Solicitation No. W9128A-19-R-0016 Install Relays at Castner, Menoher, and Wheeler Army Airfield (WAAF) substations, Schofield Barracks, Oahu, Hawaii
SCOPE OF WORK
05 Aug 2019
Electrical Scope of Work:
1. Replace 36 existing electromechanical relays with Government furnished/Contractor installed (GFCI) 125VDC SEL 751 relays at Schofield Barracks Castner & Menoher Substations.
2. Replace 15 existing electromechanical relays with GFCI 48VDC SEL 751 relays at Wheeler Army Airfield (WAAF) Substation.
3. Replace 1 ea. additional existing electromechanical relay with GFCI relay in spare or tie compartment at Castner, Menoher, and WAAF Substations. Location of additional protective device and relay settings to be determined by DPW.
4. Contractor will modify all wiring and enclosures as required, install relays, set relays to the settings provided and perform testing.
5. Contractor shall adjust new relays to settings indicated in attached Relay setting Update tables for Castner/Menoher and WAAF substations (see attachment 1 for relay setting table, attachments 2, 3 & 4 for base 1-line diagrams).
All work shall conform to the most current editions of NFPA 70, IEEE C2, UFC 3-560-01, NEMA ICS 1, NEMA ICS 2, AND NEMA ICS 3 requirements for installation of control and protective devices.
The contractor shall verify existing conditions and dimensions at the jobsite prior to the commencement of work and shall immediately notify the contracting officer of any discrepancies.
The contractor shall become familiar with the existing switchgear, relays, and associated GFCI equipment prior to the commencement of work to minimize any delays during installation
Relays and associated GFCI equipment may be obtained by contacting DPW. POC is Ms. Casey Hiraiwa, Energy Manager, Ph. (808) 656-3296 or Mr. Keith Yamanaka, Energy Branch Chief, Ph. (808) 656-1036.
The contractor shall make arrangements to perform installation of relays in spare compartments (Item 3 in scope of work) prior to installation of relays in active substation compartments to determine if any complications arise. Coordination POC shall be Ms. Hiraiwa or Mr. K Yamanaka.
Prior to any disruption of the existing Schofield Barracks or WAAF primary electrical systems, the contractor shall be responsible for obtaining an approved US Army Garrison, Directorate of Public Works Electrical Outage Permit (see attachment 5).
To minimize number/duration of utility outages, the contractor shall schedule work to combine relay installations where possible.
The Contracting Officer shall be given 5 working days' advance notice of the dates and times for checks, settings, and tests.
All exterior electrical enclosures shall be rated NEMA 4X.
Preconstructions submittals. Government approval is required for the following submittal. Submit the following in accordance with Section 01 33 00 Submittal Procedures:
Solicitation No. W9128A-19-R-0016 Install Relays at Castner, Menoher, and Wheeler Army Airfield (WAAF) substations, Schofield Barracks, Oahu, Hawaii
SCOPE OF WORK
05 Aug 2019
Shop Drawings. Shop drawings shall include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control devices, accessories, conduit/wiring runs, and other items that must be shown to ensure a coordinated installation.
Wiring diagrams shall be done by a registered engineer and shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment
Relays shall be installed, visually and mechanically inspected, adjusted, tested, and calibrated in accordance with the manufacturer's published instructions. Tests shall include pick-up, timing, contact action, restraint, and other aspects necessary to ensure proper calibration and operation. Relay settings shall be implemented in accordance with attached relay setting tables. Relay contacts shall be manually or electrically operated to verify that the proper breakers and alarms initiate. Relaying current transformers shall be field tested in accordance with IEEE C57.13. Tests shall be performed in the presence of the contracting officer or an authorized representative. The contractor shall furnish all instruments and personnel required for the tests, and the government shall furnish the necessary electric power.
Pre-Energization Services. The following services shall be performed subsequent to testing but prior to the initial energization. The equipment shall be inspected to ensure that installation is in compliance with the recommendations of the manufacturer. Terminations of conductors at major equipment shall be inspected to ensure the adequacy of connections. Bare and insulated conductors between such terminations shall be inspected to detect possible damage during installation. Components shall be inspected for damage caused during installation or shipment to ensure packaging materials have been removed. Components capable of being both manually and electrically operated shall be operated manually prior to the first electrical operation.
Submit record drawings, within 30 days after completion of equipment installation and acceptance testing. Update electrical system drawings to reflect final record as-built conditions after all related work is completed.
don't match site plan don't match site plan
TP-602
TPP-750
1-100kVA 2-75kVA
TV-760A
TR-1-2
2-167kVA
TPP-F-17
TPP-F-2
10kVA on site
TP-Gimlet
TP-Gimlet 2
TP-760A
TR-1-4
50kVA
TP-760A
TR-1-1
50kVA
TP-9104?
Substation Power
Switch SP-T-55A on Menoher one-line
TPP-G-28
TPP-G-27
TPP-660, 2-10kVA TPP-600A, 1-15kVA
TPP-3321 on site plan
TP-D-5
possible location 50kVA
One should be
TR-480-A
Should be TR-480-C Should be TR-480-D
Should be TR-480-G
Change to TP-356 Change to TP-355
Not sure where on site plan
3-50kVA
1-50kVA
Should be TP-2624
TP-589
TPP-2408
1-25kVA possible 150 or 225kVA
3-15kVA
E-Q-21
E-Q-20(R)
TPP-909
3-50kVA
TP-2800
TPP-950
1-75kVA
TPP-X2816
JP-Q-28
TPP-2440
JP-Q-7
JP-Q-54
JP-Q-8
150 kVA
TP-3004
TP-2069B
TP-2069A
150kVA
JP-N-517TPP-2038B
3-15kVA or 3-50kVA
TPP-2032
1-50kVA
This should be moved here
TPP-2056
3-75kVA
1-50 & 2-37.5?
3-50kVA
1-150kVA
TPP-2108
3-25 kVA
300kVA
JP-F-51
JP-F-9(R)
TP-557B 500kVA TP-557A 300kVA
Look at site and verify, E-115
Possibly JP-F-5(R)
TPP-586
3-25 kVA
JP-F-4
JP-F-6 or JP-F-504 JP-L-33
TPP-555
Also labeled S-2 in field
JP-T-55B
1000kVA check 30 or 300?
100kVA
167kVA no match site
TPP-1494
JP-W3-2
1-37.5kVA site plan shows SP-1503site plan shows
SP-1503A
JP-Y-5(R)
JP-Y-6(R)
J P Y
J P Y
JP
Z-
JP
Z-
TPP-1609
3-25kVA
JP-QTR-4
JP-QTR-5
JP-QTR-6
JP-QTR-7
JP-QTR-8
JP-QTR-9
JP-QTR-10
JP-QTR-11
JP-QTR-12
JP-QTR-13
JP-QTR-14
JP-QTR-15
JP-QTR-16
JP-QTR-17
JP-QTR-18
JP-QTR-19
JP-QTR-20
JP-QTR-21
JP-QTR-22
JP-QTR-23
JP-QTR-24
JP-QTR-25
JP-QTR-26
JP-QTR-27
JP-QTR-28
JP-QTR-29
JP-QTR-4-1
JP-QTR-4-10
TP-QTR-4-10
100kVA
JP-QTR-4-13
TP-QTR-4-13
167kVA
JP-Z-17
75kVA on site plan
15kVA on site plan
JP-BB-19A
TPP-BB-19B
3-50kVA
JP-BB-7(R)
15 on site plan
TPP-BB-1
TPP-Z-32(R)
TPP-T-66
JP-T-66
37.5kVA
To EM-605
TPP-W-83?
ckt 42 ckt 43
75kVA75kVA75kVA75kVA75kVA
75kVA75kVA 75kVA 75kVA 75kVA
75kVAT-M-28 50kVA
T-M-26 75kVA
T-M-29 25kVA
T-M-30 75kVA
T-M-31 75kVA
T-M-27 50kVA
T-M-32 50kVA
TP-1056
?kVA
Transformer 1
Transformer 2 ckt 43ckt 42
TP-776B?
75kVA
75kVA
50kVA
75kVA50kVA
JP-T-3
SW-A-01
PME-9
T-A-01 100 kVA
T-A-02 75 kVA
T-A-03 50 kVA
T-A-04 75 kVA
T-A-05 50 kVA
T-A-06 75 kVA
TP-891A on site plan
TP-891 on site plan diff from site plan diff from site plan
TP-780SL
can't find on site plan
SP-795A on site plan possible 300kVA doesn't match site
TPP-R-12
1-10kVA
TPP-R-35
50kVA
100kVA
75kVA
100kVA
100kVA
75kVA
50kVA
75kVA
75kVA
75kVA
75kVA
75kVA
100kVA
100kVA
100kVA
100kVA
100kVA
T-K-16
25kVA
25kVA
50kVA
100kVA
100kVA
100kVA
100kVA
100kVA
100kVA 75kVA
75kVA
75kVA
75kVA
75kVA
75kVA
50kVA
50kVA
50kVA
Kaena CC 150kVA 208Y/120V
T-K1-07
75kV 100kVA
50kVA
K3 Transformers T-k3-01 -T-k3-30 & T-k3-25A pump house
TP-7001?
Doesn't match site plan
TP-7024
TP-7022
TPP-1170
3-10kVA
3-15kVA
3-37.5kVA
3-37.5kVA3-37.5kVA1-25kVA
1-37.5kVA
1-50kVA
1-50kVA
1-50kVA 3-37.5kVA 1-25kVA
1-100kVA
1-37.5kVA
1-75kVA
1-75kVA
1-50kVA
1-37.5kVA 1-37.5kVA
1-50kVA
1-25kVA
1-75kVA
JP-AA-127
1-75kVA
TPP-130
1-50kVA
1-50kVA
1-50kVA
1-37.5kVA
JP-AA-1331
1-75kVA
1-25kVA 1-37.5kVA
3-25kVA
TPP-AA-181
JP-AA-181
1-25kVA
D
C
A
B
S O
LI
C
IT
AT
IO
N
N O
FI
LE
N
AM
E
D W
N B
Y:
C
K D
B Y:
D E
S
IG
N E
D B
Y:
D E
S C
R
IP
TI
O
N M
A R
K A
P P
R
D
AT
E
FI
LE
N U
M B
E R
SI
ZE
S U
B M
IT
TE
D B
Y:
P
LO
T S
C A
LE
PL
O
T D
AT
E:
D
AT
E M
A R
K D
E S
C R
IP
TI
O N
C O
N
TR
A C
T N
O
SHEET
IDENTIFICATION
D
AT
E A
P P
R
SHEET 1 OF 3
W or ki ng p ro du ct
, N O
T
FO
R D
IS
TR
IB
U
TI
O
N
Jo in t T ru nk in g S ys te m , P rio rit y 3B
, C ab le
4C
1 2 3 4 5
E-601
E
A N
S I E
N on e
BY
C
R E
5/
/2
5/
/2
P rio rit y3
B _P re lim
La yo ut .m xd
U S
G -H
I D P
W
US Army Corps of Engineers Honolulu District
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S H
O N
O
LU
LU
D
IS
TR
IC
T
H O
N O
LU
LU
, H
AW
A
II
H ut
C
(A M
R ) t o H ut
6X (T
A M
C
F.I.
F.I.
F.I.
F.I.
F.I.
F.I.
F.I.
F.I. F.I.
F.I.
F.I.
F.I.
F.I.
F.I.
