EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL3.pdf

PDF 31 MB Posted

Attached to
B-21 Low-Observable Restoration Facility (LO Hangar), Ellsworth AFB, SD
Solicitation number
W9128F21R0024
Issued by

About this file

This document provides details on a federal contract opportunity to construct a B-21 Low-Observable Restoration Facility at Ellsworth Air Force Base in South Dakota. The solicitation was issued by the Department of the Army Corps of Engineers Omaha District seeking construction of the LO Hangar. Interested parties should respond to solicitation number W9128F21R0024 by the unspecified deadline. The opportunity is for a design-build contract to construct the facility for restoring stealth coatings on the B-21 bomber. No other information is provided on pricing, set asides, incumbent contractors or award timing.

View the file

Other files

File Type Posted
Am_0010-Drawing.pdf PDF
Am_0009.pdf PDF
Am_0010.pdf PDF
Am_0008.pdf PDF
Appendix D.pdf PDF
Am_0008-Drawings.pdf PDF
Am_0007-Drawings.pdf PDF
Am_0007.pdf PDF
Am_0006.pdf PDF
Am_0006-Drawings.pdf PDF
Am_0005-Drawings.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL1_Part-a.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL1_Part-b.pdf PDF
28BW_COVID_Travel_Risk_Matrix_v7_04_May_21.xlsx XLSX spreadsheet
W9128F-21-R-0024_Specs.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL4.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL2.pdf PDF
Am_0003_W9128F21R0024.pdf PDF
Am_0004-Drawings.pdf PDF
SD27.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
Appendix C - Dock 60 by FMG Dec2020.zip ZIP file
Attachment A - Data Summary Tables (pdf and CD).zip ZIP file
Attachment C - Analytical Data_J15425-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14884-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - 60 ROW by FMG Dec2020.zip ZIP file
Attachment C - Analytical Data_J15666-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14679-1 Std_Tal_L4 Final Report.pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL1.pdf PDF
Attachment C - Analytical Data_J15264-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - Dock 61 by FMG Dec2020.zip ZIP file
Attachment D - SEDDs (CD only).zip ZIP file
Attachment C - Analytical Data_J15965-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14982-1 Std_Tal_L4 Final Report.pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL3.pdf PDF
Appendix C - Dock 62 by FMG Dec2020.zip ZIP file
W9128F-21-R-0024_Specs (2).pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL2.pdf PDF
Attachment C - Analytical Data_J15285-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - Dock 63 by FMG Dec2020.zip ZIP file
Attachment B - ADR Summary Reports (pdf and CD).zip ZIP file
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL4.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

K

A N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

THIS PROJECT WAS REVIEWED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THIS SET.

CHIEF, GEOTECHNICAL

ENGINEERING & SCIENCES BRANCH

DATE

CHIEF, DAM SAFETY PROD.

CENTER

DATE

CHIEF, DESIGN BRANCH DATE

CHIEF, HYROLOGIC

ENGINEERING BRANCH

DATE

DATECHIEF, ENGINEERING

DIVISION, P.E.

SUBMITTED BY:

CHIEF: ARCH. / INTER.

RA

SECTION

SUBMITTED BY:

CHIEF: CIVIL / ENVIR.

PE

SECTION

SUBMITTED BY:

CHIEF: ELEC.

PE

SECTION

SUBMITTED BY:

CHIEF: MECH.

PE

SECTION

SUBMITTED BY:

CHIEF: STRUCT.

PE

SECTION

SUBMITTED BY:

CHIEF: FUELS

RA

SECTION

SUBMITTED BY:

CHIEF: GEOT./DAM SAFETY

PE

SECTION

SUBMITTED BY:

CADD

PROJECT COORD.

W F

-2 -R

-0

G-005

C O

V E

R V

O L U

M E

T K

IM

B A

M E

S

M T

O L B

E R

T

APRIL 2021

ELLSWORTH AIR FORCE BASE, SD

B-21 LOW OBSERVABLE RESTORATION FACILITY

PN: FXBM1081508, FY 2021

KANSAS CITY DISTRICT

W9128F-21-R-0024

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

23 April 2021

VOLUME 1: CIVIL, STRUCTURAL,

VOLUME 2: ARCHITECTURAL, FIRE PROTECTION

VOLUME 3: PLUMBING, MECHANICAL

VOLUME 4: ELECTRICAL, TELECOMUNICATION

VOLUME INDEX:

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

G-006

IN

D

E X

T O

D R

A W

IN

G

S V

O L U

M E

D e s ig n e r

A u th o r

C h e c k e r

MECHANICAL SHEET INDEX

Sheet Number Sheet Name

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-507 MECHANICAL DETAILS

M-508 MECHANICAL DETAILS

M-509 MECHANICAL DETAILS

M-510 MECHANICAL DETAILS

M-511 MECHANICAL DETAILS

M-512 MECHANICAL DETAILS

M-513 MECHANICAL DETAILS

M-514 MECHANICAL DETAILS

M-515 MECHANICAL DETAILS

M-516 MECHANICAL DETAILS

M-517 PAINT BOOTH DETAILS

M-518 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-605 MECHANICAL SCHEDULES

M-606 MECHANICAL SCHEDULES

M-607 MECHANICAL SCHEDULES

M-608 MECHANICAL SCHEDULES

M-620 HANGAR BAY AIRFLOW DIAGRAM

M-621 ADMIN AIRFLOW DIAGRAM

M-622 HEATING WATER FLOW DIAGRAM (1/3)

M-623 HEATING WATER FLOW DIAGRAM (2/3)

M-624 HEATING WATER FLOW DIAGRAM (3/3)

M-625 CHILLED WATER FLOW DIAGRAM (1/2)

M-626 CHILLED WATER FLOW DIAGRAM (2/2)

M-627 PROCESS CHILLED WATER FLOW DIAGRAM

M-628 STEAM FLOW DIAGRAM (1/3)

M-629 STEAM FLOW DIAGRAM (2/3)

M-630 STEAM FLOW DIAGRAM (3/3)

M-700 HVAC CONTROLS - LEGEND

M-701 HVAC CONTROLS - SYSTEM ARCHITECTURE

M-702 HVAC CONTROLS - MISC POINTS

M-703 HVAC CONTROLS - HANGAR BAY SCHEMATIC

M-704 HVAC CONTROLS - HANGAR BAY SEQUENCE

M-705 HVAC CONTROLS - HANGAR BAY GUI

M-706 HVAC CONTROLS - HANGAR BAY SEQUENCE - POINTS LIST

M-707 HVAC CONTROLS - MAU-201 SCHEMATIC

M-708 HVAC CONTROLS - MAU-201 POINTS LIST

M-709 HVAC CONTROLS - HANGAR BAY FAN SCHEMATICS

M-710 HVAC CONTROLS - HANGAR BAY FAN SCHEMATICS - POINTS LIST

M-711 HVAC CONTROLS SCHEMATIC - AHU-101

M-712 HVAC CONTROLS POINTS SCHEDULE - AHU-101

M-713 HVAC CONTROLS SCHEMATIC - VAV TERMINAL UNIT

M-714 HVAC CONTROLS SCHEMATIC - MAKE-UP AIR UNIT MAU-101

M-715 HVAC CONTROLS SCHEMATIC - MAU & UNIT HEATER

M-716 HVAC CONTROLS SCHEMATIC - MAU & UNIT HEATER - POINTS LIST

M-717 HVAC CONTROLS SCHEMATIC - FAN COIL UNITS

M-718 HVAC CONTROLS - SUPPLY & EXHAUST FANS SCHEMATIC

M-719 HVAC CONTROLS - EXHAUST FANS SCHEMATIC - POINTS LIST

M-720 HVAC CONTROLS - CRU & ACU SCHEMATIC

M-721 HVAC CONTROLS - STEAM HUMIDIFICATION

M-722 HVAC CONTROLS - STEAM HUMIDIFICATION

M-723 HVAC CONTROLS - STEAM HUMIDIFICATION - POINTS LIST

M-724 HVAC CONTROLS - BREATHING AIR SYSTEM ALARM

M-725 HVAC CONTROLS - CHILLED WATER SCHEMATIC

M-726 HVAC CONTROLS - CHILLED WATER SEQUENCE

M-727 HVAC CONTROLS - CHILLED WATER - POINTS LIST

M-728 HVAC CONTROLS - PROCESS CHILLED WATER SCHEMATIC

M-729 HVAC CONTROLS - PROCESS CHILLED WATER SEQUENCE

M-730 HVAC CONTROLS - PROCESS CHILLED WATER - POINTS LIST

M-731 HVAC CONTROLS - HEATING WATER SCHEMATIC

M-732 HVAC CONTROLS - HEATING WATER SEQUENCE

M-733 HVAC CONTROLS - HEATING WATER - POINTS LIST

M-734 MECHANICAL CONTROLS - AIR COMPRESSOR VENTILATION

M-735 MECHANICAL CONTROLS - HANGAR DOOR TRACK HEAT SYSTEM

M-736 DOOR TRACK HEAT POINTS

M-737 CONTROL SYSTEM SCHEMATIC - DOAS-201

M-738 HVAC CONTROLS - DOAS-201 POINTS

M-739 CONTROL SYSTEM SCHEMATIC - STEAM GENERATOR / HUMIDIFIER

MF001 MECHANICAL LEGEND

MF101 OVERALL PLAN

MF401 AGE FUEL STATION NEW WORK

MF402 EXISTING AGE FUEL STATION DEMOLITION WORK

MF501 AGE FUEL STATION NEW WORK

MF502 FUEL - DETAILS

MF601 FUEL - FLOW DIAGRAMS

MECHANICAL SHEET INDEX

Sheet Number Sheet Name

M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

M-100 FIRST FLOOR - HVAC PLAN - OVERALL

M-101 FIRST FLOOR - HVAC PLAN - AREA A

M-102 FIRST FLOOR - HVAC PLAN - AREA B

M-103 FIRST FLOOR - HVAC PLAN - AREA C

M-104 FIRST FLOOR - HVAC PLAN - AREA D

M-105 FIRST FLOOR - HVAC PLAN - AREA E

M-106 FIRST FLOOR - HVAC PLAN - AREA F

M-110 FIRST FLOOR - MECH PIPING PLAN - OVERALL

M-111 FIRST FLOOR - MECH PIPING PLAN - AREA A

M-112 FIRST FLOOR - MECH PIPING PLAN - AREA B

M-113 FIRST FLOOR - MECH PIPING PLAN - AREA C

M-114 FIRST FLOOR - MECH PIPING PLAN - AREA D

M-115 FIRST FLOOR - MECH PIPING PLAN - AREA E

M-116 FIRST FLOOR - MECH PIPING PLAN - AREA F

M-117 MECH YARD PIPING PLAN

M-120 SECOND FLOOR - HVAC PLAN - OVERALL

M-121 SECOND FLOOR - HVAC PLAN - AREA A

M-122 SECOND FLOOR - HVAC PLAN - AREA B

M-123 SECOND FLOOR - HVAC PLAN - AREA C

M-124 SECOND FLOOR - HVAC PLAN - AREA D

M-130 SECOND FLOOR - MECH PIPING PLAN - OVERALL

M-131 SECOND FLOOR - MECH PIPING PLAN - AREA A

M-132 SECOND FLOOR - MECH PIPING PLAN - AREA B

M-133 SECOND FLOOR - MECH PIPING PLAN - AREA C

M-134 SECOND FLOOR - MECH PIPING PLAN - AREA D

M-140 MECHANICAL ROOF PLAN

M-301 BOILER ROOM MECHANICAL SECTIONS

M-302 BOILER ROOM MECHANICAL SECTIONS

M-303 BOILER ROOM MECHANICAL SECTIONS

M-304 AHU ROOM MECHANICAL SECTIONS

M-305 MECHANICAL ROOM SECTION

M-306 MECHANICAL ROOM SECTION

M-307 MECHANICAL SECTIONS

M-308 MECHANICAL SECTIONS

M-309 MECHANICAL SECTIONS

M-310 MECHANICAL SECTIONS

M-311 MECHANICAL SECTIONS

M-312 MECHANICAL SECTIONS

M-401 ENLARGED FIRST FLOOR - MECHANICAL PLANS - COMPRESSOR ROOM

M-402 ENLARGED FIRST FLOOR - HVAC PLAN - BOILER ROOM

M-403 ENLARGED FIRST FLOOR - MECH PIPING - BOILER ROOM

M-404 ENLARGED STEAM PIPING PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

PLUMBING SHEET INDEX

Sheet Number Sheet Name

P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-010 UNDER SLAB - PLUMBING PLAN - OVERALL

P-011 UNDER SLAB - PLUMBING PLAN - AREA A

P-012 UNDER SLAB - PLUMBING PLAN - AREA B

P-013 UNDER SLAB - PLUMBING PLAN - AREA C

P-014 UNDER SLAB - PLUMBING PLAN - AREA D

P-015 UNDER SLAB - PLUMBING PLAN - AREA E

P-016 UNDER SLAB - PLUMBING PLAN - AREA F

P-100 FIRST FLOOR - PLUMBING PLAN - OVERALL

P-101 FIRST FLOOR - PLUMBING PLAN - AREA A

P-102 FIRST FLOOR - PLUMBING PLAN - AREA B

P-103 FIRST FLOOR - PLUMBING PLAN - AREA C

P-104 FIRST FLOOR - PLUMBING PLAN - AREA D

P-105 FIRST FLOOR - PLUMBING PLAN - AREA E

P-106 FIRST FLOOR - PLUMBING PLAN - AREA F

P-110 SECOND FLOOR - PLUMBING PLAN - OVERALL

P-111 SECOND FLOOR - PLUMBING PLAN - AREA A

P-112 SECOND FLOOR - PLUMBING PLAN - AREA B

P-113 SECOND FLOOR - PLUMBING PLAN - AREA C

P-114 SECOND FLOOR - PLUMBING PLAN - AREA D

P-401 ENLARGED FIRST FLOOR - COMPRESSOR ROOM PLUMBING PLANS

P-402 ENLARGED FIRST FLOOR - BOILER ROOM PLUMBING PLANS

P-403 ENLARGED UNDER SLAB - RESTROOM WASTE AND VENT PLAN

P-404 ENLARGED FIRST FLOOR - RESTROOM PLUMBING PLAN

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-504 PLUMBING DETAILS

P-505 PLUMBING DETAILS

P-506 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-603 PLUMBING SCHEDULES

P-701 COMPRESSED AIR SCHEMATIC - PLANT

P-702 COMPRESSED AIR SCHEMATIC - DISTRIBUTION

P-703 BREATHING AIR SCHEMATIC

P-704 WATER TREATMENT FLOW DIAGRAM

P-705 NATURAL GAS PIPING SCHEMATIC

P-901 WASTE AND VENT RISER AREA E

P-902 WASTE AND VENT RISER AREA F

P-903 RESTROOM WASTE AND VENT RISER

P-904 SECOND FLOOR WASTE AND VENT RISER

P-905 DOMESTIC WATER RISER

P-906 BOILER ROOM AND SECOND FLOOR DOMESTIC WATER RISER

P-907 RESTROOM DOMESTIC WATER RISER

GENERAL VOL 3

Sheet Number Sheet Name

G-005 COVER VOLUME 3

G-006 INDEX TO DRAWINGS VOLUME 3

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

4" FD-A

EWC-1

SK-1

U-2

U-1

WC-2

WC-1

LAV-

PLUMBING SYMBOLS LEGEND

SIZE - FLOOR DRAIN

DUAL ELECTRIC WATER COOLER

KITCHEN SINK

URINAL, ACCESSIBLE

URINAL

WATER CLOSET - ACCESSIBLE

WATER CLOSET

LAVATORY, COUNTER MOUNTED

PRESSURE/TEMPERATURE RELIEF VALVE

HB HOSE BIBB

WH WALL HYDRANT

LAV- LAVATORY, WALL MOUNTED

MB-1 MOP BASIN

SK-2 SINK

EEWS-1 EMERGENCY EYEWASH / SHOWER

SH-1 SHOWER

SK-3 UNDER MOUNT SINK

EEW EMERGENCY EYEWASH

WCO

FLOOR DRAIN / EQUIPMENT DRAIN

PLUMBING FIXTURE TRAP

FLOOR OR WALL PENETRATION

VENT THRU ROOF (VTR)

