This document provides details on a federal contract opportunity to construct a B-21 Low-Observable Restoration Facility at Ellsworth Air Force Base in South Dakota. The solicitation number is W9128F21R0024 and is being issued by the Department of the Army Corps of Engineers Omaha District. The opportunity type is a solicitation to construct the B-21 Low-Observable Restoration Facility (LO Hangar) at Ellsworth AFB, SD. No pricing terms, response dates, or other contract details are included in this document.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No.0006 W9128F
LO HANGAR (FY21), FXBM1081508
ELLSWORTH AFB, SOUTH DAKOTA
See attached documentation for content of the amendment revisions to solicitation.
Date for receipt of proposals is 14 JUN 2021 at 1400 hours
Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil_
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-21-R-0024
05/28/2021
03/24/2021
05/28/2021
Am #0006 - 2 (Continuation of SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers
1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F-21-R-0024 :all amendments may cause rejec-:
:tion of the bid. See FAR : Date of Issue: 24 MAR 2021 :52.214-3 of Section 00 21 00. : Date of Receiving Proposals:
14 JUNE 2021
Amendment No. 0006
28 MAY 2021
SUBJECT: Amendment No. 0006 to Specifications and/or Drawings for Construction of LOW OBSERVABLE RESTORATION FACILITY (LO HANGAR) AT ELLSWORTH
AFB, SD
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly). Please also note that Section 03 30 00 was mistakenly included in Am_0005, despite it not having been changed since Am_0003.
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment. Sections marked with asterisks below have had revisions tracked for convenience.
Pages Deleted Pages Substituted or Added
00 10 00 00 10 00*
REGISTER REGISTER
01 41 26.01 24 01 41 26.01 24* 01 57 19 01 57 19* 01 57 23 ** ** ** 05 40 00 05 40 00*
12 50 00.13 10AT 12 50 00.13 10AT
26 56 00 26 56 00* 28 10 05 28 10 05*
b. Drawings (Reissued). The following drawings are revised, with revision dates indicated in their title blocks, and reissued with this amendment:
VOLUME 1
(1) Sheet C002, DEMOLITION NOTE #3; CIVIL GENERAL NOTES 1;
(2) Sheet GC101, LOCATION AND VICINITY MAP;
(3) Sheet S-001, GENERAL NOTES;
(4) Sheet S-520, TRUSS CONNECTION DETAILS;
(5) Sheet S-522, TRUSS CONNECTION DETAILS;
Am #0006 - 3 (Continuation of SF 30)
VOLUME 2
(6) Sheet AG002, ARCHITECTURAL GENERAL NOTES;
(7) Sheet A-701, ROOM FINISH SCHEDULE AND LEGEND;
(8) Sheet A-671, LOUVER SCHEDULE, TYPES, AND DETAILS;
VOLUME 3
(9) Sheet M-105, FIRST FLOOR - HVAC PLAN - AREA E;
(10) Sheet M-106, FIRST FLOOR - HVAC PLAN - AREA F;
(11) Sheet M-116, FIRST FLOOR – MECH PIPING PLAN - AREA F;
(12) Sheet M-121, SECOND FLOOR – HVAC PLAN - AREA A;
(13) Sheet M-122, SECOND FLOOR – HVAC PLAN - AREA B;
(14) Sheet M-123, SECOND FLOOR – HVAC PLAN - AREA C;
(15) Sheet M-124, SECOND FLOOR – HVAC PLAN - AREA D;
(16) Sheet M-307, MECHANICAL SECTIONS;
(17) Sheet M-402, ENLARGED FIRST FLOOR - HVAC PLAN - BOILER ROOM;
(18) Sheet M-606, MECHANICAL SCHEDULES;
(19) Sheet M-607, MECHANICAL SCHEDULES;
(20) Sheet M-701, HVAC CONTROLS – SYSTEM ARCHITECTURE;
(21) Sheet M-720, HVAC CONTROLS – CRU & ACU SCHEMATIC;
(22) Sheet P-401, ENLARGED FIRST FLOOR - COMPRESSOR ROOM PLUMBING
PLANS;
(23) Sheet P-601, PLUMBING SCHEDULES;
(24) Sheet P-701, COMPRESSED AIR SCHEMATIC – PLANT;
(25) Sheet P-703, BREATHING AIR SCHEMATIC;
VOLUME 4
(26) Sheet EP105, POWER PLAN – AREA E;
(27) Sheet EP136, HVAC POWER PLAN – AREA F;
(28) Sheet EP701, PANELBOARD SCHEDULES;
(29) Sheet EP710, MECHANICAL EQUIPMENT CONNECTION SCHEDULE;
(30) Sheet TN511, TELECOMMUNICATION DETAILS;
(31) Sheet TY001, SECURITY LEGEND;
(32) Sheet TY100, OVERALL SECURITY PLAN; AND
(33) Sheet EF501, ELECTRICAL DETAILS – 1.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged on the Standard Form 30. All other conditions, files, and requirements of the specifications remain unchanged.
