Am-0002_W9128F-19-R-0004.pdf

PDF 6 MB Posted

Attached to
SOF Human Performance Training Center Federal contract opportunity
Solicitation number
W9128F19R0004
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Amendment 0002 Documents

View the file

Other files for this federal contract opportunity

Other files attached to SOF Human Performance Training Center, newest first.
File Type Posted
Am-0005_W9128F-19-R-0004.pdf PDF
Am-0004_W9128F-19-R-0004.pdf PDF
Am-0003_W9128F-19-R-0004.pdf PDF
Am-0001_W9128F-19-R-0004.pdf PDF
CAD-BIM-Files_Instructions.txt TXT text file
FCBQ.zip ZIP file
SPECS_W9128F-19-R-0004.pdf PDF
SOF_HPTF_FFE_RTA_for_Binder.pdf PDF
SID_Color_Board_RTA_SOF_HPTF_FCN.pdf PDF
22x34_FCBQ_Advertisement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0002 W9128F

SOF HUMAN PERFORMANCE TRAINING CENTER, PN 79447 (FY19), FORT CARSON, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 19 FEB 2019 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist (402) 996-3722

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-19-R-0004

01/28/2019

01/09/2019

01/28/2019

Am #0002 - 1

Am #0002 - 2 (Continuation SF 30)

28 January 2019 Solicitation No. W9128F 19 R 0004

Date of Issue: 09 JAN 2019 Date of Receiving Proposals: 19 FEB 2019

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Design and Construction of SOF HUMAN PERFORMANCE TRAINING CENTER.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 81 00 Page 4, paragraph 1.3.1, in the second sentence delete “climbing” and substitute “bouldering”.

(2) Sections 01 83 00 Page 3, 01 86 10 page 6, 01 86 13 page 3, 01 86 26 page 8, and 01 89 00 page 5, paragraph 1.1, revise the title of UFC 4-010-01 to the following:

“(2018) DoD Minimum Antiterrorism Standards for Buildings”

(3) Section 01 83 00 Page 9, delete paragraph 1.3.13.5 “Slab-On-grade General Requirements” in its entirety and substitute “1.3.13.5 Not Used”.

(4) Section 01 86 10 Page 25, paragraph 1.12 “BUILDING TEMPERATURE CONTROL SYSTEM” in the third sentence “The design of the...includes Change 1.” delete “includes Change 1”.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 00 10 00 – SF1442 and CLIN 00 10 00 – SF1442 and CLIN 00 22 00 00 22 00 01 82 00 01 82 00 01 86 26 Attachment 4 01 86 26 Attachment 4 Appendix B – Room Data Sheets Appendix B – Room Data Sheets

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.

(1) Sheet CS101, SITE PLAN – AREA 101

(2) Sheet CU101, WATER AND SANITARY SEWER PLAN – AREA 101

(3) Sheet A-200, ELEVATIONS

Am #0002 - 3 (Continuation SF 30)

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 19 FEB 2019.

Attachments:

Specification Pages listed in 1.b., above Drawings listed in 1.c., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

28 JAN 2019

nep/2160

This page was intentionally left blank for duplex printing.

Am #0002 00 10 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-19-R-0004

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

9 JAN 2019

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 7

9. FOR INFORMATION

CALL:

A. NAME

Bill Rawe

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 996-3722

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

SOF HUMAN PERFORMANCE TRAINING CENTER, PN 79447 (FY19)

FORT CARSON, COLORADO

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00. ELECTRONIC COPIES OF

OFFER ARE ACCEPTABLE.

THIS SOLICITATION IS RESTRICTED 100% TO SMALL BUSINESS INTERESTS.

11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. **SEE CLIN PRICING SCHEDULE

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 19 FEB 2019. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___60_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(d)

Am #0002 00 10 00 - 2

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

CLIN SCHEDULE 00 10 00 – 3 W9128F-19-R-0004

Am #0002

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

Entire work complete for Design of the SOF Human Performance Training Center excluding design associated with alternate floor plans

Job

XXX

Entire work complete for Construction of the SOF Human Performance Training Center (basic floor plan) excluding Option Items listed separately below

TOTAL BASIC AMOUNT $_____________________________

OPTION ITEMS

[Option]

Design and Construct a 4,000 SF minimum addition to the OPEN ACTIVITY AREA

Additional cost to Design and Construct an 8,000 SF minimum addition to the OPEN ACTIVITY AREA in lieu of the 4,000 SF minimum addition

Entire work complete to Construct Bouldering Wall

Entire work complete for Procurement and Installation of therapy pools, associated equipment and controls

Installation of FF&E

Installation of Electronic Security Systems

Installation of A/V system equipment and devices excluding Option Items below

CLIN SCHEDULE 00 10 00 – 4 W9128F-19-R-0004

Installation of A/V system equipment and devices for additional 4,000 SF OPEN

ACTIVITY AREA

Additional cost for Procurement and Installation of A/V system equipment and devices for 8,000 SF minimum addition to OPEN ACTIVITY AREA in lieu A/V system equipment and devices for 4,000 SF minimum addition

Installation of Personnel Check-In System equipment

Installation of Exterior Turfed Sprint Area

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

OFFEROR'S NAME: ____________________________

Proposed Contract Duration in Calendar Days After the Notice to Proceed is Received Should Not Exceed Benchmark Duration of 720 Days.

(See Note No. 4) ____________ DAYS

NOTES:

1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The

Government reserves the right to exercise Options No. 0003 – 0005 and 0013 within 90 days after issuance of Notice to Proceed and Options No. 0006 – 0012 within 365 days of Notice to Proceed.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.

4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to

Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed the benchmark duration of 720 calendar days. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.

See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF

WORK.

5. Submit a Supplemental Price Breakdown for the “TOTAL BASIC AMOUNT” in the Pricing Schedule.

Include Offeror name, project title and project location on each page of the price breakdown. See

CLIN SCHEDULE 00 10 00 – 5 W9128F-19-R-0004

Supplemental Price Breakdown of Pricing Schedule template on the following page. See Section 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD for submission requirements.

CLIN SCHEDULE 00 10 00 – 6 W9128F-19-R-0004

SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE

TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT

AS INDICATED ON PAGE 3 OF THIS SECTION 00 10 00

DIVISION MASTERFORMAT 2016 DESCRIPTION UNIT AMOUNT

01 GENERAL REQUIREMENTS (minus item 0101) LS $_______________ 0101 01 33 29 Sustainability Documentation LS $_______________

02 EXISTING CONDITIONS LS $_______________

03 CONCRETE LS $_______________

04 MASONRY LS $_______________

05 METALS LS $_______________

06 WOOD, PLASTICS, AND COMPOSITES LS $_______________

07 THERMAL AND MOISTURE PROTECTION LS $______________

08 OPENINGS LS $_______________

09 FINISHES LS $_______________

10 SPECIALTIES LS $______________

11 EQUIPMENT LS $_______________

12 FURNISHINGS LS $_______________

13 SPECIAL CONSTRUCTION LS $_______________

14 CONVEYING EQUIPMENT LS $_______________

21 FIRE SUPPRESSION LS $_______________

22 PLUMBING LS $______________

23 HEATING, VENTILATING, AND AIR CONDITIONING LS $_______________

25 INTEGRATED AUTOMATION LS $_______________

26 ELECTRICAL LS $_______________

27 COMMUNICATIONS LS $_______________

28 ELECTRONIC SAFETY AND SECURITY LS $_______________

31 EARTHWORK LS $_______________

32 EXTERIOR IMPROVEMENTS LS $_______________

33 UTILITIES LS $_______________

34 TRANSPORTATION LS $_______________

Total Price Breakdown Amount

Prime Contractor Markups:

--G&A General and Administrative Expense $ ______________ --FOOH Field Office Overhead not defined by Division -01 $ ______________ --PROFIT Profit $ ______________ --P&PB Performance and Payment Bond $ ______________

TOTAL WITH MARKUPS

• All items must be entered in dollars.