CLEANOUT (CO) IN RISER

RISER DIAGRAM LEGEND

CO

FCO

CLEANOUT (FCO) IN FLOOR

WATER HAMMER ARRESTORWHA-A

WALL CLEANOUT (WCO)

ISOMETRIC DIRECTION ARROW

UP

DN

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGEMV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GAUGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

PIPE LINE DESIGNATIONS

VENT

STORM (ABOVE GRADE)

STORM (BELOW GRADE)

STORM OVERFLOW

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

SANITARY SEWER (ABOVE GRADE)

SANITARY SEWER (BELOW GRADE)

CONDENSATE DRAIN

COMPRESSED AIR

NATURAL GAS

CLEANOUT IN RISER

CLEANOUT IN WALL

CLEANOUT IN FLOOR

SS

SS

COND

V

DCW

DHW

DHWR

CA

NG

OD

S

S

CO

WCO

FCO

BREATHING AIRBA

A

B

COMPRESSED AIR DROP - TYPE A

C

D

COMPRESSED AIR REEL - TYPE B

BREATHING AIR DROP - TYPE C

BREATHING AIR DROP - TYPE D

INDUSTRIAL WASTE (BELOW GRADE)

IW

IW

INDUSTRIAL WASTE (ABOVE GRADE)

DOMESTIC COLD WATER (SOFTENED)DCWS

NON-POTABLE WATERNPW

STORM - PUMPEDS (F)

E

F

COMPRESSED AIR DROP - TYPE E

BREATHING AIR REEL - TYPE F

FND

FOUNDATION DRAIN (BELOW GRADE)

PLUMBING ABBREVIATIONS GENERAL NOTES:

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

CONSTRUCTION INTERFACE

DEMOLITION

EXISTING

NEW

EXISTING

EXISTING

NEW

DEMOLITION

AC AIR COCK

AFF ABOVE FINISHED FLOOR

AG AIR GAP

ARV AIR RELEASE VALVE

BF BLIND FLANGE

BOP BOTTOM OF PIPE

BW BUTT WELD

CH OP CHAIN WHEEL OPERATOR

CONC CONCENTRIC

CORP STOP CORPORATION STOP

CPVC CHLORINATED POLYVINYL CHLORIDE

D DRAIN

DI DUCTILE IRON

DN DOWN

DWH DOMESTIC WATER HEATER

ELL ELBOW

EXIST EXISTING

FCA FLANGED COUPLING ADAPTER

FD FLOOR DRAIN

FE FLANGED END

FF FLAT FACED

FI FLOW INDICATOR

FLGD FLANGED

FM FLOW METER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FOV FLOAT OPERATED VALVE

FRP FIBERGLASS REINFORCED PIPE

FW FIELD WELD

HD HUB DRAIN

I.E. INVERT ELEVATION

IF INSULATED FLANGE

LC LOCK CLOSED

LO LOCK OPEN

LR LONG RADIUS

NC NORMALLY CLOSED

NPSH NET POSITIVE SUCTION HEAD

NRS NON-RISING STEM

NWL NORMAL WATER LEVEL

PEX CROSS LINKED POLYETHYLENE

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

RED REDUCER-REDUCING

RS RISING STEM

SCH SCHEDULE

SCRD SCREWED

SR SHORT RADIUS

TD TRENCH DRAIN

TOC TOP OF CONCRETE

TOG TOP OF GRATING

TOP TOP OF PIPE

TOS TOP OF STEEL

TP TRAP PRIMER

VTR VENT THROUGH ROOF

1. UNLESS NOTED OTHERWISE, THE CIVIL AND MECHANICAL INTERFACE POINT IS 5 FEET

OUTSIDE OF THE BUILDING WALL.

2. COORDINATE ALL PIPE SLEEVE REQUIREMENTS WITH FOUNDATION SUBCONTRACTOR.

3. COORDINATE MECHANICAL ROOM FLOOR DRAINS WITH ACTUAL EQUIPMENT LOCATIONS

AND DRAINAGE REQUIREMENTS.

4. LEGEND IS GENERAL IN NATURE AND NOT ALL ITEMS SHOWN MAY BE USED ON THIS

PROJECT.

5. INSTALL SANITARY PIPING WITH 2% SLOPE DOWNWARD IN DIRECTION OF FLOW UNLESS

INDICATED OTHERWISE. INSTALL VENT PIPING WITH 1% SLOPE DOWNWARD TOWARD

FIXTURE OR STACK.

6. ALL FIXTURES SHALL HAVE A P-TRAP INSTALLED.

7. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

8. INSTALL ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE

CODES AND REGULATIONS.

9. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH STRUCTURAL, CIVIL,

ELECTRICAL WORK ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

10. MAINTAIN A MINIMUM OF 6' - 8 CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

11. LOCATE ALL PLUMBING EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS, AND VALVING.

12. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

13. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF PIPE UNLESS NOTED

OTHERWISE.

14. DO NOT SUSPEND ANYTHING DIRECTLY FROM ROOF DECK OR FROM CONCRETE SLAB ON

FLOOR DECK. PROVIDE ADDITIONAL FRAMING BETWEEN ROOF OR FLOOR MEMBERS AS

REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

W F

-2 -R

-0

P-001

P L U

M B

IN

G

N O

T E

S

L E

G E

N D

S

Y M

B O

L S

A

B B

R E

V

IA

T

IO

N S

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

B

D

E

F

G

2 3 4 5 6 7 8 9 101 191817161514131211 2010.2 15.2

J

H

9.2

C

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-010

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

O V

E R

A L L

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

0 16' 32' 48'

SCALE: 3/64" = 1'-0"C1

UNDER SLAB - PLUMBING PLAN - OVERALL

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

M

T C

H L

IN

E

P -0

MATCH LINE

P-015

SUPPLY PLENUM

HANGAR BAY 1

EXHAUST PLENUM

103A

VEST

4" IW

SEE CIVIL SHEET CU103

FOR CONTINUATION

IE=3217.94'

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

IE=3220.44' (TYP)

4" S

TRENCH DRAIN

A

B

D

E

F

G

2 3 4 51

C

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

3" V UP

3" IW

MB-1

4" IW 4" IW

IW

6" IW

4" S

6" IW TO

CONTAINMENT SEE

CIVIL SHEET CU103

FOR CONTINUATION

IE=3217.69'

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

4" S

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

4" S 4" S

6" IW UP

TO FD-E

3" IW UP

TO FD-A

3" IW UP

TO FCO-B

3" IW UP

TO FD-A

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" IW UP

TO FD-C

4" IW

4" IW UP

TO FCO-B

5 (TYP OF 3)

3" IW

3" IW

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-011

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

A

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

3.

4.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR

DRAINS AT EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SLOPE INDUSTRIAL WASTE (IW) PIPING AT 1%.

SCALE: 1/8" = 1'-0"A3

UNDER SLAB - PLUMBING PLAN - AREA A

0 4' 8' 16'

KEYED NOTES:

DOOR TRACK DRAINS REFER TO DETAIL H3 ON M-514.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC. TRANSITION PIPE TO 6".

PROVIDE TRAP PRIMER FROM ETP-102 IN AIR

COMPRESSOR ROOM 107.

COORDINATE FLOOR DRAIN TO BE DIRECTLY BELOW

EEWS SHOWER HEAD.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

DOOR TRACK DRAIN PIPING TO BE EMBEDDED IN

FOOTER. COORDINATE INSTALLATION WITH

STRUCTURAL.

COORDINATE SLEEVE THROUGH STRUCTURAL

FOOTING. REFER TO STRUCTURAL DRAWINGS FOR

FOOTING DETAILS.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

MATCH LINE

P-015

MATCH LINE

P-016

M A

T C

H L

IN

E

P -0

M A

T C

H L

IN

E

P -0

VEST

EXHAUST PLENUM

103B

(M) CLEAN

141 (M) CLEAN SHOWER

JAN

(W) CLEAN

(W) CLEAN SHOWER

(W) DIRTY SHOWER

(M) DIRTY SHOWER

(M) DIRTY

INITIAL

ACCUMULATION

POINT

(W) DIRTY

CORRIDOR

154A

AIR SHOWER

CORRIDOR

LO PART STORAGE

PAINT BOOTH

STAIR 01

SUPPLY PLENUM

HANGAR BAY 1

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

6" IW TO

CONTAINMENT SEE

CIVIL CU103 FOR

CONTINUATION

IE=3217.69'

4" S

4" S

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

IE=3220.44' (TYP)

TRENCH DRAIN

A

B

D

E

F

G

6 7 8 9 10 10.29.2

C

4" IW

IW

4" IW

B4

P-403

4" S

4" S

4" S

4" S

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION

1 1

1 1 1 1

6" IW

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

3" IW UP

TO FCO-B

3" IW UP

TO FD-A

3" IW UP

TO FD-A

4" IW UP

TO FCO-B

6" IW UP

TO FD-E

2 2

2" S (F)

IE=3220.50'

SEE CU103 FOR

CONTINUATION

4" FND

IE=3214.00'

SEE CU103 FOR

CONTINUATION

SP-101

FOAM ROOM

4" SS UP

TO FD-B

4" SS

4" IW UP

TO FCO-B

4" SS UP

TO FCO-A

4" SS UP

TO FD-B

4" SS

3" IW

4" SS UP

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-012

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

B

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

3.

4.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR

DRAINS AT EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SLOPE INDUSTRIAL WASTE (IW) PIPING AT 1%.

KEYED NOTES:

DOOR TRACK DRAINS REFER TO DETAIL H3 ON M-514.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC. TRANSITION PIPE TO 6".

PROVIDE TRAP PRIMER FROM TP-101 IN ROOM 141.

COORDINATE WITH SPRINKLER CONTRACTOR FOR

FINAL LOCATION.

COORDINATE FLOOR DRAIN TO BE DIRECTLY BELOW

EEWS SHOWER HEAD.

PROVIDE TRAP PRIMER FROM TP-104 IN ROOM 139.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

DOOR TRACK DRAIN PIPING TO BE EMBEDDED IN

FOOTER. COORDINATE INSTALLATION WITH

STRUCTURAL.

COORDINATE SLEEVE THRU STRUCTURAL STEM

WALL AT IE=3220.6'.

SCALE: 1/8" = 1'-0"A1

UNDER SLAB - PLUMBING PLAN - AREA B

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -0

M A

T C

H L

IN

E

P -0

MATCH LINE

P-016

EXHAUST PLENUM

130A

VEST

ELEC

FIELD TRAINING

DETACHMENT

SILICONE

SANDING ROOM

COMPOSITE SANDING

ROOM

CORRIDOR

AIR SHOWER

CORRIDOR

154B

PAINT BOOTH

STAIR 02

SUPPLY PLENUM

HANGAR BAY 2

4" S SEE CIVIL

SHEET CU103 FOR

CONTINUATION 6" IW TO

CONTAINMENT SEE

CIVIL SHEET CU101

FOR CONTINUATION

IE-3217.69'

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

IE=3220.69' (TYP)

TRENCH DRAIN

A

B

D

E

F

G

1514131211 15.2

C

4" IW

3" IW

IW2" SS UP

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

1 1

1 1

1 1 1 1 1

6" IW

4" S

4" S

4" S

4" S 4" S

4" S

3" IW

3" IW

6" IW UP

TO FD-E

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

3" IW UP

TO FCO-A

3" IW UP

TO FD-A

3" IW UP

TO FD-A

4" IW UP

TO FCO-A

3" IW UP

TO FD-A

2" V UP

4" SS UP

TO FD-B

4" SS

FOAM ROOM

3" IW

4" SS UP

TO FCO-A

4" SS

4" IW UP

TO FCO-B

4" SS

2" SS UP

TO FD-A

4" SS UP

4" SS UP

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-013

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

3.

4.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR

DRAINS AT EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SLOPE INDUSTRIAL WASTE (IW) PIPING AT 1%.

KEYED NOTES:

DOOR TRACK DRAINS REFER TO DETAIL H3 ON M-514.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC. TRANSITION PIPE TO 6".

PROVIDE TRAP PRIMER FROM ETP-104 IN DEMIL-127.

COORDINATE WITH SPRINKLER CONTRACTOR FOR

FINAL LOCATION.

COORDINATE FLOOR DRAIN TO BE DIRECTLY BELOW

EEWS SHOWER HEAD.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE THRU STRUCTURAL STEM

WALL AT IE=3221.94'.

DOOR TRACK DRAIN PIPING TO BE EMBEDDED IN

FOOTER. COORDINATE INSTALLATION WITH

STRUCTURAL.

PROVIDE TRAP PRIMER FROM TP-102 IN ROOM 144.

SCALE: 1/8" = 1'-0"A1

UNDER SLAB - PLUMBING PLAN - AREA C

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -0

VEST

EXHAUST PLENUM

130A

EXHAUST PLENUM

130B

HANGAR BAY 2

SUPPLY PLENUM

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

6" IW TO

CONTAINMENT

SEE CIVIL SHEET

CU101 FOR

CONTINUATION

IE=3217.69'

4" IW

SEE CIVIL SHEET CU101

FOR CONTINUATION

IE=3217.94'

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

TRENCH DRAIN

A

B

D

E

F

G

19181716 20

C

IW

4" IW 4" IW

3" V UP

MB-1

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

4" S SEE CIVIL

SHEET CU101 FOR

CONTINUATION

IE-3220.69' (TYP)

11111

4" S 4" S4" S4" S

6" IW4" S4" S

6" IW UP

TO FD-E

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

4" S UP

TO FCO-B

3" IW UP

TO FCO-B

3" IW UP

TO FD-A

IW

3" IW UP

TO FD-A

4" IW

4" IW UP

TO FD-C

4" IW UP

TO FCO-B

3" IW

3" IW

(TYP OF 3)

3" IW

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-014

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

D

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

3.

4.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

DUE TO WEEKLY TEST REQUIREMENTS, FLOOR

DRAINS AT EEWS DO NOT REQUIRE TRAP PRIMER.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SLOPE INDUSTRIAL WASTE (IW) PIPING AT 1%.

KEYED NOTES:

DOOR TRACK DRAINS REFER TO DETAIL H3 ON M-514.

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC. TRANSITION PIPE TO 6".

PROVIDE TRAP PRIMER FROM ETP-104 IN DEMIL-127.

COORDINATE FLOOR DRAIN TO BE DIRECTLY BELOW

EEWS SHOWER HEAD.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

DOOR TRACK DRAIN PIPING TO BE EMBEDDED IN

FOOTER. COORDINATE INSTALLATION WITH

STRUCTURAL.

COORDINATE SLEEVE THROUGH STRUCTURAL

FOOTING. REFER TO STRUCTURAL DRAWINGS FOR

FOOTING DETAILS.

SCALE: 1/8" = 1'-0"A2

UNDER SLAB - PLUMBING PLAN - AREA D

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P-011

MATCH LINE

P-012

M A

T C

H L

IN

E

P -0

ELEC

BOILER ROOM

SECURE OFFICE

OFFICE

BREAK ROOM

LOCKER ROOM

CORRIDOR

4" NG UP 4" DCW UP

4" DCW SEE CIVIL

SHEET CU103 FOR

CONTINUATION

6" SS SEE CIVIL

SHEET CU103 FOR

CONTINUATION

IE=3218.14'

6" SS

3" SS

2" SS UP

TO EWC-1

3 4 5 6 7 8

J

H

4" NG SEE CIVIL

SHEET CU103 FOR

CONTINUATION

6" SS UP

TO FCO-A

4" SS UP

TO FD-D

4" SS UP

TO FD-D

4" SS UP

TO FD-B

4" SS UP

TO FD-B 4" SS UP

TO FD-C

6" SS UP

TO FD-D

4" SS UP

TO FD-B

4" SS UP

TO FD-B

4" SS UP

TO FD-B

4" SS UP

TO FD-B

4" SS UP

TO FD-D

A1

P-401

4" SS

6" SS UP

TO FCO-A

6" SS

4" SS

6" SS

4" SS UP

TO FD-D

2" V UP

2" V UP

4" SS UP

TO FD-D

4" SS UP

TO FD-B

4" SS

AIR COMPRESSOR

AHU

6" SS

4" SS UP

TO FD-B

3" SS UP

TO FCO-A

2" SS

2" SS

4" SS3" SS

3" V UP

3" SS UP

TO FD-B

3" SS

4" SS UP

SECURE VEST

112A

2" SS UP

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-015

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

E

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

3.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

ALL FLOOR DRAINS IN BOILER ROOM SHALL HAVE

TRAP PRIMER FROM ETP-101 UNLESS OTHERWISE

NOTED.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SCALE: 1/8" = 1'-0"C1

UNDER SLAB - PLUMBING PLAN - AREA E

0 4' 8' 16'

KEYED NOTES:

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC.

PROVIDE TRAP PRIMER FROM ETP-102 IN AIR

COMPRESSOR ROOM 107.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE THRU STRUCTURAL STEM

WALL, IE=3221.94'.

PROVIDE TRAP PRIMER FROM ETP-101 IN BOILER

ROOM 110.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P-013

MATCH LINE

P-012

M A

T C

H L

IN

E

P -0

VEST

TRAINING ROOM

CORRIDOR

155 OFFICE

OFFICE

COMM

MOTHERS ROOM

FABRICATION

FIRE PUMP

CORRIDOR

TOOL / SUPPORT

EQUIP

HAZMAT/ LO

STORAGE

DEMIL

6" SS SEE CIVIL

SHEET CU103 FOR

CONTINUATION

IE=3217.6'

4" SS

10 151413121110.2 15.2

J

H

9.2

3" SS UP

TO FD-F

3" SS UP

TO FD-F

2" SS UP

3" SS UP

TO FD-B

3" SS UP

4" SS UP

TO FCO-A

4" SS

SP-102

2" S (F)

IE=3219.00

4" FND

IE=3214.00

3" SS UP

TO FD-B

2" V UP

3" SS

4" SS

3" SS UP

TO FD-A

3" SS UP

TO FD-B

3" SS UP

TO FD-F

2" SS UP

4" SS UP

3" SS UP

TO FD-F

4" SS

3" SS UP

TO FD-F

4" SS UP

TO FCO-A

4" SS 4" SS

2" SS

3" SS UP

TO FD-F

3" SS UP

TO FD-A

4" SS

SEE CIVIL SHEET

CU101 FOR

CONTINUATION

IE=3218.34'

3" SS UP

TO FCO-A

3" SS UP

TO FCO-A

4" SS UP

TO FCO-A

3" SS UP

TO FCO-A

4" SS

4" SS UP

TO FCO-A

3" V UP

6" SS

4 10

2" SS UP

6" SS

6" SS

6" SS

4" SS

3" SS

2" SS UP

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-016

U N

D E

R S

L A

B

P L U

M B

IN

G

P L A

N

A R

E A

F

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

ARCHITECTURAL FINISH FLOOR ELEVATION OF 100'

EQUALS CIVIL ELEVATION OF 3223.94'.

SCALE: 1/8" = 1'-0"C1

UNDER SLAB - PLUMBING PLAN - AREA F

0 4' 8' 16'

KEYED NOTES:

COAT PIPING FROM CIVIL CONNECTION TO 5' INSIDE

HANGAR FOOTPRINT WITH MIN 15 MIL THICK EPOXY

MASTIC. TRANSITION PIPE TO 6".

COORDINATE FLOOR DRAIN TO BE DIRECTLY BELOW

EEWS SHOWER HEAD.

PROVIDE TRAP PRIMER FROM ETP-104 IN DEMIL-127.

PROVIDE TRAP PRIMER FROM ETP-103 IN FIRE

PUMP-124.

SEE CIVIL SHEET CU101 FOR CONTINUATION.

ROUTE PIPING ABOVE TOP OF FOOTING. REFER TO

STRUCTURAL DRAWINGS FOR FOOTING DETAILS.

COORDINATE SLEEVE THRU STRUCTURE STEM

WALL, IE=3221.94'.

ROUTE SECTION OF PIPE INDICATED AT 1% SLOPE.

COORDINATE SLEEVE IN CONCRETE BELOW

FOOTING, IE=3218.5'.

COORDINATE WITH SPRINKLER CONTRACTOR FOR

FINAL LOCATION OF FLOOR DRAINS.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

F

P

B F

P

B F

P

BFP

A

B

D

E

F

G

2 3 4 5 6 7 8 9 101 191817161514131211 2010.2 15.2

J

H

9.2

C

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-100

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

O V

E R

A L L

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

0 16' 32' 48'

SCALE: 3/64" = 1'-0"C1

FIRST FLOOR - PLUMBING PLAN - OVERALL

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -1

MATCH LINE

P-105

EXHAUST PLENUM

103A

VEST

HANGAR BAY 1

SUPPLY PLENUM

3/4" DHWR

15' - 0" BOP EL

1 1/2" DHW

14' - 5" BOP EL

1 1/2" DCW

13' - 11" BOP EL

A

B

D

E

F

G

2 3 4 51

C MB-1

EEWS-1

EEWS-1

HB

D

B

F

E

F

E

F

E

F

E

F

E

D B

2 1/2" BA

18' - 6" BOP EL

4" CA

18' - 5" BOP EL

1" BA

1 1/2" CA

1 1/4" DCW

1 1/4" DHW

FCO-B

FCO-B

FCO-B

FCO-B FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FD-A

FD-A

3" V UP/DN

FD-E TRENCH DRAIN

FD-C

FCO-B

FCO-B

WH-1

3/4" DCW UP

1 1/2" CA UP

1" BA UP

FCO-B

3/4" DCW

WH-1

1 1/2" DCW UP

1 1/2" DHW UP

1" BA UP

1 1/2" CA UP

3/4" DHWR UP

1 1/4" DHW UP

1 1/2" DCW UP

4" CA

15' - 6" BOP EL

2 1/2" BA

14' - 10" BOP EL

3/4" DCW

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-101

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

A

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

KEYED NOTES:

PIPING SHOWN OFFSET FROM WALL FOR CLARITY,

ALL PIPING IN EXHAUST PLENUM TO BE RACKED

VERTICALLY.

SEE SECOND FLOOR PIPING PLANS FOR PIPING TO

OVERHEAD REELS.

MOUNT COMPRESSED AIR AND BREATHING AIR

DROPS AND PIPING TO STRUCTURAL SUPPORTS

USING STRUT CHANNEL AS NECESSARY.

CONTRACTOR TO COORDINATE PIPING

PENETRATIONS THRU FILTER WALL WITH

ELECTRICAL AND CONTROLS CONDUITS SO ONLY

ONE 24" x 24" FILTER LOCATION IS USED FOR

UTILITY PIPING PENETRATIONS. COORDINATE

WITH DETAIL ON SHEET EP501.

SCALE: 1/8" = 1'-0"A3

FIRST FLOOR - PLUMBING PLAN - AREA A

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P-105

MATCH LINE

P-106

M A

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

EXHAUST PLENUM

103B

VEST

HANGAR BAY 1

SUPPLY PLENUM

STAIR 01

LO PART STORAGE

CORRIDOR

PAINT BOOTH

AIR SHOWER

CORRIDOR

154A

INITIAL

ACCUMULATION

POINT

(W) DIRTY

(M) DIRTY

(M) DIRTY SHOWER

(W) DIRTY SHOWER

(W) CLEAN SHOWER

(M) CLEAN SHOWER

(M) CLEAN

(W) CLEAN

JAN

4" CA

2 1/2" BA

3/4" DHWR

1 1/2" DHW

1 1/2" DCW

1 1/2" DCW

3/4" DHWR

1 1/2" DHW

15' - 5" BOP EL

1 1/4" DCW

15' - 5" BOP EL

A

B

D

E

F

G

6 7 8 9 10 10.29.2

C

1 1/2" BA UP

1 1/2" CA UP

EEWS-1

EEWS-1

E

F

E

F

E

F

D B

B

D

4" CA

15' - 6" BOP EL

2 1/2" BA

14' - 10" BOP EL

6" NG

13' - 3" BOP EL1" BA

1 1/2" CA3 B3

P-404

FCO-B FCO-B

FCO-B FCO-B FCO-B FCO-B FCO-B FCO-B

FD-A

1 1/4" DHW

1 1/4" DCW

FD-A

3" SS UP

TO FD-B

FD-E TRENCH DRAIN

FCO-B

FD-B

FCO-B FCO-B

FCO-B FCO-B

CO

1 1/2" DHW

1" DCW UP

C

A5

3/4" BA

3/4" CA

WH-1

HB6

FCO-B

FCO-B

FCO-A

FD-B

SUMP PUMP

CONTROL

PANEL

3/4" DHWR

11' - 7" BOP EL

1 1/2" DHW

11' - 6" BOP EL

2 1/2" DCW

11' - 6" BOP EL

1/2" DHWR

15' - 0" BOP EL

3" SS

2" V UP

6" NG

13' - 3" BOP EL

2 1/2" BA

14' - 10" BOP EL

4" CA

15' - 6" BOP EL

2" V

6" NG

1/2" DCWS UP

1/2" DCWS

3/4" DCW

CO

1 1/4" DHW

1 1/4" DCW

1" BA

1 1/2" CA

3/4" DHWR

1 1/2" CA

1" BA

1 1/4" DCW

1 1/4" DHW 1" DCW

4" SS DN

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-102

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

B

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

PROVIDE 1" THICK INSULATION ON OVERHEAD

SANITARY PIPING SERVING SECOND FLOOR

MECHANICAL ROOM FLOOR DRAINS.

KEYED NOTES:

PIPING SHOWN OFFSET FROM WALL FOR CLARITY,

ALL PIPING IN EXHAUST PLENUM TO BE RACKED

VERTICALLY.

SEE SECOND FLOOR PIPING PLANS FOR PIPING TO

OVERHEAD REELS.

MOUNT COMPRESSED AIR AND BREATHING AIR

DROPS AND PIPING TO STRUCTURAL SUPPORTS

USING STRUT CHANNEL AS NECESSARY.

CONTRACTOR TO COORDINATE PIPING

PENETRATIONS THRU FILTER WALL WITH

ELECTRICAL AND CONTROLS CONDUITS SO ONLY

ONE 24x24 FILTER LOCATION IS USED FOR UTILITY

PIPING PENETRATIONS. COORDINATE WITH DETAIL

ON SHEET EP501.

CALIBRATED BALANCE VALVE SET TO 0.5 GPM.

PROVIDE AIR DROPS INSIDE PAINT BOOTH.

SUMP PUMP CONTROL PANEL.

PIPING SHOWN OFFSET FROM WALL FOR CLARITY,

PIPING TO BE RACKED VERTICALLY.

SEE SECURE PENETRATION DETAIL FOR PIPING

AND FLOOR DRAINS THROUGH SLAB ON SHEET

P-503.

SCALE: 1/8" = 1'-0"A1

FIRST FLOOR - PLUMBING PLAN - AREA B

0 4' 8' 16'

8 3 A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -1

M A

T C

H L

IN

E

P -1

MATCH LINE

P-106

EXHAUST PLENUM

130A

VEST

ELEC

FIELD TRAINING

DETACHMENT

SILICONE

SANDING ROOM

COMPOSITE SANDING

ROOM

CORRIDOR

AIR SHOWER

CORRIDOR

154B

PAINT BOOTH

STAIR 02

SUPPLY PLENUM

HANGAR BAY 2

1 1/2" BA

1 1/2" CA

1 1/2" CA

3/4" DHWR

13' - 9" BOP EL

2" DHW

13' - 8" BOP EL

2" BA

4" CA

3/4" DHWR

18' - 6" BOP EL

1 1/2" DHW

18' - 5" BOP EL

1 1/2" DCW

18' - 5" BOP EL

A

B

D

E

F

G

1514131211 15.2

C

B

D

DB

E

F

E

F

E

F

E

F

E

F

EEWS-2

EEWS-1

EEWS-1

A

A

A

A

A

HB

1 1/4" DHW

1 1/4" DCW

1/2" DHWR

1 1/4" DCW

1 1/4" DHW

A

A

EEW

EEW

A

A

1 1/4" DHW

1 1/4" DCW

3/4" DCW

3/4" DHW

1/2" DHWR

1 1/2" CA

1" CA

1" CA

1" CA

1" CA

1 1/2" CA

1" BA

1" CA

1" BA

1 1/2" CA

2" CA

15' - 7" BOP EL

1 1/2" BA UP

1 1/2" CA UP

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FD-E

3" SS UP

3" SS UP

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B

3" SS UP

TO FD-B

TRENCH DRAIN

FD-A

FCO-B

FD-A

FCO-B

3/4" DHWR

1 1/2" DHW

1 1/2" DCW

2" SS DN

3/4" DCW

3/4" DHW

FD-B

2" V DN

2" V

FCO-B FCO-B

CO

2" BA

14' - 10" BOP EL

4" CA

15' - 6" BOP EL

3/4" DHWR

1 1/2" DHW

2 1/2" BA

4" CA

3" DCW

13' - 8" BOP EL

A

C

53/4" BA

3/4" CA

FCO-B

1 1/2" CA

A

A 1" CA

FOAM ROOM

CO

CO

4" SS DN

4" SS

FD-A

3/4" CA

3/4" BA

8 3" SS

WCO-1

1" CA

14' - 7" BOP EL

1" CA

A

A

A

1 1/2" CA

1 1/2" CA

3" DCW

2 1/2" DCW

11' - 6" BOP EL

1 1/2" DHW

11' - 6" BOP EL

3/4" DHWR

11' - 7" BOP EL

2" BA

14' - 10" BOP EL

4" CA

12' - 10" BOP EL

2" BA

12' - 11" BOP EL

1 1/2" V UP

3" SS UP

1 1/2" DCW

1/2" DHWR

1 1/2" DHW

1 1/2" BA

1 1/2" CA

1 1/4" DHW

1 1/4" DCW

FCO-B

1 1/2" CA

1" CA (TYP)

1 1/2" CA

1" CA (TYP)

1/2" DHWR

1 1/2" DHW

1 1/2" DCW

2 1/2" DCW

1 1/2" DHW

3/4" DHWR 1 1/2" CA

1" CA

CO

4" CA

2" CA

CO

3" SS

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-103

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

PROVIDE 1" THICK INSULATION ON OVERHEAD

SANITARY PIPING SERVING SECOND FLOOR

MECHANICAL ROOM FLOOR DRAINS.

KEYED NOTES:

PIPING SHOWN OFFSET FROM WALL FOR

CLARITY, ALL PIPING IN EXHAUST PLENUM TO BE

RACKED VERTICALLY.

SEE SECOND FLOOR PIPING PLANS FOR PIPING

TO OVERHEAD REELS.

MOUNT COMPRESSED AIR AND BREATHING AIR

DROPS AND PIPING TO STRUCTURAL SUPPORTS

USING STRUT CHANNEL AS NECESSARY.

CONTRACTOR TO COORDINATE PIPING

PENETRATIONS THRU FILTER WALL WITH

ELECTRICAL AND CONTROLS CONDUITS SO ONLY

ONE 24x24 FILTER LOCATION IS USED FOR UTILITY

PIPING PENETRATIONS. COORDINATE WITH

DETAIL ON SHEET EP501.

DO NOT ROUTE PIPING IN ELECTRICAL ROOM.

PROVIDE AIR DROPS IN PAINT BOOTH.

CALIBRATED BALANCE VALVE SET TO 0.5 GPM.

PROVIDE 1" CA BALL VALVE AND CAP 6" BELOW

CEILING. PROVIDE LABEL ON EXPOSED PIPE.

ROUTE TIGHT TO BEAMS.

SCALE: 1/8" = 1'-0"A1

FIRST FLOOR - PLUMBING PLAN - AREA C

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -1

VEST

EXHAUST PLENUM

130A

EXHAUST PLENUM

130B

HANGAR BAY 2

SUPPLY PLENUM

2" BA

2" CA

3/4" DHWR

1 1/2" DHW

1 1/2" DCW

A

B

D

E

F

G

19181716 20

C

MB-1

B D

HB

EEWS-1

D

B

F

E

F

E

F

E

EEWS-1

1" BA

1 1/2" CA

1 1/4" DHW

1 1/4" DCW

1 1/2" DHW UP

1 1/2" DCW UP

3" V UP/DN

FCO-B

FD-A

FCO-B

FCO-B

FCO-B

FCO-B

FCO-B FCO-B

FCO-B

FCO-B

FCO-B

FCO-B

FD-E

FD-A

TRENCH DRAIN

FD-C

FCO-B

FCO-B

1 1/2" BA UP

1 1/2" CA UP

3/4" DCW UP

FCO-B

WH-1

3/4" DCW

WH-1

3/4" DCW

WH-1

1 1/2" DCW

18' - 5" BOP EL

1 1/2" DHW

18' - 5" BOP EL

3/4" DHWR

18' - 6" BOP EL

2" CA

15' - 7" BOP EL

1 1/2" DCW UP

1 1/2" DHW UP

3/4" DHWR UP

2" BA UP

2" CA UP

2" BA

14' - 10" BOP EL

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-104

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

D

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

KEYED NOTES:

PIPING SHOWN OFFSET FROM WALL FOR

CLARITY, ALL PIPING IN EXHAUST PLENUM TO BE

RACKED VERTICALLY.

SEE SECOND FLOOR PIPING PLANS FOR PIPING

TO OVERHEAD REELS.

MOUNT COMPRESSED AIR AND BREATHING AIR

DROPS AND PIPING TO STRUCTURAL SUPPORTS

USING STRUT CHANNEL AS NECESSARY.

CONTRACTOR TO COORDINATE PIPING

PENETRATIONS THRU FILTER WALL WITH

ELECTRICAL AND CONTROLS CONDUITS SO ONLY

ONE 24x24 FILTER LOCATION IS USED FOR

UTILITY PIPING PENETRATIONS. COORDINATE

WITH DETAIL ON SHEET EP501.

CALIBRATED BALANCE VALVE SET TO 1.5 GPM.

SCALE: 1/8" = 1'-0"A2

FIRST FLOOR - PLUMBING PLAN - AREA D

0 4' 8' 16'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P-101

MATCH LINE

P-102

M A

T C

H L

IN

E

P -1

ELEC

SECURE OFFICE

112 SECURE VEST

112A

OFFICE

BREAK ROOM

LOCKER ROOM

2 1/2" DHW

3/4" DHWR

4" DCW

EWC-1

SK-2

4" CA

2 1/2" BA

3 4 5 6 7 8

J

H

AR-102

6" NG

18' - 2" BOP EL

AR-103

AIR COMPRESSOR

B1

P-402

A9

P-401

3/4" DCW

A1

P-401

4" DCW

1/2" DCW

1/2" DHW

1/2" DCW

1" DHWR

3/4" DCW

1 1/2" DCW

3/4" DHWR

1 2" V

3" VTR

4" DCW

1 1/2" DHW

AHU

2" V

1/2" DCWS

11' - 9" BOP EL

2 1/2" DHW

16' - 6" BOP EL

4" DCW

16' - 5" BOP EL

1/2" DCWS

16' - 0" BOP EL

4" DCW

16' - 5" BOP EL

2 1/2" DHW

16' - 0" BOP EL

3/4" DHWR

17' - 9" BOP EL

4" CA

2 1/2" BA

BOILER ROOM

2 1/2" BA

FD-B

FCO-A

2" V 1 1/2" V

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-105

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

E

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

SCALE: 1/8" = 1'-0"C1

FIRST FLOOR - PLUMBING PLAN - AREA E

0 4' 8' 16'

KEYED NOTES:

DO NOT ROUTE PIPING INSIDE SECURE OFFICE.

DO NOT ROUTE PIPING INSIDE ELECTRICAL ROOM.

1/2" DCW TO ICE MAKER OUTLET BOX AT 2'-0"

ABOVE FLOOR.

SUPPORT EQUIPMENT FROM ROOF STRUCTURE.

BOT EL: 13'-0"

TAP 3/8" DCW CONNECTION TO DCW UNDER SINK.

PROVIDE ISOLATION VALVE AND DUAL CHECK

BACKFLOW PREVENTER (ASSE 1024) AND ROUTE

3/8" DCW THROUGH CABIN ENTRY AND THROUGH

HOLE IN COUNTER FOR COFFEE CONNECTION.

PROVIDE 1/2" DOUBLE CHECK VALVE BACKFLOW

PREVENTER BFP-104, FOR CONNECTION TO ICE

MAKER.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P-103

MATCH LINE

P-102

M A

T C

H L

IN

E

P -1

VEST

TRAINING ROOM

CORRIDOR

OFFICE

OFFICE

COMM

MOTHERS ROOM

FABRICATION

FIRE PUMP

CORRIDOR

TOOL / SUPPORT

EQUIP

HAZMAT/ LO

STORAGE

DEMIL

1 1/2" CA

1" DHWR

3/4" DCW

1 1/2" CA

2" DHW

3/4" DHWRSK-1

9 10 151413121110.2 15.2

J

H

9.2

A A

A

A

A

A

A

A

AEEWS-1

FD-B

FD-F

FD-F FD-F

FD-A

1" DCW

1" DHW

1" DCW

1" DHW

1" DHWR

2" DHW

2" DCW

3/4" DHW

3/4" DCW

3/4" DCW

3/4" DHWR

2" DHW

2" DCW

1" DHWR

3/4" DHW

3/4" DCW

1/2" DCW

1/2" DCW

3/4" DCW

WH-1

3" VTR

1 1/2" V

1 1/2" V

1 1/4" V

1" CA

1" CA

1" CA 1" CA

1" CA

1" DHWR

2" DHW

2" DCW

3/4" CA

1" CA

1" CA

WH-1

3/4" DCW

2" DCW

2" DHW

3/4" DHWR

1 1/2" CA

EEW

2" V

1" CA

EEW

EWC-1

FD-B

2" V DN

2" V

3" DCW

STORAGE

3/4" CA 2

3/4" CA 2

3/4" CA

1 1/2" CA

A

SUMP PUMP

CONTROL

PANEL

3/4" DCW

3/4" DCW

FD-A

2 1/2" DHW

4" DCW

FD-F

FD-F

FD-F

FD-B

FCO-A

EWC-1

3/4" CA

3/4" CA FCO-A

WH-1

3/4" DCW

ETP-104

ETP-103

FCO-A

1/2" DHW

1/2" DCWS

2 1/2" DHW

4" DCW

EEW

2" DHW 3" VTR1 1/2" V

2" V

2" V DN

2" V

3" VTR

2" V

FD-A

2" SS DN

1 1/2" V 2" SS DN

CO

3" V

FCO-A

FCO-A

3/4" DHWR

1 1/2" DHW

1 1/2" DCW

FCO-A

2" BA

12' - 11" BOP EL

4" CA

12' - 10" BOP EL

1/2" DCWS

10' - 2" BOP EL

1 1/4" DHW

1 1/4" DCW

2" BA

4" CA

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-106

F

IR

S T

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

F

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

SCALE: 1/8" = 1'-0"C1

FIRST FLOOR - PLUMBING PLAN - AREA F

0 4' 8' 16'

KEYED NOTES:

DO NOT ROUTE PIPING IN ELECTRICAL OR COMM

ROOMS.

PROVIDE VALVE AND CAP FOR FUTURE

CONNECTION.

CAP FOR FUTURE CONNECTION.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P

A

B

D

E

F

G

2 3 4 5 6 7 8 9 101 191817161514131211 2010.2 15.2

J

H

9.2

C

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-110

S E

C O

N D

F L O

O R

P

L U

M B

IN

G

P L A

N

O V

E R

A L L

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

SCALE: 3/64" = 1'-0"C1

SECOND FLOOR - PLUMBING PLAN - OVERALL

GENERAL NOTES:

1. SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

0 16' 32' 48'

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

D

E

F

G

2 3 4 51

C

M A

T C

H L

IN

E

P -1

SUPPLY PLENUM

EXHAUST PLENUM

103A

HANGAR BAY 1

3" VTR

1" BA DN

1 1/2" CA DN

3/4" DHWR

39' - 8" BOP EL

1 1/2" DHW

39' - 7" BOP EL

1 1/2" DCW

39' - 7" BOP EL

1 1/2" CA

39' - 7" BOP EL

1" BA

39' - 7" BOP EL

3/4" CA

34' - 0" BOP EL

3/4" BA

34' - 0" BOP EL

3/4" CA

33' - 8" BOP EL

3/4" BA

33' - 8" BOP EL

1 1/2" BA

33' - 11" BOP EL

1 1/2" CA

33' - 11" BOP EL

3/4" CA

3/4" BA

1 1/2" BA

1 1/2" CA

3/4" CA

3/4" BA

3/4" CA

3/4" BA

3/4" CA

3/4" BA

1 1

3/4" DCW DN

1 1/4" DHW DN

1 1/2" DCW DN

1 1/2" DCW DN

1 1/2" DHW DN

3/4" DHWR DN

1" BA DN

1 1/2" CA DN

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-111

S E

C O

N D

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

A

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

SCALE: 1/8" = 1'-0"A3

SECOND FLOOR - PLUMBING PLAN - AREA A

0 4' 8' 16'

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

COORDINATE INSTALLATION OF PIPING WITH

DUCTWORK, LIGHTING, AND FIRE PROTECTION. DO

NOT BLOCK ACCESS TO LIGHTING OR EQUIPMENT.

KEYED NOTES:

SEE DETAIL A12 ON P-505 FOR OVERHEAD HOSE

REEL DETAIL.

CALIBRATED BALANCE VALVE SET TO 1.0 GPM.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

P

M A

T C

H L

IN

E

P -1

6" NG DN

A

B

D

E

F

G

6 7 8 9 10 10.29.2

C

DOAS-201

6" NG

1 1/2" BA DN

1 1/2" CA DN

M A

T C

H L

IN

E

P -1

1" DCW

3/4" DCW

FD-BFD-B

FD-B

FD-BFD-B

3/4" CA

33' - 8" BOP EL

3/4" BA

33' - 8" BOP EL

MECHANICAL

HANGAR BAY 1

STAIR 01

SUPPLY PLENUM

1/2" NPW DN

1/2" NPW DN 1

1" CA

33' - 11" BOP EL

1" BA

33' - 11" BOP EL

3/4" BA

34' - 0" BOP EL

3/4" CA

34' - 0" BOP EL

3/4" BA

3/4" CA

3/4" BA

3/4" CA

1" NPW

1" NPW

BFP-201

SG-201

3" NG

3" NG

3" V DN

FD-B

HB

1" DCW

HB

3" V

1" NPW

FCO-B

(FD-B

BELOW)

4 4

ETP-201

2" V

FCO-A

CO

3" SS DN

2" V DN

3" VTR

6" NG

FCO-A

1" DCW DN

TO GROUND FLOOR

MAU-202

MAU-201

1/2" DCWS DN

1/2" DCWS1" DRAIN

1" NPW

3" VTR

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-112

S E

C O

N D

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

B

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

SCALE: 1/8" = 1'-0"A1

SECOND FLOOR - PLUMBING PLAN - AREA B

0 4' 8' 16'

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

COORDINATE INSTALLATION OF PIPING WITH

DUCTWORK, LIGHTING, AND FIRE PROTECTION. DO

NOT BLOCK ACCESS TO LIGHTING OR EQUIPMENT.

KEYED NOTES:

ROUTE NPW DOWN AND CONNECT INTO

CONDENSATE COOLER ADJACENT TO

MECHANICAL EQUIPMENT. REFER TO DETAIL A1

ON SHEET M-503.

SEE DETAIL A12 ON P-505 FOR OVERHEAD HOSE

REEL DETAIL.

ROUTE COPPER TUBING TRAP PRIMERS FROM

ETP HORIZONTALLY ABOVE FLOOR UNTIL TUBING

CAN BE ROUTED BETWEEN STEEL STRUCTURE TO

TRAPS ON FLOOR BELOW.

CONNECT FLOOR DRAIN TO ETP-201.

A

M -0

D

E S

IG

N

I S

S U

E D

F O

R P

R

IC

IN

G

A P

R

T C

H L

IN

E

P -1

6" NG

A

B

D

E

F

G

1514131211 15.2

C

MAU-203

MAU-204

MAU-205

M A

T C

H L

IN

E

P -1

3" NG

1 1/2" NG

1 1/2" BA DN

1 1/2" CA DN

3/4" DCW

2" V DN

FD-B

FD-B

FD-B

FD-B

FD-B

MECHANICAL

HANGAR BAY 2

STAIR 02

SUPPLY PLENUM

1/2" NPW DN

1/2" NPW DN

1/2" NPW DN

3/4" BA

34' - 0" BOP EL

3/4" CA

34' - 0" BOP EL

1" CA

33' - 11" BOP EL

1" BA

33' - 11" BOP EL

3/4" BA

3/4" CA

3/4" CA

3/4" BA

3" VTR

1/2" NPW

1" NPW

3" NG

1 1/2" NG

HB

ETP-202

CO

CO

1 1/2" CA

33' - 7" BOP EL

1 1/2" BA

33' - 7" BOP EL

1 1/2" V DN

3" VTR

2" V DN

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

N

S A

S C

IT

Y

D

IS

T R

IC

T

E

T

H S

T R

E E

T K

A N

S A

S C

IT

Y

M

O

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

W

A R

D P

A R

K W

A Y

K

A N

S A

S C

IT

Y

M

O

A M

A S

H E

K E

L

A F

D R

A W

IN

G

C O

D E

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D

P N

F X

B M

F

Y

B -2

L

O W

O B

S E

R V

A B

L E

-B

A Y

R E

S T

O R

A T

IO

N

F A

C

IL

IT

Y

A P

R

IL

A D

V E

R T

IS

E

M E

N T

D

E S

IG

N

A B C D

E F

KEY PLAN

NOT TO SCALE

W F

-2 -R

-0

P-113

S E

C O

N D

F L O

O R

P

L U

M B

IN

G

P L A

N

A R

E A

C

T K

A R

R E

C P

IE

R

A T

T

J M c C

L U

S K

E Y

SCALE: 1/8" = 1'-0"A1

SECOND FLOOR - PLUMBING PLAN - AREA C

GENERAL NOTES:

1.

2.

SEE SHEET P-001 FOR GENERAL NOTES, LEGEND,

SYMBOLS, AND ABBREVIATIONS.

COORDINATE INSTALLATION OF PIPING WITH

DUCTWORK, LIGHTING, AND FIRE PROTECTION. DO

NOT BLOCK ACCESS TO LIGHTING OR EQUIPMENT.

0 4' 8' 16'

KEYED NOTES:

ROUTE NPW DOWN AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .