W9128F21R0051 - Washrack - RTA Drawings - VOLUME III.pdf

PDF 28 MB Posted

Attached to
B-21 Washrack and Maintenance Hangar, Ellsworth AFB, South Dakota
Solicitation number
W9128F-21-R-0051
Issued by

About this file

This federal contract opportunity is a solicitation for the B-21 Washrack and Maintenance Hangar at Ellsworth Air Force Base in South Dakota. The solicitation seeks proposals for design and construction services for a new washrack facility and maintenance hangar to support the B-21 bomber. Interested parties must access all solicitation attachments through the Projnet plan room using the provided quick add key. Proposals are due by the date specified on Projnet. The solicitation is issued by the Department of the Army Corps of Engineers Omaha District on behalf of Ellsworth Air Force Base.

View the file

Other files

File Type Posted
Am_0011.pdf PDF
Am_0010_Dwgs_Vol1.pdf PDF
Am_0010_Dwgs_Vol3.pdf PDF
Am_0010.pdf PDF
Am_0009.pdf PDF
Am_0008.pdf PDF
Am_0007.pdf PDF
Am_0006.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
W9128F21R0051 - Washrack - RTA Drawings - VOLUME I-.pdf PDF
Am_0003.pdf PDF
W9128F21R0051_Specifications_Am3.pdf PDF
W9128F21R0051 - Washrack - RTA Drawings - VOLUME II.pdf PDF
Am_0002.pdf PDF
Am0001_W9128F21R0051.pdf PDF
21-R-0051_Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D E

S

IG

N

THIS PROJECT WAS REVIEWED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THIS SET.

CHIEF, GEOTECHNICAL

ENGINEERING & SCIENCES BRANCH

DATE

CHIEF, DAM SAFETY PROD.

CENTER

DATE

CHIEF, DESIGN BRANCH DATE

CHIEF, HYROLOGIC

ENGINEERING BRANCH

DATE

DATECHIEF, ENGINEERING

DIVISION, P.E.

SUBMITTED BY:

CHIEF: ARCH. / INTER.

RA

SECTION

SUBMITTED BY:

CHIEF: CIVIL / ENVIR.

PE

SECTION

SUBMITTED BY:

CHIEF: ELEC.

PE

SECTION

SUBMITTED BY:

CHIEF: MECH.

PE

SECTION

SUBMITTED BY:

CHIEF: STRUCT.

PE

SECTION

SUBMITTED BY:

CHIEF: FUELS

RA

SECTION

SUBMITTED BY:

CHIEF: GEOT./DAM SAFETY

PE

SECTION

SUBMITTED BY:

CADD

PROJECT COORD.

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

G-005

C O

V E

R V

O L U

M E

A H

A N

K

IN

S

A H

A N

K

IN

S

B L E

G R

E

ID

W9128F-21-R-0051

XXXXXX XX X XXXX

OCTOBER 2021

ELLSWORTH AIR FORCE BASE, SD

B-21: WASHRACK AND MAINTENANCE HANGAR

(WASHRACK)

PN: FXBM1090404, FY 2022

10-22-202122 OCT 2021

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D E

S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

G-006

IN

D

E X

T O

D R

A W

IN

G

S V

O L U

M E

A H

A N

K

IN

S

A H

A N

K

IN

S

B L E

G R

E

ID

VOLUME INDEX:

VOLUME 1: GENERAL, CIVIL, & STRUCTURAL

VOLUME 2: ARCHITECTURAL, INTERIORS, & FIRE PROTECTION

VOLUME 3: PLUMBING, MECHANICAL, ELECTRICAL, & TELECOMMUNICATIONS

INDEX TO DRAWINGS VOLUME 3

SHEET NO. SHEET NAME

M-708 HVAC CONTROLS - FURNACE

M-709 HVAC CONTROLS - MAU-201 SCHEMATIC

M-710 HVAC CONTROLS - MAU-203 SCHEMATIC

M-711 HVAC CONTROLS - MAU-203 POINTS LIST

M-712 HVAC CONTROLS - STEAM GENERATOR / HUMIDIFIER SCHEMATIC

M-713 HVAC CONTROLS - EXHAUST FANS SCHEMATIC

M-714 HVAC CONTROLS - EXHAUST FANS SCHEMATIC POINTS LIST

M-715 HVAC CONTROLS - UNIT HEATER SCHEMATIC

M-716 HVAC CONTROLS - HANGAR DOOR TRACK HEAT SYSTEM

M-717 HVAC CONTROLS - HANGAR DOOR TRACK HEAT POINTS LIST

M-718 HVAC CONTROLS - HIGH BAY EQUIPMENT SCHEMATIC

M-719 HVAC CONTROLS - CRU & ACU SCHEMATIC

M-720 HVAC CONTROLS - IW DIVERSION VALVE

ELECTRICAL

E-001 ELECTRICAL LEGEND 1 OF 2

E-002 ELECTRICAL LEGEND 2 OF 2

E-100 OVERALL HAZARDOUS AND WET LOCATION PLANS

ES100 OVERALL ELECTRICAL SITE PLAN

ES101 ELECTRICAL SITE PLAN - AREA 1

ES102 ELECTRICAL SITE PLAN - AREA 2

ES151 APRON LIGHTING PLAN

ES501 ELECTRICAL SITE DETAILS

ES502 ELECTRICAL SITE DETAILS

EL101 LIGHTING PLAN - AREA A

EL102 LIGHTING PLAN - AREA B

EL103 LIGHTING PLAN - AREA C

EL104 LIGHTING PLAN - AREA D

EL105 LIGHTING PLAN - AREA E

EL106 LIGHTING PLAN - MECHANICAL PLATFORM

EL201 LIGHTING ELEVATION

EL501 LIGHTING DETAILS

EL502 LIGHTING DETAILS

EL503 LIGHTING DETAILS

EL504 LIGHTING DETAILS

EL601 LIGHT FIXTURE SCHEDULE

EL602 LIGHTING CONTROL MATRIX

EP101 POWER PLAN - AREA A

EP301 ELECTRICAL DUCTBANK SECTION

EP102 POWER PLAN - AREA B

EP103 POWER PLAN - AREA C

EP104 POWER PLAN - AREA D

EP105 POWER PLAN - AREA E

EP106 POWER PLAN - MECHANICAL PLATFORM

EP111 HVAC POWER PLAN - AREA A

EP112 HVAC POWER PLAN - AREA B

EP113 HVAC POWER PLAN - AREA C

EP114 HVAC POWER PLAN - AREA D

EP115 HVAC POWER PLAN - AREA E

EP116 HVAC POWER PLAN - MECHANICAL PLATFORM

EP201 POWER ELEVATIONS

EP401 ENLARGED POWER PLANS

EP501 POWER DETAILS

EP502 POWER DETAILS

EP600 PRIMARY ELECTRICAL ONE-LINE DIAGRAMS

EP601 ONE-LINE DIAGRAM

EP602 ONE-LINE CONDUCTOR TABLE

EP701 PANELBOARD SCHEDULES

EP702 PANELBOARD SCHEDULES

EP703 PANELBOARD SCHEDULES

EP704 PANELBOARD SCHEDULES

EP710 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EG101 OVERALL GROUNDING PLAN

EG102 LIGHTNING PROTECTION SYSTEM ROOF PLAN

EG501 GROUNDING DETAILS

EG502 GROUNDING DETAILS

EG503 GROUNDING DETAILS

EG504 GROUNDING DETAILS

EG510 TELECOMMUNICATIONS GROUNDING DETAILS

EG601 TYPICAL GROUNDING RISER DIAGRAMS

TELECOMMUNICATIONS

TN001 TELECOMMUNICATIONS LEGEND

TN002 TELECOMMUNICATIONS LABELING

TN003 TELECOMMUNICATIONS LABELING

TN102 TELECOMMUNICATIONS PLAN - AREA B

TN103 TELECOMMUNICATIONS PLAN - AREA C

TN104 TELECOMMUNICATIONS PLAN - AREA D

TN106 TELECOMMUNICATIONS PLAN - MECHANICAL PLATFORM

TN301 COMMUNICATIONS DUCTBANK SECTION

TN401 ENLARGED TELECOMMUNICATIONS PLANS

TN402 ENLARGED TELECOMMUNICATIONS PLANS

TN501 TELECOMMUNICATIONS DETAILS

TN502 TELECOMMUNICATIONS DETAILS

TN511 TELECOMMUNICATIONS DETAILS

TN701 TELECOMMUNICATIONS RISER DIAGRAM

TY001 SECURITY LEGEND

TY100 SECURITY PLAN - OVERALL

TY101 SECURITY PLAN - AREA A

TY102 SECURITY PLAN - AREA B

TY103 SECURITY PLAN - AREA C

TY104 SECURITY PLAN - AREA D

TY105 SECURITY PLAN - AREA E

TY501 SECURITY DETAILS

TY502 SECURITY DETAILS

TY503 SECURITY DETAILS

INDEX TO DRAWINGS VOLUME 3

SHEET NO. SHEET NAME

GENERAL

G-005 COVER VOLUME 3

G-006 INDEX TO DRAWINGS VOLUME 3

PLUMBING

P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-100 UNDER SLAB PLUMBING PLAN - OVERALL

P-101 UNDER SLAB PLUMBING PLAN - AREA A

P-102 UNDER SLAB PLUMBING PLAN - AREA B

P-103 UNDER SLAB PLUMBING PLAN - AREA C

P-104 UNDER SLAB PLUMBING PLAN - AREA D

P-105 UNDER SLAB PLUMBING PLAN - AREA E

P-110 GROUND FLOOR PLUMBING PLAN - OVERALL

P-111 GROUND FLOOR PLUMBING PLAN - AREA A

P-112 GROUND FLOOR PLUMBING PLAN - AREA B

P-113 GROUND FLOOR PLUMBING PLAN - AREA C

P-114 GROUND FLOOR PLUMBING PLAN - AREA D

P-115 GROUND FLOOR PLUMBING PLAN - AREA E

P-143 EQUIPMENT LEVEL PLUMBING PLAN - AREA C

P-401 ENLARGED PLUMBING PLANS - BATHROOM 115

P-402 ENLARGED PLUMBING PLANS - BATHROOM 126

P-403 ENLARGED PLUMBING PLANS - SOAP ROOMS

P-404 ENLARGED PLUMBING PLAN - BOILER ROOM

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-504 PLUMBING DETAILS

P-505 PLUMBING DETAILS

P-506 PLUMBING DETAILS

P-507 PLUMBING DETAILS

P-508 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-603 PLUMBING SCHEDULES

P-604 PLUMBING SCHEDULES

P-605 WATER FLOW DIAGRAM

P-606 SOAP FLOW DIAGRAM

P-701 COMPRESSED AIR SCHEMATIC

P-901 WASTE & VENT RISER

P-902 WASTE & VENT RISER

P-903 RESTROOM WASTE & VENT RISERS

P-904 DOMESTIC WATER RISER

P-905 RESTROOM DOMESTIC WATER RISERS

P-906 NATURAL GAS PIPING DIAGRAM

P-907 PROCESS PIPING PLUMBING RISER

MECHANICAL

M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

M-100 GROUND FLOOR HVAC PLAN - OVERALL

M-101 GROUND FLOOR HVAC PLAN - AREA A

M-102 GROUND FLOOR HVAC PLAN - AREA B

M-103 GROUND FLOOR HVAC PLAN - AREA C

M-104 GROUND FLOOR HVAC PLAN - AREA D

M-105 GROUND FLOOR HVAC PLAN - AREA E

M-113 EQUIPMENT LEVEL HVAC PLAN - AREA C

M-130 GROUND FLOOR MECH PIPING PLAN - OVERALL

M-131 GROUND FLOOR MECH PIPING PLAN - AREA A

M-132 GROUND FLOOR MECH PIPING PLAN - AREA B

M-133 GROUND FLOOR MECH PIPING PLAN - AREA C

M-134 GROUND FLOOR MECH PIPING PLAN - AREA D

M-135 GROUND FLOOR MECH PIPING PLAN - AREA E

M-143 EQUIPMENT LEVEL MECH PIPING PLAN - AREA C

M-150 MECHANICAL ROOF PLAN

M-301 SOAP ROOM 102 MECHANICAL SECTIONS

M-302 SOAP ROOM 108 MECHANICAL SECTIONS

M-303 MECHANICAL SECTIONS

M-304 MECHANICAL SECTIONS

M-401 ENLARGED PLAN - BOILER ROOM

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-507 MECHANICAL DETAILS

M-508 MECHANICAL DETAILS

M-509 MECHANICAL DETAILS

M-510 MECHANICAL DETAILS

M-601 HVAC SCHEDULES

M-602 HVAC SCHEDULES

M-603 HVAC SCHEDULES

M-604 HVAC SCHEDULES

M-605 HVAC SCHEDULES

M-610 HEATING WATER FLOW DIAGRAM (1/2)

M-611 HEATING WATER FLOW DIAGRAM (2/2)

M-612 SNOW MELT HEATING WATER FLOW DIAGRAM

M-700 HVAC CONTROLS - LEGEND

M-701 HVAC CONTROLS - SYSTEM ARCHITECTURE

M-702 HVAC CONTROLS - MISC POINTS

M-703 HVAC CONTROLS - HEATING WATER SCHEMATIC

M-704 HVAC CONTROLS - HEATING WATER SEQUENCE

M-705 HVAC CONTROLS - HEATING WATER POINTS LIST

M-706 HVAC CONTROLS - DOAS-101 SCHEMATIC

M-707 HVAC CONTROLS - DOAS-101 POINTS LIST

22 OCT 2021

4" FD-A

EWC-1

JS-1

SK-1

U-2

U-1

WC-2

WC-1

LAV-

PLUMBING SYMBOLS LEGEND

SIZE - FLOOR DRAIN

DUAL ELECTRIC WATER COOLER

JANITOR SINK

KITCHEN

URINAL, ACCESSIBLE

URINAL

WATER CLOSET - ACCESSIBLE

WATER CLOSET

LAVATORY, COUNTER MOUNTED

PRESSURE/TEMPERATURE RELIEF VALVE

HB HOSE BIBB

WH WALL HYDRANT

LAV- LAVATORY, WALL MOUNTED

MB-1 MOP BASIN

SK-2 SINK

EEWS- EMERGENCY EYEWASH / SHOWER

SH-1 SHOWER

SK-3 UNDER MOUNT SINK

WCO

FLOOR DRAIN / EQUIPMENT DRAIN

PLUMBING FIXTURE TRAP

FLOOR OR WALL PENETRATION

VENT THRU ROOF (VTR)

CLEANOUT (CO) IN RISER

RISER DIAGRAM LEGEND

CO

FCO

CLEANOUT (FCO) IN FLOOR

WATER HAMMER ARRESTORWHA-A

WALL CLEANOUT (WCO)

ISOMETRIC DIRECTION ARROW

UP

DN

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC SPRING RETURN CLOSED BALL

VALVE

DOUBLE DIAPHRAGM PUMP

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

PIPE LINE DESIGNATIONS

VENT

STORM (ABOVE GRADE)

STORM (BELOW GRADE)

STORM OVERFLOW

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

SANITARY SEWER (ABOVE GRADE)

SANITARY SEWER (BELOW GRADE)

CONDENSATE DRAIN

COMPRESSED AIR

NATURAL GAS

CLEANOUT IN RISER

CLEANOUT IN WALL

CLEANOUT IN FLOOR

SS

SS

COND

V

DCW

DHW

DHWR

CA

NG

OD

S

S

CO

WCO

FCO

SOAPSOAP

PROCESS COLD WATERPCW

PROCESS HOT WATERPHW

INDUSTRIAL WASTE (ABOVE GRADE)IW

INDUSTRIAL WASTE (BELOW GRADE)IW

DOMESTIC COLD WATER (SOFTENED)DCWS

A

B

COMPRESSED AIR DROP TYPE A

COMPRESSED AIR DROP TYPE B

STORM - PUMPEDS(F)

FOUNDATION DRAIN (BELOW GRADE)FND

PLUMBING ABBREVIATIONS GENERAL PLUMBING NOTES

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

AC AIR COCK

AFF ABOVE FINISHED FLOOR

AG AIR GAP

ARV AIR RELEASE VALVE

BF BLIND FLANGE

BOP BOTTOM OF PIPE

BW BUTT WELD

CH OP CHAIN WHEEL OPERATOR

CONC CONCENTRIC

CORP STOP CORPORATION STOP

CPVC CHLORINATED POLYVINYL CHLORIDE

D DRAIN

DI DUCTILE IRON

DN DOWN

DWH DOMESTIC WATER HEATER

ELL ELBOW

EXIST EXISTING

FCA FLANGED COUPLING ADAPTER

FD FLOOR DRAIN

FE FLANGED END

FF FLAT FACED

FI FLOW INDICATOR

FLGD FLANGED

FM FLOW METER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FOV FLOAT OPERATED VALVE

FRP FIBERGLASS REINFORCED PIPE

FW FIELD WELD

HD HUB DRAIN

I.E. INVERT ELEVATION

IF INSULATED FLANGE

LC LOCK CLOSED

LO LOCK OPEN

LR LONG RADIUS

NPSH NET POSITIVE SUCTION HEAD

NRS NON-RISING STEM

NWL NORMAL WATER LEVEL

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RED REDUCER-REDUCING

RS RISING STEM

SCH SCHEDULE

SCRD SCREWED

SR SHORT RADIUS

TD TRENCH DRAIN

TOC TOP OF CONCRETE

TOG TOP OF GRATING

TOP TOP OF PIPE

TOS TOP OF STEEL

TP TRAP PRIMER

VTR VENT THROUGH ROOF

1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET - 4

INCHES OUTSIDE OF THE BUILDING WALL.

2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.

3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS

AND DRAINAGE REQUIREMENTS.

4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS

PROJECT.

5. INSTALL SANITARY PIPING WITH 2% SLOPE DOWNWARD IN DIRECTION OF FLOW. INSTALL

VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD FIXTURE OR STACK.

6. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.

7. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

8. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE

CODES AND REGULATIONS.

9. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL,

ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

10. MAINTAIN A MINIMUM OF 6' - 8 CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

11. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS, AND VALVING.

12. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

13. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED

OTHERWISE.

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-001

P L U

M B

IN

G

N O

T E

S

L E

G E

N D

S

Y M

B O

L S

A

B B

R E

V

IA

T

IO

N S

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

B F

P

A

B

C

D

E

F

14 15 16 21 221312111054321 6 7 8 9 9.1 9.2 17 18 19 20

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-100

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

O V

E R

A L L

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

3/64" = 1'-0" D1

UNDER SLAB PLUMBING PLAN - OVERALL

32'16' 64'0 32'16' 64'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

1.

A

C

D

E

F

HANGAR BAY 1

M A

T C

H L

IN

E

P -1

TRENCH DRAIN

4" IW

SEE CIVIL SHEET CU105

FOR CONTINUATION

IE = 3218.94'

4" V UP

4" IW UP

TO FCO-B

3" IW UP

TO FD-A

4" IW UP

TO FCO-B

3" IW UP

TO FD-A

4" IW

6" IW

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.69'

6" IW

6" FD-E

1 1 444

4" IW

4"

IW

4" S

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3221.44'

1 4 1 4 1 4 1 4

2 2 2 2 2

1 4

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-101

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

A R

E A

A

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A4

UNDER SLAB PLUMBING PLAN - AREA A

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT

EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

KEYED NOTES

CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL

SHEET CU105 FOR CONTINUATION. IE = 3221.44'

DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR

TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.

COORDINATE INSTALLATION WITH STRUCTURAL.

COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS

SHOWER HEAD.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.

TRANSITION PIPE TO 6".

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE THROUGH STRUCTURAL FOOTING.

REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

1.

2.

3.

1.

2.

3.

4.

5.

6.

C

D

E

F

11105 6 7 8

9 9.1

HANGAR BAY 1

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

3" IW UP

TO FD-A

4" IW

TRENCH DRAIN

4" IW UP

TO FCO-B

3" IW UP

TO FD-A

4" IW UP

TO FCO-B

6" IW

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.69'

6" FD-E

6" IW

2 2 22

14 14 14 14 14 14 14 14

2" SS

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-102

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

A R

E A

B

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A2

UNDER SLAB PLUMBING PLAN - AREA B

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT

EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

KEYED NOTES

CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL

SHEET CU103 FOR CONTINUATION. IE = 3221.44'

DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR

TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.

COORDINATE INSTALLATION WITH STRUCTURAL.

COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS

SHOWER HEAD.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.

TRANSITION PIPE TO 6".

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

1.

2.

3.

1.

2.

3.

4.

5.

C

D

E

F

14 15 16131211107 8 9 9.1 9.2

PUMP/FOAM

ELEC

MECH / AHU

COMM

OPEN OFFICE

MULTI-PURPOSE

STORAGE

SECURE VEST

SECURE OFFICE

CORRIDOR

WASH BAY EQUIP

NURSING

VEST 1

VEST 2

STORAGE

FLIGHT LINE

VESTIBULE

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

P-401 D3

P-402 C2

TD-BTD-B

4" SS UP

TO FCO-A

4" SS

4" SS UP

TO FD-B

S S

4" SS

4" SS

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.94'

BOILER

2" NG

SEE CIVIL SHEET CU103

FOR CONTINUATION

4" DCW

SEE CIVIL FOR

CONTINUATION

2" NG UP

4" DCW UP

4" SS

SOAP

SOAP

CORRIDOR

3" SS UP

TO SK-1

2" SS UP

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

4" SS UP

TO FD-B

4" SS UP

TO FD-B

4" SS UP

TO FD-D

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B 3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B

4" SS UP

TO FD-B

TD-B

4" SS UP

S S

4" SS

SP-101

SP-102

ENTRY

VESTIBULE

4" SS UP

TO FD-C

3" SS UP

TO FD-B

3" SS

2" V UP

4" SS UP

TO FCO-A

4" SS

4" SS

3" SS UP

4" SS UP

TO FCO-B

4" SS UP

TO FD-B

3" SS UP

TO FD-B

4" SS UP

TO FD-B

4" SS UP

TO FCO-B

4" SS

4" SS

S S

4" SS

S

S 4" SS

TO FD-B

4" SS

TO FD-C

4" SS UP

TO FCO-B

4" SS UP

TO FCO-B4" SS UP

TO V

4" SS UP

TO V

4" SS UP

TO WCO

4" FND

4" FND

SEE CIVIL SHEET CG120

FOR CONTINUATION

IE = 3214.86'

2" S(F)

IE = 3218.0'

3" SS UP

1/2" TRAP PRIMER UP

(TYP OF 7)

2" S(F)

IE = 3218.75'

4" FND

SEE CIVIL SHEET CG120

FOR CONTINUATION

IE = 3214.63'

4" SS

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.94'

4" SS

2" V UP

3" SS UP

TO FD-B

6" S(F)

IE = 3221.44'

6" S(F)

SEE CIVIL SHEET CG120

FOR CONTINUATION

IE = 3221.44'

2" S(F)

IE = 3218.38'

MENS

MENS SHOWER

WOMENS

WOMENS

SHOWER

3" SS

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-103

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A1

UNDER SLAB PLUMBING PLAN - AREA C

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

CONNECT FLOOR DRAINS IN ROOMS 106, 107, AND 108 TO

TRAP PRIMER ETP-101 LOCATED IN BOILER ROOM 107.

CONNECT FLOOR DRAINS IN ROOMS 102, 103, AND 118 TO

TRAP PRIMER ETP-102 LOCATED IN SOAP ROOM 102.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'

CONNECT FLOOR DRAINS IN ROOM 128 AND TRENCH

DRAINS IN CORRIDOR 103 TO TRAP PRIMER ETP-103

LOCATED IN WASH BAY EQUIPMENT ROOM 128.

KEYED NOTES

COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS

SHOWER HEAD.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.

TRANSITION PIPE TO 6".

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE BELOW STRUCTURAL FOOTING.

REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE WITH SPRINKLER CONTRACTOR FOR FINAL

LOCATION OF FLOOR DRAINS.

COORDINATE SLEEVE THRU STRUCTURE STEM WALL, IE =

3222.25'

ROUTE NATURAL GAS ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

1/2" TRAP PRIMER UP. TYPICAL OF 15.

ROUTE PIPING BELOW FOOTING. COORDINATE SLEEVE

BELOW FOOTING.

COORDINATE SLEEVE THRU STRUCTURAL STEM WALL FOR

TRAP PRIMER LINES. IE = 3222.25'.

TURN 2" S(F) PIPE UP AND TRANSITION TO 6" IN

HORIZONTAL. IE SHOWN IS FOR 6".

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

C

D

E

F

15 16

13129.2

HANGAR BAY 2

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

4" IW

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.94'

3" IW UP

TO FD-A

4" IW UP

TO FCO-B

4"

IW

4" IW

TRENCH DRAIN

3" IW UP

TO FD-A

4" IW UP

TO FCO-B

6" IW

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE = 3218.69'

6" IW

6" FD-E

4" V UP

4" IW UP

TO FCO-B

17 18

1 41 41 41 41 41 41 41 4

2 2 2 2

2" SS

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-104

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

A R

E A

D

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A3

UNDER SLAB PLUMBING PLAN - AREA D

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT

EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

KEYED NOTES

CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL

SHEET CU103 FOR CONTINUATION. IE = 3221.44'

DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR

TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.

COORDINATE INSTALLATION WITH STRUCTURAL.

COORDINATE FLOOR DRAIN TO BE LOCATED BELOW EEWS

SHOWER HEAD.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.

TRANSITION PIPE TO 6".

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE THROUGH STRUCTURAL FOOTING.

REFER TO STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

1.

2.

3.

1.

2.

3.

4.

5.

C

D

E

F

21 22

HANGAR BAY 2

M A

T C

H L

IN

E

P -1

TRENCH DRAIN

4" IW

4" IW UP

TO FCO-B

3" IW UP

TO FD-A

4" IW

4" IW UP

TO FCO-B

4" IW UP

TO FD-A

6" IW

6" IW

SEE CIVIL SHEET CU101

FOR CONTINUATION

IE = 3218.69'

6" FD-E

4" SS

SEE CIVIL SHEET CU103

FOR CONTINUATION.

IE = 3221.44'

19 20

1 41 41 41 41 41 41 41 4

2 2 2 2 2

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-105

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

A R

E A

E

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A3

UNDER SLAB PLUMBING PLAN - AREA E

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR DRAINS AT

EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

KEYED NOTES

CONNECT 4" DOOR TRACK PIPE TO STORM DRAIN. SEE CIVIL

SHEET CU101 FOR CONTINUATION. IE = 3221.44'

DOOR TRACK DRAINS REFER TO DETAIL H1 ON M-507. DOOR

TRACK DRAIN PIPING TO BE EMBEDDED IN FOOTER.

COORDINATE INSTALLATION WITH STRUCTURAL.

COORDINATE FLOOR DRAINS TO BE LOCATED BELOW EEWS

SHOWER HEAD.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY MASTIC.

TRANSITION PIPE TO 6".

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

1.

2.

3.

1.

2.

3.

4.

P B F

P

BFP

B F

P

A

B

C

D

E

F

14 15 16 21 221312111054321 6 7 8 9 9.1 9.2 17 18 19 20

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-110

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

O V

E R

A L L

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

3/64" = 1'-0" D1

GROUND FLOOR PLUMBING PLAN - OVERALL

32'16' 64'0 32'16' 64'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

1.

C

D

E

F

HANGAR BAY 1

M A

T C

H L

IN

E

P -1

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIREEWS-1

1 1/2" DCW

1 1/2" DCW

31' - 11" BOP EL

2" PCW

31' - 11" BOP EL

2 1/2" SOAP

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

1" DHWR

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1 1/2" CA

31' - 11" BOP EL

2" PCW

2" SOAP

2" PHW

1 1/2" CA

WH-1

HB-1

3/4" DCW

1 1/2" CA

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1" DHWR

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

2" SOAP

31' - 11" BOP EL

2" PCW

31' - 11" BOP EL

1 1/2" DCW

31' - 11" BOP EL

EEWS-1

FCO-B

TRENCH DRAIN

FCO-B

4" V UP

A

A1" CA

B

2 1/2" NG

31' - 11" BOP EL

IRH-103

IRH-102

1 1/2" NG

IRH-106 IRH-105

1 1/2" DHW

6" FD-E

1 1/2" NG

2" NG

1 1/2" NG

2" NG

32' - 11" BOP EL

FCO-B

1 1/4" NG

2" NG1 1/2" NG

31' - 11" BOP EL

FD-A

FD-A

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-111

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

A R

E A

A

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A4

GROUND FLOOR PLUMBING PLAN - AREA A

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW

25 FOOT ELEVATION IN HANGAR BAYS.

KEYED NOTES

REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER

DETAIL ON P-503.

LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.

CALIBRATED BALANCE VALVE SET TO 1.0 GPM.

1.

2.

1.

2.

3.

C

D

E

F

11105 6 7 8

9 9.1

HANGAR BAY 1

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

HB-1

2 1/2" PCW

2 1/2" PHW

WF-1

EEWS-1

1 1/2" CA

1 1/2" DHW

13' - 3" BOP EL

3/4" DCWWH-1

HB-1 EEWS-1

1 1/2" DCW

2" CA

13' - 2" BOP EL

2" CA

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1" DHWR

31' - 11" BOP EL

2" SOAP

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

1 1/2" DCW

31' - 11" BOP EL

2" PCW

2" SOAP

2" PHW

1 1/2" CA

TRENCH DRAIN

FCO-B

2" PHW

UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

A

A

B

2 1/2" NG

31' - 11" BOP EL

1 1/2" CA

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1" DHWR

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

2 1/2" SOAP

31' - 11" BOP EL

2" PCW

31' - 11" BOP EL

1 1/2" DCW

31' - 11" BOP EL

IRH-101

IRH-104

1 1/2" NG

IRH-107

1" NG

1 1/2" NG

2 1/2" NG

31' - 11" BOP EL

6" FD-E

3/4" DCW

FCO-B

2 1/2" PCW

32' - 11" BOP EL

3/4" DHW

1/2" DHWR

3/4" CA

1" CA

2" CA

2 1/2" SOAP

4" NG

27' - 10" BOP EL

1 1/2" DHW

4" NG

1" NG

2 1/2" PCW

2 1/2" SOAP

2 1/2" PHW

2 1/2" PCW

31' - 11" BOP EL

1" DHWR

13' - 2" BOP EL

1 1/2" DCW

13' - 2" BOP EL

2" SOAP

2" PCW

2" CA

FD-A

FD-A

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-112

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

A R

E A

B

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A2

GROUND FLOOR PLUMBING PLAN - AREA B

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW

25 FOOT ELEVATION IN HANGAR BAYS.

KEYED NOTES

REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER

DETAIL ON P-503.

LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.

SOAP PUMP ON / OFF VALVE. SEE SHEET P-403.

1.

2.

1.

2.

C

D

E

F

14 15 16131211107 8 9 9.1 9.2

PUMP/FOAM

ELEC

COMM

OPEN OFFICE

MULTI-PURPOSE

STORAGE

SECURE VEST

SECURE OFFICE

CORRIDOR

WASH BAY EQUIP

VEST 1

VEST 2

STORAGE

FLIGHT LINE

VESTIBULE

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

P-401 D11 P-402

C10

WH-1

3" DCW

9' - 11" BOP EL

1/2" DHW

10' - 8" BOP EL

2" DHW

FD-B

FCO-A

1" DHWR

13' - 11" BOP EL

2" DHW

13' - 11" BOP EL

1" DHWR

10' - 9" BOP EL

1 1/2" DHW

10' - 9" BOP EL

3/4" CA

10' - 0" BOP EL

2" CA

13' - 8" BOP EL

3" DCW

9' - 3" BOP EL

CORRIDOR

SK-1

P-403 C1

P-403 C2

P-404 C5

1" DHWR

12' - 11" BOP EL

TD-B TD-B

1/2" DHWR

10' - 8" BOP EL

ENTRY

VESTIBULE

FD-B

FD-B

B

3/4" CA

10' - 6" BOP EL

2" V UP

TD-B

3/4" DCW

3/4" DCW

FCO-B

EWC-1

2" DHW

13' - 1" BOP EL

1/2" DCW

14' - 0" BOP EL

3" DCW

2" CA

13' - 2" BOP EL

1" DHWR

13' - 2" BOP EL

1 1/2" DHW

13' - 3" BOP EL

3" DCW

13' - 2" BOP EL

3/4" CA

13' - 8" BOP EL

1/2" DHW

14' - 0" BOP EL

3" DCW

2" DHW

1" DHWR

2" CA

1 1/2" DHW

12' - 3" BOP EL

1/2" DHWR

12' - 7" BOP EL

2" V

3/4" DCW

2" V

10' - 6" BOP EL

2" CA

1" DHWR

1 1/2" V 2" V

B

HB-1

2" V DN

FD-B

1 1/2" V

2 1/2" PCW

13' - 2" BOP EL

2 1/2" PCW

2" V DN

SOAP

BOILER

MECH / AHU

SOAP

WOMENS

MENS SHOWER

MENS

NURSING

JAN

WOMENS SHOWER

1/2" DCW

13' - 3" BOP EL

2" DHW

ETP-103

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-113

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A1

GROUND FLOOR PLUMBING PLAN - AREA C

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

KEYED NOTES

DO NOT ROUTE PIPING INSIDE ROOM INDICATED.

SUMP PUMP CONTROL PANEL

PROVIDE 1/2" DOUBLE CHECK VALVE BACKFLOW

PREVENTER BFP-103, FOR CONNECTION TO ICE MAKER.

1/2" DCW TO ICE MAKER OUTLET BOX AT 2'-0" ABOVE FLOOR.

TAP 3/8" DCW CONNECTION TO DCW UNDER SINK. PROVIDE

ISOLATION VALVE AND DUAL CHECK BACKFLOW

PREVENTER (ASSE 1024) AND ROUTE 3/8" DCW THROUGH

CABINETRY AND THROUGH HOLE IN COUNTER FOR COFFEE

CONNECTION.

CALIBRATED BALANCE VALVE SET TO 0.5 GPM.

PROVIDE RESTROOM SHUT-OFF VALVES IN ACCESSIBLE

LOCATION.

1.

1.

2.

3.

4.

5.

6.

7.

C

D

E

F

15 16

13129.2

HANGAR BAY 2

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

EEWS-1

WH-1

HB-1

1 1/2" DCW

WF-1

EEWS-1

2" SOAP

1 1/2" CA

2 1/2" PCW

2 1/2" SOAP

2 1/2" PHW

1" DHWR

1 1/2" DHW

1 1/2" CA

3" PCW

31' - 11" BOP EL

2" SOAP

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

2" PCW

2" SOAP

2" PHW 1 1/2" CA

1 1/2" DCW

35' - 9" BOP EL

2" PCW

31' - 11" BOP EL

2 1/2" SOAP

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

1" DHWR

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1 1/2" CA

31' - 11" BOP EL

2" CA

31' - 11" BOP EL

FCO-B

FCO-B

TRENCH DRAIN

2 1/2" PHW

14' - 5" BOP EL

1 1/2" NG

31' - 11" BOP EL

A

IRH-108

IRH-114

1" NG

B

1" NG

FD-A

IRH-111

1 1/2" NG

6" FD-E

2 1/2" NG

31' - 11" BOP EL

4" NG

3/4" DCW

1 1/2" DHW

10' - 9" BOP EL

1" DHWR

10' - 9" BOP EL

2" CA

2 1/2" PCW

1 1/2" DCW

1 1/2" DHW

1/2" DCW

1/2" DHW

3" PCW

12' - 11" BOP EL

4" V UP

1/2" DHWR

14' - 0" BOP EL

2" CA

27' - 4" BOP EL

2 1/2" SOAP

14' - 5" BOP EL

FCO-B4

2" CA

1 1/2" DHW

1 1/2" DCW

35' - 9" BOP EL

1 1/2" DCW

2" PCW

1" CA DN

2" V A

17 18

FD-A

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-114

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

A R

E A

D

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A3

GROUND FLOOR PLUMBING PLAN - AREA D

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW

25 FOOT ELEVATION IN HANGAR BAYS.

KEYED NOTES

REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER

DETAIL ON P-503.

LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.

SOAP PUMP ON / OFF VALVE. SEE SHEET P-403.

SEE SHEET P-143 FOR CONTINUATION.

1.

2.

1.

2.

3.

4.

C

D

E

F

21 22

HANGAR BAY 2

M A

T C

H L

IN

E

P -1

EEWS-1

UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

1 1/2" DCW

1 1/2" DCW

35' - 9" BOP EL

2" PCW

31' - 11" BOP EL

2 1/2" SOAP

31' - 11" BOP EL

2" PHW

31' - 11" BOP EL

1 1/2" CA

31' - 11" BOP EL

HB-1

WH-1

3/4" DCW

1 UTILITY REELS:

(SOAP) SOAP SOLUTION

(PHW) PROCESS HOT WATER

(PCW) PROCESS COLD WATER

(CA) COMPRESSED AIR

EEWS-1

1" DHWR

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

1 1/2" CA

31' - 11" BOP EL

1 1/2" DHW

1 1/2" DCW

2" PHW

31' - 11" BOP EL

2" SOAP

31' - 11" BOP EL

2" PCW

31' - 11" BOP EL

1 1/2" DCW

35' - 9" BOP EL

FCO-B

TRENCH DRAIN

1" DHWR

31' - 11" BOP EL

1 1/2" DHW

31' - 11" BOP EL

2" PCW

2" SOAP

2" PHW

1 1/2" CA

2 1/2" NG

31' - 11" BOP EL

IRH-109

A

IRH-110

B

1" CA

A

IRH-112 IRH-113

6" FD-E

1" NG

2" NG

30' - 5" BOP EL

1 1/2" NG

1 1/2" NG

FCO-B

1 1/2" DHW

1 1/2" NG

31' - 11" BOP EL

19 20

2" NG

FD-A

FD-A

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-115

G R

O U

N D

F L O

O R

P L U

M B

IN

G

P L A

N

A R

E A

E

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/8" = 1'-0" A3

GROUND FLOOR PLUMBING PLAN - AREA E

8'4' 16'0

PLAN

NORTH

KEY PLAN

A B C D E

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

PROVIDE METAL JACKET ON ALL INSULATED PIPING BELOW

25 FOOT ELEVATION IN HANGAR BAYS.

KEYED NOTES

REELS TO BE OFF FLOOR, MOUNT TO STRUCTURE PER

DETAIL ON P-503.

LOCATE FLOOR DRAIN BELOW EEWS SHOWER HEAD.

CALIBRATED BALANCE VALVE SET TO 1.0 GPM.

1.

2.

1.

2.

C

D

E

F

14 15 16131211107 8 9 9.1 9.2

B9

M-301

B1

M-301

B9

M-302

B1

M-302

MAU-204

MAU-202

AR-102

AR-101

MAU-201

MAU-203

2" NG DN4" NG DN

2" NG

2" NG DN

2" NG

2" CA

TO AR-101

4" NG

2" V DN

2" V DN

FD-B

FD-B

FD-B

FD-B

MECHANICAL

PLATFORM

MECHANICAL

PLATFORM

3" V DN

3" VTR

3" VTR

2" V

2" V DN

3/4" DCW

3/4" DCW DN

1" CA DN

2" CA

3/4" CA DN

3/4" DHW DN

1/2" DHWR DN

2" CA DN

FROM AD-102

2" CA

27' - 4" BOP EL

3" VTR

2" V DN

3" VTR

2" CA

HB-1

3/4" DCW DN

FCO-A

FCO-A

ETP-102

ETP-104

HB-1

1 1/2" DCW

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-143

E Q

U

IP

M E

N T

L E

V E

L P

L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

PLAN

NORTH

KEY PLAN

A B C D E

1/8" = 1'-0" A1

EQUIPMENT LEVEL PLUMBING PLAN - AREA C

8'4' 16'0

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

KEYED NOTES

PRESSURE REGULATOR. 2 PSIG INLET, 8 IN WC OUTLET

PRESSURE.

REMOVEABLE HANDRAIL SECTION FOR MEZZANINE ACCESS,

DO NOT BLOCK PATH WITH PIPING.

1.

1.

2.

C

WOMENS

FCO-A 1/2" DHWR

TD-A

JAN

WOMENS

SHOWER

WC-2

WC-1

LAV-1

(TYP 2)

MB-1

FCO-A

2" V

2" V

2" V

2" V UP

4" SS DN

2" V DN

1 1/2" V

WCO

1 1/2" V

2" SS DN

2" SS

WCO

TD-B

2" V

3/4" DCW

FCO-B

1" DCW

1/2" DHW

1/2" DHW

1" DCW

1/2" DHW

1/2" DCW

1/2" DHW

WF-1

1 1/2" DHW

1 1/2" DCW

3" DCW

1 1/2" DHW

2" CA

1/2" DHWR

SK-1

2" CA

3/4" DHW

2" DCW

FD-B

EEWS-1

FCO-A

2" V DN

SH-2

2 1/2" PCW

1" DHW

1" DCW

1 1/2" DCW

1/2" DCW

1" DHWR

2" V

1/2" DHW

2" V DN

1 1/2" DHW

WCO

WCO

1 1/2" DCW

TP-101

2 1/2" PCW

1" DHWR

1 1/2" DHW

1 1/2" DCW

C

NURSING

WOMENS

4" SS

4" SS UP

TO FCO-A

JAN

WC-2 WC-1

LAV-1

(TYP 2)

WOMENS

SHOWER

2" SS UP

4" SS UP

MB-1

2" SS UP

2" SS UP

TO FD-A

WF-1

4" SS UP

TO TD-B

2" SS UP

2" SS

4" SS

2" V UP

4" SS UP

TO FCO-A

3" SS

TD-A

4" IW UP

TO FCO-B

3" IW UP

TO FD-A

3" SS UP

TO FCO-A

3" SS

SH-2

2" V UP

4" SS

2" V UP

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-401

E N

L A

R G

E D

P L U

M B

IN

G

P L A

N S

B

A T

H R

O O

M

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/4" = 1'-0" D11

ENLARGED GROUND FLOOR

PLUMBING PLAN - RESTROOM 115

0 2' 4' 8' 1/4" = 1'-0"

D3

ENLARGED UNDER SLAB

PLUMBING PLAN - RESTROOM 115

0 2' 4' 8'

PLAN

NORTH

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

FOR CONNECTION SIZES TO INDIVIDUAL FIXTURES SEE

PLUMBING FIXTURE SCHEDULE ON P-602.

SEE RISER DIAGRAMS FOR PIPING SIZES AND ROUTING NOT

SHOWN ON PLAN DRAWINGS.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

KEYED NOTES

CONNECT FLOOR DRAIN TO TRAP PRIMER TP-101.

CALIBRATED BALANCE VALVE SET TO 0.5 GPM.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

MOUNT SHUT-OFF VALVES FOR RESTROOM AREA IN

ACCESSIBLE LOCATION.

CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-103 IN ROOM

128.

COORDINATE SLEEVE THRU STRUCTURAL STEM WALL.

IE = 3222.44'

1.

2.

3.

4.

1.

2.

3.

4.

5.

C

14 1513

SH-1

(TYP 3)

TD-A

(TYP 2)

4" SS

LAV-1

(TYP 4)

UR-1

(TYP 2)

MENS SHOWER

MENS

MENS

CORRIDOR

UR-2

4" SS UP

TO FCO-A

3" SS UP

TO FD-A

2" SS UP

2" SS UP

WF-1

TD-B 5

CORRIDOR

VEST 2

4" SS UP

TO FCO-B

UR-1

3" SS UP

TO WCO/V

S S

S S

4" SS UP

TO FD-A

4" SS UP

TO FCO-A

2" SS

TO SH-1 (TYP 4)

WC-2

WC-1

(TYP 2)

SH-2

4" SS UP

3" SS

2" V UP

3" SS

2" SS

2" SS UP

4" SS

2" SS UP C

14 1513

SH-1

(TYP 3)

UR-1

LAV-1

(TYP 4)

MENS SHOWER

MENS

FCO-A

WCO

WCO

CORRIDOR

UR-2

FD-A

TD-A

(TYP 2)

2" SS DN

1 1/2" DCW

3/4" DHW

TD-B

FCO-B

3" V UP

2" DCW

WCO

1/2" DHWR

3" DCW

2" DHW

1" DHWR

2" CA

2" CA

1" DHWR

2" DCW

2" DHW

1 1/2" DCW

1 1/2" DHW

1/2" DCW

1/2" DHW

EEWS-1

WF-1

UR-1

(TYP 2)

WC-2WC-1

(TYP 2)

FCO-A

2 1/2" PCW

2" V

2" V 1 1/2" V1 1/4" V 1 1/2" V

2" V

2" V

1 1/2" DHW

SH-2

FD-A

2 1/2" PCW

4" SS2" SS

4" SS

4" SS DN

2" V DN

2" V

2" V DN

TP-102

2" SS DN

WCO

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-402

E N

L A

R G

E D

P L U

M B

IN

G

P L A

N S

B

A T

H R

O O

M

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

0 2' 4' 8'

1/4" = 1'-0" C2

ENLARGED UNDER SLAB

PLUMBING PLAN - RESTROOM 126

1/4" = 1'-0" C10

ENLARGED GROUND FLOOR

PLUMBING PLAN - RESTROOM 126

0 2' 4' 8'

PLAN

NORTH

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

FOR CONNECTION SIZES TO INDIVIDUAL FIXTURES SEE

PLUMBING FIXTURE SCHEDULE ON P-602.

SEE RISER DIAGRAMS FOR PIPING SIZES AND ROUTING NOT

SHOWN ON PLAN DRAWINGS.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100' EQUALS

CIVIL ELEVATION OF 3224.94'.

SEE DETAIL ON P-501 FOR URINAL DRAINAGE PIPING.

KEYED NOTES

CONNECT FLOOR DRAIN TO TRAP PRIMER TP-102.

COORDINATE SLEEVE THRU STRUCTURAL STEM WALL.

IE = 3222.4'

LOCATE RESTROOM SHUT-OFF VALVE IN ACCESSIBLE

LOCATION.

ROUTE PIPING ABOVE TOP OF FOOTING.

CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-103 IN ROOM

128.

1.

2.

3.

4.

5.

1.

2.

3.

4.

P

E

F

7 8

B9

M-301

B1

M-301

SOAP

2 1/2" PCW

14' - 11" BOP EL

HB-1

2 1/2" PHW

HB-1

T-101

AD-101

T-102

AC-101

ET-104

2" SOAP

0' - 11" BOP EL

2" SOAP

14' - 11" BOP EL

2" CA UP

TO AR-101

2" NG UP

2 1/2" PCW

WH-1

2" SOAP

FD-B

3" SS UP

TO FD-B

2" V UP

3" SS DN

3" SS UP

TO FD-BFD-B

FD-B

TMV-102

2 1/2" SOAP

3/4" DCW

15' - 5" BOP EL

3/4" DCW

3/4" DCW UP

B

C

1 1/2" SOAP DN

1 1/2" PCW DN

2 1/2" PCW

10' - 11" BOP EL

EEW

2 1/2" SOAP

14' - 11" BOP EL

1" CA

14' - 11" BOP EL

4" SOAP

3" SOAP

0' - 7" BOP EL

3/4" CA

15' - 0" BOP EL

3/4" CA

15' - 5" BOP EL

2" PCW

1" CA UP

1" CA

1" CA

3/4" CA UP

PWP-101

PWP-102

PWP-103

PWP-104

4" SOAP2 3

3/4" DCW

FCO-B

1" PCW DN

3" SS

15' - 8" BOP EL

2" CA

2" PCW

13' - 5" BOP EL

3/4" DCW

15' - 5" BOP EL

3/4" CA

3/4" DCW

FD-B

3/4" DHW

3/4" DHW

15' - 5" BOP EL

3/4" DHW UP

1/2" DHWR UP

2" CA

14' - 11" BOP EL

4" V

4" V

4" V

4" V

3" SS UP

TO FCO-A

2" V DN

2" V

2" NG DN

2" NG DN

2 1/2" PCW DN

2 1/2" PHW DN

2 1/2" PHW

2 1/2" PHW

PWH-101

PWH-102

3/4" DCW DN

E

F

15 16

B9

M-302

B1

M-302

SOAP

BFP-102

AC-102

AD-102

T-104

ET-105

T-103

WH-1

2" NG UP

3/4" DCW

2 1/2" PCW

2 1/2" NG

FD-B

FD-B

TMV-103

3" SS UP

TO FD-B 3" SS UP

TO FD-B

EEW

FD-B

2" NG

PWP-108

FD-B

2" CA

4" SOAP2" SOAP3 2

1 1/2" SOAP DN 4

C

3/4" CA

3" PCW

2" SOAP

0' - 11" BOP EL

4" SOAP4

3/4" CA

3/4" CA

2" SOAP

2" CA UP

3" SS

12' - 2" BOP EL

2 1/2" SOAP

1" CA

7' - 11" BOP EL

1" CA UP

1" CA

1" CA

PWP-107

PWP-105

PWP-106

2" DCW

1 1/2" DCW

3/4" DCW

FCO-B3/4" DHW

1" DHW

3" SS

FCO-B

3" DCWS

2" V UP

1/2" DHWR

3" PCW

2 1/2" PHW UP

2 1/2" SOAP

14' - 5" BOP EL

1" PCW

2 1/2" PHW

3" SOAP

3/4" CA

2" PCW

2 1/2" PCW

4" V

4" V

4" V

4" V

3/4" DCW

3/4" DCW UP

2" V

3" SS UP

TO FCO-A

WCO

2" V DN

182" V

FD-C

1" CA DN

3" PCW UP17

1 1/2" DCW

HB-1

3/4" DCW

1" DCW

1 1/2" PCW

2 1/2" PCW

12' - 11" BOP EL

2 1/2" PHW

2 1/2" SOAP DN

2 1/2" PHW

14' - 5" BOP EL

2 1/2" PHW DN

2 1/2" PHW DN

2 1/2" PCW DN

2" NG DN

PWH-104

PWH-103

TO AR-102

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-403

E N

L A

R G

E D

P L U

M B

IN

G

P L A

N S

S

O A

P R

O O

M S

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/4" = 1'-0" C1

ENLARGED GROUND FLOOR

PLUMBING PLAN - SOAP 102

1/4" = 1'-0" C2

ENLARGED GROUND FLOOR

PLUMBING PLAN - SOAP 108

0 2' 4' 8' 0 2' 4' 8'

PLAN

NORTH

PLAN

NORTH

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

COMPRESSED AIR EQUIPMENT SHALL BE PURCHASED AS

BID OPTION. CONTRACTOR SHALL PROVIDE PIPING,

ACCESSORIES, AND THE EQUIPMENT INSTALLATION

LOCATED INSIDE THE SOAP ROOMS AS PART OF BID

OPTION. CONTRACTOR SHALL PROVIDE ALL PIPING AND

ACCESSORIES LOCATED OUTSIDE THE SOAP ROOM AS

PART OF BASE BID.

SEE COMPRESSED AIR FLOW DIAGRAM ON DRAWING P-701

FOR COMPRESSED AIR ACCESSORIES AND PIPING NOT

SHOWN ON PLAN.

PROCESS WATER HEATERS AND SOAP SYSTEM EQUIPMENT

SHALL BE PURCHASED AS BID OPTION. CONTRACTOR SHALL

PROVIDE PIPING, ACCESSORIES, AND THE EQUIPMENT

INSTALLATION LOCATED INSIDE THE SOAP ROOMS AS PART

OF BID OPTION. CONTRACTOR SHALL PROVIDE ALL PIPING

AND ACCESSORIES LOCATED OUTSIDE THE SOAP ROOMS

AS PART OF BASE BID.

SEE SOAP SYSTEM FLOW DIAGRAM ON DRAWING P-703 FOR

ACCESSORIES AND PIPING NOT SHOWN ON PLAN.

SEE DETAIL ON P-504 FOR PIPING AT PROCESS WATER

HEATER AND ASSOCIATED RECIRC PUMP AND MIXING

VALVE.

KEYED NOTES

PRESSURE REGULATOR. 2 PSIG INLET, 13 IN WC OUTLET

PRESSURE.

ROUTE 4" TANK OVERFLOW DRAIN DOWN TO

APPROXIMATELY 24" ABOVE FLOOR AND TERMINATE

THROUGH WALL TO EXTERIOR. PROVIDE STAINLESS STEEL

SCREEN ON OUTLET.

ROUTE 2" SOAP PIPING DOWN TO TRUCK FILL CONNECTION,

SEE DETAIL ON SHEET P-505. PROVIDE HEAT TRACE ON

EXTERIOR PIPE AND 3 FEET INTO BUILDING.

ROUTE 1-1/2" SOAP PIPING DOWN TO APPROXIMATELY 48"

AFF AND PROVIDE DRUM PUMP PIPING CONNECTION.

CONNECT 2" SOAP PIPING TO BOTTOM OUTLET OF TANK

AND ROUTE TO PUMPS AS INDICATED.

ROUTE 4" TANK OVERFLOW DRAIN DOWN TO

APPROXIMATELY 12" ABOVE FLOOR AND TERMINATE WITH

FLAP CHECK VALVE.

CONNECT 3" SOAP PIPING TO BOTTOM OUTLET OF TANK

AND ROUTE TO PUMPS AS INDICATED.

ROUTE 3/4" CA AND 2" PCW DOWN TO OPERATOR FILL

STATION, SEE DETAIL ON P-505.

TANK SIGHT GLASS, DO NOT OBSTRUCT VIEW OF SIGHT

GLASS FROM AISLE.

ROUTE COMPRESSED AIR PIPING TO DIAPHRAGM PUMPS.

REFER TO DETAIL ON P-506 AND FLOW DIAGRAM ON P-606.

PROVIDE CALIBRATED BALANCE VALVE SET TO 0.5 GPM.

PROVIDE 1" CA VALVE AT APPROXIMATELY 48" ABOVE

FLOOR. PROVIDE SIGNAGE INDICATING "SOAP PUMPS ON /

OFF VALVE".

CONNECT FLOOR DRAINS IN ROOMS 102 AND 103 TO TRAP

PRIMER ETP-102 LOCATED ON MEZZANINE ABOVE SOAP

ROOM 102. ROUTE TRAP PRIMER TUBING PROTECTED IN

CONDUIT OR PIPE.

5 MICRON COALESCING FILTER.

CONNECT FLOOR DRAIN TO TRAP PRIMER ETP-102 LOCATED

ON MEZZANINE ABOVE SOAP ROOM 102. ROUTE DRAIN

PIPING AS HIGH AS POSSIBLE.

TERMINATE 4" TANK VENT THROUGH WALL TO EXTERIOR.

PROVIDE ELBOW DOWN WITH STAINLESS STEEL SCREEN

ON OUTLET.

SEE SHEET P-143 FOR CONTINUATION.

CONNECT FLOOR DRAIN TO TRAP PRIMER FROM ETP-104

LOCATED ON MEZZANINE ABOVE SOAP ROOM.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

P

BFP

E

F

1413129.2

EEW

WATER

METER

GAS METER

2" NG DN

ET-101

WS-101

ET-103

DWH-101

SALT PALLET

BFP-101

BOILER

4" NG

4" NG UP

HWB-101

HWB-102

2 1/2" NG

2 1/2" NG

FD-B

FD-B

FD-B

BFP-104

SG-101

DOAS-101

ET-102

FD-B

FD-B

3/4" DCW

3/4" DCW

HB-1

TMV-101

RP-101

HWB-103

FURN-101

FD-B

FD-B

2" NG

2" DHW

ET-104

1" DHWR

3" DCW

1/2" DCWS

1" DCWS

1 1/2" NG

DWB-101

2" V UP

DDC PANELS

1" DCWS

3" DCWS

5 2" DCWS

3/4" NG

HB-1

3/4" DCW

SUMP PUMP

CONTROL PANEL

MECH / AHU

3" DCW

2" DCW

2" DCW

4" DCW DN

4" DCW

1" DHW

1" DHW

1 1/2" DHW

2" DCWS

1/2" DCWS

3" DCWS

FCO-B

DWB-101

CONTROLLER

3" DCWS

2" V

2" DCW

1" DHW

FD-B

4" SS DN

FD-C

FD-D

3" DCW

2" V

2" V 2" V

3" SS

3" SS DN

2" V

ETP-101

HS-101

4" NG

2" NG

4" NG

WH-1

2" V DN

FD-B

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

B L E

G R

E

ID

E L

A F

D R

A W

IN

G

C O

D E

O M

A H

A D

IS

T

R

IC

T C

A P

IT

O

L A

V E

N U

E O

M A

H A

N

E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F

X B

M F

Y

B -2

W

A S

H R

A C

K A

N D

M A

IN

T

E N

A N

C E

H A

N G

A R

W

A S

H R

A C

K

O C

T O

B E

R

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

A

M -0

D E

S

IG

N I S

S U

E D

F O

R P

R

IC

IN

G

O C

T

P-404

E N

L A

R G

E D

P L U

M B

IN

G

P L A

N

B O

IL

E

R R

O O

M

T K

A R

R E

C P

IE

R

A T

T

L D

A N

A H

E R

1/4" = 1'-0" C5

ENLARGED GROUND FLOOR

PLUMBING PLAN - BOILER ROOM

0 2' 4' 8'

PLAN

NORTH

GENERAL NOTES

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND, SYMBOLS

& ABBREVIATIONS.

SEE DETAIL ON P-505 FOR PIPING AT DOMESTIC WATER

HEATER, RECIRC PUMP AND MIXING VALVE.

KEYED NOTES

EMERGENCY GAS SHUT-OFF VALVE.

PRESSURE REGULATOR. 2 PSIG INLET, 10 IN WC OUTLET

PRESSURE.

PROVIDE 3" PRESSURE REDUCING VALVE SET TO 65 PSIG IN

VERTICAL PIPE.

3" CONNECTIONS TO WS-101. PIPE 1-1/2" DRAIN FROM

WS-101 TO FD-D.

PROVIDE 2" PRESSURE REDUCING VALVE SET TO 65 PSIG IN

VERTICAL PIPE.

3/4" DCW AND 3/4" DHW DOWN TO EMERGENCY EYEWASH.

DO NOT ROUTE PIPING AROUND ACCESS LADDER.

ROUTE 1/2" DCWS FROM OUTLET OF BFP-104 TO STEAM

GENERATOR.

SEE P-143 FOR CONTINUATION.

1.

2.

1.

2.

3.

4.

5.

6.

7.

8.

9.

V E

N T

E X

T E

N S

IO

N

A S

R E

Q U

IR

E

D

VENT PIPE 3" MIN.

MASTIC

STAINLESS STEEL

CLAMPING RING

EPDM PREMOLDED

PIPE SEAL

SPLICING CEMENT

LAP SEALANT

METAL ROOF

METAL DECK

ROOF PENETRATION

BY ROOF MFGR.

INCREASER

IF REQUIRED

VENT

WALL SURFACE

CLEANOUT PLUG

ROUND POLISHED STAINLESS

STEEL WALL COVER PLATE

(NOT REQUIRED UNLESS

LOCATED IN WALLS)

COUNTERSUNK SCREW

SCREWED COUNTERSUNK PLUG

OPENING CUT-OUT IN WALL

HORIZO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .