sf30-20b1-am5.pdf

PDF 1 MB Posted

Attached to
Honolulu Harbor Maintenance Dredging, Honolulu, Island of Oahu, State of Hawaii
Solicitation number
W9128A-20-B-0001
Issued by

About this file

This pre-solicitation notice announces the U.S. Army Corps of Engineers' intent to issue a solicitation for maintenance dredging of Honolulu Harbor on the island of Oahu in Hawaii. The project involves removing approximately 140,000 cubic yards of accumulated sediment to restore authorized harbor depths, using a mechanical clamshell dredge. Sediment will be disposed at the South Oahu Ocean Dredged Material Disposal Site and an upland disposal site, with dewatering at Kalaeloa Harbor. The notice provides a project description, estimated 540-day performance period, $10-25 million magnitude, and small business subcontracting goals. Interested parties should monitor the beta SAM website for solicitation documents and plans/specifications releasing no sooner than 15 days after this pre-solicitation notice. The resulting firm-fixed price contract will be awarded under NAICS code 237990 with a $30 million small business size standard.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0005 08 Apr 2020

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-20-B-0001 X

9B. DATED (SEE ITEM 11)

02/14/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Honolulu Harbor Maintenance Dredging, Honolulu, Island of Oahu, State of Hawaii

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0005 Standard Form 30

IFB No. W9128A20B0001 Page 2 of 2 Pages

Item No. 14 (Continued)

1. CHANGES TO SPECIFICATIONS. Attached hereto are new, revised and deleted sections to the specifications. Revised pages replace like-numbered pages. The revision mark (Am-0005) is shown on each revised page.

A. DELETED CLAUSE. The following clause was deleted and indicated with a bold strikethrough:

N/A

B. REVISED SECTIONS. The following sections were revised and indicated in red colored font:

Section 01 57 18, paragraph 3.1.2.m

Section 35 20 23, paragraph 1.8

C. ADDITIONS TO SECTIONS: The following was added to sections:

Section 00 73 00, Appendix B, Answers to RFI #32

Section 00 73 00, Appendix C, Electronic Bid Submission

Section 00 73 00, Appendix D, Virtual Bid Opending

D. REPLACED SECTION: The following section is to be replaced in its entirety:

N/A

2. Requests for Information due date: See Am-0003, SF30, Page 2 of 2, Item 2.

3. The bid opending date remains unchanged. See Am-0003, SF1442, Block 13

O&M DREDGING W9128A-20-B-0001

HONOLULU HARBOR

period.

j. In-water sediment containment devices must be used to contain project-generated turbidity and prevent spread beyond the active work area. At a minimum, the reach of the equipment is positioned inside the sediment containment device while the containment scow is positioned outside the sediment containment device, to minimize ingress/egress frequency. The size and position of the area enclosed by the sediment containment device must be strategically planned to reduce the number of times it must be repositioned. Prior to repositioning, sediment containment devices must remain in place until turbidity levels within the enclosure have returned to ambient levels. Sediment containment devices must be appropriately sized.

(1) In the inner harbor, a full-depth silt curtain shall be employed to encircle the active dredging area.

(2) In the entrance channel, a mid-depth silt curtain shall be employed to encircle the active dredging area.

k. Containment scows must be adequately sized to prevent overflow/over-topping and must be equipped with functional seals to prevent leakage of dredged material.

l. Contractor must develop and submit to the Government a site-specific BMP plan to be reviewed and approved by the Government prior to start of work. The Site-Specific BMP Plan must contain turbidity to the active dredge area to the greatest extent practicable. The plan must include a visual and instrumented turbidity monitoring plan to ensure the efficacy of the sediment containment BMP in comparison to ambient levels, with minimum once-daily visual inspections and instrumented readings throughout the duration of construction. When reviewing the contractor's proposed BMP plan, the Corps will only approve a plan that, at a minimum, includes the following or comparable alternative components:

(1) Visual inspection of sediment containment devices of sufficient frequency to minimize potential failure and to ensure proper use and installation.

(2) Instrumented monitoring of ambient turbidity levels near the surface, mid-column and near the bottom taken shortly before dredging begins in a location upcurrent of the enclosure and during dredge readings taken along a depth gradient near the surface, mid-column and near the bottom along a spatial gradient of short (1 yard), medium (50 yards) and long (up to 150 yards) distances oriented downcurrent of the enclosure.

(3) Establishment of a turbidity threshold (e.g. 10% above ambient) and corresponding progressive responses to exceedances beginning with taking a second reading to verify threshold exceedances, followed by inspecting the BMPs, to replacing the BMPs, adjusting/doubling up BMPs and stopping work.

(4) Contingency. The Contractor must develop a plan to swiftly implement pre-approved contingency response procedures in the event of equipment (e.g. scow) or BMP failure.

m. Contractor shall employ use of an environmental clamshell bucket designed to minimize the release of de minimis discharges of

SECTION 01 57 19 Page 21

(Am-0005)

3.1.3 Clean Water Act

to ensure the maintenance dredging complies with State of Hawaii Water Quality Standards. A Section 401 Water Quality Certification is not required. The Contractor must develop a site-specific water quality monitoring plan that at a minimum includes the following components.

3.1.3.1 Water Quality Monitoring

The purpose of the water quality monitoring plan is to ensure appropriate installation, maintenance and efficacy of in-water sediment containment devices e.g. silt curtains, and to ensure the maintenance dredging complies with state Water Quality Standards.

The Water Quality Monitoring Plan is provided in Attachment 1.

3.1.4 Flow Ways

Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as specified and permitted.

3.1.5 Vegetation

Disclose a removal and planting plan, if proposed, in the EPP. Except in the areas specified in the EPP, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor is responsible for any resultant damage.

Protect existing trees that are to remain to ensure they are not injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. Coordinate with the Contracting Officer and Corps' Civil Works Environmental Compliance Coordinator to determine appropriate action for trees and other landscape features scarred or damaged by equipment operations.

3.1.6 Streams

Stream crossings are not permitted

3.2 STORMWATER

Do not discharge stormwater from construction sites to the sanitary sewer. If the water is noted or suspected of being contaminated, it may only be released to the storm drain system if the discharge is specifically permitted. Obtain authorization in advance from the Contracting Officer and Corps' Civil Works Environmental Compliance Coordinator for any release of contaminated water.

3.2.1 Construction General Permit

A Notice of General Permit Coverage (NGPC) National Pollutant Discharge Elimination System (NPDES) has been obtained by the Government and is provided in Attachment 2. Under the terms and conditions of the permit install, inspect, maintain BMPs, prepare stormwater erosion and sediment

SECTION 01 57 19 Page 22 dredged material into harbor waters.

The Contractor must employ necessary procedures, measures and monitoring economical removal.

1.5 QUANTITY OF MATERIAL

Refer to paragraph 1.9 BASIS FOR BIDS below.

1.6 SIDE SLOPES

Dredging on side slopes shall not be paid for. Dredging outside of the Federal limits is not authorized. However, some of the material immediately outside the Federal limits may slough into the Federal limits. This material shall be removed prior to acceptance of the work as final. A 3 to 1 slope (horizontal to vertical) can be used to estimate the slope quantities.

1.7 PERMIT

The Contractor shall reference 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS of these specifications regarding permits for environmental protection, pollution control, and abatement that are applicable to construction and dredging operations.

1.8 ENVIRONMENTAL PROTECTION

The Contractor shall provide and maintain environmental protection measures during the life of the contract. Environmental protection measures shall also be provided to correct conditions, such as oil spills or debris, that occur during the dredging operations. The Contractor shall comply with Federal, State, and local regulations pertaining to water, air, and noise pollution.

The Contractor shall use an environmental clamshell bucket for dredging excavation. The environmental clamshell bucket shall be in accordance with Subsection 3.1.2.1 of Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Turbidity curtains shall be in conformance with Subsections 2.1 and 3.12 of Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.

Spillage into the State waters of dredge material from the scow during transport to the ocean disposal site will not be allowed. Spillage into State waters during transport from Honolulu Harbor to the offloading site at Kalaeloa Barber's Point, from the scow to the transport trucks at Kalaeloa Barber's Point, from the transport trucks to the dewatering site at Kalaeloa Barber's Point, and during the dewatering operations will not be allowed. Take necessary precautions to comply with this requirement.

1.9 BASIS FOR BIDS

Payment will be at the contract lump sum price. Data of survey and cross sections are provided in the plans for estimating quantities. Dredging conditions specified and indicated describe conditions which are known.

However, the Contractor is responsible for other conditions encountered which are not unusual when compared to conditions recognized in the dredging business as usual in dredging activities such as those required under this contract.

Over-depth dredging of up to one (1) foot is allowable. No additional payment will be made for dredging performed beyond this depth.

SECTION 35 20 23 Page 4

1.10 WIND, WAVE AND CURRENT DATA SOURCES

The following internet links are provided as sources of real-time

Honolulu Harbor Maintenance Dredging, Island of Oahu, State of Hawaii

W9128A‐20‐B‐0001

RFI # Question Issued Response

The datasheet for 'BM 8' provided in answer to RFI #31 has the ortho height elevation but not the elevation in MLLW datum as requested. With now knowing the official benchmark PID we were able to see what MLLW elevation NOAA provides for 'BM 8' but would like confirmation of what elevation in MLLW was used by the USACE at 'BM 8'.

The elevation for benchmark "BM 8" used by USACE is 8.44 feet Mean Lower Low Water (MLLW)

Section 00 73 00, Appendix B, Requests for Information ‐ Page 1 (Am‐0005)

Section 00 73 00, Appendix C – Electronic Bid Submission

(Am-0005)

Electronic Bid Submission

The Bidder shall electronically submit its bid, as described below. The IFB will provide the Government address and receipt date for bid submittal. The Bidder shall not submit classified data. The use of hyperlinks in a bid is prohibited. Elaborate brochures or documentation, detailed artwork, or other embellishments are unnecessary and are not desired. The bids will be submitted in electronic copies. No models, mockups, or videos will be accepted.

NOTE: The only authorized transmission method for a bid in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHOD WILL

BE ACCEPTED.

The bid must be received by the Government no later than the date and time specified in the solicitation. A Bidder shall use the following link for bid submission:

https://safe.apps.mil/

Please submit bids using the link above to Contract Specialist, Ms. Dayna Matsumura, at Dayna.N.Matsumura@usace.army.mil at AND to the Contracting Officer, Mr. Kent Tamai, at Kent.A.Tamai@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:

In an effort to reduce paperwork and cost, each bid shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. There is a limit of five (5) files per upload (total size cannot exceed 2GB). If the bid contains a large number of files, recommend that the files be combined or condensed (ZIP files) before uploading to the SAFE site. A Bidder may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR DROP-OFF LINK:

A Bidder must e-mail the Contract Specialist, Ms. Dayna Matsumura, at Dayna.N.Matsumura@usace.army.mil at AND to the Contracting Officer, Mr. Kent Tamai, at Kent.A.Tamai@usace.army.mil no later than three (3) working days prior to the bid due date to request a drop-off link to upload files via the SAFE site. A Bidder that fails to submit an email for request at least three (3) working days before the bid submission date might not be able to receive a drop-off link in time to upload the submission.

Once the drop-off request is submitted by the Government, you will receive an automated email from noreplyto@mail.mil with “[DoD SAFE]” in the subject line. The email will contain a unique web link that will direct you to the SAFE web page that will allow you to drop-off (upload) your bid.

FILE DESCRIPTION:

Include a "File Description" for each file(s) you upload. The "File Description" will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Submission shall be in Adobe PDF format.

mailto:Dayna.N.Matsumura@usace.army.mil mailto:Kent.A.Tamai@usace.army.mil mailto:Dayna.N.Matsumura@usace.army.mil mailto:Kent.A.Tamai@usace.army.mil mailto:noreplyto@mail.mil

Section 00 73 00, Appendix C – Electronic Bid Submission

INSTRUCTIONS FOR UPLOADING BID:

1. Click the link contained in your email from noreplyto@mail.mil.

2. Enter the email address for every recipient in the “To:” line. For this solicitation, the

Contract Specialist and the Contracting Officer will be the recipients.

The Contract Specialist’s e-mail for this solicitation is:

Dayna.N.Matsumura@usace.army.mil and the Contracting Officer’s e-mail is Kent.A.Tamai@usace.army.mil.

The e-mail address of the Government Employee who initiated the request code will be automatically entered. The Bidder must enter the e-mail address for both the Contracting Officer and Contract Specialist. The Bidder can enter an additional e-mail address if desired. After entering the e-mail address, click the green “+” button to add the person(s) email to the "Recipients List" of your response.

3. Enter the Solicitation number, followed by your Firm’s name, in the “Short note to the Recipients:” section.

4. Click the “Click to Add Files” icon or drag them over to the web page to add them.

5. Complete your drop off by clicking the “Drop-off Files” icon.

When your bid is submitted, a “Drop-Off Completed” screen will be displayed, and a notification will be sent to the recipients you added with a download URL and Claim Passcode.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Entering an incorrect email may result in the rejection of your submission. A Bidder can confirm proper submission by the 'Drop-Off Completed" screen that is generated based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox or Google Chrome web browser. The Government cannot verify that this is true and offers no guarantee that a Bidder will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS:

For the purpose of establishing a timely bid, the government will use the date and time the submission is completely uploaded into the SAFE website. For a Bid that is larger than the 2GB capacity of the SAFE website and that requires multiple submissions, the Government will use the date and time the final submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It may take several minutes or even hours in some cases.

The Government will not be responsible for any submission that is not delivered in accordance with these instructions. A Bidder is responsible for ensuring that its bid is submitted such that it reaches the designated recipient. The Bidder is also responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

mailto:noreplyto@mail.mil mailto:Dayna.N.Matsumura@usace.army.mil mailto:Kent.A.Tamai@usace.army.mil

Section 00 73 00, Appendix D – Virtual Bid Opening

(Am-0005)

VIRTUAL BID OPENING

Due to the COVID-19 emergency situation and in light of the Hawaii Governor’s Proclamation, the Government is temporarily suspending in-person attendance at public bid openings for Invitation for Bids issued by our office. The bid opening for this solicitation will be held via an audio-enabled conference call (teleconference).

Any interested persons who would like to listen to the opening of this bid can attend via teleconference with the information below on the date and time of the bid opening.

NOTE: Bid opening will start 30 minutes after the deadline for receipt of bids, due to the requirement to download the bids from DoD SAFE.

Following the bid opening, the Government will e-mail a copy of the abstract and requested bids to those who participated in the virtual bid opening.

To listen to the live audio portion of the electronic bid opening:

1. Telephone number: 877-336-4441

2. When prompted enter the Access Code or Meeting Number via web: 4104980

3. Host Password or Code via Web: 5595

4. Web Conference URL: https://www.webmeeting.att.com

5. Those participating in the virtual bid opening are requested to mute their line to prevent disruptions and distractions.

6. To exit the teleconference, simply hang up your phone.

PRELIMINARY and BID SUMMARY RESULTS:

Bid Abstract will be posted on the BetaSAM website within 24 hours after the bid opening.

To obtain Bid Results, go to the BetaSAM web page at https://beta.sam.gov and search “Search Contract Opportunities” under Keyword “ENTER SOLICITATION NUMBER.”

https://beta.sam.gov/

SF30-Am-0005
Section 01 57 18
Section 35 20 23
Section 00 73 00, Appendix B, Requests for Information
Section 00 73 00, Appendix C, Electronic Bid Submission
Section 00 73 00, Appendix D, Virtual Bid Opending