This is a solicitation for a construction contract to rehabilitate bank stabilization and navigation structures on the Missouri River between River Miles 611 and 498 in Nebraska, Iowa, and Missouri. The work involves adding quarried rock to replace deteriorated areas and rebuild parts of structures damaged in 2019 floods. A mandatory site visit will be held on July 15, 2021 at 9:00 am CDT at the Missouri River Project Office in Omaha, NE. Contractors must RSVP by July 12 to the contact provided. The solicitation is issued by the Department of the Army Corps of Engineers Omaha District for an indefinite delivery indefinite quantity contract with fixed unit prices. Offerors must submit bids by the date listed in block 13 of the SF1442 form.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F21B0013 Bid Abstract.pdf | ||
| 6. AM0004 Drawings.pdf | ||
| AM0004_21B0013_1Aug2021.pdf | ||
| AM0003_21B0013_27Jul2021.pdf | ||
| AM0002_21B0013_22Jul2021.pdf | ||
| 4. AM0002 01 22 00.pdf | ||
| 5. AM0002 Drawings.pdf | ||
| 2021 BSNP site visit sign-in sheet.pdf | ||
| AM0001 drawings.pdf | ||
| W9128F21B0013_6-29-2021.pdf | ||
| Specs 2021 Mo River BSNP.pdf | ||
| BSNP 2021 RTA Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG10989674
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Am0001 in SF30 Block 14 Continuation Page for description of amendment changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 50
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F21B0013
X 9B. DATED (SEE ITEM 11)
29-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jul-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F21B0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AM0001
SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of 2021 Bank Stabilization & Navigation Project (BSNP) Structures Repair project (Rm 611 to 498), Missouri River, IA, MO and NE.
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Drawings (Reissued). The following drawings are revised with latest revision date of 09 July 2021, and reissued with this amendment.
(1) Sheets C 2.04, C 2.05, C 2.06, C 2.07 and C 3.02
b. Bid Schedule. See Section Section 00 10 00 for revised bid schedule. All offerors must use the bid schedule from Amendment 0001, unless changed by a subsequent amendment.
c. Instructions to Bidders. See Section 00 21 00, paragraph 1.1.2 BID OPENING. The second sentence is revised to remove “when the bids are due.”
d. FAR 52.236-27 Alt I. See Section 00 21 00; clause updated to add call-in information for participants to use that cannot attend in person.
e. General Decision Revisions. See Section 00 73 00 for the below changes.
(1) Incorporated revised General Decision Number IA20210002 dated 9 July 2021.
(2) Incorporated revised General Decision Number MO20210001 dated 9 July 2021.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
3. Attachments: Am0001 Drawings listed in 1(a) above.
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specs 2021 Mo River
BSNP - June 2021
Attachment 2 BSNP 2021 RTA Drawings - June 2021 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specs 2021 Mo River
BSNP - June 2021
Attachment 2 BSNP 2021 RTA Drawings - June 2021
Attachment 3 AM0001 Drawings 5 09-JUL-2021
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The following have been modified:
BID SCHEDULE
BID SCHEDULE
Item Estimated Unit No. Description Quantity Unit Price Amount
BASIC
0001. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 498 to 520 (10 Structures) 23,306 Tons $_________ $___________
0002. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 520 to 540 (10 Structures) 30,535 Tons $_________ $___________
0003. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 540 to 560 (11 Structures) 22,882 Tons $_________ $___________
0004. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (5 Structures) 11,955 Tons $_________ $___________
0005. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 590 (3 Structures) 11,081 Tons $_________ $___________
0006. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 520 to 530 (8 Structures) 12,550 Tons $_________ $___________
0007. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 518 to 519 (1 Structure) 9,884 Tons $_________ $___________
0008. All remaining work Except for Option
Items listed below 1 Job XXX $___________
TOTAL BASIC AMOUNT (Items 0001 thru 0008) $_______________
OPTION 1
0009. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 505 to 520 (4 Structures) 15,453 Tons $_________ $___________
0010. All remaining work in the option area as shown on the drawings and 1 Job XXX $___________ in the specifications
TOTAL AMOUNT – OPTION 1 (Items 0009 & 0010) $_______________
OPTION 2
0011. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 530 to 540 (4 Structures) 7,948 Tons $_________ $___________
0012. All remaining work in the option area
TOTAL AMOUNT – OPTION 2 (Items 0011 & 0012) $_______________
OPTION 3
0013. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 530 to 535 (1 Structure) 17,130 Tons $_________ $___________
0014. All remaining work in the option area
TOTAL AMOUNT – OPTION 3 (Items 0013 & 0014) $_______________
OPTION 4
0015. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 537 to 539 (3 Structures) 4,639 Tons $_________ $___________
0016. All remaining work in the option area as shown on the drawings and 1 Job XXX $___________
TOTAL AMOUNT – OPTION 4 (Items 0015 & 0016) $_______________
OPTION 5
0017. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 548 to 556 (3 Structures) 15,253 Tons $_________ $___________
0018. All remaining work in the option area as shown on the drawings and in the specifications 1 Job XXX $___________
TOTAL AMOUNT – OPTION 5 (Items 0017 & 0018) $_______________
OPTION 6
0019. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 555 to 560 (3 Structures) 10,117 Tons $_________ $___________
0020. All remaining work in the option area
TOTAL AMOUNT – OPTION 6 (Items 0019 & 0020) $_______________
OPTION 7
0021. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 565 (1 Structures) 5,656 Tons $_________ $___________
0022. All remaining work in the option area
TOTAL AMOUNT – OPTION 7 (Items 0021 & 0022) $_______________
OPTION 8
0023. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 590 to 612 (2 Structures) 6,882 Tons $_________ $___________
0024. All remaining work in the option area
TOTAL AMOUNT – OPTION 8 (Items 0023 & 0024) $_______________
OPTION 9
0025. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 542 to 555 (17 Structures) 20,389 Tons $_________ $___________
0026. All remaining work in the option area
TOTAL AMOUNT – OPTION 9 (Items 0025 & 0026) $_______________
TOTAL BASIC AMOUNT (Items 0001 thru 0008) $_______________
TOTAL AMOUNT BASIC PLUS OPTIONS (Items 0001 thru 0026) $_______________
Notes:
1. See SECTION 00 21 00, INSTRUCTIONS, FAR 52.217-5 for information on evaluation of options.
2. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to FAR 52.211-18 "Variation in Estimated Quantity."
3. Bid prices must be entered for all items of the schedule. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.11 REJECTION OF BIDS FOR information on rejection of bids. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.4 Arithmetic Discrepancies for information on clerical mistakes.
4. See SECTION 00 21 00, INSTRUCTIONS, paragraph 1.1.3 INFORMATION FOR MODIFYING BIDS for information if bid modifications are needed.
5. See SECTION 01 22 00 MEASUREMENT AND PAYMENT for additional information.
6. See SECTION 00 72 00, GENERAL CONDITIONS, FAR 52.217-7 Option for Increased Quantity—Separately Priced Line Items for additional information on how the Government will award option items.
SECTION 00 21 00 - INSTRUCTIONS
INSTRUCTIONS TO BIDDERS
1.1 GENERAL BIDDING INFORMATION
Bidders shall e-mail bids to the below individuals no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recent SF 30, as applicable:
David Neal, Contracting Officer: david.w.neal@usace.army.mil Clinton Russell, Contract Specialist: clinton.e.russell@usace.army.mil
Each email shall contain the following information:
a. Solicitation No: W9128F21B0013
b. Bid Due Date and Time:
c. Bid Validity Date: 60 Days
Bids received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the bidder must ensure the e-mail submission is virus-free. The government will follow FAR 14.406 if an e-mail bid is unreadable.
Bidders should enter a description for every file submitted. Bidders should separate files over 20 megabytes (MB) into smaller files and send separate e-mails. Bidders shall identify each e-mail with the number relative to the total number of e-mails submitted (i.e., “e-mail 1 of 4”). Bidders should request government receipt upon sending all e-mails. Bidders should not assume e-mail submissions are instantaneous and must consider file size and number of files sent.
Bidders must be registered in the System for Award Management (SAM) when sending the bid to comply with the annual representations and certifications requirements. The offeror certifies with its offer that the representations and certifications included in SAM are current, accurate, and complete.
1.1.1 INFORMATION TO BE PROVIDED WITH BID
Bidders must include the below information with the bid:
a. Standard Form (SF) 1442 with Blocks 14 through 20c completed and a person’s signature authorized to sign. Bidders must include their CAGE Code in Block 14, under “CODE.”
b. Bid Schedule (SECTION 00 10 00).
c. Bid Bond (SF-24); and
d. Bidder must complete provisions from SECTION 00 45 00 – Representations and Certifications, as applicable and listed below.
i. Bidders must complete and include the certification at FAR 52.209-13 Violation of Arms
Control Treaties or Agreements-Certification.
ii. Bidders must complete and include the representation at FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment ONLY based on its online representation in the provision at 52.204-26 Covered Telecommunications Equipment or Services-Representation in SAM.
iii. Bidders must include the representation at 252.204-7017 Prohibition on the Acquisitions of
Covered Defense Telecommunications Equipment or Services-Representation ONLY based on its online representation in the provision at 252.204-7016 Covered Defense Telecommunications Equipment or Services-Representation in SAM.
1.1.2 BID OPENING
The government will NOT conduct a physical bid opening for this solicitation. The government will hold the bid opening by conference call at 3:00 pm CST. The government scheduled the bid opening an hour after the due date to allow enough time to download all e-mail documents. No hard copy documents will be accepted.
1.1.3 INFORMATION FOR MODIFYING BIDS
If a bidder needs to modify its bid, the bidder shall send the revised offer by e-mail before the date submitted within Block 13 of the SF 1442 or Block 14 of the most recently issued SF 30 applicable.
1.1.4 ARITHMETIC DISCREPANCIES
Any clerical mistake, including arithmetic discrepancies in a bid, will be handled according to FAR 14.407-
2. Any clerical error, apparent on its face in the offer, may be corrected by the contracting officer before award, but only after first obtaining bidder verification of the bid intended. The following are examples of mistakes that may be fixed:
(1) Obviously misplaced decimal points;
(2) Discrepancies between unit price and extended price (unit price will govern);
(3) Apparent errors in extension of unit prices;
(4) Apparent errors in addition of lump sum and extended prices.
1.1.5 BASIS FOR AWARD
Per FAR 52.214-19 Contract Award-Sealed Bidding-Construction in Section 00 21 00 (Instructions), the government will evaluate bids in response to this solicitation without discussions. It will award a contract to the responsible bidder whose offer, conforming to the solicitation, will be most advantageous to the government, considering only price and the price-related factors specified elsewhere in the solicitation.
1.1.6 DESCRIPTION OF WORK
The 2019 floods caused significant damage to the Missouri River Bank Stabilization and Navigation Project (BSNP) structures. The damaged structures include revetments, dikes, kickers, L-head dikes and vanes. These structures are critical to maintaining a navigation channel on the Missouri River. Under this construction contract, critical damaged BSNP structures will be rehabilitated by adding quarried rock to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The quantity of rock for each site is intended to bring the structures to the lines and grades shown on the cross-sections.
1.1.7 ESTIMATED CONSTRUCTION COST
The estimated magnitude of construction is between $10,000,000 and $25,000,000.
1.1.8 BID GUARANTEE
See 52.228-1, Bid Guarantee in Section 00 72 00 (General Conditions). The bid guarantee must be on SF 24 and include a Power of Attorney appointing an attorney-in-fact with authority to bind the surety. At the time of bid opening, the bond is enforceable against the surety should the bidder fail to meet its obligation.
A power of attorney must include a certification as to the authority of the surety’s agents supported by a resolution of the surety authorizing their use and committing it bound by them. Electronic signatures and electronic, mechanically-applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF-24 is not required. Mailing a bid guarantee is not allowed.
1.1.9 PERFORMANCE AND PAYMENT BONDS OR ALTERNATE PAYMENT PROTECTION
See 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) (DEVIATION 2020-O0016) in Section 00 72 00 (General Conditions). The performance bond must be on SF-25, and the payment bond must be on SF-25A. Electronic signatures and electronic, mechanically-applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF-25 or SF-25A is not required.
1.1.10 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by internet access only. The government will post all solicitation documents to https://beta.sam.gov/. The bidder is responsible for checking the website for amendments.
To view a list of interested vendors and receive notifications or e-mail of changes regarding the solicitation, bidders must register as vendors on the website listed above. If a bidder is already registered, enter the user name and password to log in and search for the solicitation number. If you wish for general contractors, subcontractors, suppliers, plan rooms, or print shops to have the ability to contact you, click on the “Add Me to Interested Vendors” for this solicitation.
1.1.11 REJECTION OF BIDS
The government will handle the rejection of bids per FAR 14.404. The government may reject an offer if the prices for line items or subline items are materially unbalanced (see 15.404-1(g)). Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or underestimated as indicated by the application of cost or price analysis techniques.
1.1.12 NOTICE REGARDING BUY AMERICAN STATUE
The Buy American statute (41 USC 83 chapter 83, Buy American) generally requires that contractors use only domestic construction material during the performance of this contract. Exception from the Buy American statute is permitted only in the case of non-availability of domestic construction materials or allowed under Trade Agreements if included in the solicitation. A bid offering non-domestic construction material will not be accepted unless specifically approved by the government or authorized under Trade Agreements if included in the solicitation. When a bidder proposes to furnish non-domestic construction material, the bid must set forth an itemization of the quantity, unit price, and intended use of any non-domestic construction material.
1.1.13 FEDERAL, STATE AND LOCAL TAXES
The bidder is responsible for investigating applicable federal, state, and local taxes and any specific exemptions that may exist and includes applicable Value-Added Taxes (VAT), sales, use, and excise taxes.
See 52.229-3 Federal, State, and Local in Section 00 72 00 (General Conditions).
1.1.14 NEBRASKA SALES AND USE TAX
Materials installed under this contract are not exempt, and the bidder must include tax in the bid.
Telephone: (402) 595-2065 (Department of Revenue-Omaha).
1.1.15 MISSOURI SALES AND USE TAX
Materials installed under this contract are not exempt, and the bidder must include tax in the bid. Contact the Missouri Department of Revenue.
1.1.16 IOWA SALES AND USE TAX
The contractor is responsible for payment of Iowa Sales and Use taxes for all materials used under this contract. Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS, provision "IOWA SALES AND USE TAX," requires the Contractor to furnish to the Contracting Officer the statement required by Section 422.45 (7a), Iowa Code annotated, and to include in subcontracts and purchase orders a clause insuring submission of the statement by first tier subcontractors and suppliers and their subcontractors and suppliers. Telephone: (515) 281-3114 (Department of Revenue).
a. In the event goods, wares or merchandise on which the Contractor has paid Iowa sales or use tax become an integral part of the project, the Contractor shall obtain appropriate forms from the Iowa State Tax Commission for recording the amount of purchases of such goods, wares, or merchandise, and shall complete, execute, and deliver them to the Contracting Officer prior to final settlement of the contract. The Contractor shall provide and report all data and information which may be necessary or required to enable the Contracting Officer to obtain all refunds from the Iowa Tax Commission to which the Federal Government may be entitled.
b. The contractor shall insert a clause containing the substance of the foregoing paragraph a. in every first tier subcontractor or vendor to include such a clause in any subcontract or purchase order which he places. The Contractor shall obtain completed forms from his subcontractor and suppliers for submission to the Contracting Officer before final settlement of the contract.
1.1.17 BIDDER’S QUESTIONS AND COMMENTS
Bidders must submit questions and comments relative to the bidding documents via Bidder Inquiry as indicated below.
Bidders may submit questions and comments relative to any proprietary concerns or bidding documents, or if the Bidder Inquiry system is out of service, to the individuals below:
Contract Specialist – Clinton Russell Clinton.e.russell@usace.army.mil
Contracting Officer – David Neal David.w.neal@usace.army.mil
1.1.17.1 BIDDER INQUIRY
Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment.
Bidders must use the Bidder Inquiry Key and instructions below to submit and review inquiry items. A bidder who enters a comment/question will receive an acknowledgment of their comment /question by e-mail, followed by an answer to the comment/question after the government has processed it.
The government will make available all timely questions and approved answers in ProjNet.
The Solicitation Number is: W9128F21B0013
The Bidder Inquiry Key is: CAVRZJ-V66W94
a. Registration for ProjNet Bidder Inquiry Access
1. From the ProjNet home page listed above, click on Quick Add on the upper right side of the screen.
2. Select USACE for the Agency.
3. Enter the Bidder Inquiry Key above.
4. Enter the primary e-mail address to use for communication for.
5. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Bidders will use the answer to the Secret Question from this point on to access the ProjNet system.
7. Click Add User. Once completed, ProjNet registration is complete, and the bidder is logged into the system.
b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, bidders will not receive a password by e-mail. Bidders will utilize the Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Select USACE for the Agency.
4. Enter the Bidder Inquiry Key above.
5. Enter the primary e-mail address used to register.
6. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once complete, the bidder is logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
c. Bidders are requested to review the plans and specifications in their entirety and review the Bidder
Inquiry System for answers to questions prior to submitting a new inquiry.
d. The call center operate weekdays from 8 am to 5 pm Central Standard Time Zone (Chicago). The telephone number for the call center is 800-428-HELP.
1.1.18 AVAILABILITY OF BID RESULTS
Bid results will be available after bid opening on https://www.beta.sam.gov/.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Thursday, 15 July 2021 at 9:00 am CDT.
(c) Participants will meet at—the Missouri River Project Office, 9901 John J Pershing Dr, Omaha, NE 68112.
Bidders interested in attending the site visit need to make a reservation with Kyle Madson by e-mail at Kyle.M.Madson@usace.army.mil by close-of-business on 12 July 2021. The email must include the company name and the names of the individual(s) attending the site visit.
Participants that cannot attend in person may use the below call-in information.
US Toll Free: 1-844-800-2712 Attendee access code: 43376249
(End of provision)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
IA20210002
"General Decision Number: IA20210002 07/09/2021
Superseded General Decision Number: IA20200002
State: Iowa
Construction Type: Heavy River Work
Counties: Iowa Statewide.
HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING
TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI
RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA
WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES
CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING
WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE
WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES,
RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY
CONSTRUCTION.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 03/12/2021 2 07/09/2021
CARP0004-007 01/01/2020
SCOTT COUNTY
Rates Fringes
CARPENTER........................$ 31.14 26.32
ENGI0150-008 06/01/2020
CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT
COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 36.50 34.75
GROUP 2.....................$ 35.50 34.75
GROUP 3.....................$ 32.85 34.75
GROUP 4.....................$ 31.80 34.75
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat
GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt Paver Screed; Asphalt Plant; Automatic Curbing Machine;
Backfiller (throw bucket); Blastholer Self-Propelled Rotary Drill or Similar Machines; Boom Tractor or Side Boom;
Boring Machine (Directional, Vertical or Horizontal);
Building Hoist (1,2 or 3 drums); Caisson Auguring Machines;
Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming Machine; Combination Backhoe Front End Loader; Combination Concrete Finishing Machine and Float; Concrete Breaker or Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;
Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.);
Curing-Tinning Machine; Dipper Dredge Crane man; Dipper Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.);
Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);
Grader, Motor Grader, Motor Patrol, Auto Grader, Form Grader, Pull Grader, Sub Grader, Elevating Grader; Group Equipment Greaser; Guard Rail Post Driver; Hoists;
Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck Mounted or Pull Type, and Similar Equipment; Laser Screed;
Loader (Track, Rubber Tire or Articulated); Locomotive Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad Foot Compactor; Shovel; Slip Form Paver; Steel Track-Type Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy;
Trenching Machine (40 H.P. & over); Work Boat.
GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster;
Boiler (Engineer or Fireman); Conveyor Over 20 H.P.;
Distributor; Driver on Truck Crane or Similar Machines;
Elevator; Farm-Type Tractor (Without Power Attachment);
Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant;
Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine (Under 40 H.P.).
GROUP 4: Air Compressor (400 C.F.M. or over); Compact Loader (Rubber Tire, Track & Utility); Engine Driven Welding Machine; Mechanical Heater (other than steam boiler); Small Outboard Motor Boat (Safety Boat & Life Boat); Water Pump (More than one well point pump).
* ENGI0234-002 12/01/2020
REMAINING COUNTIES
Rates Fringes
Power equipment operators:
MISSISSIPPI RIVER
GROUP A....................$ 39.02 15.50
GROUP B....................$ 38.33 15.50
GROUP C....................$ 36.00 15.50
MISSOURI RIVER
GROUP A....................$ 38.54 15.50
GROUP B....................$ 37.87 15.50
GROUP C....................$ 35.61 15.50
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol (finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics - welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self-propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.
GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self-propelled sheepsfoot roller, self-propelled roller, dristributor, screening and washing plant, self-propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self-propelled elevator grader, water wagon on compaction
GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver-oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3"", farm type tractor (pulling disc, harrow or roller).
IRON0111-005 07/01/2020
(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE,
HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON,
LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)
Ironworker.......................$ 33.00 27.73
LABO0309-005 01/01/2019
SCOTT COUNTY
Rates Fringes
LABORERS
GROUP 1.....................$ 28.13 21.07
GROUP 2.....................$ 28.63 21.07
GROUP 3.....................$ 29.26 21.07
LABORER CLASSIFICATIONS
GROUP 1 - Flagman; Dumpman; Spotter; Broom Man; Landscaper;
Planting & Removal of Trees; Fencing Laborers; Cleaning of Forms or Lumber (in Bone Yard); Laying of Sod; Moving and/or Maintenance of Flares & Barricades; Operation of all Hand, Electric, Air, Hydraulic or Mechanically Powered Tools under the the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator; Mortar Mixer; Power & Hand Saw (When Clearing Timber); General Laborer; Material Handler; Form Handler; Concrete Dumper; Puddler; Explosives Handler;
Center Strip Handler & Installer; Prime Mover or any Mechanical Device Taking the Place of Concrete Buggy or Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting Hammer Driver; Laying & Jointing of Telephone Conduit; Gas Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin;
Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker;
Bankman on Floating Plant; Jointman With Pipelayer; Back-up Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water Main; Batterboard Man or Laser Operator on Sewer & Water Main; Laborer in Ditch or Tunnel, on Sewer or Water Main & Telephone Conduit, Cutters; Burners; Torchman; Gravel Box Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of Steel & Rebar; & Wrecking Laborers
GROUP 2 - Asphalt Raker or Luteman; Pipe Setter on Sewer or Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb Machine Operator; Concrete Burning Machine Operator; & Coring Machine Operator; Hazardous Waste Worker; Asbestos Abatement Worker
GROUP 3 - Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)
PLAS0544-001 01/01/2019
SCOTT COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.90 23.16
TEAM0371-001 05/01/2019
SCOTT COUNTY
Truck drivers:
GROUP 1.....................$ 38.17 13.25+a GROUP 2.....................$ 38.71 13.25+a GROUP 3.....................$ 39.01 13.25+a GROUP 4.....................$ 30.34 13.25+a GROUP 5.....................$ 40.39 13.25+a
Footnote:
a. PENSION: $52.80 per day
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons , air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick- up-trucks when hauling material, tools or men to and from and on the job site, and forklifts up to 6,000 lb capacity
GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A-frame winch trucks, or similar equipment when used for transportation purposes. Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or simiolar equipment when used for transportation purposes..
GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks
GROUP 4: Oil distributors, lowboys
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
SUIA2002-002 12/01/2014
Rates Fringes
CARPENTER
Mississippi River (Iowa Side).......................$ 28.55 16.29 Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay previalis in the adjoining states, then those rates shall apply)................$ 34.60 21.38 Missouri River..............$ 31.25 12.43
CEMENT MASON/CONCRETE FINISHER...$ 33.35 10.05
Ironworkers: (setting of all structural steel and reinforcing steel installation:)
Des Moines and Lee Counties....................$ 29.42 16.68 Dubuque, Clayton & Allamakee Counties..........$ 26.67 16.68 Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.89 16.68 Jackson, Clinton, Louisa & Muscatine Counties........$ 36.20 16.68 Woodbury & Monona Counties..$ 19.46 16.68
Laborers:
Class A Mississippi River..........$ 30.92 8.60 Missouri River.............$ 28.92 8.60 Class AA Mississippi River..........$ 31.95 8.60 Missouri River.............$ 29.95 8.60 Class B Mississippi River..........$ 29.22 8.60 Missouri River.............$ 28.22 8.60 Class C Mississippi River..........$ 26.05 8.60 Missouri River.............$ 24.05 8.60
TRUCK DRIVER
Mississippi River...........$ 24.88 10.50 Missouri River..............$ 24.88 10.50
LABORERS CLASSIFICATIONS
GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.
GROUP AA: Pipelayer, concrete specialist; tunnelman
GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper), timber and chair-sawman, mechanical stresser or strechman on post-tension or pre-stressed concrete on or off job, form tamper, air-gas and electric tool opertors-vibrators- Barcohammer-Pavec-tampers-electric drills-hammers and jackhammers, tree groundman, chair tenders-tool room men and checkers, concrete processing material and monitors, stringman on paving work, broom operator (not self propelled), fence erectors, handling and placing of metal mesh, dowel bars, reinforcing baars and chairs, dumpmen and spotters, carring reinforcing rods, corrugated culvert pipe, stake chaser, seeding or mulching and planting of trees shrubs and flowers, water pumps (under 3""), compressors (under 400 CFM), general laborer, rodman, hot asphalt labor, carpenter tender, concrete finisher tender.
GROUP C: Waterboy, flagman, flagger/traffic control, watchman.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
MO20210001
"General Decision Number: MO20210001 07/09/2021
Superseded General Decision Number: MO20200001
State: Missouri
Construction Types: Heavy and Highway
Counties: Missouri Statewide.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 02/05/2021 2 02/12/2021 3 04/09/2021 4 04/23/2021 5 05/21/2021 6 05/28/2021 7 06/25/2021 8 07/09/2021
CARP0002-002 05/01/2019
ST. LOUIS COUNTY AND CITY
Rates Fringes
Carpenters.......................$ 38.02 17.77
CARP0005-006 05/03/2015
CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY
Carpenters:
CARPENTERS & LATHERS........$ 36.34 15.55
MILLWRIGHTS & PILEDRIVERS...$ 36.34 15.55
CARP0011-001 05/01/2019
Rates Fringes
Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND
SULLIVAN COUNTIES...........$ 32.28 17.77
ATCHISON, ANDREW, BATES,
CALDWELL, CARROLL,DAVIESS,
DEKALB,GENTRY, GRUNDY,
HARRISON, HENRY, HOLT,
LIVINGSTON, MERCER,
NODAWAY,ST. CLAIR, SALINE
AND WORTH COUNTIES..........$ 30.76 17.77
AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 32.29 17.77
BARRY, BARTON, CAMDEN,
CEDAR, CHRISTIAN, DADE,
DALLAS, DOUGLAS, GREENE,
HICKORY,JASPER, LACLEDE,
LAWRENCE, MCDONALD,
NEWTON, OZARK, POLK,
STONE, TANEY, VERNON,
WEBSTER AND WRIGHT COUNTIES.$ 30.36 17.77
BENTON, MORGAN AND PETTIS...$ 30.81 17.77
BOLLINGER, BUTLER, CAPE
GIRARDEAU, DUNKLIN,
MISSISSIPPI, NEW MADRID,
PEMISCOT, PERRY, STE.
GENEVIEVE, SCOTT, STODDARD
AND WAYNE COUNTIES..........$ 32.14 17.77
BUCHANAN, CLINTON, JOHNSON
AND LAFAYETTE COUNTIES......$ 31.49 17.77
CARTER, HOWELL, OREGON AND
RIPLEY COUNTIES.............$ 31.09 17.77
CRAWFORD, DENT, GASCONADE,
IRON, MADISON, MARIES,
MONTGOMERY, PHELPS,
PULASKI, REYNOLDS, SHANNON
AND TEXAS COUNTIES..........$ 32.13 17.77
FRANKLIN COUNTY.............$ 35.56 17.77
JEFFERSON AND ST. CHARLES
COUNTIES....................$ 38.02 17.77
LINCOLN COUNTY..............$ 34.00 17.77
PIKE, ST. FRANCOIS AND
WASHINGTON COUNTIES.........$ 32.92 17.77
WARREN COUNTY...............$ 34.44 17.77
ELEC0001-002 05/31/2020
BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN,
IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID,
PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,
ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES
Electricians.....................$ 40.61 27.06
ELEC0002-001 01/01/2021
ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .