Amendment #0006 to RFP #W9128F-18-R-0004 SBIRS Ops Facility, Buckley AFB, CO

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0006

SBIRS OPERATIONS SUPPORT FACILITY (SOF), CRWU 09 3002, BUCKLEY AFB, COLORADO

See attached documentation for content of the amendment changes to RFP

Date for receipt of proposals is 18 APR 2018 at 1400 hours

Government Point of Contact: Stephanie Harr, Contract Specialist (402) 996-3713

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F18R0004

04/04/2018

01/26/2018

04/04/2018

Am #0006 - 1

Am #0006 - 2 (Continuation of SF30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers

1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F18R0004 :all amendments may cause rejec-:

:tion of the offer. See FAR : Date of Issue: 26 JAN 2018 :52.215-1 of Section 00 21 01. : Date of Receiving Proposals:

18 APR 2018

Amendment No. 0006

04 APR 2018

SUBJECT: Amendment No. 0006 to Request for Proposal Solicitation Package for Design and Construction of SBIRS OPERATIONS SUPPORT FACILITY (SOF).

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes)

(1) Contract Line Item Pricing Schedule (CLIN), Pages 00 10 00-4 & 5, delete the benchmark duration of 730 days and substitute 800 days.

(2) Section 01 33 00.32, Page 13, second paragraph, add Section “01 91 00.15 TOTAL BUILDING COMMISSIONING” to the end of the list of Division 0 and 1 specification sections contained in the RFP to be included in the project specifications.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this Amendment. If applicable, on the revised specification pages, changes have been identified by highlighting text. (All portions of reissued specification pages shall apply whether or not changes thereon have been indicated.)

Pages Deleted Pages Substituted or Added 01 81 00 01 81 00 01 86 10 01 86 10 01 86 26 01 86 26 01 91 00.15

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal thereby occasioned.

Electronic Proposals shall be delivered via AMRDEC Safe Access File Exchange (SAFE), https://safe.amrdec.army.mil/, to the USACE Contracting Activity at the following email addresses:

Am #0006 - 3 (Continuation of SF30)

Stephanie.A.Harr@usace.army.mil and Denise.M.Cramer@usace.army.mil

3. Offers will be received until 2:00 p.m, local time at place of receiving proposals, 18 APR 2018.

Attachments:

Section 00 10 00 – Standard Form 1442 and CLIN Pricing Schedule Specification Pages listed in 1.b., above U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

04 APR 2018

NEP/2160

Am #0006 00 10 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F18R0004

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

26 JAN 2018

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave

9. FOR INFORMATION

CALL:

A. NAME

Stephanie Harr

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 996-3713

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

SBIRS OPERATIONS SUPPORT FACILITY (SOF)

CRWU 09 3002

BUCKLEY AFB, COLORADO

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.

*BLOCK 13A. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.

THIS SOLICITATION IS UNRESTRICTED.

11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (** - See CLIN Pricing Schedule)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 18 APR 2018. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

Am #0006 00 10 00 - 2

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

CLIN SCHEDULE 00 10 00 – 3 W9128F-18-R-0004

Am #0006

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

Entire work complete for Design of the Space Based Infrared System (SBIRS) Operations Facility (SOF), including all Basic and Option Items listed below, unless noted otherwise.

Design in compliance with all requirements contained in this RFP, its attachments, references, and appendices.

Job

XXX

Entire work complete for Construction of the SOF, complete to the five-foot line (up to 5,430 square meters), excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract.

Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the SOF, including all required demolition associated with construction of the SOF.

Entire work complete for Construction of Emergency Power Facility (130 square meters) including sitework, redundant power feed, utilities, fuel piping, and connection to existing fuel tank farm, including generator sets and switchgear.

Entire work complete to Demolish Buildings 429 and 431 including sitework and utilities.

TOTAL BASIC AMOUNT $_____________________________

OPTION ITEMS

[Option]

Command Suite (285 square meters).

CLIN SCHEDULE 00 10 00 – 4 W9128F-18-R-0004

CCTV communication lines from the SOF to the CCTV head-end in Building 1028.

Entire work complete for Design and Construction of raised access flooring in remaining areas of the Secure Area (including depressed slab, revised foundation walls, and revised building systems).

1,400

S.M.

Entire work complete for Procurement and Installation of FF&E excluding Item No. 0010 below.

Installation of Command Suite FF&E.

Installation of Intrusion Detection System.

Installation of Electronic Security Systems.

Installation of A/V system equipment and devices.

Installation of CCTV system equipment and devices excluding head-end cabling described above.

Installation of horizontal SOF communications cabling as defined in Section 01 86 29 and associated documents and references.

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

OFFEROR'S NAME: ____________________________

Proposed Contract Duration in Calendar Days After the Notice to Proceed is Received Should Not Exceed Benchmark Duration of 800 Days.

(See Note No. 4) ____________ DAYS

CLIN SCHEDULE 00 10 00 – 5 W9128F-18-R-0004

NOTES:

1. See SECTION 00 21 01, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option No. 0006 through 0008 within 90 days after issuance of Notice to Proceed and Options No. 0009 through 0015 within 365 days of Notice to Proceed.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.

4. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to

Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for design and construction through completion, ready for turnover should not exceed the benchmark duration of 800 calendar days. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.

See Section 00 73 00, paragraph 1.1: COMMENCEMENT, PROSECUTION AND COMPLETION OF

WORK.

5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantities”.

SBIRS Operational Support Facility, Buckley AFB, CO BU75

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 81 00

SUMMARY OF WORK

07/17

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

1.1.1 Function of Facility

1.2 DESIGN AND CONSTRUCTION OBJECTIVES

1.2.1 Building Durability

1.2.2 Site Constraints

1.2.2.1 Critical Fiber Communications Standoff Distance

1.2.2.2 Existing Direct-Buried Cables

1.2.2.3 Existing Radar Array Look Angles

1.2.2.4 Existing Restricted Area Perimeter Fence

1.2.2.5 Site Access and Work Restrictions

1.2.3 Codes and Criteria

1.2.4 Secure Area

1.2.4.1 Future Special Access Program (SAP) Spaces

1.2.5 Open-Storage Areas

1.2.6 Shelter-in-Place Provisions

1.2.7 Changes to RFP Criteria Requirements

1.3 FACILITY TYPE AND SIZE

1.3.1 Facility Type

1.3.2 Facility Size

1.4 PERSONNEL AND EQUIPMENT

1.5 DRAWINGS

1.6 BUILDING INFORMATION MODELING (BIM) AND FACILITY DATA REQUIREMENTS

1.7 OPERATION AND MAINTENANCE REQUIREMENTS

1.7.1 Operation and Maintenance Manuals

1.8 SUSTAINABILITY DOCUMENTATION REQUIREMENTS

1.8.1 TOTAL BUILDING COMMISSIONING

1.9 OVERVIEW OF DESIGN-BUILD PROCESS

1.9.1 Overview

1.9.2 Process

1.10 DESIGN-BUILD CONTRACTOR REQUIRED A/E SERVICES

1.10.1 Dimensions

1.10.2 Professional Registrations, Licenses and/or Certifications

1.10.3 Request For Proposal - Binding Information

1.10.4 Evaluation of Systems

1.10.5 Documents Requirements

1.11 COMMON DEFICIENCIES

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 81 00 Page 1Am #0006

SECTION 01 81 00

SUMMARY OF WORK

07/17

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

1.1.1 Function of Facility

The purpose of this project is to design and construct a new SBIRS Operations Facility (SOF) and associated facilities to be located at Buckley Air Force Base, Colorado.

1.2 DESIGN AND CONSTRUCTION OBJECTIVES

The design and construction of the SOF and associated facilities under this Contract shall comply with specifications and requirements contained in this Request for Proposal (RFP). Requirements emphasize low maintenance exterior and interior finishes as well as high energy efficiency. This project has been registered with the U.S. Green Building Council (USGBC) under LEED v2009 and shall be designed and constructed to achieve LEED Silver certification as well as federal guiding principles compliance via completion of the Air Force MILCON Sustainability Requirements Scoresheet.

The floor plans and elevations provided in this RFP are conceptual and establish the general requirements for square foot area, functional arrangement of rooms and spaces, exterior treatments and the overall unit configuration. During the design stages, the contractor shall make necessary adjustments to ensure constructability and compliance with the RFP criteria and requirements. The plans and elevations do not indicate all necessary construction requirements or components; the RFP describes associated technical, performance and system requirements. Design and construction shall be in accordance with all applicable industry and Air Force criteria, and the requirements of this RFP.

Design Quality Objective: The project objective is to obtain facilities to accommodate 5,715 SM (61,515 SF) of accredited secure and open-storage administrative and training space with complementary site development within the funds available. Design quality is achieved through the integration of the facility to the site, balancing architecture features, managing design and construction security requirements, functionality and design for low-cost maintenance and operation. The Government desires to construct facilities of such quality that the foundations, foundation walls, footings, slabs and other foundation components last for a life of 50 years without structural damage, due to expansive soils or other geologic conditions, to the foundation or structures that the foundation supports.

