Attachment I - Return To Service Letter.docx

DOCX document 13 KB Posted

Attached to
Seymour Johnson AFB Internal API and STI Tank Inspections - POL-MCX
Solicitation number
W9128F22Q0002
Issued by

About this file

This document contains a return to service letter for an API 653 fuel system inspection of a storage tank at Seymour Johnson AFB in North Carolina. The letter documents that Tank XXX was inspected by [Company Name] on [date] in accordance with API STD 653 and relevant state regulations. The inspection found the tank to be in suitable condition for return to service, with no mandatory repairs requiring immediate attention. Recommended future inspection dates included additional API 653 inspections, UT roundness surveys, and corrosion inspections. The return to service letter was signed by the inspector and acknowledged by installation and USACE contacts.

The related federal contract opportunity is a solicitation from the USACE Engineering District Omaha seeking proposals for internal API and STI tank inspections, and external API inspections of bulk tanks, hydrant tanks, and an E85 tank at Seymour Johnson AFB. Services include tank cleaning, replacing wiper seals, providing strapping charts, and performing AST inspections in accordance with applicable industry standards and federal, state, and local regulations. Proposers must provide all necessary personnel, equipment, transportation, and materials to execute fuel removal, inspections, and repairs.

View the file

Other files

File Type Posted
SMJ Mogas 2.jpg JPG image
SMJ Mogas 3.jpg JPG image
SMJ Tanks 1.jpg JPG image
SMJ Diesel 1.jpg JPG image
SMJ E85-1.jpg JPG image
SMJ Diesel 2.jpg JPG image
SMJ E85-2.jpg JPG image
SMJ Mogas 1.jpg JPG image
SMJ E85-3.jpg JPG image
SMJ Mogas 4.jpg JPG image
Attachment B - Fuel Storage Tank List (SMJ) UPDATED 13DEC2021.xlsx XLSX spreadsheet
SMJ-FY17-FAC 10242-Tank 2-FINAL.pdf PDF
SMJ-FY15-FAC 10208-Bulk Tank 3-FINAL.pdf PDF
SMJ-FY15-FAC 10104-Bulk Tank 1-FINAL.pdf PDF
SMJ-FY12-FAC 10227-Tank 5-FINAL.pdf PDF
SMJ-FY20-FAC 10241-Tank 1-FINAL.pdf PDF
SMJ-FY15-FAC 10206-Bulk Tank 2-FINAL.pdf PDF
SP-POL-CMP-INSPECT-FY22-SMJ PWS.pdf PDF
W9128F22Q0002 AMENDMENT 0001.pdf PDF
Attachment C Fuel Storage Tank Excel Document.xls XLS spreadsheet
Attachment D - Monthly Contractors Progress Management and Status Report.xlsx XLSX spreadsheet
Attachment E- API In-Service Template.docx DOCX document
Attachment A - General Installation Security Requirements.pdf PDF
Attachment G - API Out-of-Service Telecon Briefing Template.docx DOCX document
Attachment H - STI In-Service Template.docx DOCX document
Attachment F - API Out-of-Service Template.docx DOCX document
Attachment B - Fuel Storage Tank List (SMJ) (1).xlsx XLSX spreadsheet
RFQ W9128F22Q0002.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[COMPANY Letter Head]

DATE

Subject: RETURN TO SERVICE LETTER

STORAGE TANK NO. [ XXXXX]

Fuel System Inspection, [Location] Contract No. [XXXXX], Task Order [XX] Out-of-Service [API 653] Inspection

Tank [XXX] was inspected for serviceability evaluation in accordance with the requirements of [API STD 653, XX Edition, Date.]. The Inspection was performed by [Company Name] on [ddmmmyy].

The results of the inspection: The tank is in suitable condition for return to service. There are no mandatory repairs that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment.

The Tank was returned to service on [date].

RECOMMENDED FUTURE INSPECTION DATES no later than (NLT):

API 653 Out-Of-Service tank inspection[date]
API 653 In-Service tank inspection[date]
…UT Roundness…Corrosion…etc[date]

SATE REGULATIONS (N/A if Not Applicable):

[State] Regulations follow [……] State Regulations for API 653 Out-Of-Service tank inspections is NLT [date]

Final documents will be included in the close out documentation as required by the task order.

Prepared by:

[Inspectors Name] [Title] [Company] API 653 Certified Inspector No. [XXXX]

Installation acknowledgement:

[Installation Point of Contact Name] [Title]

[USACE Fuels Project Manager] Fuels Project Manager

USACE-NWO-PMS-C

[USACE Fuels Project Manager Email]@usace.army.mil

File details come from the government source that posted it. Updated .