• “TOTAL WITH MARKUPS” from this Price Breakdown must match the “TOTAL BASIC

AMOUNT”.

Section 00 22 00 W9128F19R0004

Section 00 22 00 Page 1

SECTION 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF

AWARD

1.0 OVERVIEW

2.0 BASIS OF AWARD

3.0 GENERAL INSTRUCTIONS

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS AND SUBFACTORS

4.1. VOLUME 1 – TECHNICAL

4.2. VOLUME 2 – PAST PERFORMANCE

4.3. VOLUME 3 – PRICE AND PRO-FORMA INFORMATION

5.0 VOLUME 1 –FACTOR 1 – TECHNICAL

5.1. TAB A –SUBFACTOR 1 – SPECIALIZED EXPERIENCE

5.2. TAB B –SUBFACTOR 2 – PROJECT MANAGEMENT PLAN

5.3. TAB C –SUBFACTOR 3 – KEY PERSONNEL CAPABILITIES AND EXPERIENCE

6.0 VOLUME 2 – FACTOR 2 - PAST PERFORMANCE

6.1 TAB A - FACTOR 2 – PAST PERFORMANCE

7.0 VOLUME 3 – PRICE AND PRO FORMA INFORMATION

7.1. GENERAL

7.2. TAB A – FACTOR 3 – PRICE (STANDARD FORM 1442, PROPOSAL DATA SHEET AND CONTRACT

LINE ITEM SCHEDULE)

7.3. TAB B – EVIDENCE OF BONDABILITY

7.4. TAB C– REQUIRED PRE-AWARD INFORMATION

8.0 EVALUATION PROCEDURES

8.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

8.2. EVALUATION

8.3. DEFINITIONS

8.4. EVALUATION RATING SYSTEM

8.5. PAST PERFORMANCE CONFIDENCE ASSESSMENT RATING SYSTEM

ATTACHMENTS

1 - NOT USED

2 - NOT USED

Section 00 22 00 Page 2

3 - COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR

4 - COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY

5 - COMPANY SPECIALIZED EXPERIENCE KEY SUBCONTRACTOR (OR PRIME IF WORK NOT TO BE

SUBCONTRACTED)

6 - PAST PERFORMANCE EVALUATION TELEPHONE INTERVIEW QUESTIONNAIRE

7 - KEY PERSONNEL RESUME

8 - LETTER OF COMMITMENT FOR KEY PERSONNEL

9 - LETTER OF COMMITMENT FOR (DESIGN FIRM OR KEY SUBCONTRACTOR)

10 - PROPOSAL DATA SHEETS

Section 00 22 00 Page 3

1.0 OVERVIEW

1.1. This is a “Best Value-Tradeoff” solicitation for the Design and Construction of the SOF Human Performance Training Center at Fort Carson, Colorado. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm-fixed-price contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

1.2. PROPOSAL SUBMITTAL INSTRUCTIONS

[*Am-2] In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically via the AMRDEC SAFE website. In the event that the AMRDEC SAFE website remains disabled, submit proposals on CD/DVD as described in the NOTE below. All submissions, other than the Supplemental Price Breakdown (see paragraph 7.2.1.2), shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The Supplemental Price Breakdown may be submitted in Excel format to the recipients listed below via email and must be submitted no later than three working days after the proposal submission. The three (3) volumes listed below shall be submitted as “SEPARATE” single files via AMRDEC. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission when using AMRDEC. Offerors are encouraged to send all three (3) files in the same AMRDEC transmission, if possible.

Volume I: Technical and Small Business Utilization Volume II: Past Performance Volume III: Price and Pro Forma Information

Title the single files in the following format:

W9128F19R0004_Company Name_Volume_I_Technical W9128F19R0004_Company Name_Volume_II_Past_Performance W9128F19R0004_Company Name_Volume_III_Price_and_Pro_Forma_Information

(Note: Company name may be abbreviated)

It is imperative that none of the pricing or Volume 3 information show up in Volumes 1 or 2.

To submit proposals electronically via AMRDEC SAFE, go to the following website:

https://safe.amrdec.army.mil/SAFE/ At the AMRDEC SAFE website select “Non-CAC Users” in order to register, access the site and submit your proposal(s). When completing the information for transmittal at the AMRDEC SAFE website, you will be asked to enter e-mail addresses for the recipients. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipients will be:

Mr. Bill Rawe, william.t.rawe@usace.army.mil Ms. Christine Wilson, christine.l.wilson@usace.army.mil

After submitting your information, you will receive two (2) disclaimers:

A. “The files were successfully uploaded.”

B. “Your files cannot be downloaded by recipients until you verify your email address. Please check your email for further instructions.”

***OFFERORS MUST FOLLOW THE INSTRUCTIONS SENT TO YOUR EMAIL TO COMPLETE THE

SUBMITTAL PROCESS***

For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are uploaded into the AMRDEC SAFE website as identified in the AMRDEC e-mail sent to the Contract Specialist(s)/Contracting Officer will be the time and date the Government received the proposal. Please note that the process involves two steps, after the proposal has been uploaded to the AMRDEC SAFE website the Offeror must verify its email address in order for the Government to receive access to the proposal uploaded onto the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal.

Section 00 22 00 Page 4

[*Am-2] NOTE: In the event that the AMRDEC website remains disabled, Offeror shall submit one CD/DVD containing their proposal to the following address prior to the proposal due date and time:

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

In the event that Offerors choose to hand-carry their proposals, Offerors shall contact Bill Rawe, Contract Specialist, 402-996-3722, william.t.rawe@usace.army.mil at least one business day prior to delivery to ensure availability of appropriate Government personnel to receive the package in person. Offers shall be received by the date and time indicated in Block 13 of the SF 1442 for this solicitation or as identified in subsequent amendments.

1.3. PROPOSAL FORMAT

Written materials: 8 ½” x 11” format using 10 point or larger font size. For each volume, provide a title sheet on the cover and table of contents. Volume 1 shall have bookmarks, at a minimum, corresponding to each factor and sub-factor. Provide a title sheet identifying the prime, consortium, or joint venture’s name, address, telephone, and email address and point of contact. Include the signature, title and contact information of the official that can bind the firm. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

Volume number and tab section submitted shall appear in the bottom right corner of each page (along with the revision number and revision date for the amended page, if necessary)

2.0 BASIS OF AWARD

2.1. The Contracting Officer will award a firm-fixed-price contract to that responsible Offeror whose proposal conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than cost or price, when combined, are equal to cost or price; however, the Contract award should not exceed the cost limitation described in Section 00 21 00 for this project. The intent of this solicitation is to obtain the best proposal within the cost limitation. There is no obligation to approach or match the cost limitation in the offer. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the Contracting Officer/Source Selection Official must determine that the added value of a more expensive proposal (within the cost limitation) would justify award to that offeror.

3.0 GENERAL INSTRUCTIONS

3.1. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

3.2. The proposal shall describe the capability of the Offeror to perform the requirements of the RFP. The proposal should be specific and complete in every detail and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.