It is desired that all equipment and products be easy to service, maintain, repair, and replace. All products or equipment shall follow industry standards. In extenuating circumstances, the use of special designed or manufactured items may be allowed, but they shall be submitted to the government for review and written approval prior to production, order or manufacture.

SECTION 01 81 00 Page 2Am #0006

Scope of Work:

The following scope of work descriptions reflect the Contract Pricing Schedule found in 00 10 00 CONTRACT LINE ITEM PRICING SCHEDULE.

The proposal documents shall include adequate information to enable the Government to adequately evaluate the proposal for understanding and compliance with the entire scope of work. See Section 00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS AND EVALUATION for complete requirements.

Project architectural features included but are not limited to masonry veneer, stud backup wall construction, insulation, doors, windows/curtainwall, building hardware, gypsum wallboard, paint, wall coverings, cabinets, carpets, tile, acoustical ceiling tile, toilets, lavatories and accessories. Mechanical work includes but is not limited to construction of complete HVAC system(s) for the new facility, boilers and chillers, HVAC equipment and all associated controls, plumbing, EMCS/DDC and fire protection systems, lightning protection systems, complete cathodic protection system utilizing sacrificial anodes. Interior electrical includes panel boards, lighting fixtures, generator sets, generator hookups, and general building power requirements. Communications work includes but is not limited to fiber optic and voice/data cabling including pre-wiring keyless access, CATV, security systems infrastructure, mass notification system and paging system. Anti-terrorism and force Protection design and construction will be applied on this project. The project scope is itemized as follows:

CLIN 0001: Entire work complete for Design of the SBIRS Operations Facility (SOF), including design of all Basic and Option Items listed below. Design in compliance with all requirements contained in this RFP, its attachments, references, and appendices.

CLIN 0002: Entire work complete for Construction of SOF, complete to the five-foot line (up to 5,430 square meters), excluding items separately listed below. Scope includes construction of the design and associated systems described above and throughout this Contract.

CLIN 0003: Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the SOF, including all required site preparation associated with the construction of the SOF.

CLIN 0004: Entire work complete for Construction of Emergency Power Facility (130 square meters) including [*Am-4]sitework, redundant power feed, utilities, generator sets, switchgear, fuel piping, and connection to existing fuel tank farm as indicated in the bridging documents and herein.[**Am-4]

CLIN 0005: Entire work complete to Demolish Buildings 429 and 431 including utilities and sitework described herein.

CLIN 0006 (bid option): Entire work complete for Construction of the Command Suite (285 square meters) as indicated in the RFP and bridging documents, including site preparation, foundations, building envelope, structure, architectural components and building systems described herein.

CLIN 0007 (bid option): Entire work complete for construction of the CCTV comm lines from the SOF to the CCTV head-end in Building 1028.

SECTION 01 81 00 Page 3Am #0006

CLIN 0008 (bid option): Entire work complete for design and construction of raised access flooring in remaining areas of the Secure Area (approximately 1,400 square meters) not already equipped with access flooring under the base bid.

CLIN 0009 (bid option): Entire work complete for Procurement and Installation of Furniture, Fixtures, and Equipment (FF&E) as described herein, minus Command Suite FF&E described below.

CLIN 0010 (bid option): Entire work complete for Procurement and Installation of Command Suite Furniture, Fixtures, and Equipment (FF&E) as described herein.

CLIN 0011 (bid option): Entire work complete for Procurement and Installation of Intrusion Detection Systems as described herein.

CLIN 0012 (bid option): Entire work complete for Procurement and Installation of Electronic Security Systems as described herein.

CLIN 0013 (bid option): Entire work complete for Procurement and Installation of A/V system equipment and devices as described herein.

CLIN 0014 (bid option): Entire work complete for Procurement and Installation of CCTV system equipment and devices as described herein, minus installation of head-end cabling described above.

CLIN 0015 (bid option): Entire work complete for Procurement and Installation of horizontal SOF comm cabling as defined in 01 86 29 and associated documents and references.

The majority of work under this Project is contained within the Restricted (PL-1) Area at Buckley AFB, CO. Utility connections are the only significant scope that occurs outside the Restricted Area. Some work will occur within the Restricted Area, but outside the project construction boundary depicted in the bridging documents. See 01 14 00 WORK RESTRICTIONS and the bridging documents for additional information. As such, the Contractor shall coordinate the staging, phasing, and construction of all construction activities with the Government to ensure that secure operations continue within the Restricted area through the duration of the Project. Contractor responsibilities are further described below.

Demolition of above and below-ground utilities, site features, lighting and CATV is required by this Project - both within and outside the Restricted (PL-1) Area. See 02 41 00 DEMOLITION and the bridging documents for additional requirements. Use specification sections 02 82 13.00 10 ASBESTOS ABATEMENT and 02 83 13.00 20 LEAD IN CONSTRUCTION to proper procedures and protocols for handling asbestos-containing materials and lead-based paint during the demolition process. See 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT for minimum waste diversion requirements.

1.2.1 Building Durability

Materials and equipment will be chosen for their durability and minimum maintenance. The building design shall conserve natural and manmade resources, and energy usages.

SECTION 01 81 00 Page 4Am #0006

1.2.2 Site Constraints

See the bridging documents for the proposed project site(s). The site is highly constrained by a variety of factors. The contractor shall ensure the facility is designed and constructed in compliance with all site constraints including but not limited to the following:

1.2.2.1 Critical Fiber Communications Standoff Distance

A fiber communications concrete-encased duct which bisects the site shall remain undisturbed in its entirety. See the provided survey for the approximate location. Installation of foundations and utilities along the duct shall be located no closer than 5'-0" from the horizontal edge of the concrete encasement. Installation of grade beams (or other appropriate foundation feature) and utilities crossing the duct shall be located no closer than 1'-6" in any direction of the concrete encasement. Protective measures shall be taken during grading and construction activities to prevent disturbance to this concrete-encased duct.

1.2.2.2 Existing Direct-Buried Cables

Direct-buried mission cables exist on the north side of Building 438. The approximate location of these cables is reflected in the provided survey.

The Buckley AFB Comm Squadron is not the owner of these cables. Cables shall remain undisturbed during grading, construction, and demolition activities.

1.2.2.3 Existing Radar Array Look Angles

Buckley AFB has radar arrays with look angles that intersect the proposed site. Some of these arrays are in close proximity to the proposed site. The contractor shall ensure that the project design does not interfere with the prevailing look angles. Based upon preliminary analysis, the controlling look angle plane at the site boundary is approximately 5569 feet above MSL.

Verify this plane during design and coordinate any conflicts (design and/or construction) with the Government.

1.2.2.4 Existing Restricted Area Perimeter Fence

The Restricted (PL-1) Area is enclosed by a double fence perimeter with an array of security features. The design and construction of the proposed facility shall not alter, relocate, or affect the established perimeter fence in any way without prior approval by the Government.

1.2.2.5 Site Access and Work Restrictions

The various components of work fall under different levels of protection and oversight. Close coordination with the Government will be required during all phases of design and construction. See 01 14 00 WORK RESTRICTIONS and the bridging documents for requirements and restrictions related to various components of work.

1.2.3 Codes and Criteria

All pertinent building codes and Life Safety codes shall be met or exceeded. See the referenced codes and criteria in the applicable discipline specifications referenced in the RFP. Careful coordination of the design and construction is required for the integration of security standards for this project.

SECTION 01 81 00 Page 5Am #0006

1.2.4 Secure Area

Areas identified in the RFP and bridging documents as "secure area" shall be designed, constructed, and accredited to the criteria listed below. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria:

The listed criteria carries impacts to all building systems within the designated boundary. Use the most current version of the referenced criteria available at the RFP proposal submission deadline:

a. ICD/ICS 705 - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities.

b. ICS 705-1 - Physical and Technical Security Standards for Sensitive Compartmented Information Facilities.

c. ICS 705-2 - Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information.

d. UFC 4-010-05 - Sensitive Compartmented Information Facility Planning, Design and Construction.

The following factors shall be used when applying criteria described above:

e. Facility is being constructed within the Continental United States

(CONUS).

f. Amplified sound is present in all occupied spaces within the secure area.

g. Facility shall be treated as having moderate threat level per TEMPEST risk assessment.

h. RF shielding is not required at the secure area perimeter.

i. All open and private offices shall be constructed to "open storage" requirements per secure area criteria.

j. Spaces and/or space groups shall be constructed to compartmented areas when indicated in the room data sheets. See secure area criteria for requirements.

k. Two Classrooms shall have perimeters constructed as future special access program spaces. See requirements below.

