This document contains details of a federal solicitation for internal and external aboveground storage tank inspections at Seymour Johnson Air Force Base. The solicitation seeks inspection services for one STI E85 tank, MOGAS, and diesel fuel internal API inspections, external API inspections of bulk tanks and hydrant tanks. Services may include ultrasonic testing, replacement of wiper seals, roundness surveys, preparation of strapping charts, and inspection of fuel storage and transfer systems. Inspections must comply with API 653, NFPA 30 and 326, UFGS 33 01 50.60, and 40 CFR 112, UFC 3-460-01, and UFC 3-460-03. The contractor must provide personnel, equipment, transportation, and other resources to remove and transfer remaining fuel, replace wiper seals, prepare strapping charts, clean tanks, and perform in-service or out-of-service AST inspections. The soliciting agency is the Department of the Army Corps of Engineers Omaha District.

View the file

Other files

File Type Posted
SMJ Mogas 2.jpg JPG image
SMJ Mogas 3.jpg JPG image
SMJ Tanks 1.jpg JPG image
SMJ Diesel 1.jpg JPG image
SMJ E85-1.jpg JPG image
SMJ Diesel 2.jpg JPG image
SMJ E85-2.jpg JPG image
SMJ Mogas 1.jpg JPG image
SMJ E85-3.jpg JPG image
SMJ Mogas 4.jpg JPG image
Attachment B - Fuel Storage Tank List (SMJ) UPDATED 13DEC2021.xlsx XLSX spreadsheet
SMJ-FY17-FAC 10242-Tank 2-FINAL.pdf PDF
SMJ-FY15-FAC 10208-Bulk Tank 3-FINAL.pdf PDF
SMJ-FY15-FAC 10104-Bulk Tank 1-FINAL.pdf PDF
SMJ-FY12-FAC 10227-Tank 5-FINAL.pdf PDF
SMJ-FY20-FAC 10241-Tank 1-FINAL.pdf PDF
SP-POL-CMP-INSPECT-FY22-SMJ PWS.pdf PDF
W9128F22Q0002 AMENDMENT 0001.pdf PDF
Attachment C Fuel Storage Tank Excel Document.xls XLS spreadsheet
Attachment D - Monthly Contractors Progress Management and Status Report.xlsx XLSX spreadsheet
Attachment E- API In-Service Template.docx DOCX document
Attachment A - General Installation Security Requirements.pdf PDF
Attachment G - API Out-of-Service Telecon Briefing Template.docx DOCX document
Attachment H - STI In-Service Template.docx DOCX document
Attachment F - API Out-of-Service Template.docx DOCX document
Attachment B - Fuel Storage Tank List (SMJ) (1).xlsx XLSX spreadsheet
Attachment I - Return To Service Letter.docx DOCX document
RFQ W9128F22Q0002.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TANK 10206 (Bulk Tank 2)

API 653 IN-SERVICE INSPECTION REPORT

Seymour Johnson AFB, North Carolina Final Submittal

A/E Contract No. W9128F-12-D-0006; Delivery Order No. 0006

Submitted to:

U.S. Army Corps of Engineers Omaha District

1616 Capital Avenue; Omaha, NE 68102

3 April 2015

Submitted by:

1011 Boulder Springs Drive, Suite 200; Richmond, Virginia 23225 Phone: 804.592.3900 Fax: 804.592.3901 www.brockenbrough.com Job No. 14-101.13

Austin Brockenbrough & Associates, LLP | Est. 1955

1011 Boulder Springs Drive, Suite 200 | Richmond, Virginia 23225 | 804.592.3900 main | 804.592.3901 fax www.brockenbrough.com

Adam Ashton

U.S. Army Corps of Engineers

Omaha District

1616 Capital Avenue

Omaha, Nebraska, 68102

Re: Final Inspection Report – Tank 10206 (Bulk Tank 2), Seymour Johnson AFB, NC

USACE Omaha Contract No. W9128F-12-D-0006 D.O. 0006

Brockenbrough Job No. 14-101.13 API 653 In-service Tank Inspections

Various CONUS Locations

Dear Mr. Ashton:

On February 24th and 25th, 2015, personnel from Austin Brockenbrough & Associates, LLP

(Brockenbrough) performed an API 653 In-service (visual external) Inspection of Tank 10206

(AKA Bulk Tank 2) located at Seymour Johnson Air Force Base, North Carolina. The In-service

Inspection of the nominal 17,597 bbl, 60 feet in diameter by 38 feet and 10 inches tall, F-24 (Jet-

AA), aboveground vertical storage tank was performed in accordance with API Standard 653, “Tank Inspection, Repair, Alteration, and Reconstruction,” and the referenced contract. The confined space between the internal floating roof and the fixed roof was not entered during the inspection. All observations made during this In-service (visual external) Inspection were made from the exterior of the tank.

The tank’s data plate indicates the tank was built in 1955 and reconstructed in 2003. Leak detection is provided by leak detection ports located below the double bottom and through the tank’s shell. The underside of the tank bottom is protected by an impressed current cathodic protection system. The tank’s roof is accessible by a circumferential stairway mounted on the shell of the tank. As-built drawings of the original construction were not available at the time of the inspection. Facility records indicate the tank was cleaned and an out-of-service inspection was conducted in March 2010. Repairs were completed in August 2010.

Jet-AA fuel is received into the 17,597 bbl tank from a pipeline through the facility’s filter/separators and is issued from the tanks through filters/separators to a truck fillstand and a hydrant system.

A list of the tank’s general construction features is included on page 2.

Tank 10206 (Bulk Tank 2) General Construction Data

Item Description

Owner U.S. Air Force

Tank Identification 10206 (Bulk Tank 2)

Location Seymour Johnson AFB, Goldsboro, North Carolina

Manufacturer Original - Horton Tank (Chicago Bridge & Iron); Reconstructed -

Superior Industrial Maintenance Company, Inc.

Design Standard Original - API Standard 12C (Assumed); Reconstructed - API 653

Edition 1995

Year Built Original - 1955; Reconstructed - 2003

Current Product Stored Jet-AA (F-24) jet fuel, specific gravity: 0.775 to 0.840, true vapor pressure: 0.04 psia at 100F, flash point: 100-150F, viscosity: 1.6 x

10-5 ft2/s at 100F, Class II combustible liquid.

Dimensions 60’-0” diameter x 38’-10” shell (straight side) height.

Storage Capacity Original nominal capacity = 20,000 bbl.

Reconstructed nominal capacity = 17,597 bbl.

Cleaning, Inspection, or

Repair

Cleaned and Out-of-service Inspected – March 2010.

Repairs completed – August 2010.

Foundation Concrete ringwall below grade.

RPB/Leak Detection (5) Leak detection ports suggest a RPB.

Bottom Construction Lap welded cone-down, per 2011 out-of-service inspection report.

Shell Construction (5) butt-welded shell courses, carbon steel plate; wind girder.

Fixed Roof Construction Aluminum geodesic dome.

Stairs/Ladders Circumferential stairway; aluminum interior vertical ladder.

Manholes (1) 36” diameter and (1) 36”x20” shell manholes.

Cathodic Protection Impressed current system.

Interior Coating System Interior coated. Type unknown.

Exterior Coating System Exterior coated. Type unknown.

Level Gauging Shand & Jurs tape level gauge and Enraf ATG

Overfill Protection/Level

Alarms

Shell mounted high-high, high, low, and low-low level alarms;

hydraulic operated level control valve.

Piping 2” low suction, 8” receipt, 10” issue, 3” water draw-off.

Venting/Vapor Emission

Controls

Aluminum honeycomb internal floating roof with perimeter seal, center and perimeter vented geodesic dome roof, (4) shell mounted overflow-vents.

Strapping Tables Strapping tables are available.

Water Draw-Off/Product

Recover System

Product saver tank.

Secondary Containment FML covered with gravel and FML over concrete covered earthen berms.

Tank 10206 (Bulk Tank 2) General Construction Data

Item Description

Fire Protection System Several fire hydrants in vicinity.

The results of the inspection are included with the Tank In-Service Inspection Checklist starting on page 7. A checkmark beside an item indicates it was examined and no deficiency was noted.

An “X” beside a checklist item indicates a deficiency and a comment/note is made. During this evaluation, the tank was found to be in a generally good and acceptable condition. There were several anomalies or deficiencies noted, most of which are included on the checklist. These deficiencies, and recommendations for addressing them, are noted below in no particular order:

1. The FML covering the dike area and concrete covered earthen berms is itself covered with gravel ballast. At the time of inspection, the dike area had collected water from a storm. The drains were operational and open, but water had still accumulated around the tank and piping contrary to NFPA requirements. The dike area grading was not allowing the water to drain from the dike. Upon return the day after inspection, temperatures had caused the standing water to freeze as shown in Photograph #1 on page 14. There is also some grass and vegetation growth in the gravel ballast throughout the dike area. See Photograph #2 on page

14. Continued growth of vegetation could potential lead to liner issues as well as continued drainage problems. The dike area liner has holes in the visible portion around the perimeter of the containment. There are many areas that appear to have previous repairs. The seals around the concrete dike access stairs have also failed. There is also water under the liner at the tank and some areas throughout the containment appear to be floating. It is assumed that water is entering either through a failure of the liner under the gravel ballast or through the liner to concrete seal around the tank. See Photographs #13 and #14 on page 20. The following actions should be performed to correct this deficiency:

The gravel covered secondary containment liner system should be replaced with an exposed secondary containment liner per UFGS specification 33 56 63 “Fuel Impermeable Liner

System”. The design of the new secondary containment should include a sump, drainage away from the tank and the piping, and verification of the capacity of the secondary containment to meet NFPA and military criteria.

Estimated construction cost is $200,000.

2. Bulk fuel personnel indicated the mechanical tape gauge system is broken. The elbow at the top of the tank is broken off as shown in Photograph #3 on page 15. The following action should be performed to correct this deficiency:

Replace the mechanical tape gauge system.

Estimated construction cost is $25,000.

3. There is some coating failure and corrosion on the tank bottom exterior extension, the bottom-to-shell plate weld, the shell plate, shell plate welds, and manhole covers. There is dirt build-up on the tank bottom exterior extension around the entire perimeter. This build-up could provide a place for corrosion to take place. See Photographs #4 to #9 starting on page 15. The following actions should be taken to correct these deficiencies:

Remove dirt build-up from around the tank bottom protrusion. Clean the corroded areas and spot repair the coating failures.

Estimated construction cost is $5,000.

4. There is some coating failure and corrosion on the tank circumferential stairs, platforms/gratings, handrails, and supports. Also, some of the stair tread to shell welds, as well as the stair tread to handrail post welds, exhibit coating failure and corrosion.

Photographs #10 to #12 starting on page 18 show some of these areas. The following actions should be taken to correct these deficiencies:

Remove the corrosion and spot repair the coating failures.

Estimated construction cost is $1,000.

5. The rise of the circumferential stairway measures approximately 8 3/4" to 9”. However, the distance from the concrete walk around the tank to the top of the lowest stair tread measures approximately 7 1/2". OSHA requires a consistent rise and run over the entire stairway. The following action should be taken to correct the deficiency:

Install landing at same level as bottom tread.

Estimated construction cost is $5,000.

6. The thermal relief valves and water draw-off, and their associated piping, are threaded. UFC

3-460-01 states to “use threaded connections only where unavoidable…” The thermal relief piping also does not have testing tees as required by the UFC. Threaded connections provide a location for fuel to leak from the system. The following actions should be taken to correct the deficiencies:

Monitoring of the threaded water draw-off piping and valves for leaks should be added to the periodic maintenance checklists. Replace threaded pipe at next out-of-service inspection.

Estimated construction cost is $15,000.

7. Algae is growing on the topside of the wind girder, presumably around the entire perimeter.

The following action should be taken to correct this deficiency:

Power wash the wind girder to remove algae and to not damage coating.

Estimated construction cost is $5,000.

8. Runoff from snow on top of the aluminum geodesic dome roof was observed running freely through the joints of the geodesic dome roof and onto the internal floating pan. The following action should be taken to correct the deficiency:

Replace the seals of the geodesic dome roof.

Estimated construction cost to replace the seals is $20,000.

All repairs and modifications should be performed in accordance with API 653, UFC 3-460-01, DoD Standard Design 78-24-27, and applicable UFGS specifications.

The estimated construction costs noted above are based upon all of the work being performed under a single construction contract. The costs do not include any special conditions or prime contractor markup that might be applicable, but they do include the cost of any coating repairs that would be required due to the contractor’s work. The total estimated cost for all the recommended repairs is $276,000.

TANK INSPECTION, REPAIR, ALTERATION, AND RECONSTRUCTION

Tank In-service Inspection Checklist

Item Completed Comments

C.1.1 Foundation

Measure foundation levelness and bottom elevations (see Annex B for extent of measurements). See notes.

C.1.1.1 Concrete Ring a)

Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell.

N/A b)

Inspect drain openings in ring, back of water-draw basins and top surface of ring for indications of bottom leakage.

N/A

c) Inspect for cavities under foundation and vegetation against bottom of tank. N/A

d) Check that runoff rainwater from the shell drains away from tank. N/A

e) Check for settlement around perimeter of tank. N/A

C.1.1.2 Asphalt

a) Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it.

b) Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage.

C.1.1.3 Oiled Dirt or Sand

Check for settlement into the base which would direct runoff rain water under the tank rather than away from it. N/A

C.1.1.4 Rock

Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.

N/A

C.1.1.5 Site Drainage

a) Check site for drainage away from the tank and associated piping and manifolds. X See notes.

b) Check operating condition of the dike drains.

C.1.1.6 Housekeeping

Inspect the area for buildup of trash, vegetation, and other inflammables buildup. X See notes.

C.1.1.7 Cathodic Protection

Review cathodic protection potential readings. 11.5V, 0.8A

C.1.2 Shells

C.1.2.1 External Visual Inspection

a) Visually inspect for paint failures, pitting, and corrosion. X See notes.

b) Clean off bottom angle area and inspect for corrosion and thinning on plate and weld.

X See notes.

c) Inspect the bottom-to-foundation seal, if any. N/A

C.1.2.2 Internal (Floating Roof Tank)

Visually inspect for grooving , corrosion, pitting, and coating failures No access

C.1.2.3 Riveted Shell Inspection

a) Inspect external surface for rivet and seam leaks. N/A

b) Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting). N/A

c) Inspect rivets for corrosion loss and wear. N/A

d) Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency. N/A

Tank In-service Inspection Checklist (Continued)

e) If no record exists of vertical riveted seams, dimension and sketch (or photograph) the rivet pattern: number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.

C.1.2.4 Wind Girder (Floating Roof Tanks)

a) Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion, product buildup), especially where it occurs at tack-welded junction, and for broken welds.

b) Check support welds to shell for pitting, especially on shell plates.

c) Note whether supports have reinforcing pads welded to shell. N/A

C.1.3 Shell Appurtenances

C.1.3.1 Manholes and Nozzles

a) Inspect for cracks or signs of leakage on weld joint at nozzles, manholes, and reinforcing plates.

b) Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection.

c) Inspect for flange leaks and leaks around bolting.

d) Inspect sealing of insulation around manholes and nozzles. N/A

e) Check for inadequate manhole flange and cover thickness on mixer manholes. N/A

C.1.3.2 Tank Piping Manifolds

a) Inspect manifold piping, flanges, and valves for leaks.

b) Inspect firefighting system components. N/A

c) Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement.

d) Check for adequate thermal pressure relief of piping to the tank.

e) Check operation of regulators for tanks with purge gas systems. N/A

f) Check sample connections for leaks and for proper valve operation. N/A

g) Check for damage and test the accuracy of temperature indicators. N/A

h) Check welds on shell-mounted davit clips above valves 6 inches and larger. N/A

C.1.3.3 Autogauge System

a) Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks. N/A

b) Inspect autogauge head for damage.

c) Bump the checker on autogauge head for proper movement of tape. X See notes.

d) Identify size and construction material of autogauge tape guide (floating roof tanks). No access

e) Ask operator if tape tends to hang up during tank roof movement (floating roof tanks). X See notes.

f) Compare actual product level to the reading on the autogauge (maximum variation is 2 in.).

X See notes.

g) On floating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide. N/A

h) Inspect condition of board and legibility of board-type autogauges. N/A

i) Test freedom of movement of marker and float. N/A

C.1.3.4 Shell-mounted Sample Station

a) Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line. N/A

b) Check circulation pump for leaks and operating problems. N/A

c) Test bracing and supports for sample tines and equipment. N/A

C.1.3.5 Heater (Shell Manhole Mounted)

Inspect condensate drain for presence of oil indicating leakage. N/A

Tank In-service Inspection Checklist (Continued)

Item Completed Comments

C.1.3.6 Mixer

a) Inspect for proper mounting flange and support. N/A

b) Inspect for leakage. N/A

c) Inspect condition of power lines and connections to mixer. N/A

C.1.3.7 Swing Lines: Winch Operation

a) Nonfloating. Raise, then lower the swing line with the winch, and check for cable lightness to confirm that swing line lowered properly.

b) Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable light, indicating that the winch is operating properly.

c) Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.

N/A

C.1.3.8 Swing Lines: External Guide System

Check for leaks at threaded and flanged joints N/A

C.1.3.9 Swing Lines: Identify Ballast Varying Need

Check for significant difference in stock specific gravity. N/A

C.1.3.10 Swing Lines: Cable Material and Condition

a) For nonstainless steel cable, check for corrosion over entire length. N/A

b) All cable: check for wear or fraying. N/A

C.1.3.11 Swing Lines: Product Sample Comparison

Check for water or gravity differences that would indicate a leaking swing joint. N/A

C.1.3.12 Swing Lines: Target

Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support.

N/A

C.1.4 Roofs

C.1.4.1 Deck Plate Internal Corrosion

For safety, before accessing the roof, check with ultrasonic instrument or lightly use a ball peen hammer to test the deck plate near the edge of the roof for thinning.

(Corrosion normally attacks the deck plate at the edge of a fixed roof and at the rafters in the center of the roof first.)

No access

C.1.4.2 Deck Plate External Corrosion

Visually inspect for paint failure, holes, pitting, and corrosion product on roof deck. N/A

C.1.4.3 Roof Deck Drainage

Look for indication of standing water. (Significant sagging of fixed roof deck indicates potential rafter failure. Large standing water areas on a floating roof indicate inadequate drainage design or, if to one side, a nonlevel roof with possible leaking pontoons.)

C.1.4.4 Level of Floating Roof

At several locations, measure distance (inches) from roof rim to the horizontal weld seam above the roof. A variance in the readings indicates a non-level roof with possible shell out-of-round, out-of-plumb, leaking pontoons, or hang-up. On small diameter tanks, an un-level condition can indicate unequal loading at that level.

No access

C.1.4.5 Gas Test Internal Floating Roof

Test for explosive gas on top of the internal floating roof, Readings could indicate a leaking roof, leaking seal system, or inadequate ventilation of the area above the internal floating roof.

0.0 ppm on pan.

C.1.4.6 Roof Insulation

a) Visually inspect for cracks or leaks in the insulation weather coat where runoff rain water could penetrate the insulation.

b) Inspect for wet insulation under the weather coat. N/A

c) Remove small test sections of insulation and check roof plate for corrosion and holes near the edge of the insulated area.

Tank In-service Inspection Checklist (Continued)

C.1.4.7 Floating Roof Seal Systems

a) Inspect the condition of the seal, measure and record maximum rim spaces and seal-to-shell gaps around the full roof circumference at the level of inspection.

NOTE Inspection of the seal and measurement of the rim spaces and seal-to-shell gaps at more than one level may be necessary to more fully determine if any problems exist at other levels of tank operation).

b) Measure and record annular space at 30-ft spacing (minimum of four quadrants) around roof and record. Measurements should be taken in directly opposite pairs.

1) ______ Opposite pair 1.

2) ______ Opposite pair 2.

c) Check if seal fabric on primary shoe seals is pulling shoes away from shell

(fabric not wide enough).

