This solicitation is for the construction of a B-21 Washrack and Maintenance Hangar at Ellsworth Air Force Base in South Dakota. Key details include the construction of a new hangar facility and associated site work, utilities, and pavements. Proposals are due by February 7, 2022 and the government intends to award within 90 calendar days of the proposal due date. The solicitation is unrestricted and open to both large and small businesses. The total estimated contract duration is 900 calendar days. Pricing is to be provided for base line construction items as well as multiple options that can be awarded within specified timeframes after notice to proceed. The Department of the Army Corps of Engineers Engineering District Omaha is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0011.pdf | ||
| Am_0010_Dwgs_Vol1.pdf | ||
| Am_0010_Dwgs_Vol3.pdf | ||
| Am_0010.pdf | ||
| Am_0009.pdf | ||
| Am_0008.pdf | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME I-.pdf | ||
| Am_0003.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME III.pdf | ||
| W9128F21R0051_Specifications_Am3.pdf | ||
| W9128F21R0051 - Washrack - RTA Drawings - VOLUME II.pdf | ||
| Am_0002.pdf | ||
| Am0001_W9128F21R0051.pdf | ||
| 21-R-0051_Specifications.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0007 W9128F
B-21: WASHRACK AND MAINTENANCE HANGAR AT ELLSWORTH AFB, SD
See attached documentation for content of the changes to RFP
Date for receipt of proposals is 07 FEB 2022 at 1400 hours
Government Point of Contact: Nancy Garside, Contract Specialist, via e-mail to Gloria.Garside@usace.army.mil
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-21-R-0051
01/10/2022
09/21/2021
01/10/2022
Am #0007 - 1
Am #0007 - 2 (Continuation SF 30)
10 JAN 2022
Solicitation No. W9128F21R0051
Date of Issue: 21 SEP 2021 New Date of Receiving Volume II Proposals: 07 FEB 2022
SUBJECT: Amendment No. 0007 to Request for Proposal (RFP) Solicitation Package for Construction of
B-21: WASHRACK AND MAINTENANCE HANGAR AT ELLSWORTH AFB, SD
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form 1442 (SF1442), Page 00 10 00-1, item 13.A., delete the time and date for proposal receipt and substitute “1600” and
“07 FEB 2022”.
(2) Standard Form 1442 (SF1442), Pages 00 10 00-1 & 2, items 13.d.
and 17, delete the number of calendar days for Government acceptance of proposals and substitute “90”.
(3) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number SD20210001 in its entirety and substitute General Wage Rate Decision Number SD20220001 dated 01/07/2022. General Wage Rate Decision Number SD20220001 dated 01/07/2022 is included as an attachment to this Amendment.
(4) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number SD20210027 in its entirety and substitute General Wage Rate Decision Number SD20220027 dated 01/07/2022. General Wage Rate Decision Number SD20220027 dated 01/07/2022 is included as an attachment to this Amendment.
b. Specifications (New and/or Revised and Reissued). None
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
VOLUME III OF III:
(1) Sheet P-501, PLUMBING DETAILS
(2) Sheet P-502, PLUMBING DETAILS
(3) Sheet M-602, HVAC SCHEDULES
(4) Sheet EP103, POWER PLAN – AREA C
(5) Sheet EP113, HVAC POWER PLAN - AREA C
(6) Sheet EP703, PANELBOARD SCHEDULES
(7) Sheet EP710, MECHANICAL EQUIPMENT CONNECTION SCHEDULE
(8) Sheet TY101, SECURITY PLAN - AREA A
Am #0007 - 3 (Continuation SF 30)
(9) Sheet TY102, SECURITY PLAN - AREA B
(10) Sheet TY104, SECURITY PLAN - AREA D
(11) Sheet TY105, SECURITY PLAN - AREA E
(12) Sheet TY501, SECURITY DETAILS
(13) Sheet TY502, SECURITY DETAILS
(14) Sheet TY503, SECURITY DETAILS
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the SF30. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electronic Offers will be received until 2:00 p.m. on 07 FEB 2022, local time at place of receiving proposals (CST), as stated in the RFP.
5. NOTE: Due to a recent change in hangar fire suppression policy, the Government is incorporating design changes for removal of the hangar bay foam system(s) and associated impacts to the hangar bay sprinkler and fire water system. The proposal date is being extended to allow time for these changes to be incorporated. Another amendment will be forthcoming to capture the referenced hangar bay fire suppression changes. Intent is to release that amendment the week of 24 January and allow approximately 2 weeks for pricing proposals after release of that amendment.
Attachments:
Section 00 10 00 – SF1442 and CLIN Pricing Schedule General Wage Rate Decisions SD20220001 dated 01/07/2022
SD20220027 dated 01/07/2022 Drawings listed in 1.c., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
10 JAN 2022
nep/2160
This page was intentionally left blank for duplex printing.
00 10 00 Page 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-21-R-0051
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
21 SEP 2021
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
9. FOR INFORMATION
E-MAIL:
a. NAME Nancy Garside
b. E-MAIL ADDRESS Gloria.Garside@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
B-21: WASHRACK AND MAINTENANCE HANGAR
ELLSWORTH AFB, SOUTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
THIS SOLICITATION IS UNRESTRICTED, i.e., OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION.
11. The Contractor shall begin performance within 10 calendar days and complete it within 900* calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (* - See CLIN Pricing Schedule)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 07 FEB 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due. (* - See Section 00 22 00)
b. An offer guarantee is is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than ___ 90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442(REV. 8/2014)
Prescribed by GSA - FAR(48 CFR) 53.236-1(d)
Am #0007
00 10 00 Page 2
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS or Unique Entity Identifier Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. AWARD DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
Am #0007
CLIN SCHEDULE 00 10 00 – 3 W9128F-21-R-0051
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM
NO.
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
0001 Entire work complete for Construction of the B-21 Washrack and Maintenance Hangar, complete to the five-foot line, excluding items separately listed below.
Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)
1 Job XXX $_____________________
0002 Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the B-21 Washrack and Maintenance Hangar, excluding items listed separately below. (MILCON)
1 Job XXX $_____________________
0003 Entire work complete for Demolition of Dock 61, 62 and associated existing Features, Paving, Airfield Paving, Utilities and Infrastructure on the B-21 Washrack and Maintenance Hangar site excluding items separately listed below and as communicated in the Demolition drawings and specifications. (MILCON)
1 Job XXX $_____________________
0004 Entire work complete for Construction of all Flightline paving - including Airfield Concrete and Airfield Ground Support Equipment (GSE) paving – to include all site preparation, base, drainage layer, underdrains, earthwork, underdrains, and striping - excluding bid option paving listed separately below. (MILCON)
1 Job XXX $_____________________
0005 Entire work complete for cybersecurity documentation, and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements. (MILCON)
1 Job XXX $_____________________
TOTAL BASIC AMOUNT $_____________________________
Am #0005
CLIN SCHEDULE 00 10 00 – 4 W9128F-21-R-0051
OPTION ITEMS
[Option]
Entire work complete for Procurement and Installation of a 5-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.16 in lieu of a 3-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.15. (MILCON)
1 Job XXX $______________________
[Option]
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of compressed air and soap equipment. (O&M)
1 Job XXX $______________________
[Option]
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of preconditioned air units.
(O&M)
1 Job XXX $______________________
[Option]
Entire work complete for Construction of additional asphalt shoulders - to include all associated site preparation, base, earthwork, and striping. (MILCON)
1 Job XXX $______________________
[Option]
Entire work complete for Procurement and Installation of CIPP liners. (MILCON)
1 Job XXX $______________________
[Option]
Entire work complete for Procurement and Installation of FF&E. (O&M)
1 Job XXX $______________________
[Option]
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of Intrusion Detection System (IDS), and Access Control System
(ACS). (O&M)
1 Job XXX $______________________
[Option]
Entire work complete for temporary Government trailer facilities during construction as indicated in this Contract.
(O&M or MILCON, depending upon occupancy)
1 Job XXX $______________________
[Option]
Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M)
1 Job XXX $______________________
CLIN SCHEDULE 00 10 00 – 5 W9128F-21-R-0051
[Option]
Entire work complete for removal and disposal of additional asbestos containing material (ACM) in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
2,500 SF $_____ $______________________
[Option]
Entire work complete for removal and disposal of additional asbestos containing material (ACM) in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
2,500 LF $_____ $______________________
[Option]
Entire work complete for additional removal and disposal of contaminated soils (Category 3 soils as defined in Specification 02 61 13) not previously identified in the project hazardous material survey documentation and not otherwise included in the basic amount. (MILCON)
2,500 CY $_____ $______________________
[Option]
Entire work complete for removal and disposal of non-adhered lead based paint in Dock 61 and 62 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
10,000 SF $_____ $______________________
[Option]
Entire work complete for removal and disposal of additional ACM piping not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
1,000 LF $_____ $______________________
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0006 and 0010 within 90 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0007 – 0009 and 0011 - 0014 within 730 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0015 - 0019 within 365 days of Notice to Proceed. Abbreviation: Operations and Maintenance (O&M).
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of
CLIN SCHEDULE 00 10 00 – 6 W9128F-21-R-0051
variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.
4. Contract duration is 900 calendar days for award basic and option items. No contract duration extension will be provided upon award of any combination of option items.
5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.
CLIN SCHEDULE 00 10 00 – 7 W9128F-21-R-0051
SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE
TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT
AS INDICATED ON PAGE 3 AND 4 OF THIS SECTION 00 10 00
DIVISION MASTERFORMAT 2016 DESCRIPTION UNIT AMOUNT
01 GENERAL REQUIREMENTS (minus item 0101) LS $_______________
0101 01 33 29 Sustainability Documentation LS $_______________
02 EXISTING CONDITIONS LS $_______________
03 CONCRETE LS $_______________
04 MASONRY LS $_______________
05 METALS LS $_______________
06 WOOD, PLASTICS, AND COMPOSITES LS $_______________
07 THERMAL AND MOISTURE PROTECTION LS $______________
08 OPENINGS LS $_______________
09 FINISHES LS $_______________
10 SPECIALTIES LS $______________
11 EQUIPMENT LS $_______________
12 FURNISHINGS LS $_______________
13 SPECIAL CONSTRUCTION LS $_______________
14 CONVEYING EQUIPMENT LS $_______________
21 FIRE SUPPRESSION LS $_______________
22 PLUMBING LS $______________
23 HEATING, VENTILATING, AND AIR CONDITIONING LS $_______________
25 INTEGRATED AUTOMATION LS $_______________
26 ELECTRICAL LS $_______________
27 COMMUNICATIONS LS $_______________
28 ELECTRONIC SAFETY AND SECURITY LS $_______________
31 EARTHWORK LS $_______________
32 EXTERIOR IMPROVEMENTS LS $_______________
33 UTILITIES LS $_______________
34 TRANSPORTATION LS $_______________
Total Price Breakdown Amount
Prime Contractor Markups:
--G&A General and Administrative Expense $ ______________ --FOOH Field Office Overhead not defined by Division -01 $ ______________ --PROFIT Profit $ ______________ --P&PB Performance and Payment Bond $ ______________
TOTAL WITH MARKUPS
All items must be entered in dollars.
“TOTAL WITH MARKUPS” from this Price Breakdown must match the “TOTAL BASIC
AMOUNT”.
Am #0007 SD20220001 - 1 01/07/2022
General Decision Number: SD20220001 01/07/2022
Superseded General Decision Number: SD20210001
State: South Dakota
Construction Types: Heavy and Highway
Counties: South Dakota Statewide.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
Am #0007 SD20220001 - 2 01/07/2022
* SUSD2018-001 03/20/2018
Rates Fringes
CARPENTER........................$ 27.96 0.00
CONCRETE FINISHER................$ 21.41 0.00
ELECTRICIAN......................$ 26.42 3.85
LABORER
Group 1.....................$ 18.86 0.00 Group 2.....................$ 17.51 0.00 Group 3.....................$ 18.95 0.00 Group 5.....................$ 27.96 0.00 Group 6.....................$ 21.41 0.00
LABORER CLASSIFICATIONS:
GROUP 1: Air Tool Operator; Common Laborer; Landscape Worker, Flagger, Pilot Car Driver; Trucks under 26,000 GVW; Blue-top Checker, Materials Checker.
GROUP 2: Mechanic Tender; Pipe Layer (except culvert); Form Builder Tender; Special Surface Finish Applicator; Striping.
GROUP 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser.
GROUP 5: Form Builder
GROUP 6: Grade Checker
PAINTER..........................$ 21.41 0.00
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 20.62 0.00 Group 2.....................$ 20.66 0.00 Group 3.....................$ 22.02 0.00 Group 4.....................$ 23.79 0.00 Group 5.....................$ 24.77 0.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Concrete Paving Cure Machine; Concrete Paving Joint Sealer; Conveyor; Tractor (farm type with attachments); Self- Propelled Broom; Concrete Routing Machine; Paver Feeder;
Pugmill; Skid Steer.
GROUP 2: Bull Dozer 80 HP or less; Front End Loader 1.25 CY or less; Self-Propelled Roller (except Hot Mix); Sheepsfoot/50 Ton Pneumatic Roller; Pneumatic Tire Tractor or Crawler (includes Water Wagon and Power Spray Units); Wagon Drill; Air Trac; Truck Type Auger; Concrete Paving Saw.
GROUP 3: Asphalt Distributor; Bull Dozer over 80 HP; Concrete
Am #0007 SD20220001 - 3 01/07/2022
Paving Finishing Machine; Backhoes/Excavators 20 tons or less;
Crusher (may include internal screening plant); Front End Loader over 1.25 CY; Rough Motor Grader; Self-Propelled Hot Mix Roller; Push Tractor; Euclid or Dumpster; Material Spreader; Rumble Strip Machine.
GROUP 4:Asphalt Paving Machine Screed; Asphalt Paving Machine;
Cranes/Derricks/Draglines/Pile Drivers/Shovels 30 to 50 tons;
Backhoes/Excavators 21 to 40 tons; Maintenance Mechanic;
Scrapers; Concrete Pump Truck.
GROUP 5:Asphalt Plant; Concrete Batch Plant;
Backhoes/Excavators over 40 tons;
Cranes/Derricks/Draglines/Pile Drivers/Shovels over 50 tons;
Heavy Duty Mechanic; Finish Motor Grader; Automatic Fine Grader; Milling Machine; Bridge Welder.
TRUCK DRIVER
Group 1.....................$ 21.46 0.00 Group 2.....................$ 21.66 4.22
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with trailer.
GROUP 2: Semi-Tractor and Trailer; Tandem Truck with Pup.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
Am #0007 SD20220001 - 4 01/07/2022
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Am #0007 SD20220001 - 5 01/07/2022
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Am #0007 SD20220001 - 6 01/07/2022
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Am #0007 SD20220027 - 1 01/07/2022
General Decision Number: SD20220027 01/07/2022
Superseded General Decision Number: SD20210027
State: South Dakota
Construction Type: Building
County: Meade County in South Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
Am #0007 SD20220027 - 2 01/07/2022
BRSD0004-003 05/01/2017
Rates Fringes
BRICKLAYER.......................$ 31.96 3.94
* PLUM0300-015 05/01/2021
Rates Fringes
PIPEFITTER.......................$ 31.61 15.19
SFSD0669-003 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 33.01 20.97
SUSD2012-024 08/21/2014
Rates Fringes
CARPENTER, Excludes Drywall Hanging and Metal Stud Installation, and Form Work......$ 18.67 0.00
CEMENT MASON/CONCRETE FINISHER...$ 19.58 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 18.19 0.00
ELECTRICIAN......................$ 18.84 2.42
FORM WORKER......................$ 17.50 0.00
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.20 0.00
IRONWORKER, STRUCTURAL...........$ 23.91 12.05
LABORER: Common or General......$ 11.66 1.65
LABORER: Mason Tender - Brick...$ 20.70 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.80 0.00
PAINTER (Brush, Roller, and Spray)...........................$ 18.48 0.00
PLUMBER..........................$ 20.45 7.83
Am #0007 SD20220027 - 3 01/07/2022
ROOFER...........................$ 13.74 1.35
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 18.68 3.72
TRUCK DRIVER: Dump Truck........$ 15.06 1.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
Am #0007 SD20220027 - 4 01/07/2022 the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
Am #0007 SD20220027 - 5 01/07/2022
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
V E
N T
E X
T E
N S
IO
N
A S
R E
Q U
IR
E
D
VENT PIPE 3" MIN.
MASTIC
STAINLESS STEEL
CLAMPING RING
EPDM PREMOLDED
PIPE SEAL
SPLICING CEMENT
LAP SEALANT
METAL ROOF
METAL DECK
ROOF PENETRATION
BY ROOF MFGR.
INCREASER
IF REQUIRED
VENT
WALL SURFACE
CLEANOUT PLUG
ROUND POLISHED STAINLESS
STEEL WALL COVER PLATE
(NOT REQUIRED UNLESS
LOCATED IN WALLS)
COUNTERSUNK SCREW
SCREWED COUNTERSUNK PLUG
OPENING CUT-OUT IN WALL
HORIZONTAL LINE
OR CLEANOUT TEE
GRADE
BYPASS
REDUCERGAS METER:
11,830 CFH @ 45 PSIG
GAS COCK
(LOCKING)
UNION (TYP.)
STRAINER
GAS COCK
(LOCKING)
ANODELESS RISER
GAS COCK (NON-LOCKING)
WALL
GAS MAIN
45 PSIG
PRESSURE GAUGE
PRESSURE REDUCING
VALVE (45 PSIG PRESSURE IN &
2 PSIG PRESSURE OUT)
OVERPRESSURE PRESSURE
REDUCING VALVE (45 PSIG
IN AND 3 PSIG OUT)
EXISTING
STUD WALL
CLEANOUT WITH
STAINLESS
STEEL COVER
URINAL
ROUTE PIPE
TIGHT TO
STUD WALL
EXTEND VENT TO
RECONNECT TO
EXISTING VENT
NOTES
M
IN
IM
U
M
LOCATE MAXIMUM
OF 48" AFF.
1/2" TRAP PRIMER LINE
TO FLOOR DRAIN.
(PLASTIC TUBING (PEX
EQUIVALENT)
DISTRIBUTION UNIT
PRESSURE TYPE
TRAP PRIMER
ISOLATION VALVE
1/2" DCW
DCW LINE
MAXIMUM 4 FLOOR DRAINS PER TRAP PRIMER.
ONE TRAP PRIMER LINE PER FLOOR DRAIN.
1.
2.
TRAP PRIMER, RE:
PLUMBING SCHEDULES.
PROVIDE DISTRIBUTION
UNITS WHERE MORE THAN
ONE FLOOR DRAIN IS
SERVED BY ONE PRIMER.
8"x8" ACCESS DOOR: J.R. SMITH NO. 4760 OR
ACCEPTABLE EQUIVALENT LOCKABLE, HINGED,
AND PRIME COATED. LOCATE IN ACCESSIBLE BUT
INCONSPICUOUS PLACE, OR ABOVE LAY-IN CLG.