1.2.4.1 Future Special Access Program (SAP) Spaces

Areas identified in the RFP and bridging documents as "SAP spaces" shall be designed, constructed but not separately accredited as individual secure areas within the secure area(s) that they occur. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the secure area criteria listed above, but with the following assumptions:

a. Facility is being constructed within the Continental United States

(CONUS).

b. Amplified sound is present within all SAP spaces.

c. Facility shall be treated as having moderate threat level per TEMPEST risk assessment.

d. RF shielding is not required at each SAP perimeter.

SECTION 01 81 00 Page 6Am #0006

1.2.5 Open-Storage Areas

The secure training area and boundary indicated in the bridging documents shall be classified and accredited as secure "open-storage" space in compliance with the following criteria. See the bridging documents for the approximate perimeter of "open-storage" spaces from otherwise designated functions. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria. The listed criteria carries impacts to many building systems within the designated boundary. Use the most current version of the referenced criteria available at the time of contract award:

a. AFI 31-101 - Integrated Defense.

b. DODM 5200.01 - (Volumes 1-3) DoD Information Security Program.

c. AFI 16-1404 - Air Force Information Security Program.

d. AFI 16-1406 - Air Force Industrial Security Program.

e. AFM 33-221 - Communications Security: Protected Distribution Systems (PDS)

1.2.6 Shelter-in-Place Provisions

The project design shall accommodate basic provisions for shelter-in-place activities per applicable criteria. See the room data sheets for spaces that may be considered as shelter-in-place spaces. The design shall include features, where appropriate, that allow compliance with basic shelter-in-place provisions including but not limited to open space for a short duration stay (5 SF/PN), 100% exhaust air, locking door hardware, space for an appropriately sized emergency provisions kit, etc.

1.2.7 Changes to RFP Criteria Requirements

This Request for Proposal provides requirements expected of the Design-Build Contractor during the design and construction of this project.

The RFP drawings present an overall design concept of the project, provide useful project information, establish some definition of the systems to be used, and incorporate requirements expected by the Using Service.

It shall be the responsibility of the design-build Contractor to assemble the best-valued-priced construction systems for this project that meet or exceed the design criteria set forth herein.

Offerors shall not consider changes to RFP criteria requirements during proposal preparation. After contract award, any changes to the RFP criteria requirements require approval by the Contracting Officer.

See Section 01 33 00.32 DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES for additional requirements.

NOTE: If there is a conflict between the Buckley Air Force Base Architectural Compatibility Standards standard and the RFP criteria, the RFP criteria governs with questions being directed to the Contracting Officer before proceeding.

SECTION 01 81 00 Page 7Am #0006

1.3 FACILITY TYPE AND SIZE

1.3.1 Facility Type

Concept design architectural drawings have been included in the appendices of this Contract as bridging documents. Room data sheets with minimum space and space-type requirements have also been attached as an appendix.

The SOF is divided into a larger "open-storage" mass and a smaller "secure area" mass connected by an unclassified entry area and "umbilical." The facility is positioned on an east-west axis, with the primary building entrance near the middle of the plan-north elevation. A secondary entry is positioned on axis with Building 442's primary entrance. See the "Architectural Requirements" section for additional information relating to facility configuration and aesthetic preferences.

The SOF shall document and achieve LEED Silver (v2009) level certification.

The facility shall conform to the requirements below and as listed in this Contract.

1.3.2 Facility Size

Total facility area shall be approximately 5,715 SM (61,515 SF). Facility size shall not exceed that value, calculated per UFC 3-101-01 ARCHITECTURE.

1.4 PERSONNEL AND EQUIPMENT

The facility shall be designed to accommodate 350-400 full time equivalents (FTEs), with a regular transient/student load ranging from 100-200 personnel. The facility serves primarily as administrative and classroom space, but also contains a simulator function that requires a heavy Information Technology (IT) and comm infrastructure. The entire building contains a large amount of comm equipment and infrastructure in comparison to similar facility types found in the private sector. See the room data sheets for additional personnel and equipment information.

1.5 DRAWINGS

Drawings of the site area, the floor plan, roof plan, and exterior elevations are included for use in developing this design.

1.6 BUILDING INFORMATION MODELING (BIM) AND FACILITY DATA REQUIREMENTS

The contractor shall design and construct this project by leveraging BIM to the greatest extent practical under the scope of this project. See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS for minimum project requirements. This project also requires the development and turnover of electronic facility data to the Government. See 01 78 24.00 10 FACILITY DATA REQUIREMENTS for requirements.

1.7 OPERATION AND MAINTENANCE REQUIREMENTS

1.7.1 Operation and Maintenance Manuals

See Section 01 78 23 OPERATION AND MAINTENANCE DATA for requirements.

1.8 SUSTAINABILITY DOCUMENTATION REQUIREMENTS

The Contractor shall design and construct a project that attains USGBC LEED

SECTION 01 81 00 Page 8Am #0006

(v2009) certification at "Silver" level.

Included with this RFP is a preliminary LEED checklist which has been prepared specifically for this project. See 01 33 29 SUSTAINABILITY REPORTING for additional requirements. At a minimum, the project must meet all LEED Prerequisites and those credits identified with a "Y" in the first column. Meeting these criteria alone may not be sufficient to be eligible for Certification. The Contractor shall select additional credits which they wish to pursue from the optional credits identified with a "? or Maybe" in the second column. The remaining credits have been intentionally excluded from consideration for this project and should only be considered for inclusion after significant discussion with the Government and approval

- by the Contracting Officer.-

[*Am-6]

1.8.1 TOTAL BUILDING COMMISSIONING

Apply total building commissioning principles and fully commission both the SBIRS Operation Facility and Emergency Power Facility, in compliance with 01 91 00.15 TOTAL BUILDING COMMISSIONING and UFC 1-200-02.

The Contractor shall employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. See 01 91 00.15 TOTAL BUILDING COMMISSIONING for additional requirements. [**Am-6]

1.9 OVERVIEW OF DESIGN-BUILD PROCESS

1.9.1 Overview

Since the early 1980s Congress has urged the military services to explore alternative construction methods, such as "Design-Build," which includes both design and construction under a single contract. This process is similar to "one-stop turnkey selection procedures" and is defined in Title 10 of the United States Codes, Section 2862.

1.9.2 Process

The design-build process uses a Request for Proposal (RFP) to solicit for design and construction of a facility by a single contractual entity, such as a design-build firm, or joint venture between architect-engineer (A-E) and construction firm, or a construction management (CM) firm joint venture with an A-E and a construction firm. A design-build RFP states the project functional requirements, design and engineering criteria, technical performance specifications, and proposal evaluation factors. Potential contractors develop their proposals for the government to evaluate competitively, with the contract award based on a combination of technical merit and price.

In general, the RFP is a conceptual design document and the Contractor is responsible for completing the design and constructing the project.

The plans provided in this Request For Proposal (RFP) show the User's intent and expectations. The RFP has developed the site plan and building design and given the facility an architectural character.

The Contractor will be required to coordinate and adjust final dimensioning, detailing, furniture arrangements and other items necessary

SECTION 01 81 00 Page 9Am #0006

[*Am-6]

1.8.1 TOTAL BUILDING COMMISSIONING

AApply total building commissioning principles and fully commission both the SBIRS Operation Facility and Emergency Power Facility, in compliance with 01 91 00.15 TOTAL BUILDING COMMISSIONING and UFC 1-200-02.

The Contractor shall employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the General or Prime Contractor and must be financially and corporately independent of all other subcontractors. The Commissioning Firm must employ a Lead Commissioning Specialist that coordinates all aspects of the commissioning process. See 01 91 00.15 TOTAL BUILDING COMMISSIONING for additional requirements. [**Am-6] to make this a usable facility in accordance with the furnished RFP drawings. The design, with permitted flexibility for detailing and contractibility, must be carried through to construction. The design-build contractor is responsible for all design on the project.

The RFP furnished design drawings may be used by the Contractor. However, the Contractor agrees to hold the Government harmless in acceptance of these drawings. It shall be the design-build Contractor's responsibility to verify all dimensions, drafting and accuracy for the design drawings prepared by the design-build Contractor.

After award of the contract, the design-build contractor will prepare a series of design submittals for review by the Government, so that design and criteria compliance can be effectively monitored. After approval of the final design, construction can begin. On-site construction activities shall not begin until all final corrected plans, specifications and design analysis for the entire project have been approved by the Government.

1.10 DESIGN-BUILD CONTRACTOR REQUIRED A/E SERVICES

The following is a condensed summary of Section 01 33 00.32, "DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES" contained elsewhere in this document. Refer to that Section for the full requirements.

1.10.1 Dimensions

Design, products, and construction for the project shall be accomplished using English units of measurement. All measurement in the technical specifications sections shall be shown in English. Modular construction products are concrete block, wallboard, plywood, suspended ceiling systems, recessed lighting, and other manufactured components with dimensions based upon a four (4) inch building module.

1.10.2 Professional Registrations, Licenses and/or Certifications

The award of contract will be made to one qualified contractual entity that will be responsible for design completion and the entire construction process for the facility. This contractual entity shall employ qualified building design professionals with appropriate professional registration, state licenses and/or certifications. The designer qualifications and experience shall be submitted per the requirements of Section 01 33 00.32

DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES.

1.10.3 Request For Proposal - Binding Information

The information contained in this RFP shall be considered binding unless specifically waived by the Contracting Officer. The successful offeror's proposal, along with any clarifications and best and final offers are a binding part of this contract. Site design, building design, architectural character and engineering/performance criteria shall be implemented through construction by the Contractor.

1.10.4 Evaluation of Systems

As part of the basic services, the design-build contractor shall evaluate building systems and components for their possible inclusion into the design. If these systems and components meet the specified design, performance criteria in the RFP, and intent of the design, they may then be incorporated into the work.

SECTION 01 81 00 Page 10Am #0006

1.10.5 Documents Requirements

For a more detailed list of design and construction submittals, see Section

01 33 00.32, DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES.

1.11 COMMON DEFICIENCIES

Following are some common costly deficiencies to be avoided in the preparation of contract documents. Carefully compare the building design and contact documents with these requirements at several points in the design process to avoid unnecessary changes later.

a. Improper or inadequate coordination of project security requirements (secure and open storage areas) with the appropriate personnel and criteria.

b. Improper or inadequate coordination of project security requirements (secure and open storage areas) with constraints on site (within existing and operational Restricted (PL-1) Area, and secure area construction oversight requirements).

c. Not using correct abbreviations or terminology on the drawings.

Abbreviations must match what is used on the standard abbreviation sheet, and terminology must match what is used in the UFGS guide specifications and Omaha District Guide Specifications.

d. Not using the correct scales and north arrow designation, section cut system, or incomplete dimensioning on the drawings.

e. Not providing sufficient space for door operation hardware at doors which swing into a wall running perpendicular to the opening. Four inches minimum is required between edge of door frame and perpendicular walls.

f. Not providing correct and complete Design Analysis information written in the present tense. The Design Analysis will be written following the format indicated in Section 01 33 00.32 of the Request For Proposal. A separate Fire Protection section in the Design Analysis, with input from all disciplines, is one area which is often overlooked and shall be included.

g. Not providing a structural stoop at exterior doors where the slab is at the same approximate elevation as the interior floor. The use of simple slabs on exterior grade leads to lifting of the slab in below-freezing temperatures, which interferes with the safe operation of the door.

h. Not correctly presenting or coordinating (to avoid interference) features of HVAC, Fire Protection, Noise Control, and Physical Security.

i. Not correctly referencing and cross referencing building sections, wall sections, details, etc.

j. Failure to read/use Technical Notes in the Guide Specifications.

k. Failure to coordinate all disciplines prior to submittal of projects for review.

SECTION 01 81 00 Page 11Am #0006

l. Sealant details do not reflect actual conditions.

m. Improper use of fire-retardant wood. Fire-retardant wood is combustible; its use in buildings that are of noncombustible construction is extremely limited (see IBC for the minor allowable uses). Because of the potential for severe degradation, fire retardant plywood shall not be used in a roof or roofing system, or in structural applications.

n. Incorrectly listing trade names in door hardware specifications in lieu of ANSI numbers and failure to correctly specify hardware finishes.

Control joints in CMU walls are not shown on both architectural and structural plans, or are inconsistent.

o. Failure to properly edit and tailor guide specifications. Failure to delete all publications from guide specifications which do not apply to the particular project.

p. North arrow is not oriented the same direction on all sheets (civil, site, architectural, etc.).

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 81 00 Page 12Am #0006

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 86 10

MECHANICAL REQUIREMENTS

PART 1 MECHANICAL REQUIREMENTS

1.1 MECHANICAL SYSTEMS CRITERIA

1.1.1 General Parameters/References

1.2 PROJECT DESCRIPTION

1.3 MECHANICAL SCOPE OF WORK

1.3.1 Contractor Responsibilities

1.3.2 System Design Requirements

1.3.3 Design and Construction Execution

1.4 SBIRS OPERATIONS FACILITY REQUIREMENTS

1.4.1 Core Node

1.4.2 SST Server Room, Standardized Space Trainer Room, and Training

Cab

1.4.3 Telecommunication Rooms(SIPR/NIPR)

1.4.4 UPS Room

1.4.5 Mechanical Rooms and Electrical Rooms

1.4.6 Restrooms

1.4.7 Janitor’s Closet

1.4.8 Vestibule

1.4.9 Snow Removal Equipment Storages

1.4.10 Conference Rooms

1.4.11 General Office Spaces

1.5 GENERATOR BUILDING REQUIREMENTS

1.5.1 Diesel Fueled Generator Set(s)

1.6 HEATING, COOLING AND VENTILATION DESIGN REQUIREMENTS AND EQUIPMENT

SELECTION

1.7 GENERAL REQUIREMENTS

1.7.1 Design Considerations

1.7.1.1 Calculations

1.7.1.2 Mechanical Equipment Layout

1.7.1.3 Mechanical Systems

1.7.1.4 Natural Gas

1.7.2 Installation Considerations

1.7.2.1 Mechanical/Electrical Equipment Coordination

1.7.2.2 General Mechanical Requirements

1.7.2.3 Vibration Isolation / Equipment Pads

1.7.2.4 Standard Products

1.7.2.5 Utility Interruptions

1.7.2.6 Spare Parts

1.7.2.7 Labeling

1.7.3 Design Conditions

1.7.3.1 Site Elevation

1.7.3.2 Latitude

1.7.3.3 Longitude

1.7.3.4 Outside Design Conditions

1.7.3.5 Inside Design Conditions

1.7.3.6 Minimum Ventilation Requirements

1.7.3.7 Cooling Load

SECTION 01 86 10 Page 1Am #0006

1.7.4 Antiterrorism/Force Protection

1.7.4.1 Equipment Bracing / Supports

1.7.5 EQUIPMENT REQUIREMENTS

1.7.5.1 Equipment Identification

1.7.5.2 Identification of Piping

1.7.5.3 Air Cooled Chillers

1.7.5.4 Fan Coil Units

1.7.5.5 Chilled and Heating Water Pumps

1.7.5.6 Hot Water Boilers

1.7.5.7 Glycol Feed System

1.7.5.8 Air-Handling Units - Variable Volume

1.8 SEISMIC PROTECTION FOR MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT

1.8.1 Piping

1.8.2 Ductwork

1.8.3 Miscellaneous Equipment

1.9 THERMAL INSULATION OF MECHANICAL SYSTEMS

1.9.1 Insulation Covers

1.10 PLUMBING SCOPE OF WORK

1.10.1 Pipe Materials

1.10.2 Water Service

1.10.3 Protection of Water Supplies

1.10.4 Fixture Requirements

1.10.4.1 General

1.10.4.2 Water Closets

1.10.4.3 Lavatories

1.10.4.4 Domestic Hot Water

1.10.5 Plumbing accessories

1.10.5.1 Water Hammer Arresters

1.10.5.2 Cleanouts

1.10.5.3 Plumbing Vents

1.11 HYDRONIC PIPING REQUIREMENTS

1.11.1 Piping Layout

1.11.2 Pipe Sizing

1.11.3 Pipe Materials

1.11.4 Pipe Joints

1.11.5 Pipe Expansion

1.11.6 Isolation Valves

1.12 EXTERIOR GAS DISTRIBUTION SYSTEM

1.12.1 Service Line Sizing

1.12.2 Service Line Materials

1.12.3 Gas Meters

1.13 INTERIOR GAS PIPING SYSTEM

1.13.1 Gas Pipe Sizing

1.13.2 Equipment Connections

1.14 AIR SUPPLY AND DISTRIBUTION SYSTEM

1.14.1 Ductwork

1.14.2 Variable-Air Volume Boxes/Terminals

1.14.3 Grilles, Registers and Diffusers

1.14.3.1 Ceiling Mounted Supply Diffusers

1.14.3.2 Ceiling Mounted Return and Transfer Grilles

1.15 VENTILATION AND EXHAUST SYSTEMS

1.15.1 Exhaust Fans

1.15.2 Ceiling Mounted Exhaust Grilles

1.16 BUILDING TEMPERATURE CONTROL SYSTEM

1.16.1 General DDC Requirements

1.16.2 Alarm Monitoring

1.16.3 Stand-Alone Operation

1.16.4 Input/Output Devices

1.16.5 Cable and Wiring

SECTION 01 86 10 Page 2Am #0006

1.16.6 Control Valves

1.16.7 Control Dampers and Actuators

1.16.8 Valve Actuators

1.16.9 HVAC Control Drawings

1.16.9.1 Control Schematic

1.16.9.2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.