No access

d) Inspect fabric for deterioration, holes, tears, and cracks. No access

e) Inspect visible metallic parts for corrosion and wear No access

f) Inspect for openings in seals that would permit vapor emissions. No access

g) Inspect for protruding bolt or rivet heads against the shell. No access

h) Pull both primary and secondary seal systems back all around the shell to check their operation.

i) Inspect secondary seals for signs of buckling or indications that their angle with the shell is too shallow.

No access

j) Inspect wedge-type wiper seals for flexibility, resilience, cracks, and tears. No access

C.1.5 Roof Appurtenances

C.1.5.1 Sample Hatch

a) Inspect condition and functioning of sample hatch cover.

b) On tanks governed by Air Quality Monitoring District rules, check for the condition of seal inside hatch cover.

c) Check for corrosion and plugging on thief and gauge hatch cover.

d) Where sample hatch is used to reel gauge stock level, check for marker and tab stating hold-off distance.

e) Check for reinforcing pad where sample hatch pipe penetrates the roof deck. N/A

f) On floating roof sample hatch and recoil systems, inspect operation of recoil reel and condition of rope.

g) Test operation of system. N/A

h) On ultra clean stocks such as JP4, check for presence and condition of protective coating or liner inside sample hatch (preventing rust from pipe getting into sample).

Aluminum

C.1.5.2 Gauge Well

a) Inspect visible portion of the gauge well for thinning, size of slots, and cover condition.

b) Check for a hold-off distance marker and tab with a hold-off distance (legible).

c) On floating roofs, inspect condition of roof guide for gauge well, particularly the condition of the rollers for grooving.

d) If accessible, check the distance from the gauge well pipe to the tank shell at different levels.

e) If tank has a gauge well washer, check valve for leakage and for presence of a bull plug or blind flange.

No access

C.1.5.3 Fixed Roof Scaffold Support

Inspect scaffold support for corrosion, wear and structural soundess. N/A

C.1.5.4 Autogauge: Inspection Hatch and guides (Fixed Roof)

a) Check the hatch for corrosion and missing bolts. N/A

b) Look for corrosion on the tape guide's and float guide's wire anchors. N/A

Tank In-service Inspection Checklist (Continued)

Item Completed Comments

C.1.5.5 Autogauge: Float Well Cover

a) Inspect for corrosion. No access

b) Check tape cable for wear or fraying caused by rubbing on the cover. No access

C.1.5.6 Sample Hatch (Internal Floating Roof)

a) Check overall conditions. No access

b) When equipped with a fabric seal, check for automatic sealing after sampling. No access

c) When equipped with a recoil reel opening device, check for proper operations. No access

C.1.5.7 Roof-Mounted Vents (Internal Floating Roof)

Check condition of screens, locking and pivot pins.

C.1.5.8 Gauging Platform Drip Ring

On fixed roof tanks with drip rings under the gauging platform or sampling area, inspect for plugged drain return to the tank.

C.1.5.9 Emergency Roof Drains

Inspect vapor plugs for emergency drain: that seal fabric discs are slightly smaller than the pipe 10 and that fabric seal Is above the liquid level.

N/A

C.1.5.10 Removable Roof Leg Racks

Check for leg racks on roof. N/A

C.1.5.11 Vacuum Breakers

Report size, number, and type of vacuum breakers. Inspect vacuum breakers. If high legs are set, check for setting of mechanical breaker in high leg position.

No access

C.1.5.12 Rim Vents

a) Check condition of the screen on the rim vent cover. No access

b) Check for plating off or removal of rim vents where jurisdictional rules do not permit removal.

No access

C.1.5.13 Pontoon Inspection Hatches

a) Open pontoon inspection hatch covers and visually check inside for leakage. N/A

b) Test for explosive gas (an indicator of vapor space leaks). N/A

c) If pontoon hatches are equipped with locked down coves, check for vent tubes.

Check that vent tubes are not plugged up. Inspect lock-down devices for condition and operation.

N/A

C.1.6 Accessways (See Tank Out-of-service Inspection Checklist, Item C.2.12.)

C.2.12 Access Structures

C.2.12.1 Handrails

a) Identify and report type (steel pipe, galvanized pipe, square tube, angle) and size of handrails. See notes.

b) Inspect for pitting and holes, paint failure. X See notes.

c) Inspect attachment welds.

d) Identify cold joints and sharp edges. Inspect the handrails and mid-rails.

e) Inspect safety drop bar (or safety chain) for corrosion, functioning, and length. N/A

f) Inspect the handrail between the rolling ladder and the gauging platform for a hazardous opening when the floating roof is at its lowest level.

