This document provides details on a federal contract opportunity to construct a B-21 Low-Observable Restoration Facility at Ellsworth Air Force Base in South Dakota. The solicitation number is W9128F21R0024 and is being issued by the Department of the Army Corps of Engineers Omaha District. The opportunity type is a solicitation to construct the B-21 Low-Observable Restoration Facility (LO Hangar) at Ellsworth AFB, SD. No pricing terms, response dates, or other contract details are included in this document.

View the file

Other files

File Type Posted
Am_0010-Drawing.pdf PDF
Am_0009.pdf PDF
Am_0010.pdf PDF
Am_0008.pdf PDF
Appendix D.pdf PDF
Am_0008-Drawings.pdf PDF
Am_0007-Drawings.pdf PDF
Am_0007.pdf PDF
Am_0006-Drawings.pdf PDF
Am_0005-Drawings.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL1_Part-a.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL1_Part-b.pdf PDF
28BW_COVID_Travel_Risk_Matrix_v7_04_May_21.xlsx XLSX spreadsheet
W9128F-21-R-0024_Specs.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL3.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL4.pdf PDF
EL91_MM_I_RVT19_G_ADVERTISEMENT_100_DESIGN_VOL2.pdf PDF
Am_0003_W9128F21R0024.pdf PDF
Am_0004-Drawings.pdf PDF
SD27.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
Appendix C - Dock 60 by FMG Dec2020.zip ZIP file
Attachment A - Data Summary Tables (pdf and CD).zip ZIP file
Attachment C - Analytical Data_J15425-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14884-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - 60 ROW by FMG Dec2020.zip ZIP file
Attachment C - Analytical Data_J15666-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14679-1 Std_Tal_L4 Final Report.pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL1.pdf PDF
Attachment C - Analytical Data_J15264-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - Dock 61 by FMG Dec2020.zip ZIP file
Attachment D - SEDDs (CD only).zip ZIP file
Attachment C - Analytical Data_J15965-1 Std_Tal_L4 Final Report.pdf PDF
Attachment C - Analytical Data_J14982-1 Std_Tal_L4 Final Report.pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL3.pdf PDF
Appendix C - Dock 62 by FMG Dec2020.zip ZIP file
W9128F-21-R-0024_Specs (2).pdf PDF
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL2.pdf PDF
Attachment C - Analytical Data_J15285-1 Std_Tal_L4 Final Report.pdf PDF
Appendix C - Dock 63 by FMG Dec2020.zip ZIP file
Attachment B - ADR Summary Reports (pdf and CD).zip ZIP file
EL91_B-21_LO_95_SUBMITTAL_ DRAWINGS_VOL4.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No.0006 W9128F

LO HANGAR (FY21), FXBM1081508

ELLSWORTH AFB, SOUTH DAKOTA

See attached documentation for content of the amendment revisions to solicitation.

Date for receipt of proposals is 14 JUN 2021 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil_

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-21-R-0024

05/28/2021

03/24/2021

05/28/2021

Am #0006 - 2 (Continuation of SF 30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers

1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F-21-R-0024 :all amendments may cause rejec-:

:tion of the bid. See FAR : Date of Issue: 24 MAR 2021 :52.214-3 of Section 00 21 00. : Date of Receiving Proposals:

14 JUNE 2021

Amendment No. 0006

28 MAY 2021

SUBJECT: Amendment No. 0006 to Specifications and/or Drawings for Construction of LOW OBSERVABLE RESTORATION FACILITY (LO HANGAR) AT ELLSWORTH

AFB, SD

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly). Please also note that Section 03 30 00 was mistakenly included in Am_0005, despite it not having been changed since Am_0003.

a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment. Sections marked with asterisks below have had revisions tracked for convenience.

Pages Deleted Pages Substituted or Added

00 10 00 00 10 00*

REGISTER REGISTER

01 41 26.01 24 01 41 26.01 24* 01 57 19 01 57 19* 01 57 23 ** ** ** 05 40 00 05 40 00*

12 50 00.13 10AT 12 50 00.13 10AT

26 56 00 26 56 00* 28 10 05 28 10 05*

b. Drawings (Reissued). The following drawings are revised, with revision dates indicated in their title blocks, and reissued with this amendment:

VOLUME 1

(1) Sheet C002, DEMOLITION NOTE #3; CIVIL GENERAL NOTES 1;

(2) Sheet GC101, LOCATION AND VICINITY MAP;

(3) Sheet S-001, GENERAL NOTES;

(4) Sheet S-520, TRUSS CONNECTION DETAILS;

(5) Sheet S-522, TRUSS CONNECTION DETAILS;

Am #0006 - 3 (Continuation of SF 30)

VOLUME 2

(6) Sheet AG002, ARCHITECTURAL GENERAL NOTES;

(7) Sheet A-701, ROOM FINISH SCHEDULE AND LEGEND;

(8) Sheet A-671, LOUVER SCHEDULE, TYPES, AND DETAILS;

VOLUME 3

(9) Sheet M-105, FIRST FLOOR - HVAC PLAN - AREA E;

(10) Sheet M-106, FIRST FLOOR - HVAC PLAN - AREA F;

(11) Sheet M-116, FIRST FLOOR – MECH PIPING PLAN - AREA F;

(12) Sheet M-121, SECOND FLOOR – HVAC PLAN - AREA A;

(13) Sheet M-122, SECOND FLOOR – HVAC PLAN - AREA B;

(14) Sheet M-123, SECOND FLOOR – HVAC PLAN - AREA C;

(15) Sheet M-124, SECOND FLOOR – HVAC PLAN - AREA D;

(16) Sheet M-307, MECHANICAL SECTIONS;

(17) Sheet M-402, ENLARGED FIRST FLOOR - HVAC PLAN - BOILER ROOM;

(18) Sheet M-606, MECHANICAL SCHEDULES;

(19) Sheet M-607, MECHANICAL SCHEDULES;

(20) Sheet M-701, HVAC CONTROLS – SYSTEM ARCHITECTURE;

(21) Sheet M-720, HVAC CONTROLS – CRU & ACU SCHEMATIC;

(22) Sheet P-401, ENLARGED FIRST FLOOR - COMPRESSOR ROOM PLUMBING

PLANS;

(23) Sheet P-601, PLUMBING SCHEDULES;

(24) Sheet P-701, COMPRESSED AIR SCHEMATIC – PLANT;

(25) Sheet P-703, BREATHING AIR SCHEMATIC;

VOLUME 4

(26) Sheet EP105, POWER PLAN – AREA E;

(27) Sheet EP136, HVAC POWER PLAN – AREA F;

(28) Sheet EP701, PANELBOARD SCHEDULES;

(29) Sheet EP710, MECHANICAL EQUIPMENT CONNECTION SCHEDULE;

(30) Sheet TN511, TELECOMMUNICATION DETAILS;

(31) Sheet TY001, SECURITY LEGEND;

(32) Sheet TY100, OVERALL SECURITY PLAN; AND

(33) Sheet EF501, ELECTRICAL DETAILS – 1.

2. This amendment is a part of the bidding papers and its receipt shall be acknowledged on the Standard Form 30. All other conditions, files, and requirements of the specifications remain unchanged.

3. Offers will be received until 2:00 p.m., CST, on 14 JUN 2021, in accordance with Section 00 22 00.

Attachments:

Specifications listed in 1.a., above Drawings listed in 1.b., above (under separate cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

28 MAY 2021

jlb/2099

00 10 00 Page 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-21-R-0024

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

24 MAR 2021

PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901

9. FOR INFORMATION

CALL:

a. NAME Bill Rawe

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 996-3722

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

LO HANGAR (FY21)

FXBM1081508

ELLSWORTH AFB, SOUTH DAKOTA

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.

THIS SOLICITATION IS UNRESTRICTED, i.e., OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION.

11. The Contractor shall begin performance within 10 calendar days and complete it within 1,100* calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (* - See CLIN Pricing Schedule)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12b.)

YES NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 14 JUN 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than ___90_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442(REV. 8/2014)

Prescribed by GSA - FAR(48 CFR) 53.236-1(d)

Am_0006

00 10 00 Page 2

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS or Unique Entity Identifier Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. AWARD DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

CLIN SCHEDULE 00 10 00 – 3 W9128F-21-R-0024

CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE

ITEM

NO.

DESCRIPTION EST

QTY

UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

Entire work complete for Construction of the B-21 Low Observable Restoration Facility (LO Hangar), complete to the five-foot line, excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)

Job

XXX

Sitework, Utilities, and Pavements from five-foot line to the limits of Construction of the B-21 Low Observable Restoration Facility; excluding all required Demolition and excluding items listed separately below. (MILCON)

Entire work complete for Demolition of Dock 60 and associated existing Features, Paving, Airfield Paving, Utilities and Infrastructure on the Low Observable Restoration Facility site excluding items separately listed below and as communicated in the Demolition drawings and specifications. (MILCON) the replacement AGE Fuel Island. Scope includes all required Demolition and Construction of the design and associated systems described above and throughout this Contract. (MILCON) all Flightline paving - including Airfield Concrete, Airfield Ground Support Equipment (GSE) asphalt, and Airfield Shoulder Paving – to include all site preparation, base, drainage layer, underdrains, earthwork, underdrains, and striping - excluding bid option paving listed separately below. (MILCON)

CLIN SCHEDULE 00 10 00 – 4 W9128F-21-R-0024

Entire work complete for Cybersecurity documentation and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements as described in this Contract), excluding Cybersecurity items separately listed below. (MILCON)

TOTAL BASIC AMOUNT $_____________________________

OPTION ITEMS

[Option] concrete GSE airfield paving in lieu of asphalt GSE paving as described in this Contract. This includes any additional base course and earthwork as required by the change in paving section. (MILCON) extended PCC concrete apron paving as described in this Contract - to include all associated site preparation, base, drainage layer, underdrains, earthwork, and striping. (MILCON)

Asphalt Shoulder #1 as described in this Contract - to include all associated site preparation, base, earthwork, and striping.

(MILCON)

Asphalt Shoulder #2 as described in this Contract - to include all associated site preparation, base, earthwork and striping.

(MILCON)

Entire work complete for Procurement and Installation of a 5-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.16 in lieu of a 3-Part Fuel Resistive Resinous Flooring System per specification 09 67 23.15. (MILCON)

Entire work complete for Procurement, and Installation, Commissioning, and Cybersecurity of FF&E. (O&M)

CLIN SCHEDULE 00 10 00 – 5 W9128F-21-R-0024

Installation, Commissioning, and Cybersecurity of Intrusion Detection System (IDS), Closed-Circuity Television (CCTV) system and Access Control System (ACS). (O&M)

Cybersecurity for Paint Booth System in Paint Booth Room 153 - to include all associated air handling unit, exhaust fan, ductwork, piping, insulation, utility connections, controls, and wiring. (O&M)

Cybersecurity for user-funded contractor installed equipment. (O&M)

Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M)

Entire work complete for removal and disposal of additional asbestos containing material (ACM) in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)

2,500

SF

disposal of additional asbestos containing material (ACM) in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)

LF

Entire work complete for additional removal and disposal of contaminated soils not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)

CY

disposal of non-adhered lead based paint in Dock 60 not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)

10,000

SF

CLIN SCHEDULE 00 10 00 – 6 W9128F-21-R-0024

disposal of additional ACM piping not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)

1,000

LF

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

NOTES:

1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0007, 0008, and 0011 within 90 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0009, 0010, and 0012 - 0016 within 900 days of Notice to Proceed. The Government reserves the right to exercise Option Items 0017 - 0021 within 365 days of Notice to Proceed. Abbreviation: Operations and Maintenance (O&M).