DOMESTIC WATER LINE BELOW
GRADE. SLOPE DOWN TO FLOOR DRAIN.
DOMESTIC WATER LINE IN PLUMBING
CHASE OR ABOVE CEILING
FLOOR DRAIN WITH
TRAP
PRIMER CONNECTION
PER SPECIFICATIONS.
/2
FLOOR
/2
SECTION THRU PIPE HEAT TRACE CONTROL BOX DIAGRAM
TO POWER SUPPLY AT
DISCONNECT SWITCH
NO
PIPE STRAPS
AT APPROX.
18" INTERVALS
PIPE INSULATION
WATERPROOF
JACKET OVER
INSULATION
HEAT TRACE
CABLE
END CAP
CONTACTOR
WATER TIGHT
CONTROL BOX
THERMOSTAT WITH
AMBIENTAIR SENSOR.
SET ON AT 35°F
UNLESS OTHERWISE
INDICATED
SELF REGULATING
HEAT TRACE
CABLE
ALUMINUM
FOIL TAPE
INSTALLATION DETAIL
INSTALLATION AT VALVES
NOTES
1.
1'-6"
HEAT TRACE
CABLE
EVENLY
DISTRIBUTED
ALONG PIPE
PIPE INSULATION
AND ALUMINUM FOIL
TAPE NOT SHOWN
VALVE
SELF
REGULATING
TYPE HEAT
TRACE CABLE
PIPE STRAPS
HOT-COLD JOINT ALUMINUM FOIL TAPE
AND INSULATION
NOT SHOWN.
PROVIDE WEATHER RESISTANT
LABELING ON EXTERIOR OF JACKET
IDENTIFYING PIPES AS BEING "ELECTRIC
TRACED" WITH VOLTAGE INDICATED.
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
P-501
P L U
M B
IN
G
D E
T A
IL
S
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
NTSSCALE:
E1
VENT PIPE FLASHING
NTSSCALE:
A1
WALL C/O CONCEALED WITHIN WALL OR END OF PIPE
NTSSCALE:
A8
NATURAL GAS PRESSURE
REGULATOR/METER W/ BYPASS
NTSSCALE:
A15
URINAL SECTION DETAIL
NTSSCALE:
G17
PRESSURE TYPE TRAP PRIMER
NTSSCALE:
E8
TRAP PRIMER WALL ACCESS
NTSSCALE:
J8
HEAT TRACING 3
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
A
M E
N D
M E
N T
J A
N
12"
ANCHOR PIPE TO WALL
(TYP.)
1" x 1/2" BUSHING
1/2" BLOWDOWN BALL VALVE & CAP
1-1/4" CA UNLESS OTHERWISE INDICATED
30" AFF
UNLESS
OTHERWISE
INDICATED
1" FPT PRESSURE REGULATING VALVE/IN-LINE
COALESCING FILTER WITH INTEGRAL PRESSURE
GAUGE; OPERATING RANGE 5 TO 150 PSIG;
INTEGRAL 0.01 MICRON FILTER
COMPRESSED AIR
MAIN SEE PLANS FOR SIZE
1. DESIGNATED AS A ON DRAWINGS.
NOTES
3/4" x 1/2" BUSHING
BALL VALVE
CA HOSE REEL W/150' OF 1/2" CA HOSE
1" x 3/4" BUSHING
1" x 1/2" BUSHING
1/2" CA QUICK DISCONNECTS (TYP.)
A
MIN.
12"
ANCHOR PIPE TO WALL
3/4" x 1/2" BUSHING
1/2" BLOWDOWN BALL VALVE
SIZE AS INDICATED
FEMALE TYPE QUICK
DISCONNECT WITH 1/2"
NPT
48" AFF
UNLESS
OTHERWISE
INDICATED
1/2" FPT COMBINATION PRESSURE
REGULATING VALVE/IN-LINE FILTER
WITH INTEGRAL PRESSURE GAUGE;
OPERATING RANGE 5 TO 150 PSIG;
INTEGRAL 25 MICRON FILTER
COMPRESSED AIR
MAIN SEE PLANS FOR SIZE
3/4" BALL VALVE
NOTES
DESIGNATED AS B ON DRAWINGS.
TYPE C SHOWN ON DRAWINGS IS SIMILAR
EXCEPT WITH ONLY 2 QUICK DISCONNECTS.
PROVIDE DUAL SET OF ASSEMBLIES WHERE
INDICATED ON DRAWINGS.
1.
2.
3.
B
C
CIVIL
INTERFACE
TYPE K COPPER
OR SCH 40 PVC PIPE
5'-4"
12"
INSULATING FLANGE
SLEEVE PENETRATION.
FILL SPACE AROUND PIPE
WITH FIREPROOF MASTIC
GRADE
ALL PIPE AND FITTINGS SHALL BE AS INDICATED IN SPECIFICATIONS.
COAT UNDERGROUND PIPING WITH PE COATING FOR CORROSION PROTECTION.
FULL FACED NEOPRENE GASKETS SHALL BE REQUIRED ON ALL FLANGED
FITTINGS.
PROVIDE STRAIGHT SECTION OF PIPE BEFORE AND AFTER METER AS REQUIRED
BY METER MANUFACTURER'S WRITTEN INSTRUCTIONS.
1.
2.
3.
4.
NOTES
CONCRETE THRUST BLOCK
(TYP)
OS&Y VALVE (TYP)
TRANSITION OR
JOINT
AIR GAP
30" MINIMUMROUTE FULL
SIZE TO NEAREST
FLOOR DRAIN
FINISHED FLOOR
SUPPORT
STAND
(TYP)
ANCHOR TO FLR (TYP)
FLOOR DRAIN WITH FUNNEL
REDUCED PRESSURE
BACKFLOW PREVENTER
(SEE PLANS FOR SIZE)
STRAINER
3" BYPASS
NC
3" WATER
METER
FOOTING
SLEEVE
CONCRETE
16'-0"
3" TO WS-101
PRESSURE
GAUGE (TYP)
PRESSURE
REDUCING VALVE
M A
X
M
IN
6 1/2" OD
CAST IRON DOME
6" HUB JOINT FLUSH WITH
BOTTOM OF TRENCH
TRENCH COVER. REFER TO
STRUCTURAL PLANS TRENCH/SUMP CENTERLINE
(SMITH 1330 CID)
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
P-502
P L U
M B
IN
G
D E
T A
IL
S
T K
A R
R E
C P
IE
R
A T
T
L D
A N
A H
E R
NTSSCALE:
A1
HANGAR COMPRESSED AIR SERVICE DROP
NTSSCALE:
A11
COMPRESSED AIR SERVICE DROP
NTSSCALE:
G9
DOMESTIC WATER ENTRANCE AND BACKFLOW PREVENTER
A
M -0
D E
S
IG
N I S
S U
E D
F O
R P
R
IC
IN
G
O C
T
A
M E
N D
M E
N T
J A
N
NTSSCALE:
G1
CAST IN PLACE TRENCH DRAIN FD-E
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
W
A R
D P
A R
K W
A Y
K
A N
S A
S C
IT
Y
M
O
B L E
G R
E
ID
E L
A F
D R
A W
IN
G
C O
D E
O M
A H
A D
IS
T
R
IC
T C
A P
IT
O
L A
V E
N U
E O
M A
H A
N
E
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
P N
F
X B
M F
Y
B -2
W
A S
H R
A C
K A
N D
M A
IN
T
E N
A N
C E
H A
N G
A R
W
A S
H R
A C
K
O C
T O
B E
R
A D
V E
R T
IS
E
M E
N T
D
E S
IG
N
W F
-2 -R
-0
M-602
H V
A C
S C
H E
D U
L E
S
T K
A R
R E
C P
IE
R
A T
T
S L
IF
F E
R T
H
NOTES:
1. PROVIDE WITH MANUFACTURER'S DISCONNECT FOR A SINGLE POINT ELECTRICAL CONNECTION PER DIVISION 26 SPECIFICATIONS.
2. PROVIDE WITH MANUFACTURER'S STANDARD LOUVER AND WALL/CEILING MOUNTING BRACKET.
3. OPERATING FLUID IS 35% PROPYLENE GLYCOL.
4. MOUNTING HEIGHTS ARE APPROXIMATE. COORDINATE WITH LIGHTING, STRUCTURE, AND OTHER UTILITIES.
NOTES:
1. CABINET UNIT HEATER MOTORS SHALL BE ECM TYPE.
2. MOUNT HEATER 16" AFF AND PROVIDE WITH MANUFACTURER'S STANDARD WALL MOUNTING BRACKET.
CONDENSING UNIT AND HEAT PUMP SCHEDULE (CU)
TAG SERVICE TYPE
HEATING
CAPACITY
(BTU/H)
COOLING
CAPACITY
(BTU/H)
COMPRESSOR
TYPE
COMPRESSOR
QUANTITY
CIRCUIT
QUANTITY MODULATION
CONDENSER
FAN
QUANTITY
EFFICIENCY
(SEER)
RATED
SUMMER
OUTDOOR DB
(DEG. F)
RATED
WINTER
OUTDOOR DB
(DEG. F)
REFRIGERANT
TYPE
UNIT ELECTRICAL BASIS OF DESIGN
WEIGHT
(LBS) NOTESVOLT PHASE MCA MOP MANUFACTURER MODEL NUMBER
CU-101 FURN-101 HEAT PUMP 31,500 40,600 SCROLL 1 1 N/A 1 12.0 95 40 R-410A 208 1 30.8 50 YORK RHP14L48 300 1, 3, 4, 5, 7
CU-102 DOAS-101 CONDENSING UNIT N/A 50,400 SCROLL 2 2 2 / 1 1 12.0 95 N/A R-410A 460 3 15 20 TRANE TTA072 300 1, 3, 4, 5, 7
CU-103 ACU-101 HEAT PUMP 4,500 22,900 SCROLL 1 1 N/A 2 18.5 95 0 R-410A 208 1 24 40 MITSUBISHI PUZ-A36 325 1, 2, 3, 4, 5, 6
CU-104 ACU-102 HEAT PUMP 1,000 9,100 INVERTER 1 1 N/A 1 18.5 95 0 R-410A 208 1 11 28 MITSUBISHI PUZ-A18 150 1, 2, 3, 4, 5, 6
CU-105 ACU-103 HEAT PUMP 1,500 5,700 INVERTER 1 1 N/A 1 21.1 95 0 R-410A 208 1 11 28 MITSUBISHI PUZ-A12 100 1, 2, 3, 4, 5, 6
NOTES:
1. PROVIDE WITH MANUFACTURER'S DISCONNECT AND SINGLE POINT POWER CONNECTION IN ACCORDANCE WITH DIVISION 26 SPECIFICATIONS.
2. FEED POWER FROM CONDENSING UNIT TO INDOOR UNIT. VERIFY WITH FINAL SELECTION AND COORDINATE WITH ELECTRICAL SUBCONTRACTOR.
3. REFER TO SPECIFICATIONS FOR MOUNTING.
4. PROVIDE ALUMINUM JACKETING FOR EXTERIOR REFRIGERANT LINES.
5. PROVIDE LOW AMBIENT KIT FOR OPERATION DOWN TO 0°F.
6. PROVIDE WITH WIND BAFFLE.
7. PROVIDE WITH HAIL GUARDS.
HOT WATER BOILER SCHEDULE (HWB)
TAG LOCATION SERVICE TYPE
ALTITUDE
(FT.) FLUID
PRESSURE
RATING
(PSI…