3. Offers will be received until 2:00 p.m., CST, on 14 JUN 2021, in accordance with Section 00 22 00.
Attachments:
Specifications listed in 1.a., above Drawings listed in 1.b., above (under separate cover)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
28 MAY 2021
jlb/2099
00 10 00 Page 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-21-R-0024
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
24 MAR 2021
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
9. FOR INFORMATION
CALL:
a. NAME Bill Rawe
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(402) 996-3722
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
LO HANGAR (FY21)
FXBM1081508
ELLSWORTH AFB, SOUTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
THIS SOLICITATION IS UNRESTRICTED, i.e., OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION.
11. The Contractor shall begin performance within 10 calendar days and complete it within 1,100* calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (* - See CLIN Pricing Schedule)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 14 JUN 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than ___90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442(REV. 8/2014)
Prescribed by GSA - FAR(48 CFR) 53.236-1(d)
Am_0006
00 10 00 Page 2
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS or Unique Entity Identifier Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. AWARD DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
CLIN SCHEDULE 00 10 00 – 3 W9128F-21-R-0024
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM
NO.
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
Entire work complete for Construction of the B-21 Low Observable Restoration Facility (LO Hangar), complete to the five-foot line, excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)
Job
XXX
Sitework, Utilities, and Pavements from five-foot line to the limits of Construction of the B-21 Low Observable Restoration Facility; excluding all required Demolition and excluding items listed separately below. (MILCON)
Entire work complete for Demolition of Dock 60 and associated existing Features, Paving, Airfield Paving, Utilities and Infrastructure on the Low Observable Restoration Facility site excluding items separately listed below and as communicated in the Demolition drawings and specifications. (MILCON) the replacement AGE Fuel Island. Scope includes all required Demolition and Construction of the design and associated systems described above and throughout this Contract. (MILCON) all Flightline paving - including Airfield Concrete, Airfield Ground Support Equipment (GSE) asphalt, and Airfield Shoulder Paving – to include all site preparation, base, drainage layer, underdrains, earthwork, underdrains, and striping - excluding bid option paving listed separately below. (MILCON)
CLIN SCHEDULE 00 10 00 – 4 W9128F-21-R-0024
Entire work complete for Cybersecurity documentation and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements as described in this Contract), excluding Cybersecurity items separately listed below. (MILCON)
TOTAL BASIC AMOUNT $_____________________________
OPTION ITEMS
[Option] concrete GSE airfield paving in lieu of asphalt GSE paving as described in this Contract. This includes any additional base course and earthwork as required by the change in paving section. (MILCON) extended PCC concrete apron paving as described in this Contract - to include all associated site preparation, base, drainage layer, underdrains, earthwork, and striping. (MILCON)
Asphalt Shoulder #1 as described in this Contract - to include all associated site preparation, base, earthwork, and striping.
(MILCON)
Asphalt Shoulder #2 as described in this Contract - to include all associated site preparation, base, earthwork and striping.
(MILCON)
Entire work complete for Procurement and Installation of a 5-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.16 in lieu of a 3-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.15. (MILCON)
Entire work complete for Procurement, and Installation, Commissioning, and Cybersecurity of FF&E. (O&M)
CLIN SCHEDULE 00 10 00 – 5 W9128F-21-R-0024
Installation, Commissioning, and Cybersecurity of Intrusion Detection System (IDS), Closed-Circuity Television (CCTV) system and Access Control System (ACS). (O&M)
Cybersecurity for Paint Booth System in Paint Booth Room 153 - to include all associated air handling unit, exhaust fan, ductwork, piping, insulation, utility connections, controls, and wiring. (O&M)
Cybersecurity for user-funded contractor installed equipment. (O&M)
Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M)
Entire work complete for removal and disposal of additional asbestos containing material (ACM) in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
2,500
SF
disposal of additional asbestos containing material (ACM) in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
LF
Entire work complete for additional removal and disposal of contaminated soils not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
CY
disposal of non-adhered lead based paint in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
10,000
SF
CLIN SCHEDULE 00 10 00 – 6 W9128F-21-R-0024
disposal of additional ACM piping not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
1,000
LF
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0007, 0008, and 0011 within 90 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0009, 0010, and 0012 - 0016 within 900 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0017 - 0021 within 365 days of Notice to Proceed. Abbreviation: Operations and Maintenance (O&M).