N/A

C.2.12.2 Platform Frame

a) Inspect frame for corrosion and paint failure. X See notes.

b) Inspect the attachment of frame to supports and supports to tank for corrosion and weld failure.

c) Check reinforcing pads where supports are attached to shell or roof.

Tank In-service Inspection Checklist (Continued)

Item Completed Comments

d) Inspect the surface that deck plate or grating rests on, for thinning and holes.

e) Check that flat surface–to-flat surface junctures are seal-welded.

C.2.12.3 Deck Plate and Grating

a) Inspect deck plate for corrosion-caused thinning or holes (not drain holes) and paint failure N/A

b) Inspect plate-to-frame weld for rust scale buildup. N/A

c) Inspect grating for corrosion-caused thinning of bars and failure of welds.

d) Check grating tie down clips. Where grating has been retrofitted to replace plate, measure the rise of the step below and above the grating surface and compare with other risers on the stairway.

C.2.12.4 Stairway Stringers

a) Inspect spiral stairway stringers for corrosion, paint failure, and weld failure.

b) Inspect stairway supports to shell welds and reinforcing pads.

c) Inspect steel support attachment to concrete base for corrosion. N/A

C.2.12.5 Rolling Ladder

a) Inspect rolling ladder stringers for corrosion. N/A

b) Identify and inspect ladder fixed rungs (square bar, round bar, angles) for weld attachment to stringers and corrosion, particularly where angle rungs are welded to stringers.

N/A

c) Check for wear and corrosion where rolling ladder attaches to gauging platform. N/A

d) Inspect pivot bar for wear and that it is secure. N/A

e) Inspect operation of self-leveling stairway treads. N/A

f) Inspect for corrosion and wear on moving parts. N/A

g) Inspect rolling ladder wheels for freedom of movement, flat spots, and wear on axle.

h) Inspect alignment of rolling ladder with roof rack. N/A

i) Inspect top surface of rolling ladder track for wear by wheels to assure at least 18

in. of unworn track (track long enough).

N/A

j) Inspect rolling ladder track welds for corrosion. N/A

k) Inspect track supports on roof for reinforcing pads seal-welded to deck plate. N/A

l) Check by dimensioning, the maximum angle of the rolling ladder when the roof is on low legs.

Max. angle ______________.

m) If rolling ladder track extends to within 5 ft of the edge of the roof on the far side, check for a handrail on the top of the shell on that side.

NOTES:

C.1.1: The foundation measurements indicate the tank is relatively level and with no appreciable out of plane deflection. The distance measured from the horizontal weld between the first and second shell courses to a horizontal level line at 8 equal distant locations, with a 9th reading taken at the first reading location, were: 20 1/8” (origin), 21 3/8”, 20 11/16”, 20", 19 3/4”, 19 1/2”, 19 3/16”, 19 1/8" (low point), 20 3/8” (origin).

C.1.1.5.a) Water does not drain away from tank.

C.1.1.6 Grass/vegetation in dike area.

C.1.2.1.a) Coating failure/pitting on several places on shell and on manhole.

C.1.2.1.b) Coating failure/pitting on chime.

C.1.3.3.c),e),f) Personnel indicated tape gauge system is broken. Elbow at top of tank is broken off.

C.2.12.1.a) Handrail on stairway is 1 1/2" diameter and 2”x2” angle on the platform.

C.2.12.1.b) Minor surface rust/coating failure at several locations on handrail.

C.2.12.2.a) Minor surface rust/coating failure at several locations on platform frame.

ADDITIONAL NOTES:

Threaded thermal relief vales and piping. No testing tees, as well.

Wind girder has algae on topside surface.

Water draw-off pipe is threaded.

Containment area liner has holes near the drain.

Sealant at concrete dike access stairs has failed.

Dike area does not drain water away from tank. Standing water in containment area.

Water is under the liner around tank.

Runoff from snow on geodesic dome roof running freely into joints of dome roof and onto internal floating pan.