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.

4. Contract duration is 1,100 calendar days for award basic and option items. No contract duration extension will be provided upon award of any combination of option items.

5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 135 PAGES

B-21 Low Observable Restoration Facility

01 14 00 SD-01 Preconstruction Submittals

1.4 G ROProject Security And Site Access

Management Plan

01 30 00.24 SD-02 Shop Drawings

1.27 G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.2.1 GRO AEPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GRO AESustainability Action Plan

1.5.2.1 GRO AEPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.2.1 GRO AEFinal High Performance and

Sustainable Building Checklist

1.5.2.1 GRO AEFinal Sustainability eNotebook

1.5.2.1 GRO AEAmended Final Sustainability

eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 135 PAGES

01 33 29 1.5.2.1 GRO AEAmended Final High

Performance and Sustainable

Building Checklist

3.2 GRO AEThird Party Certification

Certificate, Assessment, or

Validation

01 33 39.00 10 SD-01 Preconstruction Submittals

1.4.1 G DOAdvanced Modeling Project

Execution Plan (PxP)

1.4.2 G ROPxP Demonstration

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 135 PAGES

01 35 26 G ROPortable Gauge Operations

Planning Worksheet

01 41 26.01 24 SD-01 Preconstruction Submittals

3.2.1Notice of Intent

Authorization Letter

3.2.4Storm Water Pollution Prevention

Plan

3.2.7Notice of Termination

SD-06 Test Reports

3.2.5Reports

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1Written NDT Practices

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

1.5.14 GAcoustic Testing

SD-07 Certificates

2.1AISC Certified Steel Fabricator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 135 PAGES

01 45 35 2.1Steel Joist Institute Membership

2.1Certificate of Compliance

1.5.13 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

SD-11 Closeout Submittals

3.1.1 GInterim Report

3.1.3 GInterim Report

3.1.1 GComprehensive Final Report

01 74 19 SD-01 Preconstruction Submittals

1.5 G ROWaste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.6.1 G DOFacility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 135 PAGES

01 78 24.00 10 3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.6.3 G ROFacility Document Set, Construction Final

3.2 G ROFacility Document Set, Construction Final

01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet

01 78 39.00 24 SD-03 Product Data

1.8.2 G DO50 Percent Preliminary As-Built

Drawings

1.8.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.8.4 G DOFinal As-Built Drawings

01 91 00.15 10 SD-06 Test Reports

3.1.2.1Interim Construction Phase

Commissioning Plan

3.1.2.2Final Construction Phase

Commissioning Plan

3.1.4.2Pre-Functional Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 135 PAGES

01 91 00.15 10 3.1.4Functional Performance Tests

1.8Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.9 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5Training Plan

3.1.5Training Attendance Rosters

3.1.6Systems Manual

3.1.7Maintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2Final Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.3Receipts

02 61 13 SD-03 Product Data

1.2 GWork Plan

3.10 GClosure Report

SD-06 Test Reports

2.2Backfill

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 135 PAGES

02 61 13 3.4Confirmation Sampling and

Analysis

3.6.1 GSampling of Stored Material

3.10 GTreatment and/or Sampling

3.3.3Compaction

02 65 00 SD-01 Preconstruction Submittals

1.5.4 G ROWork Plan

1.5.4.1 G ROSite Safety and Health Plan

1.5.4.2 GExcavation and Material Handling

Plan

1.5.4.3 G ROField Sampling and Laboratory

Testing Plan

1.5.4.4 GTank and Piping Removal and

Disposal Plan

1.5.4.5 GSpill and Discharge Control Plan

1.5.1 G ROQualifications

1.5.2 GLaboratory Services

3.12.3State Licensed Hazardous Waste

Transporter

SD-06 Test Reports

3.15 GLaboratory and Field Testing

Reports

2.1Backfill Material

3.2Tank Contents Verification

3.5.2 G ROContaminated Water Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 135 PAGES

02 65 00 3.10Soil Examination, Testing, and

Analysis

3.11 GBackfilling

SD-11 Closeout Submittals

3.12.4 GSalvage Rights

3.15 G ROTank Closure Report

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

Part 3 GSafety Data Sheets (SDSs)