NO
C
TP-514
TP-347A
TP-XFMR-T1
TP-207
B 159
150/KVA
208Y/120
TP-239
B 190
150/KVA
208Y/120
TP-1010
(TR RUNWAY
SOUTH)
25/KVA
240Y/120
TP-118
500/KVA
208Y/120
TP-AT&T
150/KVA
480Y/277
TP-832
B 1073
300KVA
480Y/277
NATIONAL
GUARD
TP-310
480Y/277
TP-408
100KVA
240/120
TP-427
75KVA
240/120
TP-402
75KVA
240/120
TP-404
75KVA
240/120
TP-431
75KVA
240/120
TP-547
225KVA
208Y/120
TP-528
50KVA
240/120
TP-541
50KVA
240/120
TP-520
50KVA
240/120
TP-505
50KVA
240/120
TP-108
500KVA
480Y/277
TP-1580-1A
TP-1580
12470/ KVA
4160Y/2400
TP-745
50KVA
240/120
TP-744
75KVA
240/120
TP-746
75KVA
240/120
TP-751
100KVA
240/120
TP-752
75KVA
240/120
TP-743
75KVA
240/120
TP-470
75KVA
240/120
TP-470A
75KVA
240/120
TP-750
75KVA
240/120
TP-719
75KVA
240/120
TP-732
75KVA
240/120
TP-711
75KVA
240/120
TP-720
100KVA
240/120
TP-660
37.5KVA
240/120
TP-664
50KVA
240/120
TP-658
50KVA
240/120
TP-619
75KVA
240/120
TP-618
50KVA
240/120
TP-612
100KVA
240/120
TP-102
225/KVA
208Y/120
TP-114
1000/KVA
208Y/120
TP-113
150KVA
208Y/120
TP-102A
1500/KVA
480Y/277
TP-800
75/KVA
208Y/120
CONTROL
TOWER
TP-825
150/KVA
208Y/120
NATIONAL
GUARD
TP-100
112.5/KVA
208Y/120
TP-817
75/KVA
208Y/120
COURT HOUSE
A B A B
TP-840
500KVA
480Y/277
NEW BARRACKS
TP-835
208Y/120
BOWLING
ALLEY
TP-829
300/KVA
480Y/277
NATIONAL
TP-442
50KVA
240/120
TP-515
100KVA
240/120
TP-508
112.5KVA
208Y/120
TP-107
300/ KVA
208Y/120
TP-117
112.5/ KVA
TP-251
75/ KVA
208Y/120
TP-110B
500/ KVA
480Y/277
TP-110A
500/ KVA
208Y/120
TP-110
112.5KVA
208Y/120
TP-111
750KVA
208Y/120
TP-111A
25KVA
480/240
TP-205
750/ KVA
240/120
TP-1100
150/KVA
208Y/120
TP-1012
500/KVA
480Y/277
TP-1014
112.5/KVA
208Y/120
TP-1111
112.5/KVA
208Y/120
TP-844
150KVA
208Y/120
TP-600
DOIM
500KVA
480Y/277
TP-679
CHAPEL
150KVA
208Y/120
NO NC
B A
TP-102B
225/KVA
240 /120
TP-1003
225/KVA
480Y/277
TP-1004
225/KVA
208Y/120
TP-605
100KVA
240/120
NC
AB
NO
TR TRL 680
500KVA
208Y/120
TP-104A
500KVA
480Y/277
TP-104
225/ KVA
208Y/120
NC NC
TP-300
225KVA
208Y/120
TP-218
300KVA
208Y/120
TP-210
500/KVA
208Y/120
TP-1015
112.5/KVA
208Y/120
TP-1013
75/KVA
208Y/120
TP-1020
75/KVA
480Y/277
TP-1021
45/KVA
208Y/120
TP-1118
75/KVA
208Y/120
TP-1006
500/KVA
480Y/277
37.5KVA
120/240
3/25KVA
120/208
37.5KVA
120/240
3/25KVA
TPP-4-32
NO NC NO NC
B1027
225KVA
TPP-5-14
1X50KVA
167KVA
240/120
500KVA
TPP-5-23(R)
TPP-5-19
TPP-5-1
TP-117A
225KVA
480Y/277
3/50KVA
75KVA
208Y/120
TP-107A
750KVA
208Y/120
TP-223
150KVA
208Y/120
TP-685
225KVA
208Y/120
TIE-SP-2
SP-TIE-1
SP-HW-1
C
C C C C
SP-HW-2
SP-STP-1 SP-IS-3
SP-IS-4
1 2 3
NCNO
NONC
NCNC NO
NC NC
SP-IW-3
SP-575N
SP-HEA-1
SP-ER-1
SP-HEB-1
SP-HEB-2
SP-A-1
SP-A-2
SP-A-3
SP- A-4
SP- B-1
SP-B-2
SP- B-3
SP- A-5
SP-IEA-3
SP-IEA-2 SP-IEB-1
SP-IEB-4SP-IEB-3
SP-IEB-2
SP-IEA-1
SP-IEA-4
SP-IEA-4A
SP-IEA-5
SP-IEA-6
1 3 4 2
HEA-TIE
SP-IW-1
B104
SP-IW-1A
SP-IW-4
SP-IS-1 SP-SS-1 SP-IS-2
SP-IS-5
SP-IS-6
NO NC
NCNCNCNC
NC NO
NC
NC NO
NC NC
NC NC
NC
NC NO
NC NCNO
NC NO
N O
N O
N O
N O
NC NC NC NC
NO
NC
NONONO
NC
NO NC
NC
SP-IW-2
NO NO NC
NC
NC NO
NO NC
NO
NC NONC
N C
N C
N C
N C
N C
N C
NO NC
B A
2 3
2 1
3 4
1 2
2 3
3 2 1 42 1 4 3
2 1
2 1
C NO NO C
2 1 3 4
NC NC NC NC NC NC NC
NC NC NC NC
3 2 4 1
NC NO NC NC
3 4 2 1
NC NC 1 2
3 4 1 2
1 2 3 4
3 4 1 2
N O
N O
N C
N C
4 1 2
C
SP-IS-7
SP-IW-2A
SPARE
SP-685
SPARE
E-4-23
E-4-24(R) E-4-22 E-4-21 E-4-20(R)
E-4-16 E-4-15
E-5-18
E-5-17 E-5-16
E-5-12
E-5-10
E-5-9
E-5-8
E-5-7
E-5-6
E-5-5
E-5-4 E-5-3E-5-2
E-5-1(R)
E-5-11 R
E-4-30
E-4-28
E-4-27
E-4-26
E-4-19
E-4-18(R)
E-4-17(R) E-4-9(R) E-4-8
E -4
-7
E-4-14(R)
E-5-19E-5-20E-5-21E-5-22E-5-23(R)
E -4
-6 (R
E -4
-5
E -4
-4
P/
IE
A/ 1A
E-2-62
P/IEA/1
E-4-31(R)
E-5-13
E-4-32(R)
E-5-11(R) E-5-14(R)
PBA
TO NEW HECO SUBSTATION
ER(7A)
ERA
GEN SET
DEEP
DEEP WELL
C
C
C
C
PSN
C C
TO HOUSING TO AMMO STORAGE
EAST RANGE
IEB
B205
#2
#24/04/0
4/0
4/0
4/0
#2
4/0
#2
#2
UE-4-34
UE-4-32 UE-4-31
UE-4-30
UE-4-29
UE-4-27 UE-4-26 UE-4-25
UE-999
(HH 26B)
UE-999
(MH 28A)
UE-999
(MH 28B)
UE-4-17
UE-4-19
UE-4-16
UE-4-13UE-4-21
UE-4-20
UE-4-50
(MH 27)
UE-999
(MH TV14B)
UE-999
(MHTV14A)
UE-4-52A
VAULT 13
VAULT 15 UE-4-49 UE-4-48
UE-4-47
UE-999
(MH S1)
UE-4-13 UE-4-12
UE-5-10
(HH 43)
UE-5-6
(MH 56) UE-5-8
(MH 44)
UE-5-9
UE-9-5
(MH 57)
UE-5-3
(MH 46)
UE-999
(HHTV88)
UE-4-15
UE-999
(MH 1)
UE-4-8
UE-4-6
UE-4-24
UE-4-7
UE-4-5
UE-4-46
UE-4-45
UE-4-10
UE-4-4 UE-4-3 UE-4-2 UE-4-1 UE-1-44
UE-1-45 UE-1-43 UE-1-38 UE-1-33
VAULT
TV4
UE-1-31
UE-1-32
UE-1-23
UE-1-27
UE-1-18
UE-1-TV2
UE-1-16
UE-1-39 UE-1-34
UE-1-25 UE-1-19 UE-1-14 MH3A
UE-1-17
UE-1-20
UE-1-21UE-1-22
MH--
WELL
UE-4-56
UE-1-29
UE-1-46UE-1-47
UE-1-51
UE-1-24
UE-1-41
UE-1-52
(MH 11)
UE-4-44A
(MH 12)
UE-4-41
UE-4-63
UE-4-65
UE-1-40
UE-4-57
UE-4-55
(MH42)
UE-4-36
UE-4-35
UE-4-54 UE-4-53
UE-4-56A
UE-4-58
UE-4-66
UE-4-67
UE-4-68
UE-4-69
UE-4-70 UE-5-16
UE-4-70E
UE-4-70A UE-5-15
UE-5-14
UE-4-70B
UE-4-70C
UE-4-70D
UE-4-52
(MHTV13)
UE-999
(MH47)
UE-2-23 UE-2-22
UE-2-21
UE-2-20
UE-1-26
UE-4-28
UE-4-33
UE-4-14
UE-4-36A
UE-4-36B
UE-4-52B
UE-4-56B
UE-4-66A
UE-1-46A
UE-1-50
UE-1-36
UE-1-35
UE-4-44
UE-4-42
UE-1-28
UE-4-63A
UE-IS-7
UE-4-64
UE-4-61
UE-4-3A
UE-4-46A
BLDG 4
SS
STP STP STP STP
SS SS
STP
TIE
HEB IEA HEA
IEA HEA
IEB
SSIEA
IEB IEA
HEA
IEA
IEB
IEB IEA
HEB
HEA
HEB
ER
HEA
ERB
ERB
ERA
IEB
IEA
HEA
IEA
IEB
HEA
IEA
IEB
HEA
IEA
IEB
IEA IEAIEB IEB
IEA IEBIEA IEB
IEB IEA
IEB
IEA
IEB
IEA
IEB IEA
IEB
IS IW
HW IS
HWIS
HW
ISHW
HW
IW SS
IW
IS SS
SS
SS
IS
IS
IS
IS
IW
IS
HW BUILDING
BUS #2 BUS #1
M2 IW SS IS ER M1
ER
HEB HEA
HEB
SW
IEA
IW SS
SS
IS
ER
IW
Legend Circuit Lines
ER
ERA
ERB
HEB
HEA
HW
IEA
IEB
IS
IW
M1
M2
SS
STP
Unconfirmed Feature Pad Mounted Transformer
Pad Mounted Switch
Unconfirmed Transformer or Switch
Poles Hand hole
Manhole
Unconfirmed Feature
Fuse_Cutouts
Pole Mounted Transformers
D R
A
FT
-S U
B
JE
C T
TO
C
H A
N G
E
SOP-658
Effective Date: June 14 Page 1 of 18
STANDARD OPERATING PROCEDURE (SOP)
IMPC-HAW-PWO 658 (under revision)
ELECTRICAL OUTAGE PERMIT (EOP)
1. Purpose: Provide procedures to initiate, coordinate, notify and schedule electrical outages necessary to repair, maintain, and connect electrical services to US Army Garrison Hawaii (USAG-HI) Electrical Distribution System.
2. Applicability: All units, activities, directorates and external agencies producing or receiving electrical and construction services from the United States Army Garrison, Hawaii, (USAG-HI) Electrical Distribution System. Any construction project or service that provides/requires electrical service or affects USAG-HI Electrical Distribution System shall also comply with this
SOP.
4. Scope: Outage Requestor (OR), to include DPW personnel if applicable, government and external agency personnel involved in the activities related to the scheduling of electric outage, service connection, and or repair shall carry out the work in a safe manner, coordinate and effectively communicate the outage requirements, secure the necessary approvals and funds required of the Directorate of Public Works (DPW), and allow for efficient and uninterrupted work to be performed during the electrical outage.
5. General Outage Requirements: All electrical outages shall comply with following requirements:
a. Electrical Outage requirements:
1. No outage will occur during the periods of two safety stand-downs during January and July. No outage will occur a week prior to a holiday when use of electrical power has heightened usage and importance to customers.
2. The OR will confirm with High Voltage Shop (HVS) the outage period, location of cut out and specifics to include drawings to document the working conditions and to assure worker safety.
3. ONLY HVS or his designated alternate will control and direct the switching (off/on) of power .
4. The OR is responsible to complete the requirements of the permit (Enclosure 1)and obtain the necessary approvals and coordination (Enclosure 2).
5. The OR shall advise DPW HVS promptly when it appears that the normal coordination time will be exceeded and project may have to be stopped and re-scheduled for another day.
Effective Date: June 14 Page 2 of 18
6. The OR will make every attempt possible to eliminate or minimize the extent, duration and scope of the outage.
b. Outage Period: Outage period shall not be scheduled to exceed 6 hours per incident.
Unforeseen work conditions may result in extending the timeline. The OR will schedule work conservatively to insure time schedules are met. Outages and frequency of outages will be minimized to the greatest extent possible.
c. Maximizing Scheduled Outage: DPW may perform other maintenance work in the outage area to maximize the scheduled outage.
d. Electrical Outage Area Map. OR shall prepare using the satellite view of Google Maps attach an 8 1/2” x 11” map showing the outage areas and duration (first overlay), location of areas with generator power, if any (second overlay), location of the Outage Notice Boards if necessary (third overlay). Electrical outage area map must stay current with the changes made being reflected in the EOP, as it is being staffed for coordination and approval. The most current outage area map must be attached to the EOP at all times. The OR will also prepare the standard formatted outage notification at Enclosures 3 and 4.
e. Outage Notice Boards: The OR and/or contractor performing the major electrical outage work such as a substation or multiple circuit outage shall provide a minimum of four (4) traffic electronic informational sign boards, a minimum of a month prior to the start of the actual electrical outage work. Outage notice boards shall be placed at each major roadside entrance and at the outer perimeter of the affected areas. Information to be presented on the traffic board shall include date, start and finish times, and facility numbers (or not possible the areas) of the affected buildings. The board shall be updated immediately if conditions change. The location of electronic traffic sign boards shall be coordinated with DPW Traffic Engineer.
f. Electrical Outage Permit Approval: Electrical Outage approval is contingent upon there being no adverse impact to the units, tenants, and mission activity, or to HVS scheduled outage work. The OR must successfully complete the EOP checklist with original signatures and attach the checklist as back up to the EOP. DPW Utility Branch will sign the final approval of the EOP.
In the event of a conflict, or the outage extends beyond 6 hours, the DPW Garrison Commander (GC) has final review and approval of the EOP. The signed approved EOP document shall be the outage approved EOP document.
g. Electrical Outage Cancellation/Reschedule: At any time during the electrical outage process, the HVS or his designated alternate has the authority to cancel and shutdown the electrical outage work and the OR shall stop all work and perform all work needed for USAG-HI electrical to re-energize the electrical distribution system.
6. Timeline to Coordinate Different Electrical Outages: Electrical outages are classified based on the power sources, size, and point of termination. Unforeseen field changes are always a possibility.
Effective Date: June 14 Page 3 of 18
a. Substation Outage- Involves the de-energizing and re-energizing of HECO power lines, under the command and control of HECO, de-energizing/re-energizing of metal clad switchgear at substation, installation primary power line(s), or affecting more than 25% of the installation net useable area, and termination at a substation. Coordination of Substation EOP will begin more than one hundred eighty (180) calendar days before the scheduled outage.
b. Multiple Circuit Outage - Involves the de-energizing and re-energizing or switching of more than two high voltage circuits or affecting less than 25% of the installation useable net area, and termination at a pole or pad mounted transformer or switch. Coordination of Multiple Circuit Outage EOP will begin more than ninety (90) calendar days before the scheduled outage.
c. Circuit Outage – Involves the de-energizing and re-energizing or switching of two or less high voltage circuits and several facilities electricity being turned off by de-energizing and re-energizing of a specific pole/pad mounted transformer and or pole/pad mounted air switch.
Coordination of circuit EOP will begin more than forty-five (45) calendar days before the scheduled outage.
d. Building Outage – Involves the building electricity being turned off at the main breaker switch. EOP is not required for building electrical outage Coordination of Building Outage will begin more than thirty (30) calendar days before the scheduled outage.
e. Emergency Outages – Involves abbreviated timelines in order to protect life, safety and health. OR to include external organizations such as HECO will expedite coordination requirements and comply with all permit requirements and standards
7. Electrical Outage Permit (EOP): EOP is structured into three parts; the EOP acceptance, EOP approval, and EOP closeout. The EOP acceptance identifies the electrical outage requirement, enables DPW to process, confirm, and schedule the outage work. OR shall notify the affected parties by conducting coordination meetings or participating at public meetings, coordinating the publishing notices in the news media through the Garrison Public Affairs Officer, posting notices on affected buildings and securing their signatures on the EOP checklist.
The EOP approval is contingent upon a satisfactory coordination of an acceptable outage date.
Once the outage work is complete, the OR shall submit a written notice of work to DPW to close out the EOP permit. Details of the EOP three (3) part process and actions are highlighted in the subsequent sections.
a. EOP Acceptance:
1) EOP: The OR shall prepare and coordinate the EOP form (Enclosure 1).
2) Work Request or Demand Maintenance Order (DMO): OR shall coordinate the outage work with their respective agency contract, Contracting Officer Representative (COR) or DPW Project Manager (PM) to obtain a copy of the Facilities Engineering Work Request (FEWR) for reimbursable work or submit a DMO to DPW Work Management Office (WMO).
Effective Date: June 14 Page 4 of 18
3) DPW Work Management Office (WMO): For reimbursable work, WMO shall confirm work request and funds accepted, record the work request and generate a PWO No. for DPW uses. WMO signature shall confirm the funding actions were established and completed.
4) DPW Engineering Branch, Electrical System Manager (ESM): OR shall staff the EOP with ESM to validate that the proposed electrical work is consistent with DPW system requirements and Standards, and USAG-HI Electrical Distribution System has the capacity to support the additional load and requirements.
5) DPW Utility Branch, High Voltage Supervisor (HVS): OR shall staff the EOP with HVS to confirm propose electrical outage request DOES NOT conflict with other work in the area, or with other mission critical work, or HVS work. The OR shall discuss and confirm with HVS the points of termination, isolation, outage area, outage period, and phasing requirements for powering up the area and/or grid. HVS has final approval on date and time.
b. EOP Approval: Outline of the EOP approval process as follows:
1) OR shall commence with the tenant coordination based on type of outage and using the Electrical Outage Coordination Checklist to record the tenant approval and signature.
Coordination breakdown by type of outage includes the following:
a) Substation outage, OR shall:
i) Contact all the tenant’s listed on the check list (See Encl 2). Confirm that all activities impacted by the outage have been notified.
ii) Brief the outage work at the Installation Operations Center (IOC), Public Meetings and prepare informational folders for participants at the meetings. (See below)
iii) Conduct Coordination Meeting. (See below)
iv) Prepare and Distribute Notification Memo. (See below)
v) Prepare and Distribute Notice Sign and Helpful Hints. (See below)
b) Multiple Circuit outage, OR shall:
i) Contact the tenant’s affected by the outage on the check list (See Encl 2)
ii) Conduct Coordination Meeting. (See below)
iii) Prepare and Distribute Notification Memo. (See below)
Effective Date: June 14 Page 5 of 18
iv) Prepare and Distribute Notice Sign and Helpful Hints. Conduct a coordination meeting or meet with the tenants directly to obtain their signature. (See below)
c) Circuit outage, the OR shall:
i) Contact the tenant affected by the outage on the check list (See Encl 2)
ii) Prepare and Distribute Notification Memo. (See below)
iii) Prepare and Distribute Notice Sign and Helpful Hints. Conduct a coordination meeting or meet with the tenants directly to obtain their signature. (See below)
2) In the event additional funds are required, agency contact or PM will advise the OR of the funding requirement and OR shall transmit the funds required to RMO for acceptance.
3) Public Meeting: OR shall brief the outage at the IOC, public forum to include the SB or FS Town Hall and Housing Mayor’s Meeting or Private Outage meeting. All meeting events and notifications will be coordinated with the DPW Operations Officer.
a) SB or FS Town Hall Council and Housing Mayor’s Meeting: OR shall present at the monthly Housing Mayor’s Meeting and SB or FS Town Council Meeting the information pertaining to the outage work and affect into the community.
b) Private Outage Meeting: OR will conduct a private public meeting on the installation to expedite the coordination process. The private outage meeting shall coordinate with all the affected parties and DPW.
c) Briefing to the IOC. The OR shall brief the IOC of the outage on request. The OR will respond to information request from the IOC prior to and during the outage without the disruption of work to HV workers.
4) Coordination/Meeting: The OR shall coordinate with all users/tenant/units/major agencies/components affected by the outage via individual and or coordination meeting.
Attendees at the meeting should include as a minimum:
a) Provost Marshal Office.
b) Army/Air Force Exchange Service.
c) Defense Commissary Agency.
d) Honolulu Engineering District, US Army Corps of Engineers.
e) Contractors.
f) DPW Engineering Division.
Effective Date: June 14 Page 6 of 18
g) DPW Planning Division.
h) Housing Division/RCI Partner.
i) 30th Signal Battalion (Network Enterprise Command)
j) Hawaii Information Transfer System.
k) Sprint.
l) Oceanic Cablevision.
m) Hawaiian Electric Company.
n) Board of Water Supply.
o) DPW Water Plant
p) AQUA Wastewater Plant.
q) Directorate of Community Activities.
r) Island Palms Community
s) DPW Operation and Maintenance Division
i. DPW Utilities Branch High Voltage Supervisor/leader, etc
ii. DPW OMD Supervisors.
t) IOC& Operations Officer; Greg Hinkle
u) The OR shall complete the coordination and obtain the necessary signatures identified on the coordination check list NLT three (3) weeks prior to schedule outage date.
5)Notification Memorandum (Enclosure 3): A sample of the Scheduled Electrical Outage Notification memorandum is provided as Enclosure 3 for the OR to prepare, staff the memorandum for signature, and distribute to the affected parties. The OR shall submit the notification memorandum to HVS and DPW Operations Officer a minimum of six (6) week prior to schedule outage date for signature.
a) The signatory of the notification memorandum as follows:
i. For major outages, and or critical mission outages, the notification letter shall be signed by the Garrison Commander.
ii. For local, specific outages and building outage notification letter shall be prepared for DPW Director’s signature.
Effective Date: June 14 Page 7 of 18
b) Upon receiving the signed notification memo, the OR shall distribute the outage notice to the following:
i. Public Affairs Office,
ii. Hawaii Army Weekly,
iii. SBTV2,
iv. Daily Bulletin,
v. Network Enterprise Command, 30th Signal Battalion
v) Notice (Enclosure 4). A sample of the Electrical Outage Notice is provided in Enclosure 4. The OR shall distribute the outage notice with helpful tips provided in Enclosure 5 to the affected tenants in the outage area no later than three (3) weeks prior to the outage date.
Notice signs and Helpful Tips shall be delivered to all the affected buildings, dwelling units, organization, and occupants. In the event an occupant is not present, the notice sign and tips must be attached to the main entrance doorway.
c. EOP Closeout: OR shall submit in writing a notice to the HVS with copies to all interested DPW personnel, containing a summary of all significant actions that occurred during the outage, identify any delays, damages to Government, and actual completion date of the work. Failure to close out an EOP, may prohibit the OR of any future EOP.
8. Final Approval Meeting: The OR shall conduct a final approval meeting with all major agencies/components affected by the outage to discuss the following items as it pertains to a type of outage:
1. Substation Outage:
a. HECO is aware and concurs with the outage requirements and timeline.
b. Affected tenant’s concur and signed off the check list (See Encl 2)
c. Public meetings conducted
d. Notification Memo, Sign, and Hints were issued.
e. IOC POC provided to answer questions prior to and during outage.
2. Multiple Circuit Outage:
a. Affected tenant’s concur and signed off the check list (See Encl 2)
b. Coordination meetings conducted
c. Notification Memo, Sign, and Hints were issued.
d. IOC POC provided to answer questions prior to and during outage
3. Circuit Outage:
a. Affected tenant’s concur and signed off the check list (See Encl 2)
b. Notification Memo, Sign, and Hints were issued.
c. IOC POC provided to answer questions prior to and during outage.
4. All Outages:
a. Confirm outage will not adversely impact any of the tenants, mission, and or installation operations.
Identify a RO POC to the IOC that will answer all questions prior to and during the outage without disruption to HV workers. What is RO? OR?
b. IOC POC provided to answer questions prior to and during outage.
Effective Date: June 14 Page 8 of 18
Comment: It is difficult to see the timelines for the EOP process with the current format. Seems to be conflict in timeline for the 2 circuit or less outages for 45 day notice.
9. Definitions.
a. Proposed Outage Date – Outage requestor propose electrical outage date.
b. Approved Outage Date – The electrical outage date that DPW and affected tenant’s are able to support.
c. Primary Power line - A primary electrical feeder that distributes medium voltage to a specified area on post either at a nominal 7,200 volts phase to phase, 11,5000 volts phase to phase, or 12,470 volts phase to phase.
d. Secondary Power line - The wiring connected to the secondary winding of a transformer, induction coil, or similar device to bring power to a specific area and or facility.
e. Schedule Outage - A planned interruption of electrical service to consumers for the purpose of performing repair or maintenance of the electrical distribution system or new connections to the electrical distribution system.
f. Outage Requestor (OR) – Government person in charge of Construction and or the Contractor Officer Representative overseeing Construction Contractor work. In the case of external agencies the person representing the agency overseeing operations of the outage requested.
g. DPW Utility Branch High Voltage Supervisor (HVS)– Person in charge of DPW Electrical High Voltage Supervisor worker and scheduling of outage work on the installation.
h. DPW Engineering Branch Electrical System Manager (ESM) - Person managing the installation electrical infrastructure future and existing conditions and the evaluator to confirm that the propose work is consistent with DPW overall plans.
Effective Date: June 14 Page 9 of 18
11. Metrics. Response times and performance of work for substation outages are monitored and measured to the criteria specified in this SOP as follows:
Legend Measurement Criteria Goal Electrical Outage Permit Request submitted
A minimum of 24 weeks before the proposed outage date
80% of all scheduled outages
Approved Electrical Outage Permit
Not less than 14 days prior to the approved outage permit date
90% of all scheduled outages
Final coordination meeting Not less than 14 days prior to the approved outage permit date
90% of all scheduled outages
Notices of Outage Complete Not less than 14 days after the day of the outage is completed
90% of all scheduled outages
12. Revision History Log.
Effective Date Description Revision/replacement of SOP-525 of 3/25/97.
Approval Block No changes to this document shall be made without the concurrence of the Primary Proponent.
Signature Name / job title / telephone number Alternate Proponent / Process Owner Travis Fellinger
High-Voltage Foreman – SB/
FS 655-1309/864-
Primary Proponent / Branch Chief Monte L. Martin Chief, Utilities Branch 655-0591/864-2411
Recommended By Emory Hicks Administrative Officer 656-1263
Approved by Director of PublicWorks 656-1289
13. Enclosures.
(1) Electrical Outages Permit (Enclosure 1)
(2) Electrical Outage Coordination Checklist (Enclosure 2)
(3) Sample - Electrical Outage Notification Memo (Enclosure 3)
(4) Sample – Sample Notice to affected buildings, dwelling units, organizations (Enclosure
4)
(5) Sample – Helpful Hints during Power Outage (Enclosure 5)
Effective Date: June 14 Page 10 of 18 Printed
(Enclosure 1)
U S Army Garrison Hawaii Directorate of Public Works
ELECTRICAL OUTAGE PERMIT
Outage Dates/Time:________
1. General Electrical Outage Permit Information
a. Outage Requestor Information
1. Outage Requestor Name: _____________________________________________
2. Phone Number: _________________ Email:______________________________
Address:___________________________________________________________
b. Contract/Project Information
1. Contract/Project Name: _______________________________________________
2. Contract Number:____________________________________________________
3. Phone Number: _________________ Email:______________________________
Address:___________________________________________________________
c. Outage Work
1. Description of Work:
2. ______________________________________________________________________
3. Reason for Outage:
4. Brief Description of affected areas (Incl Installation, Bldgs, Streets, Area) and units/activities affected:
5. Maps: Attach map of showing affected areas, areas supplied by generators or back fed, location of electronic signs: __________________________________
d. Excavation Permit/Traffic Control Plan permit has been obtained. Yes / No Describe areas where the work involves buried lines:
Effective Date: June 14 Page 11 of 18 Printed
e. Are there any work in the road? Yes / No Describe the areas where the work are in roads:
2. Electrical Outage Permit Coordination and Acceptance
a. DPW HVS, Travis Fellinger, Bldg 2624 Schofield Barracks, Power outage scheduled when crew is available to support? Yes / No
Remarks:____________________________________________________________________ Concur:________________ Non-Concur :_________________ Date: ______________
b. DPW ESM, Derek Sakai; 656-3065/3066 Remarks:______________________________________________________________________
Concur:________________ Non-Concur :_________________ Date: ______________
c. DPW PM Supervisor , 656-2480 Remarks:____________________________________________________________________ Concur:________________ Non-Concur :_________________ Date: ______________
d. USACE, Contracting Officer Representative,__________________________________ Remarks:____________________________________________________________________ Concur:________________ Non-Concur :_________________ Date: ______________
3. DPW Work Reception DPW Work Coordinator, Bldg. 104, WAAF POC: Business Hours: Mon.- Fri. 0730-1500. FEWR account established? Yes / No FEWR Doc No.:_______________________________
PWO account established? Yes / No PWO Doc No.:________________________________ Funds Received? Yes / No Funding Doc No.:______________________________________ GFEBS account established? Yes / No GFEBS No.:_________________________________
Remarks:____________________________________________________________________ Approve:____________________ Disapprove:_________________ Date: ______________
Effective Date: June 14 Page 12 of 18 Printed
4. Electrical Outage Permit Coordination and Approval Operations Officer, DPW A. Coordination Memo (Encl 3): Attached Document No.______________________________
Remarks:________________________________________________________________
Identification of facilities that require generator support and how support accomplished.
Yes / No
Remarks:________________________________________________________________
Coordination checklist attached (Encl 2) ? Yes / No Remarks:________________________________________________________________
B. Outage Notification: Attached Document No._____________________________ General public of Electrical Outage Notification? Yes /No Base wide outage, public townhall and or Mayor Meeting ? Yes / No
Remarks:____________________________________________________________________
C. Electrical Outages Coordination Check List: Attached Document No.__________________ Unit and tenant original signatures? Yes /No Remarks:____________________________________________________________________
D. Public Meeting:
a. SB or FS Townhall Council Meeting? ________date and time____________________
b. SB or FS Mayor Housing Meeting? __________date and time___________________
c. Private Outage Meeting? ___________________date and time___________________
d. IOC briefing?___________________________ date and time ___________________
E. Outage Signage Traffic Notice Boards:
a. Traffic Notice Board coordinated with DPW PM Gilbert Talavares? Yes /No
b. Traffic Notice Board placement coordinated with DPW Traffic Engineer, Dean
Miyamoto? Yes /No
F. Generators Requirements:
a. Identification of generators required (locations): ______________________
b. Overlay of generator supported areas provided: yes/no
Effective Date: June 14 Page 13 of 18 Printed
G. The Outage Requestor (OR) shall survey and determine the locations of all the building affected within the area of the outage, verify that all the affected tenants, facilities, operations, and people have been identified and notified. OR will provide a POC for all personnel to contact regarding the plans for the outage and status during the outage.
Remarks:______________________________________________________________________ Approve:____________________ Disapprove:_________________ Date: _______________
5. FINAL APPROVAL:
Directorate of Public Works (DPW), Utility Branch, Bldg 2624 , Foote Avenue, Schofield Barracks. POC: Monte Martin, Chief, Utility Branch 655-0591/864-2411. (Email: Monte.l.
Martin.civ@mail.mil). Submit one (1) copy. Business Hours: Mon.-Fri. 0730-1600.
Remarks:______________________________________________________________________ _____________________________Approved Schedule Outage Date: _____________________ Approve:____________________ Disapprove:_________________ Date: _______________
Effective Date: June 14 Page 14 of 18 Printed
(Enclosure 2)
ELECTRICAL OUTAGE COORDINATION CHECKLISTS
SUBJECT: Electrical Outages Coordination Check List
1. Electrical System Service Effected
� Installation __________________________ Location ____________________________________
� Substation___________________________ Circuit ______________________________________
� Transformers _________________________ Bldg________________________________________
� Other ___________________________________________________________________________
2. Date of Service Outage: (1 day only NTE 6 hrs)
� Day: ________________________________ Time: ______________________________________
3. List of tenants that have received briefing and acknowledged receipt of notification of outage.
� Garrison CDR, POC____________________________
� HQ CMD 25th ID (L), POC______________________
� AAFES, POC___________________________
� Defense Commissary Agency, POC____________________________
� Housing Office: POC_________________________
� Garrison Units, include POC_________________________
� DOIM, POC__________________________
� Installation Fire and Safety Office, POC____________________________
� PAO, POC__________________________
� Military Police, POC_________________________
� DCA, POC _________________________
� Federal Fire Department, POC _________________________
� 25th ID(L) Operations Center POC _________________________
� Others impacted: _________________________
� IOC Briefing: _________________________
� DPW Operations Officer: _________________________
4. Public Meetings
(1) Family Housing Mayors POC: ___________________________
(2) Town Hall POC: ___________________________
(3) Private Outage Meeting POC: ___________________________
Effective Date: June 14 Page 15 of 18 Printed
5. Outage Notice Boards________________________________________________________
(1) Wording________________________________________________________
(2) Locations and Maps________________________________________________________
6. Generators
Supported facilities and maps: __________________
7. Written Notification (Identify the source, date, and time the notifications are to be published)
� Memorandum________________________________________________________
� Notifications________________________________________________________
� Daily Bulletin________________________________________________________
� SB TV Channel 2________________________________________________________
� Hawaii Army Weekly________________________________________________________
� 30th Signal Battalion________________________________________________________
8. Final Outage Meeting (Must be schedule NLT 14 DAYS before outage event)
� List Attendees________________________________________________________
� Date/Time/Location________________________________________________________
9. Outage Requestor POC responsible to answer questions from the IOC on-site
Phone No. ________________________________ Cell No. ______________________________
Originator /Requestor
CF:
Work Order Desk
OPS
Housing Division
(Enclosure 3) Sample
SOP-658
Effective Date: June 14 Page 16 of 18 Printed 12:22 PM
APVG-GC
MEMORANDUM FOR SEE DISTRIBUTION
SUBJECT: Scheduled Electrical Outage for Date/Time
1. Notice of subject electrical outage is at Enclosure 1.
2. Units/Activities impacted will prepare and implement preparatory measures at Enclosure 2.
3. POC for further information, locations and times of informational meeting and status of the outage is Name/Cell Number.
Garrison Commander 2 Encls
Distribution:
Effective Date: June 14 Page 17 of 18 Printed 12:22 PM
(Enclosure 4)
SAMPLE
ELECTRICAL AND WATER OUTAGE NOTIFICATION
1. WHO WILL BE AFFECTED: Names of units/directorates/others impacted. Note: (a) the list of units/directorate/others impacted may not be specific and all inclusive, please check the map and information below to validate; (b) the locations of the outage is only a best estimate since depending on the field conditions the extent of the outage area may increase, units/directorate/others near and around the outage area below should be prepared for an outage in this event.
2. WHEN: Dates and times. Note: the times provided are only an estimate since depending existing field conditions my prompt additional time to complete the outage.
Units/directorates/others affected by the outage should be prepared for an extended outage in this event.
3. WHY IS OUTAGE REQUIRED: The outage is required to ______
4. WHERE: Map below. Note: see note in paragraph 1(b) above. Water outage locations at buildings bounded by Trimble and Carpenter. Power outage in red bounded by Trimble Rd, Hewitt St and Kolekole Av.
Note: Water outage location is depicted in blue and electrical outages in red.
5. POC: Mr. Greg Hinkle, Operations Officer, DPW, phone: _______________
Effective Date: June 14 Page 18 of 18 Printed 12:22 PM
(Enclosure 5)
Helpful Tips Freezer Usage:
Keep the freezer doors closed.
Only open when needed and for brief and short periods of time.
Food in your freezer will remain frozen for at least 1 day as long as the doors are closed.
Ice cream will get soft quickly. So it may be best to eat it before the power outage.
Refrigerator Usage:
Keep the refrigerator doors closed at all times.
Only open when needed and for brief periods of time to prevent the warm air from entering the refrigerator.
Refrigerators will keep the food cold and unspoiled for about 6 hours.
Typically, condiments will be fine for longer than 6 hours. Leftovers items, meat, poultry, fish, and eggs may be questionable. It is recommended that these items be stored in a cooler with ice and temperature kept constant.
Food Safety Suggestions:
If you have empty freezer space, you may want to freeze some water to make ice to place in the refrigerator to keep the unit temperature cold. Do not forget to allow for the water to expand when freezing water and provide something to catch the water droplets when the ice starts to melt.
You want to have a cooler with ice on hand to store items to eat and avoid having to open the freezer or refrigerator.
You may want to ask a neighbor to see if they can store some of your items in their freezer or refrigerator during the outage.
Check out HECO website: www.HECO.com under Food Safety During and after a Power Outage for additional safety tips.
Electronic Devices:
Prior to the morning power outage, please power down and unplug all of your sensitive electrical equipment(ex. Computers, modems, routers, TV’s, etc.), to avoid loss or damage to your data or electrical equipment.
The night prior to the outage, please charge all of your battery operated devices.