About this file

Am-0004

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0004 08 May 2019

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A-19-R-0009 X

9B. DATED (SEE ITEM 11)

04/08/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PN 92743 Repair Bucholz Army Airfield, Kwajalein Island, U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands

** Subject to Availability of Funds – See Section 00 72 00, Clause 52.232-18, Availability of Funds **

See Page 2 of 2 Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0004 Standard Form 30

RFP No. W9128A-19-R-0009 Page 2 of 2 Pages

Item No. 14 (Continued)

1. CHANGES TO SPECIFICATIONS. Attached hereto are new, revised and deleted sections to the specifications. Revised pages replace like-numbered pages. The revision mark (Am-0004) is shown on each revised page.

A. REVISED SECTIONS. The following sections were revised with changes shown in bold and red colored font for additions, and strike through with deletions.

N/A

B. ADDITIONAL PROVISION / Clause. The following provision / clause is added.

Section 00 21 16, Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency

Preparedness, and Energy Program Use (Apr 2008)

Section 00 72 00, Clause 52.211-15, Defense Priority and Allocation Requirements (Apr 2008)

C. ADDITIONS TO SECTIONS. The following sections are added in its entirety.

Section 00 73 00, Requests for Information #157 to 169

Section 00 73 00, Kwajalein Photos

2. CHANGES TO DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith:

REV NO. SHEET IDENTIFICATION REVISION DATE

1 CP-705 May 02, 2019

3. The proposal due date remains unchanged. See Am-0003, SF1442, Block 13A.

W9128A-19-R-0009

Section 00 21 16

(AM-0004)

52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and

Energy Program Use (Apr 2008)

Any contract awarded as a result of this solicitation will be [ ] DX rated order; [ X ] DO rated order certified for national defense, emergency preparedness, and energy program use under the

Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of Provision)

Section 00 72 00 – Page 1 (Am-0004)

Section 00 72 00 - General Conditions

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Agent Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity MAY 2014 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010 52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform

Employees of Whistleblower Rights

APR 2014

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984 52.204-3 Taxpayer Identification OCT 1998 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and Certifications. DEC 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters OCT 2018 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations NOV 2015 52.210-1 Market Research APR 2011 52.211-13 Time Extensions SEP 2000 52.211-15 Defense Priority and Allocation Requirements APR 2008 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-12 (Dev) Subcontractor Certified Cost or Pricing Data (Deviation 2018-O0015) JUL 2018 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified

Cost or Pricing Data -- Modifications

OCT 2010

52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-7 Notice of Radioactive Materials JAN 1997 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction

Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright Infringement DEC 2007 52.227-4 Patent Indemnity-Construction Contracts DEC 2007

PN 92743 Repair Bucholz Army Airfield (BAFF), U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands

W9128A-19-R-0009

RFI # Question Issued Response

Does existing concrete to be removed have rebar in it? This includes existing Apron locations, Runway locations, Turnarounds, etc. Reference CD101 Demolition Plan as well as detail B1/CD501 as a sample detail of concrete demolition / removal which does not indicate whether rebar is to be expected or not.

Unknown.

The above drawing depicts delineation lines between Base Bid and options. It seems that Base Bid contains only two small areas of concrete paving. Most of concrete paving is in option 1 & 2. In order to perform these two small areas, all upfront cost of supplying, mobilization and setting batching plant and paving equipment will be allocated to the base bid. For some reason, if options are not exercised, the base bid will be frontloaded with a significant cost required to produce and place only two areas of concrete airfield pavement.

(c) Suggesting same thought, Option 1 & 2 have small AC pacing, is it possible to change all AC pavement in options to concrete, in this case asphalt batching plant will be demobilized from the site once base bid is completed. The intent is cost saving by reducing the time / cost of operating & maintaining asphalt batching plant

See Am-0003, answer to RFI #11.

Spec SECTION 32 13 14.13 Page 9 – paragraph g reads, "Slipform Paving Equipment Manufacturer's Representative: A representative of the slipform paving equipment manufacturer is required to be on-site to inspect and make corrections to the paving equipment to ensure proper operations. Perform a complete and full hydraulic flow test of the vibrator system prior to the test section being placed. Submit a written Slipform Paver Manufacturer's Inspection Report signed by the manufacturer's representative noting all inspections, corrections, and flow tests have been performed and the paver is in a condition to perform the required work." If the general provides trained / experienced staff on site to perform corrections to paving equipment, can the requirement of having Slip form Paving Equipment Manufacturer's Representative to be onsite be waived for cost saving due to the project's remote location?

Subject to the approval by the COR.