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

Part 3 GWaste Analysis Reports

3.8 GRecordkeeping

3.8 GException Report

3.9Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 135 PAGES

02 81 00 3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.7Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

3.1.8 GVacuums

3.1.10 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.12.2 GEncapsulation Test Patches

3.2.14.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 135 PAGES

02 82 00 1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.7 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.2 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 135 PAGES

02 83 00 1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, and Chromium

Waste Management Plan

1.5.2.2 GLead, Cadmium, and Chromium

Compliance Plan

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

2.1 GMaterials and Equipment

SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 135 PAGES

02 83 00 3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-07 Certificates

1.8.1 GQualifications of IH

1.8.1 GTraining Documentation

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter Certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.1DD Form 1348-1

02 85 00 SD-01 Preconstruction Submittals

1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 135 PAGES

02 85 00 1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 GIH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 30 00 SD-01 Preconstruction Submittals

1.7.3.1Concrete Curing Plan

1.7.5 GQuality Control Plan

1.7.6 GQuality Control Personnel

Certifications

1.7.6Quality Control Organizational

Chart

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 135 PAGES

03 30 00 1.7.8 GLaboratory Accreditation

SD-02 Shop Drawings

1.8.1Formwork

1.7.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5 G AEJoint Sealants

2.4.4 G AEJoint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.6 G AEVapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1 G AELiquid Chemical Floor Hardeners

and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2 G AEWaterstops

2.2.3Biodegradable Form Release

Agent

1.7.3.2Pumping Concrete

1.7.3.3Finishing Plan

2.4.2Nonshrink Grout

2.3.5 G AECrystalline Waterproofing

Admixture

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 135 PAGES

03 30 00 1.7.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.7.1.1 G AEConcrete Mix Design

1.7.4.1Fly Ash

1.7.4.1Pozzolan

1.7.4.2Slag Cement

1.7.4.3Aggregates

3.10.2.1Tolerance Report

3.13.2.3 G AECompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Chloride Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.10Welder Qualifications

1.7.3.4VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.7.3.5Safety Data Sheets

1.9.1Forest Stewardship Council

(FSC) Certification

1.7.6.2Field Testing Technician and

Testing Agency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 135 PAGES

03 30 00 SD-08 Manufacturer’s Instructions

2.4.3.1 G AELiquid Chemical Floor Hardeners

and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.4.1 G AECut CMU

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.6.1 GHot Weather Procedures

1.6.2 GCold Weather Procedures

2.2.2.1.1 G AEFace CMU

2.2.3.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.6 GInsulation

SD-04 Samples

1.4.1.1 G AEMock-Up Panel

2.2.2.1.1 G AEFace CMU

2.2.3.2 G AEConcrete Masonry Units (CMU)

2.4.1.3 G AEAdmixtures for Masonry Mortar

2.6.2 G AEAnchors, Ties, and Bar

Positioners

1.4.1.3 G AEJoint Reinforcement

2.6.6 G AEInsulation

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 135 PAGES

04 20 00 2.2.3.4Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports

2.2.2.1.3Efflorescence Test

2.2.3.4Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.3Prism Tests

SD-07 Certificates

1.4.2Special Masonry Inspector

Qualifications

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

1.4.1.3Joint Reinforcement

2.6.6Insulation

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 135 PAGES

04 20 00 3.8Take-Back Program

SD-11 Closeout Submittals

2.2.3.2.2 SRecycled Content

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 135 PAGES

05 12 00 1.5.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.5.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

SD-05 Design Data

1.5.2 G AEShoring and Temporary Bracing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2 GSteel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.4 GAISC Structural Steel Fabricator

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 135 PAGES

05 12 00 1.4 GAISC Structural Steel Erector

Quality Certification

1.5.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

1.4.2Welder Qualification

SD-02 Shop Drawings

1.4.1 G AESteel Joist Framing

SD-05 Design Data

2.2 G AEDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.4.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.4.4 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.2.15Mechanical Fasteners

2.1.4Touch-Up Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 135 PAGES

05 30 00 1.4.2Welding Equipment

1.4.2Welding Rods and Accessories

SD-04 Samples

2.1.1 G AEMetal Roof Deck Units

2.2.4 G AEFlexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.4.2Welder Qualifications

1.4.2Welding Procedures

1.4.3.1Fire Safety

1.4.3.2Wind Storm Resistance

1.4.1Manufacturer's Certificate

2.2.10Stud Manufacturer's Certification

2.2.10Stud Manufacturer's Test Reports

05 40 00 SD-02 Shop Drawings

1.7.1 G AEFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.7.2 G AEMetal Framing Calculations

SD-07 Certificates

1.5Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 135 PAGES

05 50 13 2.5 G AEFloor Gratings

2.2.9 G AEExpanded Metal Plank

2.6 G AEBollards/Pipe Guards

2.7 G AEAngles and Plates

2.10 G AERoof Hatches

2.10.2 G AESafety Post

2.10.3 G AERail System

2.11 G AEFloor Hatches

SD-03 Product Data

2.4Corner Guards

2.5 GFloor Gratings

2.2.9 G AEExpanded Metal Plank

2.10 G AERoof Hatches

2.10.2 G AESafety Post

2.10.3 G AERail System

2.11 G AEFloor Hatches

2.1Recycled Content

2.8 G AESelf Closing Safety Gate

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 135 PAGES

05 51 00 2.4.2 GStructural-Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GGray Iron Castings

2.4.9 GMalleable Iron Castings

2.3.2 GConcrete Inserts

2.3.3 GMasonry Anchorage Devices

2.2.4 GProtective Coating

2.2.2 G AESteel Pan Stairs

2.3.1 G AESteel Stairs

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 135 PAGES

05 51 00 2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GGray Iron Castings

2.4.9 GMalleable Iron Castings

2.2.4 GProtective Coating

2.3.3 GMasonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.4 G AELadders

SD-03 Product Data

2.4Ladders

2.4.2 G AELadder Safety Devices

SD-07 Certificates

1.4Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.3.1 G AEFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GConcrete Inserts

2.2.6 GMasonry Anchorage Devices

2.1.2 GProtective Coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 135 PAGES

05 52 00 2.2.8 GSteel Railings and Handrails

1.3.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.5.1 GWelding Procedures

1.5.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.2.1 GNailing Strips

SD-03 Product Data

1.9Fire-retardant Treatment

1.5.3OSB Panels

2.3Oriented Strand Board

2.4.3Adhesives

SD-06 Test Reports

1.5.4Preservative-treated

SD-07 Certificates

1.12.1Certificates of Grade

2.1.1Certified Sustainably Harvested

Virgin Lumber

2.2.1Certified Sustainably Harvested

Framing Lumber

1.8Preservative Treatment

2.4.3Indoor Air Quality for Aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 135 PAGES

06 10 00 2.4.3Indoor Air Quality for Non-aerosol

Adhesives

SD-10 Operation and Maintenance

Data

3.3Take-back Program

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G AEShop Drawings

2.11 G AEShop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9Wood Finishes

2.11.7.3Finish Schedule

1.5.3Certification

SD-04 Samples

2.3 G AEPlastic Laminates

2.6 G AECabinet Hardware

SD-07 Certificates

1.5Quality Assurance

2.9Laminate Clad Casework

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.6.2 G AEDetail Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1Solid Polymer Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .