2021 BSNP site visit sign-in sheet.pdf
PDF 79 KB Posted
- Attached to
- 2021 Bank Stabilization & Navigation Project (BSNP) Structures Repair Project Federal contract opportunity
- Solicitation number
- W9128F21B0013
About this file
This federal solicitation is seeking contractors to rehabilitate critical structures along the Missouri River Bank Stabilization and Navigation Project that were damaged in 2019 floods. The structures in need of repair extend from River Mile 611 to 498 in Nebraska, Iowa and Missouri, and include revetments, dikes, kickers, L-head dikes and vanes. Under the construction contract, the selected contractor will add quarried rock to reinforce areas of deterioration and effectively rebuild parts of structures that experienced substantial material loss. A mandatory site visit will be held on July 15, 2021 at 9:00am CDT at the Missouri River Project Office in Omaha, Nebraska, and interested contractors must register with the Corps of Engineers contact Kyle Madson by email no later than July 12, 2021, providing their company name and attendee(s).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F21B0013 Bid Abstract.pdf | ||
| AM0004_21B0013_1Aug2021.pdf | ||
| 6. AM0004 Drawings.pdf | ||
| AM0003_21B0013_27Jul2021.pdf | ||
| 5. AM0002 Drawings.pdf | ||
| AM0002_21B0013_22Jul2021.pdf | ||
| 4. AM0002 01 22 00.pdf | ||
| AM0001_21B0013.pdf | ||
| AM0001 drawings.pdf | ||
| Specs 2021 Mo River BSNP.pdf | ||
| BSNP 2021 RTA Drawings.pdf | ||
| W9128F21B0013_6-29-2021.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .