockers

HDPE Material

Scranton Products

LB-1***

WP-1

TSF-1*** Terrazzo Wheelchair Shower Receptor

Huntington Terrazzo, 101 White Portland Cement, w/White chips

Fiat Products

ADAWN3636

Toilet room Showers

Tufftec Lockers, Midnight

Locker Room

SURFACE Millwork, Base Cabinets, Front and Face

MATERIAL Plastic Laminate

MANUFACTURER Wilsonart

MODEL Maize Walnut Crossgrain, Y0597-60 Matte Finish

REMARKS Millwork Cabinets

SURFACE Interior Door Finish

MATERIAL White Birch Veneer, rotary finish

MANUFACTURER Masonite Architectural

FINISH Clear Coat

REMARKS Wood Interior Doors Only

SURFACE Cabinet Pull

MATERIAL Metal

MANUFACTURER Doug Mockett

MODEL DP269B - Matte Black

REMARKS Sits over top of door/drawer edge, centered on door/drawer center line.

SURFACE Window Treatment

MATERIAL Mesh Roller Shade

MANUFACTURER MechoShade

MODEL Mecho 5 % Openess, EcoVeil, Grey - 0963

REMARKS Classrooms

SURFACE Window Treatment

MATERIAL Room Darkening Roller Shade

MANUFACTURER MechoShade

MODEL 0700 Classic Blackout/Opaque/0701 White

REMARKS Classrooms

SURFACE Raised Access Flooring System

MATERIAL N/A

MANUFACTURER Tate

MODEL Reference A-573

REMARKS Refer to A-600 for material that will reside on the floor.

SURFACE Sealed Concrete

MATERIAL Sealer

MANUFACTURER Sika

MODEL Sikaguard - Finish High Gloss, 616 Impermeable Epoxy Primer/Sealer Clear

REMARKS Clean and Prepare Existing Concrete Per Manufacturer's Recommendations

SURFACE Cell Phone Locker with Enclosure

MATERIAL Freestanding Aluminum

MANUFACTURER Salsbury Industries

MODEL Cell Phone Locker 20 A Doors , 19158-20, 19954, 30.5"W X 31"H X 9.25"D

REMARKS Refer to Architectural for installation details.

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

PL-1

D-1

CP-1

WN-1

WN-2

RAF-1***

SC-1***

CPL-1***

SURFACE Window Glazing

MATERIAL Tempered Glass

MANUFACTURER N/A

MODEL N/A

REMARKS Reference Architectural Specifications

SURFACE Grout

MATERIAL Unsanded Grout

MANUFACTURER Laticrete

FINISH Epoxy Grout 89 Smoke Grey

REMARKS Used with WT-1-3

SURFACE Ships Ladder

MATERIAL Painted Steel

MANUFACTURER OKEEFE

MODEL N/A

REMARKS Refer to A-130 and A-140 for more information

SURFACE Floor Mat (Freestanding)

MATERIAL Waterhog, Nylon fiber mat with beveled edging

MANUFACTURER American Floor Mats

MODEL Ash Grey, Waterhog Eco Eliste Entrance Mat

REMARKS Reference architectural specifications

SURFACE Mirror

MATERIAL TBD

MANUFACTURER N/A

MODEL N/A

REMARKS Reference architectural specifications

SURFACE Full Height Wall Mirror

MATERIAL N/A

MANUFACTURER N/A

MODEL N/A

REMARKS Reference architectural specifications

SURFACE Pixel Moss

MATERIAL Acoustical Moss Wall Element

MANUFACTURER Scandanavian Spaces

MODEL Moss Green 12" x 12" x 2.5" Mat

REMARKS Provided in FFE Package, Install in Room 136 Ops Workstations

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

GLZ***

GT-1***

LAD-1***

MAT-1***

MR-1***

MR-2***

PX.1

SURFACE Porcelain Tiling Trim

MATERIAL Brushed Stainless Steel 304

MANUFACTURER Schluter Systems

MODEL SCHIENE - E 60 EB

REMARKS Epoxy floor integral wall base and Porcelain Wall tile transition

SURFACE Porcelain Tiling Trim

MATERIAL Brushed Stainless Steel 304

MANUFACTURER Schluter Systems

FINISH RONDEC RO 90 EB, provide coordinating end cap

REMARKS Porcelain Tile Wall Finish outside corner reveal edge protection

SURFACE Flooring Transition Strip

MATERIAL 90 Degree 1/8" W Vinyl Trim Strip

MANUFACTURER Tarkett

MODEL 001 Profile, 179 Steel

REMARKS Transition for Carpeting to 3/16" LVT Flooring

SURFACE Flooring Transition Strip

MATERIAL Rubber T-Moulding 1/4" to 1/8"

MANUFACTURER Tarkett

MODEL(S) 21 Platinum CE21A, 120 Ft. Lengths, Class 1

REMARKS

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN FINISH LEGEND

TR-1***

TR-2***

TS-1***

TS-2***

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

ACP-1***: Armstrong Optima Tegular, White GYP-2***: Epoxy Paint - Wet Areas - Sherwin Williams, SW 7007 Ceiling Bright White

GYP-1***: Sherwin Williams, SW 7007 Ceiling Bright White OTS-1***: Sherwin Williams, SW 7007 Ceiling Bright White

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

RF-1: To Market Synthesis TM701 Blue MoonRB-1: Allstate Rubber, Big Sur Profile, A33

AWP-1: Archisonic Impact Acoustic; Facet 24mm, 712 Succulent

AWP-2: Acoustical Solutions; Alphasorb FR701 Acoustic Panel; 468 Eucalyptus

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

CPT-2: Milliken, Southern Analog/Viewfinder, VF217

CPT-3: JJ Invision; Alter Ego: 1837 Operative

CPT-1: Milliken, Southern Analog/Double Exposure, DE617 Vignette

EFB-1/EFC-1: Stonhard Stontec; Glacier Park

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

LVT-1: Milliken Lumenology Light Wash, LLW265- 189 Lucent

ESD-1: Roppe ESD Vinyl Tile, Electron 702 CPT-4: Static SmartPlus Level 3, Style:

Presidential , Color: Washington

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

PT-1: Sherwin Williams, SW 7004 Snowbound

PT-2: Sherwin Williams, SW 6493 Ebb Tide PT-3: Sherwin Williams, SW 9150 Endless Sea

CG-1: CS Specialties, Acrovyn, 262 Driftwood

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

FRP-1***: Crane Varietex Sandstone Texture (STA), Cotton White 130 Satin

PT-6: Sherwin Williams, SW7048 Urbane Bronze

PT-4: Sherwin Williams, SW7073 Network Gray PT-5: Sherwin Williams, SW9109 Natural Linen

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

WT-1: Reflex, Mercury 11 3/4" x 23 5/8", 610010003005

WT-2: Atlas Concorde USA Reflex, Mercury Mosaic,610110000571 , 2" x 2"

WT-3: Reflex, Peacock Mosaic, Bright, 610110000598 , 4.1" X 3.8", 12 5/8" X 11 5/8" Sheet

TR-2: Schluter Systems

RONDEC RO 90 EB

Brushed Stainless Steel 304

TR-1: Schluter Systems SCHIENE - E 60 EBBrushed Stainless Steel 304

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

DTW-1: Scranton Products, Tufftec Double Tier Lockers; Tufftec Midnight

LB-1:Scranton Products, Tufftec Benches; Tufftec Midnight

WP-1: LX Hausys Hi Macs, Wall Panel, Frostine W101TSF-1: 100 Fiat Products, White Portland Cement w/White Chips

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

PL-1: Wilsonart, Maize Walnut Crossgrain, Y0597- 60 Matte Finish

D-1: Door Veneer Rotary Cut, White Birch, Clear Finish

SS-1: LX Hausys Hi Macs, Frostine W101

STRUCTURAL INTERIOR DESIGN FINISH SELECTIONS

CP-1: Cabinet Pull - Doug Mockett, DP269B - Matte Black

WN-1: MechoShade, EcoVeil, Grey - 0963 WN-2: MechoShade, Classic Blackout 0701 White (Opaque)

4. Room Finish Schedule

GENERAL SHEET NOTES

1. REFER TO FLOOR PLANS FOR PARTITION TYPES.

2. REFER TO INTERIORS I-120 - IF123 FOR FINISH PLANS AND MATERIAL LEGEND.

3. PROVIDE "V" SHAPED CONTROL JOINTS IN GYPSUM BOARD ASSEMBLIES AT

30' - 0" O.C. MAXIMUM OR AS NOTED. COORDINATE LOCATIONS WITH

ARCHITECT PRIOR TO CONSTRUCTION.

4. PROVIDE FIRESTOPPING AT PERIMETERS AND PENETRATIONS OF FIRE

RATED GYPSUM BOARD ASSEMBLIES.

5. ALL FLOOR TRANSITIONS BETWEEN ROOMS TO OCCUR AT CENTERLINE OF

DOOR UNLESS OTHERWISE NOTED. REFER TO FINISH PLANS FOR

TRANSITION LOCATIONS. TRANSITIONS ARE NOT REQUIRED BETWEEN

MATERIALS OF SAME THICKNESS.

6. ALL WALLS TO BE PAINTED PT-1 UNLESS OTHERWISE NOTED. REFER TO

FINISH FLOOR PLAN, INTERIOR ELEVATIONS AND ROOM FINISH SHEET I-602

FOR ACCENT PAINT LOCATIONS. ALL WALLS TO HAVE EGGSHELL FINISH AS

TYPICAL UNLESS OTHERWISE NOTED.

7. ALL EXTERIOR WINDOWS TO RECEIVE WINDOW BLINDS WN-1, DOUBLE

ROLLER SHADES WITH ROOM DARKENING ARE NOTED IN ROOM FINISH

SCHEDULE.

8. PAINT ALL EXPOSED STEEL COLUMNS, BRACES, GIRTS, DECKS, AND

MISCELLANEOUS FRAMING STEEL TO MATCH ADJACENT WALLS UNLESS

OTHERWISE NOTED.

9. ALL MISCELLANEOUS PANELS, FIRE EXTINGUISHER CABINETS, EXPOSED

DUCTWORK, LOUVERS VENTILATION COVERS, AND ANY EQUIPMENT NOT

FACTORY FINISHED, INCLUDING BUT NOT LIMITED TO ASSOCIATED

HARDWARE MUST BE PAINTED TO MATCH ADJACENT SURFACE ON WHICH IT

OCCURS UNLESS OTHERWISE NOTED.

10. REFER TO CEILING PLAN DRAWINGS FOR CEILING FINISH INFORMATION.

11. REFER TO DRAWINGS A-572 FOR TYPICAL MOUNTING HEIGHTS OF

RESTROOM ACCESSORIES.

12. REFER TO DOOR SCHEDULE ON DRAWING A-610 FOR DOOR AND FRAME

FINISH INFORMATION.

13. ALL WALLS TO RECEIVE WALL BASE UNLESS OTHEWISE NOTED. PROVIDE

COVE BASE PROFILE AT ALL RESILIENT AND CONCRETE FLOORING AND

STRAIGHT BASE PROFILE AT ALL CARPET LOCATIONS.

14. INTERIOR DOOR FRAMES ARE PT-4 UNLESS OTHERWISE NOTED.

15. GUARDRAILS AND ROOF LADDERS ARE TO BE PAINTED TO MATCH ADJACENT

MATERIAL FINISH UNLESS OTHERWISE NOTED.

ROOM FINISH SCHEDULE REMARKS

1. CATWALK TO BE PRIMED STEEL WITH METAL GRATE WALKING SURFACE

2. DUAL ROLL (WN-2) WINDOW SHADE ROOM DARKENING/ (WN-1) TRADITIONAL

REQUIRED.

3. BLOCK WALLS FOR WALL MOUNTED GLASS MARKER BOARD (ZCLIP MOUNT)

PROVIDED BY OTHERS. REFER TO INTERIOR DRAWING A-410.

4. BLOCK WALL FOR AV MONITOR PROVIDED BY OTHERS, REFER TO INTERIOR

DRAWING A-410.

5. PROVIDE RECESSED PICTURE RAIL CHANNEL REFERENCE INTERIOR

ELEVATIONS FOR LOCATION.

6. PROVIDE SINGLE ROLL WINDOW SHADE WN-1 IN THIS ROOM.

7. CONCRETE FLOOR IS SEALED ONLY. CONCRETE WALLS ARE EXPOSED.

PAINT ALL EXPOSED STEEL INCLUDING THE HEMP SHIELD ON ALL 6 SIDES,

MATCH PT-1.

8. SHIPS LADDERS LAD-1 REFER TO A-430 FOR MORE INFORMATION.

9. CORRIDOR 101 PICTURE HANGING REVEAL REFERENCE C1/A570.

10. SOLID SURFACE (SS-1) INSET BEHIND WATER COOLER WALL TO WALL UP TO

8'-0" A.F.F.

ROOM FINISH SCHEDULE LEGEND

FLOORS

CONC CONCRETE

CPT CARPET

EFC EPOXY FLOOR

COVERING

ESD ELECTROSTATIC

DISCHARGE TILE

LVT LUXURY VINYL

FLOORING

RAF RAISED ACCESS

FLOORING

RF RUBBER ATHLETIC

FLOORING

SC SEALED CONCRETE

WALL / PARTITIONS

AWP ACOUSTICAL WALL

PANEL

CG CORNER GUARD

FRP FIBER REINFORCED

WALL PANEL

GLZ GLAZING

MR MIRROR

PT PAINT

WT WALL TILE

SS SOLID SURFACE

ROOM FINISH SCHEDULE

BASE

EFB EPOXY FLOOR BASE

NA NOT APPLICABLE

RB RESILIENT BASE

CEILINGS

ACG ACOUSTICAL CEILING

GRID

ACP ACOUSTICAL CEILING

PANEL

EXP EXPOSED TO ABOVE

GYP GYPSUM BOARD CEILNG

PAINT

NA NOT APPLICABLE

OTS OPEN TO STRUCTURE

RESILIENT TILE, AS SCHEDULED

DOOR CL IF APPLICABLE

CARPET TILE, AS

SCHEDULED

POWERHOLD - 5MM TO 3/16"

402003 (ETCHED ALUMINUM)

SEALED CONCRETE

DOOR CL IF

APPLICABLE

RESILIENT TILE, AS

SCHEDULED

POWERHOLD 7/64"

BEVEL CAP 402022

EPOXY FLOORING AS

SCHEDULED RUBBER FLOORING

AS SCHEDULED

DOOR CL IF APPLICABLE SCHLUTER SCHIENE AE

60 AS SCHEDULED

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

A-600

R O

O M

F

IN

IS

H

S C

H E

D U

L E

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

B B

Y E

R S

N B

O Y

E R

K D

IC

K

E N

S

R Y

A W

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

ROOM NO ROOM NAME

FLOOR BASE FINISH WALL FINISH CEILING

REMARKSMATERIAL FINISH NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST MATERIAL FINISH HEIGHT

100 ENTRANCE VESTIBULE CONC CPT-3 RB-1 RB-1 NA RB-1 GLZ / PT-5 PT-5 GLZ / PT-5 PT-5 ACG GYP-1 9' - 0"

101 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5 PT-2 / AWP-1/CG-1 PT-5 ACG ACP-1 9' - 0" 5,9,10

102 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6

103 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6

104 OFFICE CONC CPT-2 RB-1 RB-1 RB-1 RB-1 PT-1 / GLZ/CG-1 PT-3 PT-5 PT-5 ACG ACP-1 9' - 0" 3,6

105 CLASSROOM CONC CPT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 PT-1 PT-1 GLZ/PT-2 ACG ACP-1 9' - 0" 2,3,4

106 BREAK ROOM CONC LVT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 GLZ / PT-1 PT-5/WT-3,GT-1 PT-5 / WT-3,GT-1 ACG ACP-1 8' - 10" 4.6

107 VESTIBULE CONC CPT-3 RB-1 NA RB-1 NA PT-5 GLZ / PT-5 PT-5 GLZ / PT-5 ACG GYP-1 9' - 0"

110 PHYSICAL FITNESS CONC RF-1 RB-1 RB-1 RB-1 RB-1 PT-1 GLZ/PT-2 MR-2 / PT-1 PT-1 ACG ACP-1 8' - 10" 6

111 WOMEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 WT-1,2, GT-1 WT-1,2,GT-1 WT-1,2,GT-1 WT-1,2, GT-1 GYP GYP-1 8' - 0"

112 MEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 WT-1,2, GT-1 WT-1,2,GT-1 WT-1,GT-1 WT-1,2, GT-1 GYP GYP-1 8' - 0"

113 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5/CG-1 PT-5/CG-1 PT-2/CG-1 ACG ACP-1 9' - 0"

114 MEN'S CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 WT-1 WT-1 WT-1 PT-1 GYP GYP-1 8' - 0"

115 WOMEN'S CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 WT-1 WT-1 WT-1 PT-1 GYP GYP-1 8' - 0"

116 JANITORS CONC SC-1 RB-1 RB-1 RB-1 RB-1 FRP-1/PT-1 PT-1 PT-1 FRP-1/PT-1 EXP OTS-1 8' - 0"

117 WELLNESS ROOM CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 AWP-1 PT-1 ACG ACP-1 8' - 0"

118 LOCKERS CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-1 PT-1 PT-1 PT-1 GYP GYP-1 9' - 0"

120 CORRIDOR CONC LVT-1 RB-1 RB-1 RB-1 RB-1 PT-5/CG-1 PT-2/CG-1 PT-5 PT-5/CG-1 ACG ACP-1 9' - 0"

121 TELECOM CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

122 SECURITY CONC SC-1 RB RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

123 ELECTRICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

124 STORAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

125 STORAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

126 WORKROOM CONC CPT-1 RB-1 RB-1 RB-1 RB-1 GLZ / PT-1 PT-1 PT-1 PT-2 ACG ACP-1 9' - 0" 2,3,4

127 GARAGE CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

128 MECHANICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

130 VESTIBULE CONC MAT-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

131 CORRIDOR CONC EFC-1 EFB-1 EFB-1 EFB-1 EFB-1 PT-5/CG-1 PT-5/CG-1 PT-5/CG-1 PT-5/CG-1 ACG ACP-1 9' - 0" 10

132 JANITOR CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 FRP-1 PT-1 PT-1 EXP OTS-1 8' - 0"

133 WOMEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 PT-1 WT-1,2,GT-1 PT-1 PT-1 GYP GYP-1 8' - 0"

134 MEN'S CONC EFC-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 EFB-1/TR-1 PT-1 WT-1,2,GT-1 PT-1 PT-1 GYP GYP-1 8' - 0"

135 OPS FLOOR CONC/RAF ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1/CG-1 PT-1/CG-1 PT-1 PT-1 ACG ACP-1

136 CLASSROOM CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-3 AWP-2\PT-1 AWP-2\PT-1 PT-1 ACG ACP-1 9' - 0" 2,3,4

137 WORKROOM CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-3 PT-1 PT-1 PT-1 ACG ACP-1 9' - 0" 2,4,6

138 SUPPLY ROOM CONC/RAF SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACG ACP-1 9' - 0"

139 VESTIBULE CONC MAT-1 NA NA NA NA PT-1 PT-1 PT-1 PT-1 EXP OTS-1 10' - 0"

140 OPS FLOOR WORKSTATIONS CONC/RAF CPT-4 RB-1 RB-1 RB-1 RB-1 PT-5 PT-5 PT-5 PT-5 ACG ACP-1 9' - 0" 4

141 MECHANICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

142 CHILLER CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

143 GENERATOR CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

144 BATTERIES / UPS CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

145 BATTERIES / UPS CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

146 ELECTRICAL CONC SC-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

147 SWITCH CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

148 SWITCH CONC ESD-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP OTS-1

150 OBSERVATION SPACE CONC SC-1 NA NA NA NA PT-1 PT-1 PT-1 PT-1 EXP OTS-1 1,7,8

SCALE: 12" = 1'-0"A1

TRANSITION RESILIENT TILE TO CARPET

SCALE: 12" = 1'-0"A2

TRANSITION RESILENT TILE TO SEALED CONCRETE

SCALE: 12" = 1'-0"B1

TRANSITION EPOXY FLOORING TO RUBBER FLOORING

M A

R K

D E

S C

R

IP

T

IO

N D

A

5. Interior Finish Floor Plans

C.4 D.1 D.4 E.1 E.9 F.4 G.1 G.9

9.7 9.5

5.35.3

4.14.1

2.92.9

A B C D E F G H J

E.5

I-121

A1

I-122

A2

I-123

A2

PLAN

NORTH

T R

U E

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SCALES: KEY PLAN:

B C

A

I-120

F

IN

IS

H

S

IG

N

A G

E P

L A

N F

IR

S

T F

L O

O R

O V

E R

A L L

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

M W

A R

R

IN

E R

J W

IS

E

K D

IC

K

E N

S

C .O

B E

IR

N

E

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

SCALE: 1/16" = 1'-0"A2

FINISH & SIGNAGE PLAN - FIRST FLOOR OVERALL

08 16 3241216

SCALE: 1/16"=1'-0"

M A

R K

D E

S C

R

IP

T

IO

N D

A

111 111 111

M A

T C

H L

IN

E

A

I-

M A

T C

H L

IN

E

A

I-

CPT-1

CPT-2

CPT-3

CPT-4

EFC-1

ESD-1

LVT-1

MAT-1

RF-1

SC-1

MECHANICAL

GARAGE

127 STORAGE

ELECTRICAL

CORRIDOR

TELECOM

SECURITY

STORAGE

WORKROOM

ENTRANCE

VESTIBULE

OFFICE

OFFICE

OFFICE

CLASSROOM

BREAK ROOM

CORRIOR

PHYSICAL

FITNESS

VESTIBULE

MEN'S

WOMEN'S

WOMEN'S

MEN'S

JANITORS

WELLNESS ROOM

LOCKERS

CORRIDOR

SC-1

S C

-1

P T

-2

S C

-1

P T

-3

P T

-3

P T

-3

P T

-2

P T

-5

PT-5

C P

T -1

C P

T -3

C P

T -2

L V

T -1

L V

T -1

C P

T -1

L V

T -1

CPT-3LVT-1

L V

T -1

R F

-1

C P

T -1

L V

T -1

L V

T -1

C P

T -2

C P

T -2

ESD-1

L V

T -1

E F

C -1

EFC-1

EFC-1

EFC-1

EFC-1

LVT-1

PT-2

SC-1

SC-1

SC-1

S C

-1

105105

105105105

S3S4S5

S6

S7 S8

S9

S10

S11

S12 S13 S14

S15

S16

S17 S18

S19

S20

S21

S23

S25

S26

S27

S28

S29

S30

S1

111111 118 118 118

L V

T -1

EQ EQ

S0

GENERAL SHEET NOTES

1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /

FINISHES

2. REFER TO I-601 FOR FINISH LEGEND

3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,

DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).

4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL

INFORMATION.

5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES

ONLY. DO NO APPLY BASE TO CMU WALLS

6. REFER TO A-600 FOR ROOM FINISH SCHEDULE

7. ALL WALLS PAINTED PT-1 UON, TYPICAL

8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT

ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL

9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,

TYPICAL

10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS

ARE PAINTED PT-4 UON.

SHEET KEYNOTES

FLOOR FINISH LEGEND

CARPET TILE-FIELD

CARPET TILE-OFFICES

CARPET TILE - ENTRANCE

CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS

FLOOR

EPOXY FLOOR COATING

ELECTROSTATIC DISSIPATIVE FLOOR TILE

LUXURY VINYL TILE (RANDOM INSTALLATION)

RUBBER ATHLETIC FLOOR TILE

SEALED CONCRETE

FLOOR MAT (FREESTANDING)

PLAN

NORTH

T R

U E

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SCALES: KEY PLAN:

A

I-121

P A

R T

IA

L F

IN

IS

H

S

IG

N A

G E

P L A

N F

IR

S

T F

L O

O R

A R

E A

A

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

M W

A R

R

IN

E R

J W

IS

E

K D

IC

K

E N

S

C .O

B E

IR

N

E

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

SCALE: 1/8" = 1'-0"A1

PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA A

04 8 16268

SCALE: 1/8"=1'-0"

101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/

MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO

ARCHITECTURAL DETAIL B3/A-570.

105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO

ARCHITECTURAL DETAIL B3/A-570

111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.

113 INSTALL FULL HEIGHT MIRROR; REFER TO FINISH LEGEND ON SHEET I-601

118 FABRIC COVERED ACOUSTIC WALL PANELS AS SCHEDULED- AWP-1

M A

R K

D E

S C

R

IP

T

IO

N D

A

M A

T C

H L

IN

E

A

I-

M A

T C

H L

IN

E

A

I-

WOMEN'S

CORRIDOR

OPS FLOOR

WORKSTATIONS

MECHANICAL

CHILLER

BATTERIES / UPS

GENERATOR

VESTIBULE

OBSERVATION

SPACE

VESTIBULE

BATTERIES / UPS

ELECTRICAL

SWITCH

S C

-1 E

F C

-1

S C

-1 E

F C

-1 CPT-1

CPT-2

CPT-3

CPT-4

EFC-1

ESD-1

LVT-1

MAT-1

RF-1

SC-1

SC-1 EFC-1

SC-1 EFC-1

S C

-1 E

F C

-1

M A

T -1

E F

C -1

ESD-1

MAT-1 ESD-1

E F

C -1

M A

T -1

M A

T -1

S30

S32

S35

S36

S37

S38

S39 S40 S41

S42

S43

S44

S46

S47

S48

S49

111111

SWITCH

ESD-1

L V

T -1

S34

S S

-1

GENERAL SHEET NOTES

1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /

FINISHES

2. REFER TO I-601 FOR FINISH LEGEND

3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,

DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).

4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL

INFORMATION.

5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES

ONLY. DO NO APPLY BASE TO CMU WALLS

6. REFER TO A-600 FOR ROOM FINISH SCHEDULE

7. ALL WALLS PAINTED PT-1 UON, TYPICAL

8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT

ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL

9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,

TYPICAL

10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS

ARE PAINTED PT-4 UON.

SHEET KEYNOTES

FLOOR FINISH LEGEND

CARPET TILE-FIELD

CARPET TILE-OFFICES

CARPET TILE - ENTRANCE

CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS

FLOOR

EPOXY FLOOR COATING

ELECTROSTATIC DISSIPATIVE FLOOR TILE

LUXURY VINYL TILE (RANDOM INSTALLATION)

RUBBER ATHLETIC FLOOR TILE

SEALED CONCRETE

FLOOR MAT (FREESTANDING)

PLAN

NORTH

T R

U E

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SCALES: KEY PLAN:

B

I-122

P A

R T

IA

L F

IN

IS

H

S

IG

N A

G E

P L A

N F

IR

S

T F

L O

O R

A R

E A

B

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

M W

A R

R

IN

E R

J W

IS

E

K D

IC

K

E N

S

C .O

B E

IR

N

E

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

SCALE: 1/8" = 1'-0"A2

PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA B

04 8 16268

SCALE: 1/8"=1'-0"

101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/

MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO

ARCHITECTURAL DETAIL B3/A-570.

105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO

ARCHITECTURAL DETAIL B3/A-570

111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.

113 INSTALL FULL HEIGHT MIRROR; REFER TO FINISH LEGEND ON SHEET I-601

118 FABRIC COVERED ACOUSTIC WALL PANELS AS SCHEDULED- AWP-1

M A

R K

D E

S C

R

IP

T

IO

N D

A

M A

T C

H L

IN

E

A

I-

M A

T C

H L

IN

E

A

I-

JANITOR

WOMEN'S

MEN'S

CLASSROOM

WORKROOM

SUPPLY ROOM

CORRIDOR

OPS FLOOR

OPS FLOOR

WORKSTATIONS

VESTIBULE

EFC-1EFC-1

M A

T -1

E F

C -1

CPT-4 ESD-1

EFC-1 ESD-1

C P

T -1

C P

T -1

S C

-1

MAT-1 ESD-1

SC-1EFC-1

EFC-1EFC-1

S44

S46

S47

S48

S49

S50

S51

S52 S53 120 120

CPT-1

CPT-2

CPT-3

CPT-4

EFC-1

ESD-1

LVT-1

MAT-1

RF-1

SC-1

ESD-1

L V

T -1

S34

S S

-1

H O

L D

GENERAL SHEET NOTES

1. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS /

FINISHES

2. REFER TO I-601 FOR FINISH LEGEND

3. ALL TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR,

DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED (UON).

4. REFER TO A-171-A-173 REFLECTED CEILING PLANS FOR ADDITIONAL

INFORMATION.

5. APPLY BASE AS SPECIFIED ON GYPSUM BOARD AND FRP WALL FINISHES

ONLY. DO NO APPLY BASE TO CMU WALLS

6. REFER TO A-600 FOR ROOM FINISH SCHEDULE

7. ALL WALLS PAINTED PT-1 UON, TYPICAL

8. ALL COLUMN WRAPS PAINTED PT-1 UON, PROVIDE CORNER GUARD AT

ALL OUTSIDE COLUMN CORNERS; CG-1 TYPICAL

9. INSTALL WINDOW SHADES, WN-1, AT ALL EXTERIOR WINDOWS UON,

TYPICAL

10. INTERIOR WOOD DOORS ARE FINISHED AS D-1. INTERIOR METAL DOORS

ARE PAINTED PT-4 UON.

SHEET KEYNOTES

FLOOR FINISH LEGEND

CARPET TILE-FIELD

CARPET TILE-OFFICES

CARPET TILE - ENTRANCE

CARPET TILE - STATIC DISSIPATIVE, RAISED ACCESS

FLOOR

EPOXY FLOOR COATING

ELECTROSTATIC DISSIPATIVE FLOOR TILE

LUXURY VINYL TILE (RANDOM INSTALLATION)

RUBBER ATHLETIC FLOOR TILE

SEALED CONCRETE

FLOOR MAT (FREESTANDING)

PLAN

NORTH

T R

U E

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SCALES: KEY PLAN:

C

I-123

P A

R T

IA

L F

IN

IS

H

S

IG

N A

G E

P L A

N F

IR

S

T F

L O

O R

A R

E A

C

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

M W

A R

R

IN

E R

J W

IS

E

K D

IC

K

E N

S

C .O

B E

IR

N

E

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

SCALE: 1/8" = 1'-0"A2

PARTIAL FINISH & SIGNAGE PLAN - FIRST FLOOR - AREA C

04 8 16268

SCALE: 1/8"=1'-0"

101 ADD WALL BLOCKING FOR TELEVISIONS/ MONITORS / MARKERBOARDS/

MIRRORS AS REQUIRED. REFER TO FF&E SHEETS FOR EQUIPMENT. REFER TO

ARCHITECTURAL DETAIL B3/A-570.

105 MARKERBOARD; PROVIDE BLOCKING AS REQUIRED; REFER TO

ARCHITECTURAL DETAIL B3/A-570

111 CORNER GUARD AT ALL OUTSIDE CORNERS; CG-1. REFER TO FINISH LEGEND.

120 FABRIC WRAPPED ACOUSTIC WALL PANEL AS SCHEDULED; AWP-2

M A

R K

D E

S C

R

IP

T

IO

N D

A

6. Exterior Finish Legend

A-201

B1

A-202

A1

A-551

C2

A-201

A1

A-202

C2

A-201

A3

A-203

C2

A-551

C1

A-203

A1

EXTERIOR FINISH SCHEDULE

MANUFACTURER'S NAMES AND PRODUCT DESIGNATIONS ARE USED TO ESTABLISH A COLOR AND FINISH ONLY EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE IN THE

INDIVIDUAL SPECIFICATIONS SECTIONS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

SCALES:

A-200

E X

T E

R

IO

R E

L E

V A

T

IO

N S

O V

E R

A L L

O F

F U

T T

A

IR

F O

R C

E B

A S

E N

E B

R A

S K

A S

A T

C O

M

M

IL

S T

A R

F A

C

IL

IT

Y

P R

O J E

C T

N O

S

G B

P

O M

A H

A D

IS

T

R

IC

T C

A P

IT

A

L A

V E

S

T E

O M

A H

A N

E

N

O R

T H

B R

O A

D W

A Y

S T

L O

U

IS

M

IS

S

O U

R I

B B

Y E

R S

N B

O Y

E R

K D

IC

K

E N

S

R Y

A W

O

C T

O B

E R

W F

F

W F

D

READY TO ADVERTISE

SCALE: 1/16" = 1'-0"C1

NORTH ELEVATION - OVERALL

SCALE: 1/16" = 1'-0"B1

EAST ELEVATION - OVERALL

SCALE: 1/16" = 1'-0"B3

WEST ELEVATION - OVERALL

SCALE: 1/16" = 1'-0"A2

SOUTH ELEVATION - OVERALL

08 16 3241216

SCALE: 1/16"=1'-0"

ELEVATION

KEYED NOTE PRODUCT FINISH COLOR

40 DOWNSPOUT PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

41 SCUPPER PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

42 INSULATED PRECAST CONCRETE WITH THIN BRICK, COLOR A PREFINISHED ENDICOTT: COLOR - GOLDEN BUFF VELOUR

43 INSULATED PRECAST CONCRETE WITH THIN BRICK, COLOR B PREFINISHED ENDICOTT: COLOR - COPPERTONE VELOUR

44 PRECAST CONCRETE WALL PANEL JOINT PREFINISHED EMSEAL: COLOR CHARCOAL GRAY

45 METAL COPING PREFINISHED PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

46 OVERHEAD COILING DOOR PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

47 HOLLOW METAL DOOR AND FRAME PAINT MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

48 GLAZED ALUMINUM CURTAINWALL ASSEMBLY PREFINISHED YKK AP: COLOR - YS1N CLEAR ANODIZED PLUS

49 LOUVER PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

50 METAL COMPOSITE MATERIAL WALL, FASCIA AND SOFFIT ASSEMBLY PREFINISHED PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

51 GUARDRAIL RAILING PREFINISHED - -

52 WALL MOUNTED LIGHT FIXTURE PREFINISHED MATCH PAC-CLAD PETERSEN: COLOR - WEATHERED ZINC

53 CONCRETE FOUNDATION WALL PREFINISHED - -

54 EXPANSION JOINT PREFINISHED - -

M A

R K

D E

S C

R

IP

T

IO

N D

A

7. Structural Interior Design - Exterior Finish Selections

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL Expansion joint solution

MANUFACTURER Emseal

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS Paint finish to match the exterior metal panel color.

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

SURFACE

MATERIAL

MANUFACTURER

MODEL

REMARKS

Weathered Zinc

HOLLOW

METAL DOOR

AND FRAMES

Pac-Clad Petersen

Pac-Clad Petersen

CURTAIN WALL

ASSEMBLY

WALL, FASCIA,

SOFFIT

ASSEMBLY

Pac-Clad Petersen

PRECAST

CONCRETE

WITH BRICK

VENEER

Exterior Brick- COLOR A

Brick Veneer

Endicott

Golden Buff, Velour Finish

PRECAST

CONCRETE

WITH BRICK

VENEER

Exterior Brick- COLOR B

Brick Veneer

Endicott

Coppertone, Velour Finish

PRECAST WALL

PANEL

EXPANSION

JOINT

Expansion Joint between concrete wall panels

Charcoal Gray

METAL

CLADDING

Pac-Clad Petersen

Aluminum Downspouts, Scupper, Coping

Pac-Clad Petersen

Weathered Zinc Metallic

OFFUTT AIR FORCE BASE

STRUCTURAL INTERIOR DESIGN (SID) PACKAGE

STRUCTURAL INTERIOR DESIGN -EXTERIOR FINISH LEGEND

Pac-Clad Petersen

Weathered Zinc Metallic

YKK AP: Clear Annodized Plus Aluminum

Glazed Curtain Wall Assembly a

STRUCTURAL INTERIOR DESIGN - EXTERIOR FINISH SELECTIONS

Color A -Precast Concrete with Brick Veneer - Golden Buff, Velour Finish

Metal, Cladding, Wall, Fascia, Soffitt Assembly - Weathered Zinc Metallic and Exterior Doors Frame and Door Painted to Match

Glazed Curtain Wall Assembly- Clear Annodized Aluminum Plus

Color B - Precast Concrete with Brick Veneer - Coppertone, Velour Finish

COVER SID_RTA
TABLE OF CONTENTS
SECTION 1 DESIGN NARRATIVE
DN-1
DN - 2
DN - 3
SECTION 2 INTERIOR FINISH LEGEND
I-601
SECTION 3 INTERIOR FINISH SELECTIONS
SID-1
SID-2
SID-3
SID-4
SID-5
SID-6
SID-7
SID-8
SID-9
SID-10
SID-11
SID-12
SID-13
SID-14
SID-15
SID-16
SID-17
SECTION 4 ROOM FINISH SCHEDULE
A600- ROOM FINISH SCHEDULE
SECTION 5 INTERIOR FINISH PLANS
I-120
I-121
I-122
I-123
SECTION 6 EXTERIOR FINISH LEGEND
A200
SECTION 7 EXTERIOR FINISH SELECTIONS
SID EX-1
SID EX-2

File details come from the government source that posted it. Updated .