Photograph #1 – Standing Water

Dike grading does not allow proper drainage of standing water.

Photograph #2 – Containment Area Vegetation

Vegetation and grass growing in various areas inside containment.

Photograph #3 – Mechanical Tape Gauge Guide Pipe

Mechanical tape gauge elbow broken off at the top of the guide pipe.

Photograph #4 – Tank Bottom Extension

Dirt build-up along the bottom-to-shell weld, coating failure, and corrosion.

Photograph #5 – Tank Bottom-to-Shell Weld Corrosion

Localized corrosion of weld.

Photograph #6 – Tank Shell/Foundation Corrosion at Concrete Interface

Corrosion at the interface between the tank shell/foundation and the concrete walk around the tank. Corrosion is scattered around entire tank.

Photograph #7 – Tank Shell Vertical Weld Corrosion

Coating failure and corrosion along a vertical weld seam.

Photograph #8 – Tank Shell Corrosion

Coating failure and corrosion on tank shell.

Photograph #9 – Manhole Cover Corrosion

Coating failure and corrosion on manhole cover handles and support hinge.

Photograph #10 – Stair to Tank Corrosion

Coating failure and corrosion at stair tread to shell weld.

Photograph #11 – Stair Support Connection Corrosion

Coating failure and corrosion at stair post to treat connection.

Photograph #12 – Platform Corrosion

Coating failure and corrosion on platform.

Photograph #13 – Hole in Containment Liner at Drain

Liner failure at dike area drain.

Photograph #14 – Containment Liner Sealant Failure

Sealant at dike access stairs failed and vegetation growth.

Austin Brockenbrough & Associates, L.L.P. Job No. 14-101.13

Job Title: Seymour Johnson AFB Date: 3/12/2015

Subject: Tank 10206 - Shell Settlement Evaluation By: Andrew Swenck

API 653 Appendix B

Optimum cosine curve, B 2.2.4.e) Z = a + b x cos(theta + c)

Diameter (D) = 60 (ft)

Number of equally spaced data points (ft)= 8

L = Arc length between measurement points (ft) = 23.56

Tank Height (H) = 38.8 (ft)

* Z U S

0 19.13 0.00 0.31 0.31 0.39

1 20.13 1.00 0.45 -0.55 0.02

2 21.38 2.25 0.81 -1.44 -0.97

3 20.69 1.56 1.16 -0.41 0.10

4 20.00 0.88 1.30 0.43 0.36

5 19.75 0.63 1.16 0.53 0.10

6 19.50 0.38 0.81 0.43 -0.03

7 19.19 0.06 0.45 0.39 0.02

8 19.13 0.00 0.31 0.31 0.39

Maximum out-of -plane deflection = -0.97

* = measured elevation

Z = calculated ridged body tilt (in)

U = out-of-plane settlement =

S = out-of-plane deflection z-y

Y = yield sterength of shell material (PSI) = 36,000

E = Youngs modulas of elasticity (lbf/in2) = 29*10^6

S allowable (in) (API 653 B.3.2.1) = (L^2*Y*11)/(2EH)*12 = 1.17 in

R^2 = (Syy - SSE) / Syy = 0.3 not >=0.9 therefore cosine curve is invalid.

Evaluation by the Arc Length Method is required.

Austin Brockenbrough & Associates, L.L.P. Job No. 14-101.13

Job Title: Seymour Johnson AFB Date: 3/12/2015

Subject: Tank 10206 - Shell Settlement Evaluation By: Andrew Swenck

API 653 B.2.2.5 Evaluation by Settlement Arc Length Method

Per B.3.2.2, K = 10.5

Settlement arc length (ft), Sarc

Out of plate settlement at Point I (Si)

Allowable settlement at point i (Smax) = MIN[K*Sarc*(D/H)*(Y/E), 4]

Point Sarc (ft) Si (in) Smax

1 47.1 0.13 0.95 OK

4 141.4 0.63 2.85 OK

Evaluation of the settlement by the arc length method indicates the settlement is acceptable.

0.00

0.50

1.00

1.50

2.00

2.50

0 2 4 6 8 10

Measured Elevation (in)