Plan Sheet CG-115 calls out replace exist DI Top = 7.71. Please clarify which plan sheet detail is on. If there is no detail then please provide.

See drawings CG-501 and CG-502

Plan sheet E-132 shows electrical work inside exist building 901 and 902. We were not able to get in this area during site visit. Please provide photos of inside building work areas

See Section 00 73 00, Kwajalein Photos

Section 00 73 00, Appendix D, Requests for Information - 1

W9128A-19-R-0009

RFI # Question Issued Response

There are a variety of events that could be outside the control of the selected contractor to perform this scope. If it is captured already within the RFP documents please direct as it is not clear.

Can the following clause be added to the RFP by amendment:

52.249-14 Excusable Delays. As prescribed in 49.505(b), insert the following clause in solicitations and contracts for supplies, services, construction, and research and development on a fee basis whenever a cost-reimbursement contract is contemplated. Also insert the clause in time-and-material contracts, and labor-hour contracts. When used in construction contracts, substitute the words "completion time" for "delivery schedule" in the last sentence of the clause.

Excusable Delays (Apr 1984) (a) Except for defaults of subcontractors at any tier, the Contractor shall not be in default because of any failure to perform this contract under its terms if the failure arises from causes beyond the control and without the fault or negligence of the Contractor. Examples of these causes are (1)acts of God or of the public enemy, (2)acts of the Government in either its sovereign or contractual capacity, (3)fires, (4)floods, (5)epidemics, (6)quarantine restrictions, (7)strikes, (8)freight embargoes, and (9)unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor. "Default" includes failure to make progress in the work so as to endanger performance.

The clause will not be added. The requirement is a firm fixed-price construction contract.

(b) If the failure to perform is caused by the failure of a subcontractor at any tier to perform or make progress, and if the cause of the failure was beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either, the Contractor shall not be deemed to be in default,- unless- (1) The subcontracted supplies or services were obtainable from other sources; (2) The Contracting Officer ordered the Contractor in writing to purchase these supplies or services from theother source; and (3) The Contractor failed to comply reasonably with this order.

(c) Upon request of the Contractor, the Contracting Officer shall ascertain the factsand extent of the failure. If the Contracting Officer determines that any failure toperform results from one or more of the causes above, the delivery schedule shall berevised, subject to the rights of the Government under the termination clause of thiscontract.

(End of Clause)

Section 00 73 00, Appendix D, Requests for Information - 2

W9128A-19-R-0009

RFI # Question Issued Response

Specification 32 13 14.3 2.9.1 and 2.9.2 state the dowel bar and dowel bar basket assembly shall be "Dowels shall be hot dip galvanized in accordance with ASTM A767/A767M Class 1." In speaking with multiple dowel bar and dowel bar basket assemblers this process will lead to three key potential problems.

a. The weld between the dowel bar and dowel bar basket will lose integrity given the chromium not bonding with the second layer of galvanization.

b. By hot-dipping the individual dowel bars the outside diameter of the dowel bar will vary given the dipping process, leading to a non-uniform diameter of the bars potential leading to locking of joints and voiding their load transfer intent.

c. Newly galvanized steel when reacting to wet concrete can create a hydrogen gas that will travel through the concrete matrix and potentially weaken the surface bond of the concrete pavement itself.

ASTM A767 sets the minimum galvanized amount at 5.8 oz/SF. We believe the intent within this specification is to have a corrosion resistant dowel bar and basket assembly that at least meets the minimum galvanized weight of the ASTM specification of 5.8 oz/SF. Our recommendation would be to allow a dowel bar and basket assembly that is galvanized with a G90 weighting. These bars are currently commercially produced and used in roadway, airfield, and underwater applications due to their extreme corrosion resistant properties. The outside diameter of these bars will be uniform and meet other requirements found within the 32 13 14.3 specification.

Will you allow the use of a galvanized dowel bar and basket assembly that meets the

5.8 oz/SF standard set by ASTM A767 but not hot dipped?

For fabricated assemblies like dowels/dowel baskets, use ASTM A 123.

Provide coating grade 100 for thicker coating. ASTM A 123 is still a hot dipped galvanizing process. Individual dowels, like those installed in drilled holes in hardened concrete, should still be galvanized in accordance with ASTM A 767. Only the dowels secured in dowel baskets may be galvanized in accordance with ASTM A 123.

According to our contact FPE, Ordinary/Light hazard throughout the building is not appropriate given the hazard & function of the building. Will the Government please confirm that Ordinary/Light hazard description will be used?

The hazard classifications are appropriate and in compliance with the UFC 3-600-01.

In reference to drawing F-001 note number 10, ''All sprinkler heads that are exposed to the exterior and all sprinklers in Mechanical and Electrical Rooms must be Corrosion Resistant Electroless nickel teflon Coated (PTFE)'' . But based on drawing sheet F-003, the coverage of sprinkler system is specified and mechanical rooms are not covered within the border. Will the government please confirm that mechanical rooms do not require wet sprinkler system?

The Mechanical "Rooms" outside the border shown on the sprinkler drawings are not rooms. They are enclosures without roofs and are open to the air. They are not required to be sprinklered.

Section 00 73 00, Appendix D, Requests for Information - 3

W9128A-19-R-0009

RFI # Question Issued Response

In Drawing E-002 General Scope of Work - Airfield Lighting No. 4 as stated

PROVIDE NAVAID LIGHTS/EQUIPMENT INCLUDING (BUT NOT LIMITED TO)

REILS, PAPIS, RUNWAY THRESHOLD/END LIGHTS, RUNWAY EDGE LIGHTS

AND TAXIWAY/APRON EDGE LIGHT, ASSOCIATED WIRING AND CONDUIT;

TEMPORARY LIGHTS/EQUIPMENT SHALL BE STAKE MOUNTED AND

CONDUIT/WIRING HELD IN PLACE (IE: SANDBAGS) REFER TO FAA ADVISORY

CIRCULARS FAA AC 150/5370-2G AND FAA AC 150/5345-50B. 'PLEASE

CONFIRM THAT SOLAR LIGHT CAN BE USED FOR TEMPORARY AIRFIELD

LIGHTING.

Equipment shall comply with the requirements of the referenced FAA Advisory Circulars..

Reference: SECTION 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS Sub - Section 32 13 14.13 Page 21 – Paragraph - 2.3.2 Coarse Aggregate. The above spec section / paragraph indicates to wash coarse aggregate prior to shipment and provide approved log washer.

(a) If log washer is provided by the aggregate suppler, will it be sufficient and no need to re-wash the aggregate after it is delivered to staging area on island.

There would not be a need to re-wash the aggregate provided it meets the requirements. It is the contractor's responsibility to identify and employ proper measures for protection of aggregate to ensure it does not become contaminted in transit or by handling on island.

Reference: SECTION 32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS Sub - Section 32 13 14.13 Page 21 – Paragraph - 2.3.2 Coarse Aggregate. The above spec section / paragraph indicates to wash coarse aggregate prior to shipment and provide approved log washer.

(b) If the aggregate need to be re-washed, will the government provide washing facility, equipment, fresh / clean water & sufficient to wash the aggregate?

From our past experience with delivering aggregate for airfield pavement mixes, even if the aggregate was washed and met the specification at the quarry , it needs to be re-washed at the batching plant due to possible contamination during shipping & handling..etc.

The contractor will be responsible to provide all equipment and labor required to re-wash the aggregate. Note the availability of fresh water is a limited resource on island and preventative measures should be taken to the maximum extent possible to avoid unnecessary water use.

Reference: Aggregate, Cement, Fly Ash and other materials sources. Our intent is to supply most of the aggregate, cement & fly ash form non-USA sources, deliver and off-load to Majuro Atoll in large shipments then transport to Kwajalein in smaller barges that meet Port of Kwajalein draft and load capacity.

Please advise if this approach meets Buy America requirements on this project.

See Am-0003, answer to RFI #24.

Section 00 73 00, Appendix D, Requests for Information - 4

Section 00 73 00, Kwajalein Photos – Page 1

Kwajalein Photos

Section 00 73 00, Kwajalein Photos – Page 2

Section 00 73 00, Kwajalein Photos – Page 3

Section 00 73 00, Kwajalein Photos – Page 4

Section 00 73 00, Kwajalein Photos – Page 5

Section 00 73 00, Kwajalein Photos – Page 6

Section 00 73 00, Kwajalein Photos – Page 7

Section 00 73 00, Kwajalein Photos – Page 8

Section 00 73 00, Kwajalein Photos – Page 9

Section 00 73 00, Kwajalein Photos – Page 10

Section 00 73 00, Kwajalein Photos – Page 11

Section 00 73 00, Kwajalein Photos – Page 12

Section 00 73 00, Kwajalein Photos – Page 13

Section 00 73 00, Kwajalein Photos – Page 14

Section 00 73 00, Kwajalein Photos – Page 15

Section 00 73 00, Kwajalein Photos – Page 16

Section 00 73 00, Kwajalein Photos – Page 17

Am-0004
SF-30
Section 00 21 16
Section 00 72 00
Section 00 73 00, RFIs