W9128F21R0051 - Washrack - RTA Drawings - VOLUME III.pdf
PDF 28 MB Posted
- Solicitation number
- W9128F-21-R-0051
About this file
This federal contract opportunity is a solicitation for the B-21 Washrack and Maintenance Hangar at Ellsworth Air Force Base in South Dakota. The solicitation seeks proposals for design and construction services for a new washrack facility and maintenance hangar to support the B-21 bomber. Interested parties must access all solicitation attachments through the Projnet plan room using the provided quick add key. Proposals are due by the date specified on Projnet. The solicitation is issued by the Department of the Army Corps of Engineers Omaha District on behalf of Ellsworth Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0011.pdf | ||
| Am_0010_Dwgs_Vol1.pdf | ||
| Am_0010_Dwgs_Vol3.pdf | ||
| Am_0010.pdf | ||
| Am_0009.pdf | ||
| Am_0008.pdf | ||
| Am_0007.pdf | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME I-.pdf | ||
| Am_0003.pdf | ||
| W9128F21R0051_Specifications_Am3.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME II.pdf | ||
| Am_0002.pdf | ||
| Am0001_W9128F21R0051.pdf | ||
| 21-R-0051_Specifications.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D E
S
IG
N
THIS PROJECT WAS REVIEWED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THIS SET.
CHIEF, GEOTECHNICAL
ENGINEERING & SCIENCES BRANCH
DATE
CHIEF, DAM SAFETY PROD.
CENTER
DATE
CHIEF, DESIGN BRANCH DATE
CHIEF, HYROLOGIC
ENGINEERING BRANCH
DATE
DATECHIEF, ENGINEERING
DIVISION, P.E.
SUBMITTED BY:
CHIEF: ARCH. / INTER.
RA
SECTION
SUBMITTED BY:
CHIEF: CIVIL / ENVIR.
PE
SECTION
SUBMITTED BY:
CHIEF: ELEC.
PE
SECTION
SUBMITTED BY:
CHIEF: MECH.
PE
SECTION
SUBMITTED BY:
CHIEF: STRUCT.
PE
SECTION
SUBMITTED BY:
CHIEF: FUELS
RA
SECTION
SUBMITTED BY:
CHIEF: GEOT./DAM SAFETY
PE
SECTION
SUBMITTED BY:
CADD
PROJECT COORD.
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
G-005
C O
V E
R V
O L U
M E
A H
A N
K
IN
S
A H
A N
K
IN
S
B L E
G R
E
ID
W9128F-21-R-0051
XXXXXX XX X XXXX
OCTOBER 2021
ELLSWORTH AIR FORCE BASE, SD
B-21: WASHRACK AND MAINTENANCE HANGAR
(WASHRACK)
PN: FXBM1090404, FY 2022
10-22-202122 OCT 2021
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D E
S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
G-006
IN
D
E X
T O
D R
A W
IN
G
S V
O L U
M E
A H
A N
K
IN
S
A H
A N
K
IN
S
B L E
G R
E
ID
VOLUME INDEX:
VOLUME 1: GENERAL, CIVIL, & STRUCTURAL
VOLUME 2: ARCHITECTURAL, INTERIORS, & FIRE PROTECTION
VOLUME 3: PLUMBING, MECHANICAL, ELECTRICAL, & TELECOMMUNICATIONS
INDEX TO DRAWINGS VOLUME 3
SHEET NO. SHEET NAME
M-708 HVAC CONTROLS - FURNACE
M-709 HVAC CONTROLS - MAU-201 SCHEMATIC
M-710 HVAC CONTROLS - MAU-203 SCHEMATIC
M-711 HVAC CONTROLS - MAU-203 POINTS LIST
M-712 HVAC CONTROLS - STEAM GENERATOR / HUMIDIFIER SCHEMATIC
M-713 HVAC CONTROLS - EXHAUST FANS SCHEMATIC
M-714 HVAC CONTROLS - EXHAUST FANS SCHEMATIC POINTS LIST
M-715 HVAC CONTROLS - UNIT HEATER SCHEMATIC
M-716 HVAC CONTROLS - HANGAR DOOR TRACK HEAT SYSTEM
M-717 HVAC CONTROLS - HANGAR DOOR TRACK HEAT POINTS LIST
M-718 HVAC CONTROLS - HIGH BAY EQUIPMENT SCHEMATIC
M-719 HVAC CONTROLS - CRU & ACU SCHEMATIC
M-720 HVAC CONTROLS - IW DIVERSION VALVE
ELECTRICAL
E-001 ELECTRICAL LEGEND 1 OF 2
E-002 ELECTRICAL LEGEND 2 OF 2
E-100 OVERALL HAZARDOUS AND WET LOCATION PLANS
ES100 OVERALL ELECTRICAL SITE PLAN
ES101 ELECTRICAL SITE PLAN - AREA 1
ES102 ELECTRICAL SITE PLAN - AREA 2
ES151 APRON LIGHTING PLAN
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
EL101 LIGHTING PLAN - AREA A
EL102 LIGHTING PLAN - AREA B
EL103 LIGHTING PLAN - AREA C
EL104 LIGHTING PLAN - AREA D
EL105 LIGHTING PLAN - AREA E
EL106 LIGHTING PLAN - MECHANICAL PLATFORM
EL201 LIGHTING ELEVATION
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS
EL503 LIGHTING DETAILS
EL504 LIGHTING DETAILS
EL601 LIGHT FIXTURE SCHEDULE
EL602 LIGHTING CONTROL MATRIX
EP101 POWER PLAN - AREA A
EP301 ELECTRICAL DUCTBANK SECTION
EP102 POWER PLAN - AREA B
EP103 POWER PLAN - AREA C
EP104 POWER PLAN - AREA D
EP105 POWER PLAN - AREA E
EP106 POWER PLAN - MECHANICAL PLATFORM
EP111 HVAC POWER PLAN - AREA A
EP112 HVAC POWER PLAN - AREA B
EP113 HVAC POWER PLAN - AREA C
EP114 HVAC POWER PLAN - AREA D
EP115 HVAC POWER PLAN - AREA E
EP116 HVAC POWER PLAN - MECHANICAL PLATFORM
EP201 POWER ELEVATIONS
EP401 ENLARGED POWER PLANS
EP501 POWER DETAILS
EP502 POWER DETAILS
EP600 PRIMARY ELECTRICAL ONE-LINE DIAGRAMS
EP601 ONE-LINE DIAGRAM
EP602 ONE-LINE CONDUCTOR TABLE
EP701 PANELBOARD SCHEDULES
EP702 PANELBOARD SCHEDULES
EP703 PANELBOARD SCHEDULES
EP704 PANELBOARD SCHEDULES
EP710 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EG101 OVERALL GROUNDING PLAN
EG102 LIGHTNING PROTECTION SYSTEM ROOF PLAN
EG501 GROUNDING DETAILS
EG502 GROUNDING DETAILS
EG503 GROUNDING DETAILS
EG504 GROUNDING DETAILS
EG510 TELECOMMUNICATIONS GROUNDING DETAILS
EG601 TYPICAL GROUNDING RISER DIAGRAMS
TELECOMMUNICATIONS
TN001 TELECOMMUNICATIONS LEGEND
TN002 TELECOMMUNICATIONS LABELING
TN003 TELECOMMUNICATIONS LABELING
TN102 TELECOMMUNICATIONS PLAN - AREA B
TN103 TELECOMMUNICATIONS PLAN - AREA C
TN104 TELECOMMUNICATIONS PLAN - AREA D
TN106 TELECOMMUNICATIONS PLAN - MECHANICAL PLATFORM
TN301 COMMUNICATIONS DUCTBANK SECTION
TN401 ENLARGED TELECOMMUNICATIONS PLANS
TN402 ENLARGED TELECOMMUNICATIONS PLANS
TN501 TELECOMMUNICATIONS DETAILS
TN502 TELECOMMUNICATIONS DETAILS
TN511 TELECOMMUNICATIONS DETAILS
TN701 TELECOMMUNICATIONS RISER DIAGRAM
TY001 SECURITY LEGEND
TY100 SECURITY PLAN - OVERALL
TY101 SECURITY PLAN - AREA A
TY102 SECURITY PLAN - AREA B
TY103 SECURITY PLAN - AREA C
TY104 SECURITY PLAN - AREA D
TY105 SECURITY PLAN - AREA E
TY501 SECURITY DETAILS
TY502 SECURITY DETAILS
TY503 SECURITY DETAILS
INDEX TO DRAWINGS VOLUME 3
SHEET NO. SHEET NAME
GENERAL
G-005 COVER VOLUME 3
G-006 INDEX TO DRAWINGS VOLUME 3
PLUMBING
P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
P-100 UNDER SLAB PLUMBING PLAN - OVERALL
P-101 UNDER SLAB PLUMBING PLAN - AREA A
P-102 UNDER SLAB PLUMBING PLAN - AREA B
P-103 UNDER SLAB PLUMBING PLAN - AREA C
P-104 UNDER SLAB PLUMBING PLAN - AREA D
P-105 UNDER SLAB PLUMBING PLAN - AREA E
P-110 GROUND FLOOR PLUMBING PLAN - OVERALL
P-111 GROUND FLOOR PLUMBING PLAN - AREA A
P-112 GROUND FLOOR PLUMBING PLAN - AREA B
P-113 GROUND FLOOR PLUMBING PLAN - AREA C
P-114 GROUND FLOOR PLUMBING PLAN - AREA D
P-115 GROUND FLOOR PLUMBING PLAN - AREA E
P-143 EQUIPMENT LEVEL PLUMBING PLAN - AREA C
P-401 ENLARGED PLUMBING PLANS - BATHROOM 115
P-402 ENLARGED PLUMBING PLANS - BATHROOM 126
P-403 ENLARGED PLUMBING PLANS - SOAP ROOMS
P-404 ENLARGED PLUMBING PLAN - BOILER ROOM
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-504 PLUMBING DETAILS
P-505 PLUMBING DETAILS
P-506 PLUMBING DETAILS
P-507 PLUMBING DETAILS
P-508 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-603 PLUMBING SCHEDULES
P-604 PLUMBING SCHEDULES
P-605 WATER FLOW DIAGRAM
P-606 SOAP FLOW DIAGRAM
P-701 COMPRESSED AIR SCHEMATIC
P-901 WASTE & VENT RISER
P-902 WASTE & VENT RISER
P-903 RESTROOM WASTE & VENT RISERS
P-904 DOMESTIC WATER RISER
P-905 RESTROOM DOMESTIC WATER RISERS
P-906 NATURAL GAS PIPING DIAGRAM
P-907 PROCESS PIPING PLUMBING RISER
MECHANICAL
M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
M-100 GROUND FLOOR HVAC PLAN - OVERALL
M-101 GROUND FLOOR HVAC PLAN - AREA A
M-102 GROUND FLOOR HVAC PLAN - AREA B
M-103 GROUND FLOOR HVAC PLAN - AREA C
M-104 GROUND FLOOR HVAC PLAN - AREA D
M-105 GROUND FLOOR HVAC PLAN - AREA E
M-113 EQUIPMENT LEVEL HVAC PLAN - AREA C
M-130 GROUND FLOOR MECH PIPING PLAN - OVERALL
M-131 GROUND FLOOR MECH PIPING PLAN - AREA A
M-132 GROUND FLOOR MECH PIPING PLAN - AREA B
M-133 GROUND FLOOR MECH PIPING PLAN - AREA C
M-134 GROUND FLOOR MECH PIPING PLAN - AREA D
M-135 GROUND FLOOR MECH PIPING PLAN - AREA E
M-143 EQUIPMENT LEVEL MECH PIPING PLAN - AREA C
M-150 MECHANICAL ROOF PLAN
M-301 SOAP ROOM 102 MECHANICAL SECTIONS
M-302 SOAP ROOM 108 MECHANICAL SECTIONS
M-303 MECHANICAL SECTIONS
M-304 MECHANICAL SECTIONS
M-401 ENLARGED PLAN - BOILER ROOM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-507 MECHANICAL DETAILS
M-508 MECHANICAL DETAILS
M-509 MECHANICAL DETAILS
M-510 MECHANICAL DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-604 HVAC SCHEDULES
M-605 HVAC SCHEDULES
M-610 HEATING WATER FLOW DIAGRAM (1/2)
M-611 HEATING WATER FLOW DIAGRAM (2/2)
M-612 SNOW MELT HEATING WATER FLOW DIAGRAM
M-700 HVAC CONTROLS - LEGEND
M-701 HVAC CONTROLS - SYSTEM ARCHITECTURE
M-702 HVAC CONTROLS - MISC POINTS
M-703 HVAC CONTROLS - HEATING WATER SCHEMATIC
M-704 HVAC CONTROLS - HEATING WATER SEQUENCE
M-705 HVAC CONTROLS - HEATING WATER POINTS LIST
M-706 HVAC CONTROLS - DOAS-101 SCHEMATIC
M-707 HVAC CONTROLS - DOAS-101 POINTS LIST
22 OCT 2021
4" FD-A
EWC-1
JS-1
SK-1
U-2
U-1
WC-2
WC-1
LAV-
PLUMBING SYMBOLS LEGEND
SIZE - FLOOR DRAIN
DUAL ELECTRIC WATER COOLER
JANITOR SINK
KITCHEN
URINAL, ACCESSIBLE
URINAL
WATER CLOSET - ACCESSIBLE
WATER CLOSET
LAVATORY, COUNTER MOUNTED
PRESSURE/TEMPERATURE RELIEF VALVE
HB HOSE BIBB
WH WALL HYDRANT
LAV- LAVATORY, WALL MOUNTED
MB-1 MOP BASIN
SK-2 SINK
EEWS- EMERGENCY EYEWASH / SHOWER
SH-1 SHOWER
SK-3 UNDER MOUNT SINK
WCO
FLOOR DRAIN / EQUIPMENT DRAIN
PLUMBING FIXTURE TRAP
FLOOR OR WALL PENETRATION
VENT THRU ROOF (VTR)
CLEANOUT (CO) IN RISER
RISER DIAGRAM LEGEND
CO
FCO
CLEANOUT (FCO) IN FLOOR
WATER HAMMER ARRESTORWHA-A
WALL CLEANOUT (WCO)
ISOMETRIC DIRECTION ARROW
UP
DN
PIPE LINE ACCESSORIES
3-WAY VALVE
2-WAY VALVE
ANGLE VALVE
AV
AUTOMATIC AIR VENT
ASSEMBLY
BFP
BACKFLOW PREVENTION
ASSEMBLY
BALANCING VALVE / CIRCUIT
SETTER
BALL VALVE
BLIND FLANGE
BUTTERFLY VALVE
CHECK VALVE
FLEX CONNECTION
FLOW ARROW
FM FLOW METER
GATE VALVE
GLOBE VALVE
HOSE GATE DRAIN VALVE
IF
INSULATING FLANGE
MV
MANUAL AIR VENT ASSEMBLY
- SEE SPECIFICATIONS FOR
APPROPRIATE VALVE TYPE
M METER
M MOTORIZED CONTROL VALVE
OS&Y
OUTSIDE SCREW & YOKE VALVE
PIPE WITH HEAT TRACE
PLUG VALVE
PRESSURE GUAGE
SELF CONTAINED PRESSURE
REDUCING (REGULATING)
VALVE
PUMP
REDUCER (CONCENTRIC)
RELIEF, SAFETY OR THERMAL
RELIEF VALVE
REMOVABLE CAP
REMOVABLE PLUG
S STRAINER
SUCTION DIFFUSER
TEST CONNECTION
THERMOMETER
UNION
Y-TYPE STRAINER
SRC SPRING RETURN CLOSED BALL
VALVE
DOUBLE DIAPHRAGM PUMP
PIPE SYMBOLS
PIPE ELBOW
PIPE DOWN
PIPE UP
PIPE CONTINUATION
PIPE LINE DESIGNATIONS
VENT
STORM (ABOVE GRADE)
STORM (BELOW GRADE)
STORM OVERFLOW
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
SANITARY SEWER (ABOVE GRADE)
SANITARY SEWER (BELOW GRADE)
CONDENSATE DRAIN
COMPRESSED AIR
NATURAL GAS
CLEANOUT IN RISER
CLEANOUT IN WALL
CLEANOUT IN FLOOR
SS
SS
COND
V
DCW
DHW
DHWR
CA
NG
OD
S
S
CO
WCO
FCO
SOAPSOAP
PROCESS COLD WATERPCW
PROCESS HOT WATERPHW
INDUSTRIAL WASTE (ABOVE GRADE)IW
INDUSTRIAL WASTE (BELOW GRADE)IW
DOMESTIC COLD WATER (SOFTENED)DCWS
A
B
COMPRESSED AIR DROP TYPE A
COMPRESSED AIR DROP TYPE B
STORM - PUMPEDS(F)
FOUNDATION DRAIN (BELOW GRADE)FND
PLUMBING ABBREVIATIONS GENERAL PLUMBING NOTES
DETAIL / ENLARGED
CALLOUT SYMBOL
A
M-001
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
SHEET WHERE
DETAIL/SECTION IS
SHOWN
DETAIL/SECTION TITLE
TITLE
A1
LOCATION WHERE
DETAIL / SECTION
IS SHOWN ON
SHEET
SECTION CUT SYMBOL
A
M-001
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
SECTION
DESIGNATOR
DRAWING WHERE
SECTION IS SHOWN
AC AIR COCK
AFF ABOVE FINISHED FLOOR
AG AIR GAP
ARV AIR RELEASE VALVE
BF BLIND FLANGE
BOP BOTTOM OF PIPE
BW BUTT WELD
CH OP CHAIN WHEEL OPERATOR
CONC CONCENTRIC
CORP STOP CORPORATION STOP
CPVC CHLORINATED POLYVINYL CHLORIDE
D DRAIN
DI DUCTILE IRON
DN DOWN
DWH DOMESTIC WATER HEATER
ELL ELBOW
EXIST EXISTING
FCA FLANGED COUPLING ADAPTER
FD FLOOR DRAIN
FE FLANGED END
FF FLAT FACED
FI FLOW INDICATOR
FLGD FLANGED
FM FLOW METER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FOV FLOAT OPERATED VALVE
FRP FIBERGLASS REINFORCED PIPE
FW FIELD WELD
HD HUB DRAIN
I.E. INVERT ELEVATION
IF INSULATED FLANGE
LC LOCK CLOSED
LO LOCK OPEN
LR LONG RADIUS
NPSH NET POSITIVE SUCTION HEAD
NRS NON-RISING STEM
NWL NORMAL WATER LEVEL
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
RED REDUCER-REDUCING
RS RISING STEM
SCH SCHEDULE
SCRD SCREWED
SR SHORT RADIUS
TD TRENCH DRAIN
TOC TOP OF CONCRETE
TOG TOP OF GRATING
TOP TOP OF PIPE
TOS TOP OF STEEL
TP TRAP PRIMER
VTR VENT THROUGH ROOF
1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET - 4
INCHES OUTSIDE OF THE BUILDING WALL.
2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.
3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS
AND DRAINAGE REQUIREMENTS.
4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS
PROJECT.
5. INSTALL SANITARY PIPING WITH 2% SLOPE DOWNWARD IN DIRECTION OF FLOW. INSTALL
VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.
6. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.
7. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
8. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE
CODES AND REGULATIONS.
9. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL,
ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
10. MAINTAIN A MINIMUM OF 6' - 8 CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.
11. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS
PANELS, CONTROLS, AND VALVING.
12. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
13. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED
OTHERWISE.
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-001
P L U
M B
IN
G
N O
T E
S
L E
G E
N D
S
Y M
B O
L S
A
B B
R E
V
IA
T
IO
N S
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
B F
P
A
B
C
D
E
F
14 15 16 21 221312111054321 6 7 8 9 9.1 9.2 17 18 19 20
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-100
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
O V
E R
A L L
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
3/64" = 1'-0" D1
UNDER SLAB PLUMBING PLAN - OVERALL
32'16' 64'0 32'16' 64'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
1.
A
C
D
E
F
HANGAR BAY 1
M A
T C
H L
IN
E
P -1
TRENCH DRAIN
4" IW
SEE CIVIL SHEET CU105
FOR CONTINUATION
IE = 3218.94'
4" V UP
4" IW UP
TO FCO-B
3" IW UP
TO FD-A
4" IW UP
TO FCO-B
3" IW UP
TO FD-A
4" IW
6" IW
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.69'
6" IW
6" FD-E
1 1 444
4" IW
4"
IW
4" S
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3221.44'
1 4 1 4 1 4 1 4
2 2 2 2 2
1 4
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-101
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
A R
E A
A
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A4
UNDER SLAB PLUMBING PLAN - AREA A
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT
EEWS DO NOT REQUIRE TRAP PRIMER.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
KEYED NOTES
CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL
SHEET CU105 FOR CONTINUATION. IE = 3221.44'
DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR
TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.
COORDINATE INSTALLATION WITH STRUCTURAL.
COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS
SHOWER HEAD.
COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE
HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.
TRANSITION PIPE TO 6".
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
COORDINATE SLEEVE THROUGH STRUCTURAL FOOTING.
REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
1.
2.
3.
1.
2.
3.
4.
5.
6.
C
D
E
F
11105 6 7 8
9 9.1
HANGAR BAY 1
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
3" IW UP
TO FD-A
4" IW
TRENCH DRAIN
4" IW UP
TO FCO-B
3" IW UP
TO FD-A
4" IW UP
TO FCO-B
6" IW
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.69'
6" FD-E
6" IW
2 2 22
14 14 14 14 14 14 14 14
2" SS
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-102
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
A R
E A
B
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A2
UNDER SLAB PLUMBING PLAN - AREA B
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT
EEWS DO NOT REQUIRE TRAP PRIMER.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
KEYED NOTES
CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL
SHEET CU103 FOR CONTINUATION. IE = 3221.44'
DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR
TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.
COORDINATE INSTALLATION WITH STRUCTURAL.
COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS
SHOWER HEAD.
COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE
HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.
TRANSITION PIPE TO 6".
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
1.
2.
3.
1.
2.
3.
4.
5.
C
D
E
F
14 15 16131211107 8 9 9.1 9.2
PUMP/FOAM
ELEC
MECH / AHU
COMM
OPEN OFFICE
MULTI-PURPOSE
STORAGE
SECURE VEST
SECURE OFFICE
CORRIDOR
WASH BAY EQUIP
NURSING
VEST 1
VEST 2
STORAGE
FLIGHT LINE
VESTIBULE
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
P-401 D3
P-402 C2
TD-BTD-B
4" SS UP
TO FCO-A
4" SS
4" SS UP
TO FD-B
S S
4" SS
4" SS
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.94'
BOILER
2" NG
SEE CIVIL SHEET CU103
FOR CONTINUATION
4" DCW
SEE CIVIL FOR
CONTINUATION
2" NG UP
4" DCW UP
4" SS
SOAP
SOAP
CORRIDOR
3" SS UP
TO SK-1
2" SS UP
3" SS UP
TO FD-B
3" SS UP
TO FD-B
3" SS UP
TO FD-B
3" SS UP
4" SS UP
TO FD-B
4" SS UP
TO FD-B
4" SS UP
TO FD-D
3" SS UP
TO FD-B
3" SS UP
TO FD-B
3" SS UP
TO FD-B 3" SS UP
TO FD-B
3" SS UP
TO FD-B
3" SS UP
TO FD-B
3" SS UP
TO FD-B
4" SS UP
TO FD-B
TD-B
4" SS UP
S S
4" SS
SP-101
SP-102
ENTRY
VESTIBULE
4" SS UP
TO FD-C
3" SS UP
TO FD-B
3" SS
2" V UP
4" SS UP
TO FCO-A
4" SS
4" SS
3" SS UP
4" SS UP
TO FCO-B
4" SS UP
TO FD-B
3" SS UP
TO FD-B
4" SS UP
TO FD-B
4" SS UP
TO FCO-B
4" SS
4" SS
S S
4" SS
S
S 4" SS
TO FD-B
4" SS
TO FD-C
4" SS UP
TO FCO-B
4" SS UP
TO FCO-B4" SS UP
TO V
4" SS UP
TO V
4" SS UP
TO WCO
4" FND
4" FND
SEE CIVIL SHEET CG120
FOR CONTINUATION
IE = 3214.86'
2" S(F)
IE = 3218.0'
3" SS UP
1/2" TRAP PRIMER UP
(TYP OF 7)
2" S(F)
IE = 3218.75'
4" FND
SEE CIVIL SHEET CG120
FOR CONTINUATION
IE = 3214.63'
4" SS
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.94'
4" SS
2" V UP
3" SS UP
TO FD-B
6" S(F)
IE = 3221.44'
6" S(F)
SEE CIVIL SHEET CG120
FOR CONTINUATION
IE = 3221.44'
2" S(F)
IE = 3218.38'
MENS
MENS SHOWER
WOMENS
WOMENS
SHOWER
3" SS
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-103
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
A R
E A
C
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A1
UNDER SLAB PLUMBING PLAN - AREA C
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
CONNECT FLOOR DRAINS IN ROOMS 106, 107, AND 108 TO
TRAP PRIMER ETP-101 LOCATED IN BOILER ROOM 107.
CONNECT FLOOR DRAINS IN ROOMS 102, 103, AND 118 TO
TRAP PRIMER ETP-102 LOCATED IN SOAP ROOM 102.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'
CONNECT FLOOR DRAINS IN ROOM 128 AND TRENCH
DRAINS IN CORRIDOR 103 TO TRAP PRIMER ETP-103
LOCATED IN WASH BAY EQUIPMENT ROOM 128.
KEYED NOTES
COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS
SHOWER HEAD.
COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE
HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.
TRANSITION PIPE TO 6".
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
COORDINATE SLEEVE BELOW STRUCTURAL FOOTING.
REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
COORDINATE WITH SPRINKLER CONTRACTOR FOR FINAL
LOCATION OF FLOOR DRAINS.
COORDINATE SLEEVE THRU STRUCTURE STEM WALL, IE =
3222.25'
ROUTE NATURAL GAS ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
1/2" TRAP PRIMER UP. TYPICAL OF 15.
ROUTE PIPING BELOW FOOTING. COORDINATE SLEEVE
BELOW FOOTING.
COORDINATE SLEEVE THRU STRUCTURAL STEM WALL FOR
TRAP PRIMER LINES. IE = 3222.25'.
TURN 2" S(F) PIPE UP AND TRANSITION TO 6" IN
HORIZONTAL. IE SHOWN IS FOR 6".
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
C
D
E
F
15 16
13129.2
HANGAR BAY 2
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
4" IW
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.94'
3" IW UP
TO FD-A
4" IW UP
TO FCO-B
4"
IW
4" IW
TRENCH DRAIN
3" IW UP
TO FD-A
4" IW UP
TO FCO-B
6" IW
SEE CIVIL SHEET CU103
FOR CONTINUATION
IE = 3218.69'
6" IW
6" FD-E
4" V UP
4" IW UP
TO FCO-B
17 18
1 41 41 41 41 41 41 41 4
2 2 2 2
2" SS
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-104
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
A R
E A
D
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A3
UNDER SLAB PLUMBING PLAN - AREA D
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT
EEWS DO NOT REQUIRE TRAP PRIMER.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
KEYED NOTES
CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL
SHEET CU103 FOR CONTINUATION. IE = 3221.44'
DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR
TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.
COORDINATE INSTALLATION WITH STRUCTURAL.
COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS
SHOWER HEAD.
COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE
HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.
TRANSITION PIPE TO 6".
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
COORDINATE SLEEVE THROUGH STRUCTURAL FOOTING.
REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
1.
2.
3.
1.
2.
3.
4.
5.
C
D
E
F
21 22
HANGAR BAY 2
M A
T C
H L
IN
E
P -1
TRENCH DRAIN
4" IW
4" IW UP
TO FCO-B
3" IW UP
TO FD-A
4" IW
4" IW UP
TO FCO-B
4" IW UP
TO FD-A
6" IW
6" IW
SEE CIVIL SHEET CU101
FOR CONTINUATION
IE = 3218.69'
6" FD-E
4" SS
SEE CIVIL SHEET CU103
FOR CONTINUATION.
IE = 3221.44'
19 20
1 41 41 41 41 41 41 41 4
2 2 2 2 2
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-105
U N
D E
R S
L A
B P
L U
M B
IN
G
P L A
N
A R
E A
E
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A3
UNDER SLAB PLUMBING PLAN - AREA E
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT
EEWS DO NOT REQUIRE TRAP PRIMER.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
KEYED NOTES
CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL
SHEET CU101 FOR CONTINUATION. IE = 3221.44'
DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR
TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.
COORDINATE INSTALLATION WITH STRUCTURAL.
COORDINATE FLOOR DRAINS TO BE LOCATED BELOW EEWS
SHOWER HEAD.
COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE
HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.
TRANSITION PIPE TO 6".
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
1.
2.
3.
1.
2.
3.
4.
P B F
P
BFP
B F
P
A
B
C
D
E
F
14 15 16 21 221312111054321 6 7 8 9 9.1 9.2 17 18 19 20
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-110
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
O V
E R
A L L
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
3/64" = 1'-0" D1
GROUND FLOOR PLUMBING PLAN - OVERALL
32'16' 64'0 32'16' 64'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
1.
C
D
E
F
HANGAR BAY 1
M A
T C
H L
IN
E
P -1
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIREEWS-1
1 1/2" DCW
1 1/2" DCW
31' - 11" BOP EL
2" PCW
31' - 11" BOP EL
2 1/2" SOAP
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
1" DHWR
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1 1/2" CA
31' - 11" BOP EL
2" PCW
2" SOAP
2" PHW
1 1/2" CA
WH-1
HB-1
3/4" DCW
1 1/2" CA
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1" DHWR
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
2" SOAP
31' - 11" BOP EL
2" PCW
31' - 11" BOP EL
1 1/2" DCW
31' - 11" BOP EL
EEWS-1
FCO-B
TRENCH DRAIN
FCO-B
4" V UP
A
A1" CA
B
2 1/2" NG
31' - 11" BOP EL
IRH-103
IRH-102
1 1/2" NG
IRH-106 IRH-105
1 1/2" DHW
6" FD-E
1 1/2" NG
2" NG
1 1/2" NG
2" NG
32' - 11" BOP EL
FCO-B
1 1/4" NG
2" NG1 1/2" NG
31' - 11" BOP EL
FD-A
FD-A
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-111
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
A R
E A
A
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A4
GROUND FLOOR PLUMBING PLAN - AREA A
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW
25 FOOT ELEVATION IN HANGAR BAYS.
KEYED NOTES
REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER
DETAIL ON P-503.
LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.
CALIBRATED BALANCE VALVE SET TO 1.0 GPM.
1.
2.
1.
2.
3.
C
D
E
F
11105 6 7 8
9 9.1
HANGAR BAY 1
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
HB-1
2 1/2" PCW
2 1/2" PHW
WF-1
EEWS-1
1 1/2" CA
1 1/2" DHW
13' - 3" BOP EL
3/4" DCWWH-1
HB-1 EEWS-1
1 1/2" DCW
2" CA
13' - 2" BOP EL
2" CA
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1" DHWR
31' - 11" BOP EL
2" SOAP
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
1 1/2" DCW
31' - 11" BOP EL
2" PCW
2" SOAP
2" PHW
1 1/2" CA
TRENCH DRAIN
FCO-B
2" PHW
UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
A
A
B
2 1/2" NG
31' - 11" BOP EL
1 1/2" CA
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1" DHWR
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
2 1/2" SOAP
31' - 11" BOP EL
2" PCW
31' - 11" BOP EL
1 1/2" DCW
31' - 11" BOP EL
IRH-101
IRH-104
1 1/2" NG
IRH-107
1" NG
1 1/2" NG
2 1/2" NG
31' - 11" BOP EL
6" FD-E
3/4" DCW
FCO-B
2 1/2" PCW
32' - 11" BOP EL
3/4" DHW
1/2" DHWR
3/4" CA
1" CA
2" CA
2 1/2" SOAP
4" NG
27' - 10" BOP EL
1 1/2" DHW
4" NG
1" NG
2 1/2" PCW
2 1/2" SOAP
2 1/2" PHW
2 1/2" PCW
31' - 11" BOP EL
1" DHWR
13' - 2" BOP EL
1 1/2" DCW
13' - 2" BOP EL
2" SOAP
2" PCW
2" CA
FD-A
FD-A
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-112
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
A R
E A
B
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A2
GROUND FLOOR PLUMBING PLAN - AREA B
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW
25 FOOT ELEVATION IN HANGAR BAYS.
KEYED NOTES
REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER
DETAIL ON P-503.
LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.
SOAP PUMP ON / OFF VALVE. SEE SHEET P-403.
1.
2.
1.
2.
C
D
E
F
14 15 16131211107 8 9 9.1 9.2
PUMP/FOAM
ELEC
COMM
OPEN OFFICE
MULTI-PURPOSE
STORAGE
SECURE VEST
SECURE OFFICE
CORRIDOR
WASH BAY EQUIP
VEST 1
VEST 2
STORAGE
FLIGHT LINE
VESTIBULE
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
P-401 D11 P-402
C10
WH-1
3" DCW
9' - 11" BOP EL
1/2" DHW
10' - 8" BOP EL
2" DHW
FD-B
FCO-A
1" DHWR
13' - 11" BOP EL
2" DHW
13' - 11" BOP EL
1" DHWR
10' - 9" BOP EL
1 1/2" DHW
10' - 9" BOP EL
3/4" CA
10' - 0" BOP EL
2" CA
13' - 8" BOP EL
3" DCW
9' - 3" BOP EL
CORRIDOR
SK-1
P-403 C1
P-403 C2
P-404 C5
1" DHWR
12' - 11" BOP EL
TD-B TD-B
1/2" DHWR
10' - 8" BOP EL
ENTRY
VESTIBULE
FD-B
FD-B
B
3/4" CA
10' - 6" BOP EL
2" V UP
TD-B
3/4" DCW
3/4" DCW
FCO-B
EWC-1
2" DHW
13' - 1" BOP EL
1/2" DCW
14' - 0" BOP EL
3" DCW
2" CA
13' - 2" BOP EL
1" DHWR
13' - 2" BOP EL
1 1/2" DHW
13' - 3" BOP EL
3" DCW
13' - 2" BOP EL
3/4" CA
13' - 8" BOP EL
1/2" DHW
14' - 0" BOP EL
3" DCW
2" DHW
1" DHWR
2" CA
1 1/2" DHW
12' - 3" BOP EL
1/2" DHWR
12' - 7" BOP EL
2" V
3/4" DCW
2" V
10' - 6" BOP EL
2" CA
1" DHWR
1 1/2" V 2" V
B
HB-1
2" V DN
FD-B
1 1/2" V
2 1/2" PCW
13' - 2" BOP EL
2 1/2" PCW
2" V DN
SOAP
BOILER
MECH / AHU
SOAP
WOMENS
MENS SHOWER
MENS
NURSING
JAN
WOMENS SHOWER
1/2" DCW
13' - 3" BOP EL
2" DHW
ETP-103
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-113
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
A R
E A
C
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A1
GROUND FLOOR PLUMBING PLAN - AREA C
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
KEYED NOTES
DO NOT ROUTE PIPING INSIDE ROOM INDICATED.
SUMP PUMP CONTROL PANEL
PROVIDE 1/2" DOUBLE CHECK VALVE BACKFLOW
PREVENTER BFP-103, FOR CONNECTION TO ICE MAKER.
1/2" DCW TO ICE MAKER OUTLET BOX AT 2'-0" ABOVE FLOOR.
TAP 3/8" DCW CONNECTION TO DCW UNDER SINK. PROVIDE
ISOLATION VALVE AND DUAL CHECK BACKFLOW
PREVENTER (ASSE 1024) AND ROUTE 3/8" DCW THROUGH
CABINETRY AND THROUGH HOLE IN COUNTER FOR COFFEE
CONNECTION.
CALIBRATED BALANCE VALVE SET TO 0.5 GPM.
PROVIDE RESTROOM SHUT-OFF VALVES IN ACCESSIBLE
LOCATION.
1.
1.
2.
3.
4.
5.
6.
7.
C
D
E
F
15 16
13129.2
HANGAR BAY 2
M A
T C
H L
IN
E
P -1
M A
T C
H L
IN
E
P -1
EEWS-1
WH-1
HB-1
1 1/2" DCW
WF-1
EEWS-1
2" SOAP
1 1/2" CA
2 1/2" PCW
2 1/2" SOAP
2 1/2" PHW
1" DHWR
1 1/2" DHW
1 1/2" CA
3" PCW
31' - 11" BOP EL
2" SOAP
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
2" PCW
2" SOAP
2" PHW 1 1/2" CA
1 1/2" DCW
35' - 9" BOP EL
2" PCW
31' - 11" BOP EL
2 1/2" SOAP
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
1" DHWR
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1 1/2" CA
31' - 11" BOP EL
2" CA
31' - 11" BOP EL
FCO-B
FCO-B
TRENCH DRAIN
2 1/2" PHW
14' - 5" BOP EL
1 1/2" NG
31' - 11" BOP EL
A
IRH-108
IRH-114
1" NG
B
1" NG
FD-A
IRH-111
1 1/2" NG
6" FD-E
2 1/2" NG
31' - 11" BOP EL
4" NG
3/4" DCW
1 1/2" DHW
10' - 9" BOP EL
1" DHWR
10' - 9" BOP EL
2" CA
2 1/2" PCW
1 1/2" DCW
1 1/2" DHW
1/2" DCW
1/2" DHW
3" PCW
12' - 11" BOP EL
4" V UP
1/2" DHWR
14' - 0" BOP EL
2" CA
27' - 4" BOP EL
2 1/2" SOAP
14' - 5" BOP EL
FCO-B4
2" CA
1 1/2" DHW
1 1/2" DCW
35' - 9" BOP EL
1 1/2" DCW
2" PCW
1" CA DN
2" V A
17 18
FD-A
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-114
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
A R
E A
D
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A3
GROUND FLOOR PLUMBING PLAN - AREA D
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW
25 FOOT ELEVATION IN HANGAR BAYS.
KEYED NOTES
REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER
DETAIL ON P-503.
LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.
SOAP PUMP ON / OFF VALVE. SEE SHEET P-403.
SEE SHEET P-143 FOR CONTINUATION.
1.
2.
1.
2.
3.
4.
C
D
E
F
21 22
HANGAR BAY 2
M A
T C
H L
IN
E
P -1
EEWS-1
UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
1 1/2" DCW
1 1/2" DCW
35' - 9" BOP EL
2" PCW
31' - 11" BOP EL
2 1/2" SOAP
31' - 11" BOP EL
2" PHW
31' - 11" BOP EL
1 1/2" CA
31' - 11" BOP EL
HB-1
WH-1
3/4" DCW
1 UTILITY REELS:
(SOAP) SOAP SOLUTION
(PHW) PROCESS HOT WATER
(PCW) PROCESS COLD WATER
(CA) COMPRESSED AIR
EEWS-1
1" DHWR
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
1 1/2" CA
31' - 11" BOP EL
1 1/2" DHW
1 1/2" DCW
2" PHW
31' - 11" BOP EL
2" SOAP
31' - 11" BOP EL
2" PCW
31' - 11" BOP EL
1 1/2" DCW
35' - 9" BOP EL
FCO-B
TRENCH DRAIN
1" DHWR
31' - 11" BOP EL
1 1/2" DHW
31' - 11" BOP EL
2" PCW
2" SOAP
2" PHW
1 1/2" CA
2 1/2" NG
31' - 11" BOP EL
IRH-109
A
IRH-110
B
1" CA
A
IRH-112 IRH-113
6" FD-E
1" NG
2" NG
30' - 5" BOP EL
1 1/2" NG
1 1/2" NG
FCO-B
1 1/2" DHW
1 1/2" NG
31' - 11" BOP EL
19 20
2" NG
FD-A
FD-A
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-115
G R
O U
N D
F L O
O R
P L U
M B
IN
G
P L A
N
A R
E A
E
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/8" = 1'-0" A3
GROUND FLOOR PLUMBING PLAN - AREA E
8'4' 16'0
PLAN
NORTH
KEY PLAN
A B C D E
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW
25 FOOT ELEVATION IN HANGAR BAYS.
KEYED NOTES
REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER
DETAIL ON P-503.
LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.
CALIBRATED BALANCE VALVE SET TO 1.0 GPM.
1.
2.
1.
2.
C
D
E
F
14 15 16131211107 8 9 9.1 9.2
B9
M-301
B1
M-301
B9
M-302
B1
M-302
MAU-204
MAU-202
AR-102
AR-101
MAU-201
MAU-203
2" NG DN4" NG DN
2" NG
2" NG DN
2" NG
2" CA
TO AR-101
4" NG
2" V DN
2" V DN
FD-B
FD-B
FD-B
FD-B
MECHANICAL
PLATFORM
MECHANICAL
PLATFORM
3" V DN
3" VTR
3" VTR
2" V
2" V DN
3/4" DCW
3/4" DCW DN
1" CA DN
2" CA
3/4" CA DN
3/4" DHW DN
1/2" DHWR DN
2" CA DN
FROM AD-102
2" CA
27' - 4" BOP EL
3" VTR
2" V DN
3" VTR
2" CA
HB-1
3/4" DCW DN
FCO-A
FCO-A
ETP-102
ETP-104
HB-1
1 1/2" DCW
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-143
E Q
U
IP
M E
N T
L E
V E
L P
L U
M B
IN
G
P L A
N
A R
E A
C
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
PLAN
NORTH
KEY PLAN
A B C D E
1/8" = 1'-0" A1
EQUIPMENT LEVEL PLUMBING PLAN - AREA C
8'4' 16'0
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
KEYED NOTES
PRESSURE REGULATOR. 2 PSIG INLET, 8 IN WC OUTLET
PRESSURE.
REMOVEABLE HANDRAIL SECTION FOR MEZZANINE ACCESS,
DO NOT BLOCK PATH WITH PIPING.
1.
1.
2.
C
WOMENS
FCO-A 1/2" DHWR
TD-A
JAN
WOMENS
SHOWER
WC-2
WC-1
LAV-1
(TYP 2)
MB-1
FCO-A
2" V
2" V
2" V
2" V UP
4" SS DN
2" V DN
1 1/2" V
WCO
1 1/2" V
2" SS DN
2" SS
WCO
TD-B
2" V
3/4" DCW
FCO-B
1" DCW
1/2" DHW
1/2" DHW
1" DCW
1/2" DHW
1/2" DCW
1/2" DHW
WF-1
1 1/2" DHW
1 1/2" DCW
3" DCW
1 1/2" DHW
2" CA
1/2" DHWR
SK-1
2" CA
3/4" DHW
2" DCW
FD-B
EEWS-1
FCO-A
2" V DN
SH-2
2 1/2" PCW
1" DHW
1" DCW
1 1/2" DCW
1/2" DCW
1" DHWR
2" V
1/2" DHW
2" V DN
1 1/2" DHW
WCO
WCO
1 1/2" DCW
TP-101
2 1/2" PCW
1" DHWR
1 1/2" DHW
1 1/2" DCW
C
NURSING
WOMENS
4" SS
4" SS UP
TO FCO-A
JAN
WC-2 WC-1
LAV-1
(TYP 2)
WOMENS
SHOWER
2" SS UP
4" SS UP
MB-1
2" SS UP
2" SS UP
TO FD-A
WF-1
4" SS UP
TO TD-B
2" SS UP
2" SS
4" SS
2" V UP
4" SS UP
TO FCO-A
3" SS
TD-A
4" IW UP
TO FCO-B
3" IW UP
TO FD-A
3" SS UP
TO FCO-A
3" SS
SH-2
2" V UP
4" SS
2" V UP
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-401
E N
L A
R G
E D
P L U
M B
IN
G
P L A
N S
B
A T
H R
O O
M
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/4" = 1'-0" D11
ENLARGED GROUND FLOOR
PLUMBING PLAN - RESTROOM 115
0 2' 4' 8' 1/4" = 1'-0"
D3
ENLARGED UNDER SLAB
PLUMBING PLAN - RESTROOM 115
0 2' 4' 8'
PLAN
NORTH
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
FOR CONNECTION SIZES TO INDIVIDUAL FIXTURES SEE
PLUMBING FIXTURE SCHEDULE ON P-602.
SEE RISER DIAGRAMS FOR PIPING SIZES AND ROUTING NOT
SHOWN ON PLAN DRAWINGS.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
KEYED NOTES
CONNECT FLOOR DRAIN TO TRAP PRIMER TP-101.
CALIBRATED BALANCE VALVE SET TO 0.5 GPM.
ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO
STRUCTURAL DRAWINGS FOR FOOTING DETAILS.
MOUNT SHUT-OFF VALVES FOR RESTROOM AREA IN
ACCESSIBLE LOCATION.
CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-103 IN ROOM
128.
COORDINATE SLEEVE THRU STRUCTURAL STEM WALL.
IE = 3222.44'
1.
2.
3.
4.
1.
2.
3.
4.
5.
C
14 1513
SH-1
(TYP 3)
TD-A
(TYP 2)
4" SS
LAV-1
(TYP 4)
UR-1
(TYP 2)
MENS SHOWER
MENS
MENS
CORRIDOR
UR-2
4" SS UP
TO FCO-A
3" SS UP
TO FD-A
2" SS UP
2" SS UP
WF-1
TD-B 5
CORRIDOR
VEST 2
4" SS UP
TO FCO-B
UR-1
3" SS UP
TO WCO/V
S S
S S
4" SS UP
TO FD-A
4" SS UP
TO FCO-A
2" SS
TO SH-1 (TYP 4)
WC-2
WC-1
(TYP 2)
SH-2
4" SS UP
3" SS
2" V UP
3" SS
2" SS
2" SS UP
4" SS
2" SS UP C
14 1513
SH-1
(TYP 3)
UR-1
LAV-1
(TYP 4)
MENS SHOWER
MENS
FCO-A
WCO
WCO
CORRIDOR
UR-2
FD-A
TD-A
(TYP 2)
2" SS DN
1 1/2" DCW
3/4" DHW
TD-B
FCO-B
3" V UP
2" DCW
WCO
1/2" DHWR
3" DCW
2" DHW
1" DHWR
2" CA
2" CA
1" DHWR
2" DCW
2" DHW
1 1/2" DCW
1 1/2" DHW
1/2" DCW
1/2" DHW
EEWS-1
WF-1
UR-1
(TYP 2)
WC-2WC-1
(TYP 2)
FCO-A
2 1/2" PCW
2" V
2" V 1 1/2" V1 1/4" V 1 1/2" V
2" V
2" V
1 1/2" DHW
SH-2
FD-A
2 1/2" PCW
4" SS2" SS
4" SS
4" SS DN
2" V DN
2" V
2" V DN
TP-102
2" SS DN
WCO
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-402
E N
L A
R G
E D
P L U
M B
IN
G
P L A
N S
B
A T
H R
O O
M
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
0 2' 4' 8'
1/4" = 1'-0" C2
ENLARGED UNDER SLAB
PLUMBING PLAN - RESTROOM 126
1/4" = 1'-0" C10
ENLARGED GROUND FLOOR
PLUMBING PLAN - RESTROOM 126
0 2' 4' 8'
PLAN
NORTH
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
FOR CONNECTION SIZES TO INDIVIDUAL FIXTURES SEE
PLUMBING FIXTURE SCHEDULE ON P-602.
SEE RISER DIAGRAMS FOR PIPING SIZES AND ROUTING NOT
SHOWN ON PLAN DRAWINGS.
ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS
CIVIL ELEVATION OF 3224.94'.
SEE DETAIL ON P-501 FOR URINAL DRAINAGE PIPING.
KEYED NOTES
CONNECT FLOOR DRAIN TO TRAP PRIMER TP-102.
COORDINATE SLEEVE THRU STRUCTURAL STEM WALL.
IE = 3222.4'
LOCATE RESTROOM SHUT-OFF VALVE IN ACCESSIBLE
LOCATION.
ROUTE PIPING ABOVE TOP OF FOOTING.
CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-103 IN ROOM
128.
1.
2.
3.
4.
5.
1.
2.
3.
4.
P
E
F
7 8
B9
M-301
B1
M-301
SOAP
2 1/2" PCW
14' - 11" BOP EL
HB-1
2 1/2" PHW
HB-1
T-101
AD-101
T-102
AC-101
ET-104
2" SOAP
0' - 11" BOP EL
2" SOAP
14' - 11" BOP EL
2" CA UP
TO AR-101
2" NG UP
2 1/2" PCW
WH-1
2" SOAP
FD-B
3" SS UP
TO FD-B
2" V UP
3" SS DN
3" SS UP
TO FD-BFD-B
FD-B
TMV-102
2 1/2" SOAP
3/4" DCW
15' - 5" BOP EL
3/4" DCW
3/4" DCW UP
B
C
1 1/2" SOAP DN
1 1/2" PCW DN
2 1/2" PCW
10' - 11" BOP EL
EEW
2 1/2" SOAP
14' - 11" BOP EL
1" CA
14' - 11" BOP EL
4" SOAP
3" SOAP
0' - 7" BOP EL
3/4" CA
15' - 0" BOP EL
3/4" CA
15' - 5" BOP EL
2" PCW
1" CA UP
1" CA
1" CA
3/4" CA UP
PWP-101
PWP-102
PWP-103
PWP-104
4" SOAP2 3
3/4" DCW
FCO-B
1" PCW DN
3" SS
15' - 8" BOP EL
2" CA
2" PCW
13' - 5" BOP EL
3/4" DCW
15' - 5" BOP EL
3/4" CA
3/4" DCW
FD-B
3/4" DHW
3/4" DHW
15' - 5" BOP EL
3/4" DHW UP
1/2" DHWR UP
2" CA
14' - 11" BOP EL
4" V
4" V
4" V
4" V
3" SS UP
TO FCO-A
2" V DN
2" V
2" NG DN
2" NG DN
2 1/2" PCW DN
2 1/2" PHW DN
2 1/2" PHW
2 1/2" PHW
PWH-101
PWH-102
3/4" DCW DN
E
F
15 16
B9
M-302
B1
M-302
SOAP
BFP-102
AC-102
AD-102
T-104
ET-105
T-103
WH-1
2" NG UP
3/4" DCW
2 1/2" PCW
2 1/2" NG
FD-B
FD-B
TMV-103
3" SS UP
TO FD-B 3" SS UP
TO FD-B
EEW
FD-B
2" NG
PWP-108
FD-B
2" CA
4" SOAP2" SOAP3 2
1 1/2" SOAP DN 4
C
3/4" CA
3" PCW
2" SOAP
0' - 11" BOP EL
4" SOAP4
3/4" CA
3/4" CA
2" SOAP
2" CA UP
3" SS
12' - 2" BOP EL
2 1/2" SOAP
1" CA
7' - 11" BOP EL
1" CA UP
1" CA
1" CA
PWP-107
PWP-105
PWP-106
2" DCW
1 1/2" DCW
3/4" DCW
FCO-B3/4" DHW
1" DHW
3" SS
FCO-B
3" DCWS
2" V UP
1/2" DHWR
3" PCW
2 1/2" PHW UP
2 1/2" SOAP
14' - 5" BOP EL
1" PCW
2 1/2" PHW
3" SOAP
3/4" CA
2" PCW
2 1/2" PCW
4" V
4" V
4" V
4" V
3/4" DCW
3/4" DCW UP
2" V
3" SS UP
TO FCO-A
WCO
2" V DN
182" V
FD-C
1" CA DN
3" PCW UP17
1 1/2" DCW
HB-1
3/4" DCW
1" DCW
1 1/2" PCW
2 1/2" PCW
12' - 11" BOP EL
2 1/2" PHW
2 1/2" SOAP DN
2 1/2" PHW
14' - 5" BOP EL
2 1/2" PHW DN
2 1/2" PHW DN
2 1/2" PCW DN
2" NG DN
PWH-104
PWH-103
TO AR-102
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-403
E N
L A
R G
E D
P L U
M B
IN
G
P L A
N S
S
O A
P R
O O
M S
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/4" = 1'-0" C1
ENLARGED GROUND FLOOR
PLUMBING PLAN - SOAP 102
1/4" = 1'-0" C2
ENLARGED GROUND FLOOR
PLUMBING PLAN - SOAP 108
0 2' 4' 8' 0 2' 4' 8'
PLAN
NORTH
PLAN
NORTH
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
COMPRESSED AIR EQUIPMENT SHALL BE PURCHASED AS
BID OPTION. CONTRACTOR SHALL PROVIDE PIPING,
ACCESSORIES, AND THE EQUIPMENT INSTALLATION
LOCATED INSIDE THE SOAP ROOMS AS PART OF BID
OPTION. CONTRACTOR SHALL PROVIDE ALL PIPING AND
ACCESSORIES LOCATED OUTSIDE THE SOAP ROOM AS
PART OF BASE BID.
SEE COMPRESSED AIR FLOW DIAGRAM ON DRAWING P-701
FOR COMPRESSED AIR ACCESSORIES AND PIPING NOT
SHOWN ON PLAN.
PROCESS WATER HEATERS AND SOAP SYSTEM EQUIPMENT
SHALL BE PURCHASED AS BID OPTION. CONTRACTOR SHALL
PROVIDE PIPING, ACCESSORIES, AND THE EQUIPMENT
INSTALLATION LOCATED INSIDE THE SOAP ROOMS AS PART
OF BID OPTION. CONTRACTOR SHALL PROVIDE ALL PIPING
AND ACCESSORIES LOCATED OUTSIDE THE SOAP ROOMS
AS PART OF BASE BID.
SEE SOAP SYSTEM FLOW DIAGRAM ON DRAWING P-703 FOR
ACCESSORIES AND PIPING NOT SHOWN ON PLAN.
SEE DETAIL ON P-504 FOR PIPING AT PROCESS WATER
HEATER AND ASSOCIATED RECIRC PUMP AND MIXING
VALVE.
KEYED NOTES
PRESSURE REGULATOR. 2 PSIG INLET, 13 IN WC OUTLET
PRESSURE.
ROUTE 4" TANK OVERFLOW DRAIN DOWN TO
APPROXIMATELY 24" ABOVE FLOOR AND TERMINATE
THROUGH WALL TO EXTERIOR. PROVIDE STAINLESS STEEL
SCREEN ON OUTLET.
ROUTE 2" SOAP PIPING DOWN TO TRUCK FILL CONNECTION,
SEE DETAIL ON SHEET P-505. PROVIDE HEAT TRACE ON
EXTERIOR PIPE AND 3 FEET INTO BUILDING.
ROUTE 1-1/2" SOAP PIPING DOWN TO APPROXIMATELY 48"
AFF AND PROVIDE DRUM PUMP PIPING CONNECTION.
CONNECT 2" SOAP PIPING TO BOTTOM OUTLET OF TANK
AND ROUTE TO PUMPS AS INDICATED.
ROUTE 4" TANK OVERFLOW DRAIN DOWN TO
APPROXIMATELY 12" ABOVE FLOOR AND TERMINATE WITH
FLAP CHECK VALVE.
CONNECT 3" SOAP PIPING TO BOTTOM OUTLET OF TANK
AND ROUTE TO PUMPS AS INDICATED.
ROUTE 3/4" CA AND 2" PCW DOWN TO OPERATOR FILL
STATION, SEE DETAIL ON P-505.
TANK SIGHT GLASS, DO NOT OBSTRUCT VIEW OF SIGHT
GLASS FROM AISLE.
ROUTE COMPRESSED AIR PIPING TO DIAPHRAGM PUMPS.
REFER TO DETAIL ON P-506 AND FLOW DIAGRAM ON P-606.
PROVIDE CALIBRATED BALANCE VALVE SET TO 0.5 GPM.
PROVIDE 1" CA VALVE AT APPROXIMATELY 48" ABOVE
FLOOR. PROVIDE SIGNAGE INDICATING "SOAP PUMPS ON /
OFF VALVE".
CONNECT FLOOR DRAINS IN ROOMS 102 AND 103 TO TRAP
PRIMER ETP-102 LOCATED ON MEZZANINE ABOVE SOAP
ROOM 102. ROUTE TRAP PRIMER TUBING PROTECTED IN
CONDUIT OR PIPE.
5 MICRON COALESCING FILTER.
CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-102 LOCATED
ON MEZZANINE ABOVE SOAP ROOM 102. ROUTE DRAIN
PIPING AS HIGH AS POSSIBLE.
TERMINATE 4" TANK VENT THROUGH WALL TO EXTERIOR.
PROVIDE ELBOW DOWN WITH STAINLESS STEEL SCREEN
ON OUTLET.
SEE SHEET P-143 FOR CONTINUATION.
CONNECT FLOOR DRAIN TO TRAP PRIMER FROM ETP-104
LOCATED ON MEZZANINE ABOVE SOAP ROOM.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
P
BFP
E
F
1413129.2
EEW
WATER
METER
GAS METER
2" NG DN
ET-101
WS-101
ET-103
DWH-101
SALT PALLET
BFP-101
BOILER
4" NG
4" NG UP
HWB-101
HWB-102
2 1/2" NG
2 1/2" NG
FD-B
FD-B
FD-B
BFP-104
SG-101
DOAS-101
ET-102
FD-B
FD-B
3/4" DCW
3/4" DCW
HB-1
TMV-101
RP-101
HWB-103
FURN-101
FD-B
FD-B
2" NG
2" DHW
ET-104
1" DHWR
3" DCW
1/2" DCWS
1" DCWS
1 1/2" NG
DWB-101
2" V UP
DDC PANELS
1" DCWS
3" DCWS
5 2" DCWS
3/4" NG
HB-1
3/4" DCW
SUMP PUMP
CONTROL PANEL
MECH / AHU
3" DCW
2" DCW
2" DCW
4" DCW DN
4" DCW
1" DHW
1" DHW
1 1/2" DHW
2" DCWS
1/2" DCWS
3" DCWS
FCO-B
DWB-101
CONTROLLER
3" DCWS
2" V
2" DCW
1" DHW
FD-B
4" SS DN
FD-C
FD-D
3" DCW
2" V
2" V 2" V
3" SS
3" SS DN
2" V
ETP-101
HS-101
4" NG
2" NG
4" NG
WH-1
2" V DN
FD-B
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
P-404
E N
L A
R G
E D
P L U
M B
IN
G
P L A
N
B O
IL
E
R R
O O
M
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
1/4" = 1'-0" C5
ENLARGED GROUND FLOOR
PLUMBING PLAN - BOILER ROOM
0 2' 4' 8'
PLAN
NORTH
GENERAL NOTES
SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS
& ABBREVIATIONS.
SEE DETAIL ON P-505 FOR PIPING AT DOMESTIC WATER
HEATER, RECIRC PUMP AND MIXING VALVE.
KEYED NOTES
EMERGENCY GAS SHUT-OFF VALVE.
PRESSURE REGULATOR. 2 PSIG INLET, 10 IN WC OUTLET
PRESSURE.
PROVIDE 3" PRESSURE REDUCING VALVE SET TO 65 PSIG IN
VERTICAL PIPE.
3" CONNECTIONS TO WS-101. PIPE 1-1/2" DRAIN FROM
WS-101 TO FD-D.
PROVIDE 2" PRESSURE REDUCING VALVE SET TO 65 PSIG IN
VERTICAL PIPE.
3/4" DCW AND 3/4" DHW DOWN TO EMERGENCY EYEWASH.
DO NOT ROUTE PIPING AROUND ACCESS LADDER.
ROUTE 1/2" DCWS FROM OUTLET OF BFP-104 TO STEAM
GENERATOR.
SEE P-143 FOR CONTINUATION.
1.
2.
1.
2.
3.
4.
5.
6.
7.
8.
9.
V E
N T
E X
T E
N S
IO
N
A S
R E
Q U
IR
E
D
VENT PIPE 3" MIN.
MASTIC
STAINLESS STEEL
CLAMPING RING
EPDM PREMOLDED
PIPE SEAL
SPLICING CEMENT
LAP SEALANT
METAL ROOF
METAL DECK
ROOF PENETRATION
BY ROOF MFGR.
INCREASER
IF REQUIRED
VENT
WALL SURFACE
CLEANOUT PLUG
ROUND POLISHED STAINLESS
STEEL WALL COVER PLATE
(NOT REQUIRED UNLESS
LOCATED IN WALLS)
COUNTERSUNK SCREW
SCREWED COUNTERSUNK PLUG
OPENING CUT-OUT IN WALL
HORIZO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .