This document provides details for federal contract opportunity Solicitation Number W9128F-21-R-0051 for the construction of a B-21 Washrack and Maintenance Hangar at Ellsworth Air Force Base in South Dakota. The U.S. Army Corps of Engineers District Omaha is seeking proposals for building a washrack and hangar to service the new B-21 bomber. Interested parties can access the full solicitation documents through the Projnet plan room using the provided quick add key. Proposals are due based on the dates specified in the solicitation documents available on Projnet. The opportunity is designated for unrestricted competition among all qualifying contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0011.pdf | ||
| Am_0010_Dwgs_Vol1.pdf | ||
| Am_0010_Dwgs_Vol3.pdf | ||
| Am_0010.pdf | ||
| Am_0009.pdf | ||
| Am_0007.pdf | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME I-.pdf | ||
| Am_0003.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME III.pdf | ||
| W9128F21R0051_Specifications_Am3.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME II.pdf | ||
| Am_0002.pdf | ||
| Am0001_W9128F21R0051.pdf | ||
| 21-R-0051_Specifications.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0008 W9128F
B-21: WASHRACK AND MAINTENANCE HANGAR AT ELLSWORTH AFB, SD
See attached documentation for content of the changes to RFP
Date for receipt of proposals is 17 FEB 2022 at 1400 hours
Government Point of Contact: Nancy Garside, Contract Specialist, via e-mail to Gloria.Garside@usace.army.mil
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-21-R-0051
01/28/2022
09/21/2021
01/28/2022
Am #0008 - 1
Am #0008 - 2 (Continuation SF 30)
28 JAN 2022
Solicitation No. W9128F21R0051
Date of Issue: 21 SEP 2021 New Date of Receiving Volume II Proposals: 17 FEB 2022
SUBJECT: Amendment No. 0008 to Request for Proposal (RFP) Solicitation Package for Construction of
B-21: WASHRACK AND MAINTENANCE HANGAR AT ELLSWORTH AFB, SD
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form 1442 (SF1442), Page 00 10 00-1, item 13.A., delete the time and date for proposal receipt and substitute “1600” and
“17 FEB 2022”.
(2) Section 00 21 00, Page 23, paragraph 1.26.1 “BIDDER INQUIRY”, delete the first sentence “Technical inquiries and...receipt of offers.” and substitute the following:
“Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/ No Later Than 1600 Central on 4 FEB 2022, in order that they may be given consideration or actions taken prior to receipt of offers.”
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added 01 14 00 01 14 00 ** 01 14 00AT – EAFB Entry Authority List (EAL)
Instructions (add attachment) 01 30 00.24 01 30 00.24 07 42 63 07 42 63 21 13 25 ** (delete section) 21 30 00 ** (delete section) 28 31 76 28 31 76 ** 28 31 76AT – Preliminary & Final Hangar Fire
Suppression/Detection Acceptance Testing (PAT & FAT) (add attachment)
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
Am #0008 - 3
VOLUME I OF III:
(1) Sheet G-002, INDEX TO DRAWINGS VOLUME 1
(2) Sheet CP102, PAVEMENT JOINTING PLAN - AREA 2
(3) Sheet CP104, PAVEMENT JOINTING PLAN - AREA 4
(4) Sheet S-001, GENERAL NOTES
(5) Sheet S-130, BOTTOM CHORD FRAMING PLAN - OVERALL
(6) Sheet S-131, BOTTOM CHORD FRAMING PLAN -AREA A
(7) Sheet S-132, BOTTOM CHORD FRAMING PLAN - AREA B
(8) Sheet S-133, BOTTOM CHORD FRAMING PLAN -AREA C
(9) Sheet S-140, ROOF FRAMING PLAN - OVERALL
(10) Sheet S-141, ROOF FRAMING PLAN - AREA A
(11) Sheet S-142, ROOF FRAMING PLAN - AREA B
(12) Sheet S-143, ROOF FRAMING PLAN - AREA C
(13) Sheet S-221, GIRT ELEVATIONS - GRID F
(14) Sheet S-222, GIRT ELEVATIONS - GRIDS 1 & 22
VOLUME II OF III:
(1) Sheet A-011, AIRCRAFT CLEARANCE REQUIREMENTS SECTIONS
(2) Sheet A-110, OVERALL GROUND FLOOR PLAN
(3) Sheet A-111, GROUND FLOOR PLAN – AREA A
(4) Sheet A-112, GROUND FLOOR PLAN – AREA B
(5) Sheet A-113, GROUND FLOOR PLAN – AREA C
(6) Sheet A-150, OVERALL GROUND FLOOR REFLECTED CEILING PLAN
(7) Sheet A-152, GROUND FLOOR REFLECTED CEILING PLAN – AREA B
(8) Sheet A-160, OVERALL PLATFORM LEVEL REFLECTED CEILING PLAN
(9) Sheet A-161, PLATFORM LEVEL REFLECTED CEILING PLAN – AREA A
(10) Sheet A-162, PLATFORM LEVEL REFLECTED CEILING PLAN – AREA B
(11) Sheet A-163, PLATFORM LEVEL REFLECTED CEILING PLAN – AREA C
(12) Sheet A-301, BUILDING SECTIONS
(13) Sheet A-302, BUILDING SECTIONS
(14) Sheet A-303, BUILDING SECTIONS
(15) Sheet A-312, WALL SECTIONS
(16) Sheet A-551, MISCELLANEOUS DETAILS
(17) Sheet A-701, ROOM FINISH SCHEDULE AND LEGEND
(18) Sheet AG002, ARCHITECTURAL GENERAL NOTES
(19) Sheet F-001, LIFE SAFETY CODE AND CRITERIA
(20) Sheet FA001, FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS
(21) Sheet FA101, GROUND FLOOR FIRE ALARM PLAN -AREA A AND B
Am #0008 - 4
(22) Sheet FA102, GROUND FLOOR FIRE ALARM PLAN -AREA C
(23) Sheet FA103, GROUND FLOOR FIRE ALARM PLAN -AREA D AND E
(24) Sheet FA104, GROUND FLOOR FIRE ALARM PLAN -HEAT DETECTION -
AREA A AND B
(25) Sheet FA105, GROUND FLOOR FIRE ALARM PLAN -HEAT DETECTION -
AREA D AND E
(26) Sheet FA401, FIRE ALARM ENLARGED PLANS AND DETAILS
(27) Sheet FA501, FIRE ALARM DETAILS
(28) Sheet FA601, FIRE ALARM ONE-LINE DIAGRAM
(29) Sheet FA602, FIRE ALARM MATRIX
(30) Sheet FA603, RELEASING SYSTEM ALARM CONTROL PANEL
(31) Sheet FX001, FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
(32) Sheet FX101, GROUND FLOOR FIRE SUPPRESSION PLAN -AREA A AND B
(33) Sheet FX102, GROUND FLOOR FIRE SUPPRESSION PLAN -AREA C
(34) Sheet FX103, GROUND FLOOR FIRE SUPPRESSION PLAN -AREA D AND E
(35) Sheet FX401, FIRE SUPPRESSION ENLARGED PLANS AND DETAILS
(36) Sheet FX501, FIRE SUPPRESSSION RISER DIAGRAMS AND DETAILS
VOLUME III OF III:
(1) Sheet EG501, GROUNDING DETAILS
(2) Sheet EP101, POWER PLAN - AREA A
(3) Sheet EP102, POWER PLAN - AREA B
(4) Sheet EP103, POWER PLAN - AREA C
(5) Sheet EP104, POWER PLAN - AREA D
(6) Sheet EP105, POWER PLAN - AREA E
(7) Sheet EP601, ONE-LNE DIAGRAM
(8) Sheet EP701, PANELBOARD SCHEDULES
(9) Sheet EP703, PANELBOARD SCHEDULES
(10) Sheet EP710, MECHANICAL EQUIPMENT CONNECTION SCHEDULE
(11) Sheet M-602, HVAC SCHEDULES
(12) Sheet M-710, HVAC CONTROLS -MAU-203 SCHEMATIC
(13) Sheet M-718, HVAC CONTROLS -HIGH BAY EQUIPMENT SCHEMATIC
(14) Sheet M-720, HVAC CONTROLS -IW DIVERSION VALVE
(15) Sheet P-904, DOMESTIC WATER RISER
d. Drawings (Deleted). The following drawings are deleted with this amendment due to a determination that draft curtains and foam generators are no longer required for this facility.
Am #0008 - 5
VOLUME I OF III:
(16) Sheet S-536, DRAFT CURTAIN DETAILS
(17) Sheet S-590, HIGH EXPANSION FOAM GENERATOR FRAMING DETAILS
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the SF30. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electronic Offers will be received until 2:00 p.m. on 17 FEB 2022, local time at place of receiving proposals (CST), as stated in the RFP.
Attachments:
Section 00 10 00 – SF1442 and CLIN Pricing Schedule Specifications listed in 1.b., above Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
28 JAN 2022
nep/2160
This page was intentionally left blank for duplex printing.
00 10 00 Page 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-21-R-0051
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
21 SEP 2021
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
9. FOR INFORMATION
E-MAIL:
a. NAME Nancy Garside
b. E-MAIL ADDRESS Gloria.Garside@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
B-21: WASHRACK AND MAINTENANCE HANGAR
ELLSWORTH AFB, SOUTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
THIS SOLICITATION IS UNRESTRICTED, i.e., OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION.
11. The Contractor shall begin performance within 10 calendar days and complete it within 900* calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (* - See CLIN Pricing Schedule)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 17 FEB 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due. (* - See Section 00 22 00)
b. An offer guarantee is is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than ___ 90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442(REV. 8/2014)
Prescribed by GSA - FAR(48 CFR) 53.236-1(d)
Am #0008
00 10 00 Page 2
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS or Unique Entity Identifier Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. AWARD DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
CLIN SCHEDULE 00 10 00 – 3 W9128F-21-R-0051
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM
NO.
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
0001 Entire work complete for Construction of the B-21 Washrack and Maintenance Hangar, complete to the five-foot line, excluding items separately listed below.
Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)
1 Job XXX $_____________________
0002 Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the B-21 Washrack and Maintenance Hangar, excluding items listed separately below. (MILCON)
1 Job XXX $_____________________
0003 Entire work complete for Demolition of Dock 61, 62 and associated existing Features, Paving, Airfield Paving, Utilities and Infrastructure on the B-21 Washrack and Maintenance Hangar site excluding items separately listed below and as communicated in the Demolition drawings and specifications. (MILCON)
1 Job XXX $_____________________
0004 Entire work complete for Construction of all Flightline paving - including Airfield Concrete and Airfield Ground Support Equipment (GSE) paving – to include all site preparation, base, drainage layer, underdrains, earthwork, underdrains, and striping - excluding bid option paving listed separately below. (MILCON)
1 Job XXX $_____________________
0005 Entire work complete for cybersecurity documentation, and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements. (MILCON)
1 Job XXX $_____________________
TOTAL BASIC AMOUNT $_____________________________
CLIN SCHEDULE 00 10 00 – 4 W9128F-21-R-0051
OPTION ITEMS
[Option]
Entire work complete for Procurement and Installation of a 5-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.16 in lieu of a 3-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.15. (MILCON)
Job
XXX
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of compressed air and soap equipment. (O&M)
Cybersecurity of preconditioned air units.
(O&M)
Entire work complete for Construction of additional asphalt shoulders - to include all associated site preparation, base, earthwork, and striping. (MILCON)
Installation of CIPP liners. (MILCON)
Installation of FF&E. (O&M)
Cybersecurity of Intrusion Detection System (IDS), and Access Control System
(ACS). (O&M)
Entire work complete for temporary Government trailer facilities during construction as indicated in this Contract.
(O&M or MILCON, depending upon occupancy)
Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M)
CLIN SCHEDULE 00 10 00 – 5 W9128F-21-R-0051
Entire work complete for removal and disposal of additional asbestos containing material (ACM) in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
2,500
SF
disposal of additional asbestos containing material (ACM) in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, LF
Entire work complete for additional removal and disposal of contaminated soils (Category 3 soils as defined in Specification 02 61 13) not previously identified in the project hazardous material survey documentation and not otherwise included in the basic amount. (MILCON)
CY
disposal of non-adhered lead based paint in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
10,000
SF
disposal of additional ACM piping not previously identified in the project hazardous material survey documentation, 1,000
LF
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0006 and 0010 within 90 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0007 – 0009 and 0011 - 0014 within 730 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0015 - 0019 within 365 days of Notice to Proceed. Abbreviation: Operations and Maintenance (O&M).
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of
CLIN SCHEDULE 00 10 00 – 6 W9128F-21-R-0051
variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.
4. Contract duration is 900 calendar days for award basic and option items. No contract duration extension will be provided upon award of any combination of option items.
5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.
CLIN SCHEDULE 00 10 00 – 7 W9128F-21-R-0051
SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE
TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT
AS INDICATED ON PAGE 3 AND 4 OF THIS SECTION 00 10 00
DIVISION MASTERFORMAT 2016 DESCRIPTION UNIT AMOUNT
01 GENERAL REQUIREMENTS (minus item 0101) LS $_______________
0101 01 33 29 Sustainability Documentation LS $_______________
02 EXISTING CONDITIONS LS $_______________
03 CONCRETE LS $_______________
04 MASONRY LS $_______________
05 METALS LS $_______________
06 WOOD, PLASTICS, AND COMPOSITES LS $_______________
07 THERMAL AND MOISTURE PROTECTION LS $______________
08 OPENINGS LS $_______________
09 FINISHES LS $_______________
10 SPECIALTIES LS $______________
11 EQUIPMENT LS $_______________
12 FURNISHINGS LS $_______________
13 SPECIAL CONSTRUCTION LS $_______________
14 CONVEYING EQUIPMENT LS $_______________
21 FIRE SUPPRESSION LS $_______________
22 PLUMBING LS $______________
23 HEATING, VENTILATING, AND AIR CONDITIONING LS $_______________
25 INTEGRATED AUTOMATION LS $_______________
26 ELECTRICAL LS $_______________
27 COMMUNICATIONS LS $_______________
28 ELECTRONIC SAFETY AND SECURITY LS $_______________
31 EARTHWORK LS $_______________
32 EXTERIOR IMPROVEMENTS LS $_______________
33 UTILITIES LS $_______________
34 TRANSPORTATION LS $_______________
Total Price Breakdown Amount
Prime Contractor Markups:
--G&A General and Administrative Expense $ ______________ --FOOH Field Office Overhead not defined by Division -01 $ ______________ --PROFIT Profit $ ______________ --P&PB Performance and Payment Bond $ ______________
TOTAL WITH MARKUPS
All items must be entered in dollars.
“TOTAL WITH MARKUPS” from this Price Breakdown must match the “TOTAL BASIC
AMOUNT”.
This page was intentionally left blank for duplex printing.
B-21: Washrack & Maintenance Hangar (Washrack) - Ellsworth AFB EL94
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Secure Area(s)
1.2.2 Construction Secure Area Perimeter
1.2.2.1 CSP and Secure Area Implementation
1.2.3 Security and Site Access Management Plan (SSAMP)
1.2.4 US Persons
1.3 SUBMITTALS
1.4 PROJECT SECURITY AND SITE ACCESS MANAGEMENT PLAN (SSAMP)
1.5 ORDER OF WORK RESTRICTIONS
1.5.1 Desire for Innovation
1.6 DOCUMENT CONTROL
1.7 BASE ACCESS AND SECURITY
1.7.1 General
1.7.2 Base Hours
1.7.3 Scheduled and Unscheduled No Work Days
1.7.3.1 Operational Delays
1.7.3.2 Right to Deny Entry onto Base
1.7.4 Activity Regulations
1.7.4.1 Subcontractors and Personnel Contacts
1.7.4.2 Identification Badges and Installation Access
1.7.4.3 No Smoking Policy
1.8 RESTRICTED AREA (RA) ACCESS AND SECURITY (AS REQUIRED)
1.8.1 Right to Deny Entry into Restricted Area
1.8.2 RA Badging
1.8.3 Contractor-Provided Escorts
1.8.3.1 Escort Ratios
1.8.3.2 Self-Escort Badging
1.8.3.3 Cleared American Guards (CAGs)
1.9 FREE ZONE ACCESS AND SECURITY (AS REQUIRED)
1.10 SECURE AREA OVERSIGHT
1.10.1 Supplemental Secure Area Access Control and
Surveillance/Oversight (Bid Option)
1.10.1.1 Oversight (Surveillance) Responsibilities and Ratios
1.10.1.2 Cleared American Surveillance Technicians (CASTs)
1.10.1.3 Non-cleared American Surveillance Technicians (NASTs)
1.11 PROJECT "SECURE AREA" ACCESS AND SECURITY
1.12 ACCESS AND SECURITY ROLES AND RESPONSIBILITIES
1.12.1 Access to Construction Site
1.12.2 Access Within Construction Secure Area Perimeter
1.12.2.1 Contractor Responsibilities
1.12.2.2 Government Responsibilities
1.12.3 Access Within RA, Outside Secure Area Perimeter, within established Free Zone
SECTION 01 14 00 Page 1Am #0008
1.12.3.1 Contractor Responsibilities
1.12.3.2 Government Responsibilities
1.12.4 Access Within RA, Outside Secure Area Perimeter, no Free Zone
1.12.4.1 Contractor Responsibilities
1.12.4.2 Government Responsibilities
1.12.5 Work On or Around RA Perimeter Fence
1.12.5.1 Contractor Responsibilities
1.12.5.2 Government Responsibilities
1.12.6 Requesting New or Revised Construction Secure Area
Perimeter(s)
1.12.7 Requesting New Free Zones within RA
1.13 INFORMATION ACCESS
1.14 COMMUNICATIONS SECURITY (COMSEC) MONITORING
1.15 RECORDING DEVICES
1.15.1 Secure Area Sign
1.16 RADIOS
1.17 CELLULAR PHONES
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
EAFB Entry Authority (EAL) Instructions
-- End of Section Table of Contents --
SECTION 01 14 00 Page 2Am #0008
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
[*Am-8] Attachments: EAFB Entry Authority (EAL) Instructions. [**Am-8]
1.1 REFERENCES
The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICD/ICS 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ICS 705-1 Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
ICS 705-2 Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information
UNITED STATES AIR FORCE (USAF)
AFI 31-101 Integrated Defense
AFI 16-1404 Air Force Information Security Program
AFI 16-1406 Air Force Industrial Security Program
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
DODM 5200.01 DoD Information Security Program (Volumes 1-3)
DODM 5205.07 (Volume 3) DoD Special Access Program (SAP) Security Manual: Physical Security
UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, and Construction, with Change 1, dated 1 October 2013
SECTION 01 14 00 Page 3Am #0008
[*Am-8] Attachments: EAFB Entry Authority (EAL) Instructions. [**Am-8]
1.2 DEFINITIONS
See the design drawings and specifications for descriptions of major components of work under this project to include, but not limited to "Secure Area," "open-storage area," etc.
1.2.1 Secure Area(s)
Areas identified in the design documents as "secure areas" shall be designed, constructed, and accredited to the criteria listed below. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria:
The listed criteria carries impacts to all building systems within the designated boundary. Use the most current version of the referenced criteria available at the bid submission deadline:
a. ICD/ICS 705 - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities.
https://www.dni.gov/files/Governance/IC-Tech-Specs-for-Const-and-Mgmt-of-SCIFs-v15
b. ICS 705-1 - Physical and Technical Security Standards for Sensitive Compartmented Information Facilities.
c. ICS 705-2 - Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information.
d. UFC 4-010-05 - Sensitive Compartmented Information Facility Planning, Design and Construction.
e. DODM 5205.07 - DoD Special Access Program (SAP) Security Manual:
Physical Security
The design drawings and specifications indicate the technical mitigations required by the project. This specification indicates the Contractor and Government's role(s) in administering the secure areas during construction for accreditation by assigned authorities.
1.2.2 Construction Secure Area Perimeter
A potentially moving boundary established during project construction by which the SSO and SSM assign layers of oversight for purposes of Construction Security Plan (CSP) implementation in compliance with ICD/ICS 705 and DODM 5205.07. This perimeter is established by a site perimeter fence (described below and in the design drawings) early in construction and prior to the construction of the physical, permanent secure area boundaries as defined in the facility floor plans. Once the permanent secure area boundaries are substantial enough to establish effective access control (as determined by the SSM), the boundary may be re-established by the SSM to isolate secure area construction and materials from non-secure area construction for more effective secure area oversight. Continuity of the secure area perimeter must be maintained by the Contractor (via a combination of temporary and/or permanent construction) for the entirety of contruction from CSP implementation through facility turnover. Coordinate the perimeter(s) and transtions from one CSP implementation perimeter to another with the SSM and with the anticipated order of construction, through the duration of the project.
SECTION 01 14 00 Page 4Am #0008
1.2.2.1 CSP and Secure Area Implementation
[*Am-8] This project contains multiple secure areas within a combined facility perimeter. CSP implementation will occur on the entirety of this project within the parameters described below:
a. Secure area oversight and administration per secure area criteria referenced below will occur on both hangar bays as well as two rooms totaling approximately 1,000 SF in the admin/shop area of the proposed facility. Each of the spaces will be bound by their own secure area boundary. Exact room(s) to be identified to the awarded contractor after construction contract award. All other work under this project is not considered secure area work unless referenced otherwise.
b. The Government does not intend to establish a secure area perimeter and access control until site preparation and grading for the Washrack is complete, but the contractor shall submit an approach for Government approval in the SSAMP. Excavation for foundations may occur without a secure perimeter established, but any construction or placement of construction materials (concrete, steel, masonry, reinforcing, conduit, etc.) within the facility footprint must occur after a perimeter is secured and access control is established.
Initial secure boundaries will be established at the construction site perimeter fence and may be reduced upon SSM approval as decribed in "Construction Secure Area Perimeter" paragraph above.
c. During construction, the Contractor shall continuously notify the Government when construction secure area perimeters and secure material storage areas are intented to be established and/or revised depending upon the nature of work being performed. This shall be discussed during established weekly meetings so that the Government may position personnel to carry out inspection and oversight of those activities, materials, and features of work. The Government reserves the right to segregate and compartmentalize materials from the established stock for installation and/or inspection as part of the secure area perimeter. All materials intended to be installed in a project secure area shall be stored within a fenced perimeter on the project site - unless apprroved otherwise, in writing, by the SSM. The Contractor shall provide a high security lock and keys by which to secure each perimeter at the end of each work day. The SSM shall be provided with sole keyed access to any secure material storage area(s) and the SSM reserves the right to track entry and egress from the storage area(s). Secure area material storage areas will be secured by the SSM after the end of each work day and re-opened by the SSM each day. [**Am-8]
d. The Government will establish and man the access-controlled secure area and secure area material storage perimeter(s) - either at secureable building and/or room boundaries, or at contractor-provided fenced boundaries as indicated in the design drawings. The point at which access control is established may vary as each respective facility [*Am-8] (and perimeter) is constructed and secured. The Government does not intend to dictate the specific [**Am-8] time at which individual perimeters are established as long as the security of each facility is continually maintained as each facility is constructed. The Contractor shall notify the Government NLT 30 Days in advance when they anticipate any features of work will be ready for
SECTION 01 14 00 Page 5Am #0008
[*Am-8] (and perimeter) is constructed and secured. The Government does not intend to dictate the specific [**Am-8]
[*Am-8] This project contains multiple secure areas within a combined facility perimeter. CSP implementation will occur on the entirety of this project within the parameters described below:
a. Secure area oversight and administration per secure area criteria referenced below will occur on both hangar bays as well as two rooms totaling approximately 1,000 SF in the admin/shop area of the proposed facility. Each of the spaces will be bound by their own secure area boundary. Exact room(s) to be identified to the awarded contractor after construction contract award. All other work under this project is not considered secure area work unless referenced otherwise.
b. The Government does not intend to establish a secure area perimeter and access control until site preparation and grading for the Washrack is complete, but the contractor shall submit an approach for Government approval in the SSAMP. Excavation for foundations may occur without a secure perimeter established, but any construction or placement of construction materials (concrete, steel, masonry, reinforcing, conduit, etc.) within the facility footprint must occur after a perimeter is secured and access control is established.
Initial secure boundaries will be established at the construction site perimeter fence and may be reduced upon SSM approval as decribed in "Construction Secure Area Perimeter" paragraph above.
c. During construction, the Contractor shall continuously notify the Government when construction secure area perimeters and secure material storage areas are intented to be established and/or revised depending upon the nature of work being performed. This shall be discussed during established weekly meetings so that the Government may position personnel to carry out inspection and oversight of those activities, materials, and features of work. The Government reserves the right to segregate and compartmentalize materials from the established stock for installation and/or inspection as part of the secure area perimeter. All materials intended to be installed in a project secure area shall be stored within a fenced perimeter on the project site - unless apprroved otherwise, in writing, by the SSM. The Contractor shall provide a high security lock and keys by which to secure each perimeter at the end of each work day. The SSM shall be provided with sole keyed access to any secure material storage area(s) and the SSM reserves the right to track entry and egress from the storage area(s). Secure area material storage areas will be secured by the SSM after the end of each work day and re-opened by the SSM each day. [**Am-8] access control to be established.
e. CSP implementation will only occur on the project onces the SSAMP is approved and the secure area and secure area material storage perimeter(s) are constructed (by the Contractor) and secureable by the SSM. The contractor may perform work around and outside the secure area perimeter, but no construction that conceals a volume, void, or that transverses or penetrates the secure area perimeter/volume on the secure or unsecure side will be allowed without written approval by the Government. This would include ductwork, piping, conduit, and equipment that occurs within the secure perimeter walls, plenum, or within the secure space itself. These features may be routed to the perimeter of the secure area, but shall not penetrate that boundary until Government oversight is in place. CSP implementation will occur from that point through the entire duration of construction to include procurement and installation of any bid options.
f. Once the perimeter is coordinated and established, access to the space will be exclusively through the Government's access control procedures as defined herein. Any deviations from the procedures herein must be coordinated with USACE and the SSM in writing.
Contractor responsibilities associated with CSP implementation will only terminate upon full Government acceptance of all work on and within the secure area perimeter and upon the Contractor's departure from the project site - including procurement and installation of any bid options awarded under this contract. While it is the Contractor's responsiblity to establish the order of work within the constraints established within this Contract, no work on or within the 6-sided perimeter of the secure area shall occur without implementation of Government and Contractor responsibilities associated with the approved CSP - as described herein.
The Contractor shall document their intended order of work and required points of interface with CSP requirements in the Security and Site Access Management Plan as defined below - as well as reflect this requirement in the project schedule.
1.2.3 Security and Site Access Management Plan (SSAMP)
A detailed plan that acknowledges, describes, and details all unique access control, security, and phasing requirements in this Contract.
Project-specific requirements for the SSAMP are described below.
1.2.4 US Persons
Individuals lawfully admitted for permanent residence as defined in U.S.C.
§ 1101(a)(20) or who is a protected individual as defined by Title 8 U.S.C. §1324b (a)(3)) may be used for both general and finishing work on the project.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 01 14 00 Page 6Am #0008
Project Security And Site Access Management Plan; G, RO
1.4 PROJECT SECURITY AND SITE ACCESS MANAGEMENT PLAN (SSAMP)
This project contains a variety of work under various security, access, and oversight requirements/limitations. It is the Government's intent that the Contractor perform all work under the fewest constraints allowable under the applicable criteria, and as applicable to the individual component of work. This specification and the entirety of the design drawings and specifications communicate all applicable requirements, and the Contractor is responsible for provide a plan for compliance with these constraints that is consistent with their technical approach for construction.
Prior to the start of construction, the Contractor is to provide a Project Security and Site Access Management Plan (SSAMP) for approval by the Government. The SSAMP shall incorporate the constraints described below and throughout the Contract. This shall include, but is not limited to, the following information. Clearly separate the plan into "Secure Area" work and non-"Secure Area" Work to address the following:
a.List of primary and secondary Contractor POCs for Project security and access management.
b. List of Contractors and Subcontractors requiring site access.
c. Anticipated secure area and secure area material storage perimeter(s) with specs, dates, and durations. Indicate any anticipated changes to the perimeters(s) during the duration of the project.
d. Anticipated construction perimeter(s) (fence(s) and/or room(s)) with specs, dates, and durations. Indicate any anticipated changes to the perimeters(s) during the duration of the project. Communicate a plan for continuity of secure area and secure area material storage perimeter(s) for the entirety of construction once CSP implementation has begun.
e. Anticipated dates and durations of various work activities that will require Government oversight and/or escorts per the requirements in this Contract.
f. Description of Contractor processes and procedures associated with Secure Area construction, oversight, accreditation, and associated security requirements.
g. Anticipated procedures for Contractor site security and access management for each work activity.
h. Anticipated usage of temporary and/or permanent doors (with locks), barriers and similar at secure area perimeters, etc.
j. List of anticipated closures/outages, etc that may impact Government oversight, or work outside of normal hours as listed in 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS.
k. CONTROLLED UNCLASSIFIED INFORMATION (CUI)document storage and handling procedures.
SECTION 01 14 00 Page 7Am #0008
l. Procedures for advising Subcontractors and delivery activities on the location of the project site and appropriate POCs (primary and secondary) for Security Forces to verify project deliveries against.
m. Describe the technical approach to design and construction of the facility(ies). Include considerations for management of both the "Secure Area" construction security (in accordance with UFC 4-010-05, ICD/ICS 705, DODM 5205.07, AFI 31-101, AFI 16-1404, AFI 16-1406, and
DODM 5200.01.
The SSAMP shall serve as a living document that records the Contractor's approach for compliance with work restrictions documented herein. As Contractor requirements evolve, update the SSAMP for use and reference by the Government. Coordinate SSAMP updates with overarching construction schedule and "look-ahead" activities defined in 01 32 01.00 10 PROJECT
SCHEDULE.
1.5 ORDER OF WORK RESTRICTIONS
The order in which work is performed shall conform to the following constraints:
a. [*Am-8]See the design drawings and other specifications for project-specific order of work and phasing restrictions. This may include, but is not limited to phasing constraints relating to work occuring on adjacent construction projects, demolition of the existing facilies on the site, relocation of utilities, construction and removal/relocation of the construction perimeter fence, and placement, phasing, and tie-in of new and existing airfield paving. [**Am-8]
b. This project is one of several that serve as part of the B-21 facilities beddown at Ellsworth AFB, SD. The contractor shall continually coordinate work with other construction activities that serve as part of the EAFB B-21 Beddown. See 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS for contractor coordination meeting partcipation requirements.
c. The EAFB Flightline Restricted Area (RA) and associated flightline activities will remain in operation during the entire construction period. The Contractor must conduct their operations so as to cause the least possible interference with normal operations of RA activities. See the design drawings for additional accomodations and requirements.
d. This project sits within an established Restricted Area. Once the perimeter fence for the construction site is erected and approved by the Government, the project site will be considered outside of the EAFB Flightline Restricted Area. Until that time, all work on the project site within the EAFB Flightline Restricted Area must be escorted with Contractor-provided escorts per the RA escort requirements herein. Any work required outside of the established construction perimeter fence and within EAFB Flightline Restricted Area at any time during construction shall also be escorted with Contractor-provided escorts per the RA escort requirements herein.
e. Permission to interrupt any roads, railroads, or utility service must be requested in accordance with requirements listed in 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS.
SECTION 01 14 00 Page 8Am #0008
[*Am-8]See the design drawings and other specifications for project-specific order of work and phasing restrictions. This may include, but is not limited to phasing constraints relating to work occuring on adjacent construction projects, demolition of the existing facilies on the site, relocation of utilities, construction and removal/relocation of the construction perimeter fence, and placement, phasing, and tie-in of new and existing airfield paving. [**Am-8]
f. Permission to establish new free work zones, as well as Government escorts and oversight shall be coordinated in compliance with the requirements listed below.
g. Any utility outages associated with the project shall be planned well in advance. Contractor shall notify the Government of any required outages that may impact any RA facilities in compliance with utility outage request requirements in 01 30 00.24 OTHER ADMINISTRATIVE AND
SPECIAL REQUIREMENTS.
h. The Contractor is responsible for all labor and materials required to construct the entirety of the work sited within the RA at Ellsworth AFB. Work within an approved free zone perimeter does not require escorts. Work within the the Ellsworth AFB RA, but outside of an approved free zone requires escorts or Cleared American Guard (CAG) oversight as defined herein. Work required to establish or remove free zone perimeter(s) also requires escorts or CAG oversight as defined herein. Finally, work inside and on the existing RA perimeter fence serving the Ellsworth AFB RA requires escorts or CAG oversight as defined herein. The Contractor is required to obtain RA escort badging and/or employing the services of escorts (CAGs) as to fully execute the work within the constraints defined herein.
j. Coordination of the use of secure area oversight shall occur in compliance with the requirements listed below.
k. The Contractor is responsible for all labor, costs, and materials required to construct the entirety of the work described in this contract. For clarification, oversight and administration of the secure area per ICD/ICS 705 and DODM 5205.07 is a Government-led function. Comply with secure area oversight and administration requirements through the duration of the project. This contract contains a bid option for supplemental secure area oversight in order to augment Government forces for secure area administration during construction. Award or non-award of the referenced bid option does not affect the contractor's obligation to comply with the referenced oversight and administration requirements.
l. This project requires that the hangar bay roof structure(s) and perimeter(s) be constructed and covered prior to the installation of the hangar bay floor system. The hangar bay roof shall be installed to a level of completeness that will provide shade and water diversion over the entire hangar floor surface during slab system placement. The hangar bay perimeter shall also be enclosed to a level of completeness that the enclosures will provide freeze/thaw protection to the hangar slab(s) after placement and prior to HVAC system startup. The Contractor shall obtain Contracting Officer approval on the roof and wall systems prior to slab system installation. Required level of completeness shall be discussed at the hangar slab pre-constuction conference.
1.5.1 Desire for Innovation
The Government is looking for ways to streamline construction and manage labor and other resource constraints in an effort to mutually reduce costs and achieve an aggressive schedule while minimizing impact to the Base and Base operations. The Contractor should consider these constraints when developing the project schedule and work activities, and should propose innovative and/or alternative solutions for Government consideration. Any
SECTION 01 14 00 Page 9Am #0008 non-standard solutions require Government review and formal acceptance prior to implementation.
1.6 DOCUMENT CONTROL
All contract documents (including the design analysis, plans, and specifications) shall be treated as For Official Use Only (FOUO) or Controlled Unclassified Information (CUI) by the Contractor - regardless of labeling on the reference documents. The Contractor shall track and control access to the contract documents in compliance with AFI 16-1404 and DODM 5200.01. The Contractor shall log personnel and entities that have access to documents and hardcopies. Those logs shall be available to the Government for review and should include the entity and responsible party to which documents were issued.
Distributed hardcopies of documents shall be stored within the secure area perimeter or locked in the contractor's construction office when not in use and during non-work hours. Plans shall be returned to the Contractor as entities complete their work activities. Contractor shall destroy all hardcopy documents not turned over to the Government upon project completion.
1.7 BASE ACCESS AND SECURITY
1.7.1 General
The US Army Corps of Engineers (USACE) (in collaboration with Base Civil Engineering Squadron) will coordinate installation and secure area entry with resource managers on Ellsworth Air Force Base (EAFB). Base Security Forces Squadron (SFS), and will assist the Contractor with initiating security reviews (e.g. local and national agency checks) and requesting access and/or badges as described below. The Contractor shall furnish a list of Contractor personnel requiring entry to EAFB and the secure area.
This list will be provided as soon as possible, but not later than ten
(10) days, after contract award and maintained current as Contractor personnel are added or dismissed from the contract/project.