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.
4. Contract duration is 1,100 calendar days for award basic and option items. No contract duration extension will be provided upon award of any combination of option items.
5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 135 PAGES
B-21 Low Observable Restoration Facility
01 14 00 SD-01 Preconstruction Submittals
1.4 G ROProject Security And Site Access
Management Plan
01 30 00.24 SD-02 Shop Drawings
1.27 G ROEquipment Room Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.2.1 GRO AEPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GRO AESustainability Action Plan
1.5.2.1 GRO AEPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.2.1 GRO AEFinal High Performance and
Sustainable Building Checklist
1.5.2.1 GRO AEFinal Sustainability eNotebook
1.5.2.1 GRO AEAmended Final Sustainability
eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 135 PAGES
01 33 29 1.5.2.1 GRO AEAmended Final High
Performance and Sustainable
Building Checklist
3.2 GRO AEThird Party Certification
Certificate, Assessment, or
Validation
01 33 39.00 10 SD-01 Preconstruction Submittals
1.4.1 G DOAdvanced Modeling Project
Execution Plan (PxP)
1.4.2 G ROPxP Demonstration
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 135 PAGES
01 35 26 G ROPortable Gauge Operations
Planning Worksheet
01 41 26.01 24 SD-01 Preconstruction Submittals
3.2.1Notice of Intent
Authorization Letter
3.2.4Storm Water Pollution Prevention
Plan
3.2.7Notice of Termination
SD-06 Test Reports
3.2.5Reports
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
1.5.14 GAcoustic Testing
SD-07 Certificates
2.1AISC Certified Steel Fabricator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 135 PAGES
01 45 35 2.1Steel Joist Institute Membership
2.1Certificate of Compliance
1.5.13 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
SD-11 Closeout Submittals
3.1.1 GInterim Report
3.1.3 GInterim Report
3.1.1 GComprehensive Final Report
01 74 19 SD-01 Preconstruction Submittals
1.5 G ROWaste Management Plan
SD-11 Closeout Submittals
1.6Records
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals
1.6.1 G DOFacility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 135 PAGES
01 78 24.00 10 3.1 G ROFacility Data Workbook, Construction Progress
3.1 G ROFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 G ROFacility Data Workbook, Construction Final
1.6.3 G ROFacility Document Set, Construction Final
3.2 G ROFacility Document Set, Construction Final
01 78 36.00 24 SD-11 Closeout Submittals
1.2.5Equipment Warranty Booklet
01 78 39.00 24 SD-03 Product Data
1.8.2 G DO50 Percent Preliminary As-Built
Drawings
1.8.3 G DO100 Percent Preliminary As-Built
Drawings
SD-11 Closeout Submittals
1.8.4 G DOFinal As-Built Drawings
01 91 00.15 10 SD-06 Test Reports
3.1.2.1Interim Construction Phase
Commissioning Plan
3.1.2.2Final Construction Phase
Commissioning Plan
3.1.4.2Pre-Functional Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 135 PAGES
01 91 00.15 10 3.1.4Functional Performance Tests
1.8Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.9 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.5Training Plan
3.1.5Training Attendance Rosters
3.1.6Systems Manual
3.1.7Maintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2Final Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.3Receipts
02 61 13 SD-03 Product Data
1.2 GWork Plan
3.10 GClosure Report
SD-06 Test Reports
2.2Backfill
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 135 PAGES
02 61 13 3.4Confirmation Sampling and
Analysis
3.6.1 GSampling of Stored Material
3.10 GTreatment and/or Sampling
3.3.3Compaction
02 65 00 SD-01 Preconstruction Submittals
1.5.4 G ROWork Plan
1.5.4.1 G ROSite Safety and Health Plan
1.5.4.2 GExcavation and Material Handling
Plan
1.5.4.3 G ROField Sampling and Laboratory
Testing Plan
1.5.4.4 GTank and Piping Removal and
Disposal Plan
1.5.4.5 GSpill and Discharge Control Plan
1.5.1 G ROQualifications
1.5.2 GLaboratory Services
3.12.3State Licensed Hazardous Waste
Transporter
SD-06 Test Reports
3.15 GLaboratory and Field Testing
Reports
2.1Backfill Material
3.2Tank Contents Verification
3.5.2 G ROContaminated Water Disposal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 135 PAGES
02 65 00 3.10Soil Examination, Testing, and
Analysis
3.11 GBackfilling
SD-11 Closeout Submittals
3.12.4 GSalvage Rights
3.15 G ROTank Closure Report
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
Part 3 GSafety Data Sheets (SDSs)
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
Part 3 GWaste Analysis Reports
3.8 GRecordkeeping
3.8 GException Report
3.9Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 135 PAGES
02 81 00 3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.7Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1 GEncapsulants
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.12.2 GEncapsulation Test Patches
3.2.14.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 135 PAGES
02 82 00 1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
2.1 GEncapsulants
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.2 GWater Filtration Equipment
3.1.8 GVacuums
3.1.8 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 135 PAGES
02 83 00 1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, and Chromium
Waste Management Plan
1.5.2.2 GLead, Cadmium, and Chromium
Compliance Plan
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
2.1 GMaterials and Equipment
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 135 PAGES
02 83 00 3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of IH
1.8.1 GTraining Documentation
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.1DD Form 1348-1
02 85 00 SD-01 Preconstruction Submittals
1.2.26 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 135 PAGES
02 85 00 1.4.1.6 GMicrobial Remediation Supervisor
Qualifications
SD-03 Product Data
1.2.11 GDisinfectants or Biocide
Sanitizing Solutions
1.2.14 GFungicidal Agents, (EPA)
1.2.21 GPersonal Protective Equipment
(PPE)
1.2.24Pressure Differential Measuring
Instrument
2.2 GSafety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 30 00 SD-01 Preconstruction Submittals
1.7.3.1Concrete Curing Plan
1.7.5 GQuality Control Plan
1.7.6 GQuality Control Personnel
Certifications
1.7.6Quality Control Organizational
Chart
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 135 PAGES
03 30 00 1.7.8 GLaboratory Accreditation
SD-02 Shop Drawings
1.8.1Formwork
1.7.2.1 G AEReinforcing Steel
SD-03 Product Data
2.4.5 G AEJoint Sealants
2.4.4 G AEJoint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6 G AEVapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1 G AELiquid Chemical Floor Hardeners
and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2 G AEWaterstops
2.2.3Biodegradable Form Release
Agent
1.7.3.2Pumping Concrete
1.7.3.3Finishing Plan
2.4.2Nonshrink Grout
2.3.5 G AECrystalline Waterproofing
Admixture
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 135 PAGES
03 30 00 1.7.1.1 G AEConcrete Mix Design
SD-06 Test Reports
1.7.1.1 G AEConcrete Mix Design
1.7.4.1Fly Ash
1.7.4.1Pozzolan
1.7.4.2Slag Cement
1.7.4.3Aggregates
3.10.2.1Tolerance Report
3.13.2.3 G AECompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
3.13.2.6Chloride Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.10Welder Qualifications
1.7.3.4VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.7.3.5Safety Data Sheets
1.9.1Forest Stewardship Council
(FSC) Certification
1.7.6.2Field Testing Technician and
Testing Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 135 PAGES
03 30 00 SD-08 Manufacturer’s Instructions
2.4.3.1 G AELiquid Chemical Floor Hardeners
and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.4.1 G AECut CMU
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.6.1 GHot Weather Procedures
1.6.2 GCold Weather Procedures
2.2.2.1.1 G AEFace CMU
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.6 GInsulation
SD-04 Samples
1.4.1.1 G AEMock-Up Panel
2.2.2.1.1 G AEFace CMU
2.2.3.2 G AEConcrete Masonry Units (CMU)
2.4.1.3 G AEAdmixtures for Masonry Mortar
2.6.2 G AEAnchors, Ties, and Bar
Positioners
1.4.1.3 G AEJoint Reinforcement
2.6.6 G AEInsulation
SD-05 Design Data
2.1.2 G AEMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 135 PAGES
04 20 00 2.2.3.4Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
2.2.3.4Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
SD-07 Certificates
1.4.2Special Masonry Inspector
Qualifications
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
1.4.1.3Joint Reinforcement
2.6.6Insulation
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 135 PAGES
04 20 00 3.8Take-Back Program
