UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: FY19 Install Relays Review: Solicitation RFIs (00001) (sorted by CommentID ) Displaying 26 inquiries.
Id Discipline Sheet Detail Spec
8159459 Contracting Page 1
Comment Classification: UNCLASSIFIED (U)
I see that drawings are to be done by the contractor and are to be submitted prior to work. But the big question is where are the drawings that are to be used as a starting point? Are they CAD drawings? If just hard copies do drawings that are submitted need to be CAD'd? Do they have a standard installation example? Are test switches required? Are the relays to be powered from Breaker DC? Do they require separate fusing?
So many of my questions would be answered if you discover there are detailed drawings of each cubicle showing the 751's installed, but I don't think they exist. Although I don't see where it is explicitly stated, this sounds like a "design/build" project but with the government providing the basic component (the SEL 751 relays).
On: Aug 26 2019.
Government Response. . Revised scope of work will be incorporated via amendment to clarify drawing requirements.
Relay product data and instruction manuals will be incorporated via amendment.
The contract is still considered a design-bid-build contract; however, there are portions of the contract that are performance-based such as, but not limited to, the shop drawings of the modified one-line diagrams and any modification or additional enclosures that would be required to install the relays in the existing switchgear enclosures. On: Sep 04 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169376 Construction Management RFP RFP
Comment Classification: UNCLASSIFIED (U)
The Government supplied relays were unavailable for inspection at the site visit. Please provide description of relays to be used including brand, physical dimensions, and peripheral parts required for each application. (Submittal data)
On: Aug 30 2019.
Government Response. . See attachment 6 for relay product data and attachment 7 for relay instruction manual incorporated via Amendment 0001. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169377 Construction Management RFP RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If multiple styles / brands of relays are used, provide specific circuit location of each type.
On: Aug 30 2019.
Government Response. . See attachment 6 for relay product data and attachment 7 for relay instruction manual incorporated via Amendment 0001. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169378 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will installation of new CT 's be required?
On: Aug 30 2019.
Government Response. . No. On: Sep 11 2019
Page 1 of 6ProjNet: Logged In User
9/11/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169379 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the Government provide additional or replacement CT's as required?
On: Aug 30 2019.
Government Response. . No. CTs are not part of the SOW. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169380 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
At site visit it was observed that some of the existing relays were mounted vertically in openings created by the removal of other devices.
On: Aug 30 2019.
Government Response. . No. There are no existing relays mounted vertically. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169381 Construction Management RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the Government allow vertical installation of the new relays as observed during the site visit?
On: Aug 30 2019.
Government Response. . No. There are no existing relays mounted vertically. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169382 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the Government accept field fabricated materials for unused gear openings?
On: Aug 30 2019.
Government Response. . Per the SOW, Page 1, "All exterior electrical enclosures shall be rated NEMA 4X." On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169383 Construction Management RFP RFP
Comment Classification: UNCLASSIFIED (U)
Shall painting be required?
On: Aug 30 2019.
Government Response. . SOW revised via Amendment 0003 stating, "Touch up paint shall be provided for all exposed metals of the enclosures after installation to match existing enclosure." On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169384 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the government be required to manipulate the breakers during initial LOTO and re-energization?
On: Aug 30 2019.
Page 2 of 6ProjNet: Logged In User
Government Response. . This shall be coordinated with DPW - Please refer to SOW revised via Amendment 0003. Also, see SECTION 01 35 26, Para. 3.2 PRE-OUTAGE COORDINATION MEETING.
On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169385 Construction Management RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the contractor be required to pay for DPW electrical support services ?
On: Aug 30 2019.
Government Response. . No. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169386 Construction Management RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the contractor be required to pay for DPW electrical support services as escort while working within the substations?
On: Aug 30 2019.
Government Response. . No. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169387 Construction Phasing SPEC 33 71 02 SPEC
Comment Classification: UNCLASSIFIED (U)
The Electrical Scope of Work directs the contractor to replace existing electromechanical relays with Government furnished / Contractor installed (GFCI) 125VDC SEL 751 relays. The submittal register contains specification section 33 71 02 which is for medium voltage cable installation.
On: Aug 30 2019.
Government Response. . No medium voltage cable work is involved. Spec Section 33 71 02 will be removed via Amendment 0003. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169388 Construction Management SPEC SPEC
Comment Classification: UNCLASSIFIED (U)
Please confirm or deny that there is no conduit, 15KV cabling, terminating or testing of medium voltage cable for this project.
On: Aug 30 2019.
Government Response. . Please refer to Inquiry ID: 8169387 response. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169389 Construction Phasing RFP S-36.22 RFP 0073 00
Comment Classification: UNCLASSIFIED (U)
In Section 00 73 00, S-36.22 NOTICE OF PARTNERING (April 2004) – it states that a partnering initiative meeting between the Government and the contractor will be held in Kwajalein. Will the contractor be required to attend this meeting in Kwajalein?
On: Aug 30 2019.
Government Response. . Section 00 73 00, S-36.22 NOTICE OF PARTNERING deleted via Amendment 0003. On: Sep 11 2019
Current Request Status: Request Closed
Page 3 of 6ProjNet: Logged In User
Information for this report is procurement sensitive.
8169390 Construction Phasing RFP section 2.3 00 22 16
Comment Classification: UNCLASSIFIED (U)
00 22 16 section 2.3 states: Original and one (1) copy of the Offeror's completed Standard Form (SF) SF1449, using a printed copy of the SF 1449 included in this solicitation. Could the Government please clarify is this is to read SF 1449, or SF 1442. If SF 1449 is correct, would the Government please provide this form?
On: Aug 30 2019.
Government Response. . RFP Section 00 22 16, Para. 2.3 corrected via Amendment 0003. On: Sep 11
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169391 Construction Phasing SOW SOW
Comment Classification: UNCLASSIFIED (U)
Please confirm that the scope of work is solely as described in the SOW, Electrical Scope of Work: Descriptions 1.
Through 5.
On: Aug 30 2019.
Government Response. . The Contractor shall provide all labor, management, supervision, tools, materials, supplies, equipment and transportation necessary for work required in accordance with all Solicitation SOW documents, attachments, drawings and specifications. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169392 Construction Phasing SOW SOW
Comment Classification: UNCLASSIFIED (U)
The SOW has included Base one-line diagrams for each system that has the replacement relay installation. Were the one-line drawings added as a diversion to confuse the contractor and to direct the attention away for the intended scope of work?
On: Aug 30 2019.
Government Response. . No. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169439 Construction Management SOP-658 page 2 of 18 6.e Outage Notice Boards
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Contractor performing the major outage work is required to provide four (4) traffic electronic informational sign boards, a minimum of a month prior to the start of the actual electrical outage work. It is possible that outages will need to be scheduled in consecutive weeks where an outage one week will affect one area, and the following week it will affect another area. Are 4 message boards required to cover all outages, or are 4 message boards required for each individual outage leading to as many as 16 message boards notifying of outages if they occur back to back on consecutive weeks.
On: Aug 31 2019.
Government Response. . Message boards are not required to cover all outages. See SOW Attachment 5 - Electrical Outage SOP and Permit revised via Amendment 0003. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169440 Construction Management SOP-658 page 2 of 18 6.e Outage Notice Boards
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that message boards are required to be used for all outages, and must be in place for one month continuously prior to each outage.
On: Aug 31 2019.
Page 4 of 6ProjNet: Logged In User
Government Response. . SOW Attachment 5 - Electrical Outage SOP and Permit revised via Amendment 0003. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169441 Construction Management SOP-658 page 2 of 18 6.g Outage Notice Boards
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the event of a cancellation of an outage, will the cost of additional message boards for the re-scheduled outage be considered a changed condition?
On: Aug 31 2019.
Government Response. . SOW Attachment 5 - Electrical Outage SOP and Permit revised via Amendment 0003. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8169442 Construction Management SOP-658 page 9 of 18 11 Metrics - Outage permit
Request
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that outages for this project will require 6 months of lead time to schedule and obtain approval.
On: Aug 31 2019.
Government Response. . Please refer to SECTION 01 90 00, 1.13.4.1 Electrical Outages. On: Sep 11
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173699 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Can some of the existing control wires be re-used? Any specific wire markers needed?
On: Sep 04 2019.
Government Response. . Please refer to Section 26 11 14.00 10, Para. 1.2.4 Connection Diagram, and Section 26 11 14.00 10, Para. 1.5 DELIVERY, STORAGE, AND HANDLING. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173702 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will each relay require a Test Switch witch shorting capability for the CT signal and regular for voltage signal, trip and control power.
On: Sep 04 2019.
Government Response. . No. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173876 Construction Phasing RFP RFP
Comment Classification: UNCLASSIFIED (U)
Will the USACE provide the SEL relay setting files? Most third-party testing agencies will not create the relay setting files, only download the files that are provided to them and then verify the settings and functions work correctly.
On: Sep 04 2019.
Government Response. . The requirements for the contractor are specified in the SOW. See Electrical SOW Item #5 and Attachment #1 of the solicitation. On: Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 5 of 6ProjNet: Logged In User
8173877 Construction Phasing RFP Spec 26 11 14.00 10 page 11
Comment Classification: UNCLASSIFIED (U)
Spec 26 11 14.00 10 page 11 requires 8 hours of training that is not discussed in the SOW. The contractor recommends waiving this training and instead have the Government provide SEL relay training from SEL since the relays are government furnished.
On: Sep 04 2019.
Government Response. . Spec SECTION 26 11 14.00 10, Para. 3.5 revised via Amendment 0003. On:
Sep 11 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 6 of 6ProjNet: Logged In User
File details come from the government source that posted it.