3.3. In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affect an Offeror’s evaluation.

Section 00 22 00 Page 5

3.4. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal, provided that the Offeror or Offeror’s subcontractor has or will have professional architects and engineers, registered in the appropriate technical disciplines and provided that the requirements specified in Contract clause, “Requirements for Registration of Designers”, are met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

3.5. Submit proposals per paragraph 1.2 above. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS AND SUBFACTORS

4.1. VOLUME 1 –TECHNICAL

Factor/Sub Factor Location Description Relative Importance

FACTOR 1 TECHNICAL

Factor 1 is slightly more important than Factor

2. All evaluation factors other than cost or price, when combined are equal to than cost or price (Factor 3).

Subfactor 1 Vol. 1 TAB A Specialized Experience Most Important Subfactor

Subfactor 2 Vol. 1 TAB B Project Management Plan Second most Important Subfactor (slightly less than Subfactor 1)

Subfactor 3 Vol. 1 TAB C Key Personnel Capabilities and Experience

3rd most Important Subfactor (significantly less important than Subfactor 2)

4.2. VOLUME 2 – PAST PERFORMANCE

Factor/Sub Factor Location Description Relative Importance

FACTOR 2 Vol. 2 TAB A Past Performance

Factor 1 is slightly more important than Factor

2. All evaluation factors other than cost or price, when combined are equal to cost or price (Factor 3).

N/A Relevancy Used in determining rating for Factor 2

N/A Confidence Used in determining rating for Factor 2

4.3. VOLUME 3 – PRICE AND PRO FORMA INFORMATION

Factor/Sub Factor Location Description Relative Importance

FACTOR 3 Vol. 3 TAB A Price (Standard Form 1442, Proposal Data Sheet And Contract Line Item Schedule)

Factor 1 is slightly more important than Factor

2. All evaluation factors other than cost or price, when combined are equal to cost or price (Factor 3).

Section 00 22 00 Page 6

Factor/Sub Factor Location Description Relative Importance

N/A Vol. 3 TAB B Evidence of Bondability Not Rated

N/A Vol. 3 TAB C Required Pre-Award Information Not Rated

NOTE: 8(a) Joint Venture Offeror or Offeror submitting Proposal as HubZone Joint Venture shall submit evidence from Offerors SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or business Opportunity Specialist.

5.0 VOLUME 1 –FACTOR 1 – TECHNICAL

5.1. VOLUME 1 -TAB A – SUBFACTOR 1 - SPECIALIZED EXPERIENCE

5.1.1. Submission Requirements:

5.1.1.1. Construction and Design Projects. The Offeror shall submit a total of six (6) projects as follows. The Offeror shall submit three (3) projects performed by the Prime Construction Entity while in the same capacity as Prime Construction Entity. Additionally, the Offeror shall submit three (3) projects performed by the Lead Design Entity while in the same capacity as Lead Design Entity. The proposed prime construction and lead design entities shall have performed in the same role as the prime or lead entities on the projects submitted. Limit one (1) page per project submitted. Any information presented beyond the page limit will not be evaluated.

5.1.1.2. Teaming Experience. In one page, the Offeror shall demonstrate previous teaming experience between current team members. Teaming experience information is limited to projects that are well underway (designed and at least 50% construction progress completed) or that have been completed and turned over no longer than the past ten (10) years preceding the issue date of this solicitation. If the Offeror has no teaming experience to demonstrate, a statement stating so shall be included in place of the “Teaming Experience” page.

5.1.1.3. Project Information. All projects submitted should demonstrate experience on similar projects (design/construction complexity and size) of similar or greater value. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than ten (10) years preceding the issue date of this solicitation. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements set forth in the RFP. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. If the Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member.

If projects were design-build, so identify them.

Project information shall CLEARLY include:

(a) Type of Facility Represented

(b) Name of Firm

(c) Name of Project

(d) Location of Project

(e) Owner, including reference POC with confirmed contact information

(f) General Scope of Construction Project

Section 00 22 00 Page 7

(g) Summary of Your Role in the Project. Indicate that you were the prime construction entity for construction projects or the lead design entity for the design projects.

(h) Construction Cost at completion

(i) Percent (%) and Type of Work Subcontracted Out

(j) Dates Construction Began and Completed

5.1.2. Evaluation Criteria: The following criteria are not listed in any particular order of importance.

5.1.2.1. Experience on similar projects that exceed the scope (complexity and/or size) and/or value may be rated more favorably. A similar project does not necessarily have to perform the same mission, but should be of similar design and construction complexity and size.

5.1.2.2. Federal Government project experience may be rated more favorably than non-Federal Government project experience.

5.1.2.3. Projects that are not “well underway” or completed as defined above may be rated less favorably.

5.1.2.4. Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous D-B experience a strength.

5.1.2.5. The Government may consider previous recent (as defined above) teaming experience among the team members as a strength. The more relevant the experience (as defined above), the more favorably it may be rated.

5.1.2.6. Note: The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing DoD or Government appraisal systems, or through interviewing owners or references. The Government may check any or all cited references to verify supplied information.

5.1.2.7. Note: A firm will not receive credit under this subfactor for the relevant experience of key personnel proposed for this project while employed at a different firm.

5.2. VOLUME 1 - TAB B – SUBFACTOR 2 – PROJECT MANAGEMENT PLAN

5.2.1. Submission Requirements:

5.2.1.1. Provide information that describes the offeror’s Project Management approach to executing the design-build contract per the detailed requirements herein. Clearly and concisely describe the organizational and technical approaches to project management and execution, and proposed contract duration. Limit the information to fifteen (15) pages or less.

5.2.1.2. Organization. List the design and construction entities and describe their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each entity’s roles and responsibilities on the project. A copy of the teaming or joint venture agreement(s) shall be appended to the plan (not included in the page limitation). Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s).

Identify the design firm(s) chosen for the project, if not to be self-performed. The Offeror shall document unequivocal teaming arrangements with its lead design entity (ies) and key subcontractors (see attachment 9). Describe the proposed management structure for the team, describing the how the design and construction process will be managed and the authorities and the delegations of authority within the team. Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations and their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the D-B team entities, and with the list

Section 00 22 00 Page 8 of key personnel to be provided under the Tab, “KEY PERSONNEL CAPABILITIES AND

EXPERIENCE”.

5.2.1.3. Technical Approach for Design and Construction. Describe the technical approach to design and construction of the facility. Include any considerations of fast-tracking design and construction, panelized construction, pre-engineered components, etc. The Government is looking for ways to streamline construction and manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule while minimizing impact to the base.

5.2.1.4. Risk Assessment. Submit a list of risks specifically associated with this project. Identify the degree of risk, possible impact of the risk on project (schedule, cost, safety etc.), whether it’s within or outside the Offeror’s control, and a plan to mitigate the risk(s).

5.2.1.5. Proposed Contract Duration: The offeror shall propose the contract duration in the appropriate Contract Line Item Number in the CLIN Schedule and should not exceed the benchmark performance duration specified in the CLIN. The offeror shall also list this duration in this tab of the proposal.

5.2.2. Evaluation Criteria: The following criteria are not listed in any particular order of importance.

5.2.2.1. Organization. The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured and staffed to execute the entire scope of work. This subfactor will be rated as unacceptable if the Offeror has not selected and committed to use its lead design entity.

Joint venture participants’ contribution to the organization should be commensurate with their skills and background.

5.2.2.2. Technical Approach for Design and Construction. The Government places a higher value on an offer that provides proposed methods to streamline construction and manage labor and other resource constraints, in an effort to reduce costs and support an aggressive schedule including such things as fast-tracking, etc. The Government will also consider whether the approach reduces on-site craft labor and susceptibility to inclement weather delays.

5.2.2.3. Risk Assessment. The Government will evaluate the risk assessment to verify that the Offeror has a clear understanding of the risks, roles, and scope of the project. Proposals may be rated more favorable for risk assessments that are clearly identified with logical and accurate assessments of each risk.

5.2.2.4. Proposed Contract Duration: Unless changed during negotiations, this duration will become the contractually binding performance period. The Government will rate the proposed duration matching or shorter than the benchmark duration as “acceptable”. No advantage will be considered for proposals that provide a duration shorter than the proposed benchmark. A proposed duration that is longer than the proposed benchmark duration will be viewed as a deficiency. The Government will consider an unreasonably condensed contract duration, which places undue risk on the Government or which may create a risk of contract or performance failure, as a significant weakness or a deficiency, depending upon the evaluators' judgment.

5.3. VOLUME 1 - TAB C – SUBFACTOR 3 - KEY PERSONNEL CAPABILITIES AND EXPERIENCE

5.3.1. Submission Requirements:

5.3.1.1. For key personnel provide a brief resume using the Key Personnel Resume form at the end of this Section (Attachment 7). Indicate the position title on each project listed in resumes. Provide the name, owner, dollar amount, date of completion, and brief scope of each resume project.

Include resumes for the following key personnel:

- Project Manager responsible for the overall project (Prime Construction Contractor Employee)

- Construction Quality Control System Manager (Prime Construction Contractor Employee)

Section 00 22 00 Page 9

- General Superintendent (Prime Construction Contractor Employee)

- Design Manager (Lead Design Entity Employee)

5.3.1.2. The minimum experience requirement for the Project Manager is 5 years of experience as a Project Manager, managing similar projects to this solicitation.

5.3.1.3. The minimum experience requirement for the Contractor Quality Control (CQC) System Manager is 5 years of experience as a Quality Control Manager on similar projects to this solicitation. CQC System Manager shall comply with personnel requirements listed in Section 01 45 00.00 10.

5.3.1.4. The minimum experience requirement for the Superintendent is 5 years’ experience as superintendent, managing multiple trades and subcontractors.

5.3.1.5. The minimum experience requirements for the Design manager is at least 5 years of design management experience. The Design Manager and designers of record should be a registered in accordance with FAR 52.236-25.

5.3.1.6. Offeror shall provide unequivocal letters of commitment from all proposed key personnel NOT currently employed by the Offeror. Use the form letter (Attachment 8) at the end of this section.

5.3.2. Evaluation Criteria: The following criteria are not listed in any particular order of importance.

5.3.2.1. The Government will evaluate the required information to determine how well the offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary, which includes previous satisfactory experience in similar type work, to manage, control and perform the design, and to perform construction.

5.3.2.2. Resumes that do not clearly state the personnel’s specific duties and job title on previous projects may be rated less favorably.

5.3.2.3. Project Managers that hold active architect or engineer professional registration may be rated more favorably.

5.3.2.4. Offerors that propose key personnel who also worked on the projects in Tab A may be rated more favorably.

5.3.2.5. Key personnel that exceed the required minimum years of experience in their position may be rated more favorably.

5.3.2.6. Previous design-build experience may be rated more favorably.

5.3.2.7. Previous Federal government project experience may be rated more favorably.

5.3.2.8. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the Government. This shall be achievable with other projected on-going work.

6.0 VOLUME 2 – FACTOR 2 - PAST PERFORMANCE

6.1. VOLUME 2 – TAB A – PAST PERFORMANCE

6.1.1. Submission Requirements:

Submit past performance evaluations and ratings for each project the Offeror includes in its proposal for Factor 1 - Volume 1 - Tab A Specialized Experience.

Section 00 22 00 Page 10

If available, submit Contractor Performance Assessment Reporting System (CPARS) Performance Evaluations ratings. For projects which were designed and/or constructed for other government entities, submit the performance appraisal sheets used by that government entity if available. For projects cited in Volume 1 - Tab A Specialized Experience not covered in the CPARS database or other Government Design Performance Rating System, submit a Past Performance Questionnaire (Attachment 6).

6.1.1.1. CPARS/PPIRS Evaluations

Firms are requested to retrieve their CPARS/PPIRS past performance information directly from the merged CPARS/PPIRS Application available at: http://www.cpars.gov. For evaluations completed prior to 27 June 2014, use the Past Performance Information Retrieval System (PPIRS) module.

PPIRS is an electronic repository of performance information collected by all the major federal performance reporting systems. Logging onto PPIRS will require the following:

All firms must have purchased and installed a Public Key Infrastructure (PKI) certificate. If you do not have this certificate, you cannot access your information. Additional information about the PKI certificate is posted in red at the top, center portion, of the https://www.cpars.gov/pki_info.htm web page.

You will also need your DUNS number and Marketing Partner Identification Number (MPIN) to log onto PPIRS. The MPIN number was selected by whoever registered your firm in the System for Award Management (SAM) Registry at https://www.sam.gov/portal/public/SAM/. If you do not know your MPIN number, you will need to contact the SAM help desk by emailing them from the email link on the https://www.sam.gov/portal/public/SAM/ web page. Please be aware that they will only release the MPIN number to the person who originally registered your firm.

There are two other ways to obtain a copy of CPARS/PPIRS evaluations as follows: (1) Contact your government point of contact for the project you mentioned, and ask them if they can send you a copy, or (2) Apply for “Corporate Senior Contractor Representative” access on the merged CPARS/PPIRS web page: http://www.cpars.gov/userforms.htm. This type of access is issued to only one person within the firm, typically a member of senior management. In addition to access to your completed CPARS/PPIRS performance evaluations, you will also be able to view status of evaluations which have not yet been completed. Following receipt of your application request, you will be emailed a logon and access instructions. Be aware that you will also need to have a PKI certificate to access the PPIRS system. This is a DOD requirement.

6.1.1.2. Past Performance Questionnaire (PPQ)

The Past Performance Questionnaire (Attachment 6) is provided for the offeror or its team members to submit to the client. The Past Performance Questionnaire should be completed by an owner or owner’s representative not affiliated with your firm. Ensure correct phone numbers and email addresses are provided for the client point of contact.

Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 6), which will provide contract and client Information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

6.1.1.3. Government Utilization of Alternate Information Sources for Past Performance

The Government will assess the past performance on projects submitted under the Specialized Experience Subfactor and reserves the right to conduct telephone interviews with points of contact identified in the proposal or to review personal knowledge. In addition, the Government may review any

Section 00 22 00 Page 11 other sources of information for evaluating past performance of the Offeror on the submitted projects and any other previous work. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

6.1.2. Evaluation Criteria:

6.1.2.1. The Government will perform a performance confidence assessment of the offeror’s probability of successfully meeting the contract requirements, considering the degree of success of the D-B team's recent (well under way or turned over no longer than 5 years preceding the date of this solicitation), relevant experience. See explanation of “well underway” and relevancy under the Subfactor “Specialized Experience”. The rating system used for the performance confidence assessment is described in paragraph 8.5.

6.1.2.2. Relevancy: The Government will first assess and rate the relevancy of recent projects accomplished by the offeror to the scope of this contract for overall application to the performance confidence assessment ratings described hereinafter. The projects will include those submitted under the Specialized Experience SubFactor as well as from other sources described above. This rating is not a separate proposal rating but is only used in developing an overall past performance confidence assessment rating assigned to the Past Performance Factor. The past performance relevancy ratings are described below:

(a) Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

(b) Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

(c) Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

(d) Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

6.1.2.3. Performance: The Government will next consider how well the offeror performed on the contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. Past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance.

Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting design or construction errors, warranty work, etc. (see the interview form at attachment 6). The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, customer satisfaction, level of support for such things as as-built documentation, O&M manuals, training, problem resolution for design or construction errors, warranty work, and safety. The Government will not release the Interview Forms to the offeror at any time, in order for the Government to solicit candid, unbiased interview comments.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.