SD-11 Closeout Submittals
2.2.3.2.2 SRecycled Content
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 135 PAGES
05 12 00 1.5.1.1 G AEErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.5.2 G AEFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.1.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-05 Design Data
1.5.2 G AEShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2 GSteel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.4 GAISC Structural Steel Fabricator
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 135 PAGES
05 12 00 1.4 GAISC Structural Steel Erector
Quality Certification
1.5.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.4.2Welder Qualification
SD-02 Shop Drawings
1.4.1 G AESteel Joist Framing
SD-05 Design Data
2.2 G AEDesign Calculations
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
SD-07 Certificates
1.4.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.4.4 G AEFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
2.2.15Mechanical Fasteners
2.1.4Touch-Up Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 135 PAGES
05 30 00 1.4.2Welding Equipment
1.4.2Welding Rods and Accessories
SD-04 Samples
2.1.1 G AEMetal Roof Deck Units
2.2.4 G AEFlexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.4.2Welder Qualifications
1.4.2Welding Procedures
1.4.3.1Fire Safety
1.4.3.2Wind Storm Resistance
1.4.1Manufacturer's Certificate
2.2.10Stud Manufacturer's Certification
2.2.10Stud Manufacturer's Test Reports
05 40 00 SD-02 Shop Drawings
1.7.1 G AEFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.7.2 G AEMetal Framing Calculations
SD-07 Certificates
1.5Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 135 PAGES
05 50 13 2.5 G AEFloor Gratings
2.2.9 G AEExpanded Metal Plank
2.6 G AEBollards/Pipe Guards
2.7 G AEAngles and Plates
2.10 G AERoof Hatches
2.10.2 G AESafety Post
2.10.3 G AERail System
2.11 G AEFloor Hatches
SD-03 Product Data
2.4Corner Guards
2.5 GFloor Gratings
2.2.9 G AEExpanded Metal Plank
2.10 G AERoof Hatches
2.10.2 G AESafety Post
2.10.3 G AERail System
2.11 G AEFloor Hatches
2.1Recycled Content
2.8 G AESelf Closing Safety Gate
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 G AEMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 135 PAGES
05 51 00 2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GGray Iron Castings
2.4.9 GMalleable Iron Castings
2.3.2 GConcrete Inserts
2.3.3 GMasonry Anchorage Devices
2.2.4 GProtective Coating
2.2.2 G AESteel Pan Stairs
2.3.1 G AESteel Stairs
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 135 PAGES
05 51 00 2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GGray Iron Castings
2.4.9 GMalleable Iron Castings
2.2.4 GProtective Coating
2.3.3 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.4 G AELadders
SD-03 Product Data
2.4Ladders
2.4.2 G AELadder Safety Devices
SD-07 Certificates
1.4Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.3.1 G AEFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GConcrete Inserts
2.2.6 GMasonry Anchorage Devices
2.1.2 GProtective Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 135 PAGES
05 52 00 2.2.8 GSteel Railings and Handrails
1.3.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.5.1 GWelding Procedures
1.5.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.1 GNailing Strips
SD-03 Product Data
1.9Fire-retardant Treatment
1.5.3OSB Panels
2.3Oriented Strand Board
2.4.3Adhesives
SD-06 Test Reports
1.5.4Preservative-treated
SD-07 Certificates
1.12.1Certificates of Grade
2.1.1Certified Sustainably Harvested
Virgin Lumber
2.2.1Certified Sustainably Harvested
Framing Lumber
1.8Preservative Treatment
2.4.3Indoor Air Quality for Aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 135 PAGES
06 10 00 2.4.3Indoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
3.3Take-back Program
06 41 16.00 10 SD-02 Shop Drawings
1.5.2 G AEShop Drawings
2.11 G AEShop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9Wood Finishes
2.11.7.3Finish Schedule
1.5.3Certification
SD-04 Samples
2.3 G AEPlastic Laminates
2.6 G AECabinet Hardware
SD-07 Certificates
1.5Quality Assurance
2.9Laminate Clad Casework
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.6.2 G AEDetail Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1Solid Polymer Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .