16b1-Am4-SBHC-Parking-Structure.pdf
PDF 3 MB Posted
- Solicitation number
- W9128A-16-B-0001
About this file
Am-0004 Drawings
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
S
IZ
E :
FI
LE
N
A M
E:
IS
SU
E D
A
TE
C O
N
TR
AC
T
N O
S O
LI
C
IT
AT
IO
N
N O
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
P
LO
T S
C
AL
E:
P
LO
T D
AT
E:
SHEET OF
This project was designed by the Honolulu District of the U.S. Army Corps of Engineers.
The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
3/ 1/
2 0
5:
: 3
PM
SC
H
O
FI
EL
D
B A
R R
AC
K S, O A H
U , H
A W
A
II
N
O V
R
TA
M
AM
H
KE
BM
C
G-003
H O
N O
LU
LU
D
IS
TR
IC
T
FT
S H
AF
TE
R , H
AW
A I
I
R
EG
IO
N
AL
E
N G
IN
EE
R
IN
G C
EN
TE
R B
U
IL
D
IN
G
FT
S H
AF
TE
R , H
I 9
-5
M
AM
SC
H
ED
U
LE
O
F D
R
AW
IN
G
S
FY
1 6
P N
SB
H C
P
AR
K I N
G
ST
R U
C
TU
R E
G E N
ER
A L
1-
G
EN
ER
AL
- G -0
SHT ID SHT OF SHTS SHEET TITLE REV STATUS
S-111 12 OF 50 ROOF FRAMING PLANS 1
S-201 13 OF 50 STRUCTURAL ELEVATIONS
S-202 14 OF 50 STRUCTURAL ELEVATIONS
S-203 15 OF 50 STRUCTURAL ELEVATIONS 1
S-204 16 OF 50 STRUCTURAL ELEVATIONS 1
S-205 17 OF 50 STRUCTURAL ELEVATIONS 4
S-206 18 OF 50 STRUCTURAL ELEVATIONS 1
S-301 19 OF 50 BUILDING SECTIONS
S-401 20 OF 50 ENLARGED FRAMING PLANS
S-501 21 OF 50 SECTIONS AND DETAILS 4
S-502 22 OF 50 SECTIONS AND DETAILS
S-503 23 OF 50 SECTIONS AND DETAILS 4
S-504 24 OF 50 SECTIONS AND DETAILS
S-505 25 OF 50 SECTIONS AND DETAILS 4
S-506 26 OF 50 SECTIONS AND DETAILS 4
S-507 27 OF 50 SECTIONS AND DETAILS
S-508 28 OF 50 SECTIONS AND DETAILS 4
S-509 29 OF 50 SECTIONS AND DETAILS 4
S-510 30 OF 50 SECTIONS AND DETAILS
S-511 31 OF 50 SECTIONS AND DETAILS 4
S-512 32 OF 50 SECTIONS AND DETAILS 4
S-513 33 OF 50 SECTIONS AND DETAILS 4
S-514 34 OF 50 SECTIONS AND DETAILS
S-515 35 OF 50 SECTIONS AND DETAILS
S-601 36 OF 50 TYPICAL DETAILS
S-602 37 OF 50 TYPICAL SLAB-ON-GRADE DETAILS
S-603 38 OF 50 TYPICAL FOUNDATION DETAILS
S-604 39 OF 50 TYPICAL CMU WALL DETAILS AND STRUCTURAL STEEL DETAILS 1
S-605 40 OF 50 TYPICAL PRECAST CONCRETE DETAILS – PLANKS
S-606 41 OF 50 TYPICAL PRECAST CONCRETE DETAILS – DOUBLE TEES
S-607 42 OF 50 TYPICAL PRECAST CONCRETE DETAILS – DOUBLE TEES 4
S-608 43 OF 50 TYPICAL PRECAST CONCRETE DETAILS – COLUMNS
S-609 44 OF 50 TYPICAL PRECAST CONCRETE DETAILS – COLUMNS
S-610 45 OF 50 TYPICAL PRECAST CONCRETE DETAILS – BEAMS
S-611 46 OF 50 TYPICAL PRECAST CONCRETE DETAILS – WALL PANELS 1, 4
S-612 47 OF 50 TYPICAL PRECAST CONCRETE DETAILS – WALL PANELS 4
S-613 48 OF 50 TYPICAL PRECAST CONCRETE DETAILS – WALL PANELS 4
S-614 49 OF 50 TYPICAL PRECAST CONCRETE DETAILS – WALL PANELS 4
S-615 50 OF 50 TYPICAL PRECAST CONCRETE DETAILS – WALL PANELS 4
ARCHITECTURAL
A-001 1 OF 43 ARCHITECTURAL ABBREAVIATIONS AND GENERAL NOTES
A-101 2 OF 43 BASEMENT FLOOR PLAN 1, 4
A-102 3 OF 43 FIRST FLOOR PLAN 4
A-103 4 OF 43 SECOND FLOOR PLAN 4
A-104 5 OF 43 THIRD FLOOR PLAN 4
A-105 6 OF 43 FOURTH FLOOR AND ELEVATOR MACHINE ROOM PLAN 1
A-106 7 OF 43 ROOF PLAN
A-107 8 OF 43 BASEMENT REFLECTED CEILING PLAN 1
A-108 9 OF 43 FIRST FLOOR REFLECTED CEILING PLAN
A-109 10 OF 43 SECOND FLOOR REFLECTED CEILING PLAN
A-110 11 OF 43 THIRD FLOOR REFLECTED CEILING PLAN
A-111 12 OF 43 FOURTH FLOOR REFLECTED CEILING PLAN 1
A-201 13 OF 43 BUILDING ELEVATIONS
A-202 14 OF 43 BUILDING ELEVATIONS 1
A-301 15 OF 43 BUILDING SECTIONS
A-302 16 OF 43 WALL SECTIONS
A-401 17 OF 43 STAIR SECTIONS
A-402 18 OF 43 STAIR SECTIONS AND STAIR #2 PLANS
A-403 19 OF 43 STAIR #3 AND STAIR #4 FLOOR PLANS
A-404 20 OF 43 ELEVATOR SECTIONS
A-405 21 OF 43 STAIR #1 SECTIONS
A-406 22 OF 43 ELEVATOR LOBBY AND STAIR #1 FLOOR PLANS 1
A-407 23 OF 43 ELEVATOR LOBBY AND STAIR #1 FLOOR PLANS 1
A-501 24 OF 43 STRIPING DETAILS
A-502 25 OF 43 DETAILS
A-503 26 OF 43 DETAILS 4
A-504 27 OF 43 DETAILS
A-505 28 OF 43 DETAILS
A-510 29 OF 43 DOOR FRAME DETAILS AND LOUVER FRAME DETAILS
A-601 30 OF 43 DOOR, DOOR FRAME, DOOR TYPES, LOUVER TYPES AND SCHEDULES 1
AF101 31 OF 43 FINISH LEGEND AND SCHEDULE
AG101 32 OF 43 BASEMENT STRIPING AND SIGNAGE PLAN
AG102 33 OF 43 FIRST FLOOR STRIPING AND SIGNAGE PLAN
AG103 34 OF 43 SECOND FLOOR STRIPING AND SIGNAGE PLAN
AG104 35 OF 43 THIRD FLOOR STRIPING AND SIGNAGE PLAN
AG105 36 OF 43 FOURTH FLOOR STRIPING AND SIGNAGE PLAN AND ELEVATOR MACHINE ROOM SIGNAGE PLAN
AG106 37 OF 43 BASEMENT REFLECTED CEILING TRAFFIC SIGNAGE PLAN
AG107 38 OF 43 FIRST FLOOR REFLECTED CEILING TRAFFIC SIGNAGE PLAN
AG108 39 OF 43 SECOND FLOOR REFLECTED CEILING TRAFFIC SIGNAGE PLAN
AG109 40 OF 43 THIRD FLOOR REFLECTED CEILING TRAFFIC SIGNAGE PLAN
AG501 41 OF 43 SIGNAGE TYPES AND DETAILS
AG502 42 OF 43 TRAFFIC SIGNAGE TYPES AND DETAILS
AG503 43 OF 43 SIGNAGE AND TRAFFIC SIGNAGE SCHEDULES
SHT ID SHT OF SHTS SHEET TITLE REV STATUS
GENERAL
G-001 1 OF 4 TITLE SHEET
G-002 2 OF 4 PROJECT LOCATION PLAN
G-003 3 OF 4 SCHEDULE OF DRAWINGS 1, 2, 3, 4
G-004 4 OF 4 SCHEDULE OF DRAWINGS 1, 2, 3
CIVIL
BJ001 1 OF 58 BORING LOCATION PLAN
BJ002 2 OF 58 BORING LOGS
C001 3 OF 58 NOTES, LEGENDS, SYMBOLS AND ABBREVIATIONS
C002 4 OF 58 TRAFFIC CONTROL AND WATER NOTES
C003 5 OF 58 WORK AREA, PARKING, AND PROTECTION OF PUBLIC 3
C004 6 OF 58 EROSION CONTROL PLAN
C005 7 OF 58 TEMPORARY PARKING EROSION CONTROL PLAN
C006 8 OF 58 EROSION CONTROL DETAILS
C007 9 OF 58 CONTRACTOR'S HAUL ROUTE - 1 AND TRAILER LOCATION
C008 10 OF 58 CONTRACTOR'S HAUL ROUTE - 2 TEMPORARY PARKING AND COSA SITE
C009 11 OF 58 EXISTING CONDITIONS - 1
C010 12 OF 58 EXISTING CONDITIONS - 2
C011 13 OF 58 EXISTING CONDITIONS - 3
CD101 14 OF 58 SITE AND UTILITY DEMOLITION PLAN
CD102 15 OF 58 TEMPORARY PARKING SITE DEMOLITION PLAN
CD103 16 OF 58 DEMOLITION PLAN - MCCORNACK AND PX ACCESS ROAD TRAFFIC IMPROVEMENTS
CS101 17 OF 58 SITE PLAN
CS102 18 OF 58 SITE LAYOUT PLAN
CS103 19 OF 58 TEMPORARY PARKING AND COSA SITE PLAN
CS104 20 OF 58 TEMPORARY PARKING AND SITE PLAN
CS105 21 OF 58 SHUTTLE BUS ROUTE
CS106 22 OF 58 TEMPORARY PARKING - DENTAL CLINIC SITE (OPTION 3)
CS501 23 OF 58 SITE DETAILS - 1
CS502 24 OF 58 SITE DETAILS - 2 2
CS503 25 OF 58 SITE DETAILS - 3 2
CS504 26 OF 58 SITE DETAILS - 4 2
CS505 27 OF 58 SITE DETAILS - 5 2
CP101 28 OF 58 STRIPING AND SIGNAGE PLAN 2
CP102 29 OF 58 TEMPORARY PARKING STRIPING PLAN 2
CP501 30 OF 58 STRIPING AND SIGNAGE DETAILS - 1 2
CP502 31 OF 58 STRIPING AND SIGNAGE DETAILS - 2 2
CU101 32 OF 58 UTILITY PLAN 2
CU102 33 OF 58 FOUNDATION DRAIN PLAN 2
CU103 34 OF 58 UTILITY LAYOUT PLAN 2
CU301 35 OF 58 SEWER FORCE MAIN AND WATER LINE PROFILES 2
CU302 36 OF 58 DRAIN LINE PROFILES - 1 2
CU303 37 OF 58 DRAIN LINE PROFILES - 2 2
CU501 38 OF 58 TRENCH BACKFILL AND RESTORATION DETAILS 2
CU502 39 OF 58 SEWER DETAILS - 1 2
CU503 40 OF 58 SEWER DETAILS - 2 2
CU504 41 OF 58 WATER DETAILS - 1 2
CU505 42 OF 58 WATER DETAILS - 2
CU506 43 OF 58 WATER DETAILS - 3
CU507 44 OF 58 DRAIN DETAILS - 1
CU508 45 OF 58 DRAIN DETAILS - 2
CU509 46 OF 58 DRAIN DETAILS - 3
CG101 47 OF 58 GRADING PLAN - 1
CG102 48 OF 58 GRADING PLAN - 2
CG103 49 OF 58 GRADING PLAN - 3 2
CG301 50 OF 58 GRADING SECTIONS - 1
CG302 51 OF 58 GRADING SECTIONS - 2
CG303 52 OF 58 GRADING SECTIONS - 3
CG304 53 OF 58 GRADING SECTIONS - 4
CT101 54 OF 58 SITE PLAN - MCCORNACK AND PX ACCESS ROAD TRAFFIC IMPROVEMENTS
CT102 55 OF 58 SITE PLAN - MCCORNACK AND WAIANAE AVENUE INTERSECTION TRAFFIC SIGNAL (OPTION 4)
CT501 56 OF 58 TRAFFIC SIGNAL DETAILS - 1
CT502 57 OF 58 TRAFFIC SIGNAL DETAILS - 2
CT503 58 OF 58 CROSSWALK FLASHER DETAILS
LANDSCAPE
LD101 1 OF 6 TREE DISPOSITION PLAN
LD501 2 OF 6 TREE DISPOSITION NOTES
LD502 3 OF 6 TREE PROTECTION NOTES & DETAIL
LP101 4 OF 6 LANDSCAPE PLAN
LP501 5 OF 6 PLANTING DETAILS & SCHEDULE
LP502 6 OF 6 PLANTING NOTES & GENERAL PROJECT NOTES 3
STRUCTURAL
S-001 1 OF 50 GENERAL NOTES 4
S-101 2 OF 50 PARTIAL BASEMENT FLOOR / FOUNDATION PLAN
S-102 3 OF 50 PARTIAL BASEMENT FLOOR / FOUNDATION PLAN 1
S-103 4 OF 50 PARTIAL FIRST FLOOR FRAMING PLAN
S-104 5 OF 50 PARTIAL FIRST FLOOR FRAMING PLAN
S-105 6 OF 50 PARTIAL SECOND FLOOR FRAMING PLAN
S-106 7 OF 50 PARTIAL SECOND FLOOR FRAMING PLAN
S-107 8 OF 50 PARTIAL THIRD FLOOR FRAMING PLAN
S-108 9 OF 50 PARTIAL THIRD FLOOR FRAMING PLAN
S-109 10 OF 50 PARTIAL FOURTH FLOOR FRAMING PLAN
S-110 11 OF 50 PARTIAL FOURTH FLOOR FRAMING PLAN 1
SCHEDULE OF DRAWINGS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
JA
N
M
AM
FE
B2
M
AM
FE
B2
M
AM
FE
B2
M
AM
IN
D
IC
A
TE
D
R
EV
IS
IO
N S
TA
TU
S
IN
D
IC
AT
ED
R
EV
IS
IO
N S
TA
TU
S, R
EV
IS
ED
S
H T
ID
A
N D
S H
EE
T
TI
TL
ES
IN
D
IC
A
TE
D R
EV
IS
IO
N
S
TA
TU
S
IN
D
IC
A
TE
D
R
EV
IS
IO
N S
TA
TU
S
40 PSF (REDUCIBLE FOR
COLUMNS AND FOOTINGS -20%
MAX REDUCTION)
3,000 LBS POINT LOAD
100 PSF
100 PSF
100 PSF
20 PSF (REDUCIBLE 12 PSF MIN.)
6,000 LBS HORIZONTAL
POINT LOAD
5 PSF
5 PSF
SELF WEIGHT + 10%
AS REQUIRED BY ELEVATOR
SUPPLIER + 10%
ADDED 10 PSF DEAD LOAD AND
20 PSF LIVE LOAD. SEE SHEET
S-109 & S-110 FOR LOCATIONS
130 MPH
II
B
PARTIALLY ENCLOSED
+0.55
II
1.0
0.55g
0.15g
D
0.50g
0.22g
D
SPECIAL REINFORCED
CONCRETE SHEARWALL
Cs x W
Cs = 0.10
R = 5
EQUIVALENT LATERAL FORCE
PROCEDURE
D
4,000 PSF
1/3 INCREASE
40 PCF
60 PLF
350 PCF
0.40
GENERAL:
A. WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE BUILDING CODE AS STATED
BELOW. HOWEVER, WHERE REFERENCE IS MADE TO PERFORMANCE CONFORMING
TO OTHER STANDARDS THE MORE STRINGENT SHALL APPLY.
1. INTERNATIONAL BUILDING CODE: 2012 ADDITION
B. THE CONTRACTOR SHALL COMPARE ALL THE CONTRACT DOCUMENTS WITH EACH
OTHER AND REPORT IN WRITING TO THE CONTRACTING OFFICER ALL
INCONSISTENCIES AND OMISSIONS.
C. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD
CONDITIONS AND SHALL COMPARE SUCH FIELD MEASUREMENTS AND CONDITIONS
WITH THE DRAWINGS BEFORE COMMENCING WORK. REPORT IN WRITING TO THE
CONTRACTING OFFICER ALL INCONSISTENCIES AND OMISSIONS.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL
TRADES.
E. THE CONTRACTOR SHALL BE RESPONSIBLE FOR METHODS OF CONSTRUCTION,
WORKMANSHIP AND JOB SAFETY. THE CONTRACTOR SHALL PROVIDE TEMPORARY
SHORING AND BRACING AS REQUIRED FOR STABILITY OF STRUCTURAL MEMBERS AND
SYSTEMS.
F. CONSTRUCTION LOADING SHALL NOT EXCEED DESIGN LIVE LOAD UNLESS SPECIAL
SHORING IS PROVIDED. ALLOWABLE LOADS SHALL BE REDUCED IN AREAS WHERE
THE STRUCTURE HAS NOT ATTAINED FULL DESIGN STRENGTH.
G. CONTRACTOR SHALL ENGAGE A REGISTERED STRUCTURAL ENGINEER IN THE STATE
OF HAWAII TO DESIGN CONSTRUCTION SHORING AND BRACING.
H. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THE ADJACENT
PROPERTIES, STRUCTURES, STREETS AND UTILITIES DURING THE CONSTRUCTION
PERIOD.
I. DETAILS NOTED AS TYPICAL ON THE STRUCTURAL DRAWINGS SHALL APPLY IN ALL
CONDITIONS UNLESS SPECIFICALLY SHOWN OR NOTED.
DESIGN CRITERIA:
A. FLOOR LIVE LOAD
1. GARAGES (PASSENGER VEHICLES ONLY):
2. STAIRS AND EXITS:
3. ELEVATOR LOBBIES:
4. MECHANICAL ROOMS:
B. ROOF LIVE LOAD:
C. VEHICLE BARRIER SYSTEM LOAD:
D. SUPER IMPOSED DEAD LOADS
1. MECHANICAL / PIPING / MISC.
2. ROOFS - ROOFING AND MISC
3. MECH. EQUIP
4. ELEVATOR LOADS
5. FUTURE PV AND SUPPORT FRAMING
E. WIND DESIGN DATA
1. BASIC WIND SPEED (3-SECOND GUST):
2. OCCUPANCY CATEGORY:
3. EXPOSURE CATEGORY:
4. BUILDING ENCLOSURE CLASSIFICATION:
5. INTERNAL PRESSURE COEFFICIENT:
6. COMPONENTS AND CLADDING DESIGN WIND PRESSURE: VARIES
F. EARTHQUAKE DESIGN DATA:
1. OCCUPANCY CATEGORY:
2. IMPORTANCE FACTOR:
3. MAPPED SPECTRAL RESPONSE ACCELERATIONS
a. SHORT PERIOD:
b. 1-SEC PERIOD:
4. SITE CLASS:
5. SPECTRAL RESPONSE COEFFICIENTS
a. SHORT PERIOD:
b. 1-SEC PERIOD:
6. DESIGN CATEGORY:
7. BASIC SEISMIC-FORCE-RESISTING SYSTEM:
8. DESIGN BASE SHEAR (ULTIMATE):
9. SEISMIC RESPONSE COEFFICIENT:
10. RESPONSE MODIFICATION FACTOR:
11. ANALYSIS PROCEDURE:
G. SOILS
1. SITE CLASS:
2. ALLOWABLE BEARING CAPACITY:
3. ALLOWABLE BEARING CAPACITY
FOR WIND AND SEIMIC
4. EARTH PRESSURES
a. ACTIVE (LEVEL BACKFILL):
i. UNRESTRAINED:
ii. RESTRAINED:
b. PASSIVE:
5. COEFFICIENT OF FRICTION:
SPECIAL INSPECTIONS:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT SPECIAL
INSPECTION OF PORTIONS OF THE WORK AS REQUIRED BY THE BUILDING CODE IS
MADE AT THE APPROPRIATE TIME. THE CONTRACTOR SHALL SUBMIT STATEMENT OF
RESPONSIBILITY TO THE COR PRIOR TO THE COMMENCEMENT OF WORK. THE
CONTRACTOR SHALL GIVE TIMELY NOTICE OF WHEN AND WHERE INSPECTIONS ARE
TO BE MADE AND PROVIDE ACCESS FOR THE INSPECTOR. FREQUENCY OF
INSPECTION IS DEFINED IN THE IBC, SECTION 1704 TABLES. THE CONTRACTOR SHALL
CORRECT DEFECTIVE WORK AT NO ADDITIONAL COST TO THE GOVERNMENT AND PAY
FOR RE-INSPECTION AS REQUIRED.
B. SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS. REPORTS SHALL
INDICATE THAT WORK INSPECTED WAS DONE IN CONFORMANCE WITH APPROVED
CONSTRUCTION DOCUMENTS. THE INSPECTOR SHALL SUBMIT A FINAL SIGNED
REPORT TO THE CONTRACTING OFFICER DOCUMENTING THAT THERE ARE NO KNOWN
UNRESOLVED CODE REQUIREMENTS.
C. THE FOLLOWING TYPE OF WORK LISTED IN THE IBC, SECTION 1704, REQUIRES
SPECIAL INSPECTION:
1. INSPECTION OF FABRICATOR/SHOP UNLESS WORK IS DONE BY A REGISTERED
AND APPROVED FABRICATOR SHOP.
a. STRUCTURAL STEEL
b. PRECAST CONCRETE
2. STEEL CONSTRUCTION
a. WELDING
3. CONCRETE CONSTRUCTION
a. EXCEPTIONS: INSPECTIONS NOT REQUIRED FOR CONCRETE POURS FOR
i. NON STRUCTURAL SLABS SUPPORT DIRECTLY ON GROUND.
b. REINFORCING STEEL WELDING.
c. BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT
OF CONCRETE.
d. PLACEMENT OF CONCRETE
e. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
TECHNIQUES.
f. POST INSTALLED CONCRETE BOLTS.
4. MASONRY CONSTRUCTION
a. PLACEMENT OF REINFORCING STEEL.
b. MORTAR AND MORTAR JOINTS
c. PLACEMENT OF GROUT
5. SOILS
a. FOUNDATION BEARING MATERIAL
b. FILL GREATER THAN ONE FOOT
FOUNDATION:
A. FOUNDATION DESIGN IS BASED ON THE FOLLOWING GEOTECHNICAL INVESTIGATION
REPORT.
1. GEOTECHNICAL ENGINEERING EXPLORATION. FY16 PN 80412 SB HEALTH CLINIC
PARKING STRUCTURE, SCHOFIELD BARRACKS, OAHU, HAWAII, W.O. 6274-00 (B),
BY GEOLABS, INC. ON FEBRUARY 27, 2015
B. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATION FROM SURFACE
WATER, GROUND WATER OR SEEPAGE.
C. EXCAVATIONS FOR ANY PURPOSE SHALL NOT REMOVE LATERAL SUPPORT FROM ANY
FOOTING OR FOUNDATION WITHOUT FIRST UNDERPINNING OR PROTECTING THE
FOOTING OR FOUNDATION AGAINST SETTLEMENT OR LATERAL TRANSLATION.
D. BOTTOM OF FOOTINGS AND RAT SLAB SHALL BE COMPACTED TO A MINIMUM OF 90%
RELATIVE COMPACTION PRIOR TO PLACEMENT OF REINFORCING STEEL AND
CONCRETE. IF SOFT AND/OR LOOSE MATERIALS ARE ENCOUNTERED AT THE BOTTOM
OF FOOTING EXCAVATIONS, THEY SHALL BE OVER-EXCAVATED TO EXPOSE THE
UNDERLYING FIRM MATERIALS. THE OVER-EXCAVATION SHALL BE BACKFILLED WITH
SELECT GRANULAR MATERIAL COMPACTED TO A MINIMUM OF 95% RELATIVE
COMPACTION OR THE FOOTING BOTTOM MAY BE EXTENDED DOWN TO THE
UNDERLYING COMPETENT MATERIAL.
E. SLAB SUBGRADES SHALL BE SCARIFIED TO A DEPTH OF ABOUT 8 INCHES,
MOISTURE-CONDITIONED TO AT LEAST 2 PERCENT ABOVE THE OPTIMUM MOISTURE,
AND COMPACTED TO A MINIMUM OF 95 PERCENT RELATIVE COMPACTION (ASTM D
1557) PRIOR TO PLACEMENT OF AGGREGATE BASE COURSE. THE UNDERLYING
SUBGRADE SOILS SHALL BE WETTED AND KEPT MOIST UNTIL THE FINAL PLACEMENT
OF SLAB CONCRETE. WHERE SHRINKAGE CRACKS ARE OBSERVED AFTER
COMPACTION OF THE SUBGRADE, PREPARE THE SOILS AGAIN AS INDICATED ABOVE.
IF SATURATION AND SUBSEQUENT YIELDING OF THE EXPOSED SUBGRADE DUE TO
INCLEMENT WEATHER AND POOR DRAINAGE OCCURS, THE CONTRACTOR SHALL
OVER-EXCAVATE THE SOFT AREAS AND REPLACE WITH STRUCTURAL FILL.
F. UNLESS NOTED OTHERWISE, THE MINIMUM DEPTH OF BOTTOM OF FOOTINGS SHALL
BE 24 INCHES BELOW THE LOWEST ADJACENT FINISH GRADE OR ADJACENT FINISHED
FLOOR.
G. EXCAVATIONS FOR FOUNDATIONS SHALL BE MONITORED AND APPROVED BY THE
CONTRACTOR'S GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF CONCRETE AND
REINFORCING STEEL TO CONFIRM FOUNDATION BEARING CONDITIONS AND
REQUIRED EMBEDMENT DEPTHS.
H. CONTRACTOR SHALL BRACE OR PROTECT ALL WALLS BELOW GRADE FROM LATERAL
LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED
THEIR FULL DESIGN STRENGTH.
I. UNLESS NOTED OTHERWISE, WALLS OR PORTIONS THEREOF THAT RETAIN EARTH,
AND ENCLOSE INTERIOR SPACES AND FLOORS BELOW GRADE SHALL BE
WATERPROOFED AND DAMPPROOFED.
J. JOINTS IN WALLS AND FLOOR, JOINTS BETWEEN THE WALL AND FLOOR AND
PENETRATIONS IN THE WALL AND FLOOR SHALL BE MADE WATERTIGHT UTILIZING
APPROVED METHODS AND MATERIALS.
CONCRETE:
A. CONCRETE CONSTRUCTION SHALL CONFORM TO AMERICAN CONCRETE INSTITUTE
ACI 318
B. CAST-IN-PLACE CONCRETE SHALL BE REGULAR WEIGHT HARD ROCK CONCRETE AND
SHALL HAVE THE FOLLOWING MINIMUM 28 DAY COMPRESSIVE STRENGTHS:
1. FOOTINGS AND GRADE BEAMS:
2. FOUNDATION RETAINING WALLS:
3. SLAB-ON-GRADE:
4. TOPPING OVER PRECAST PLANKS AND TEES:
5. ALL OTHER CONCRETE:
C. CONCRETE DELIVERY TICKETS SHALL RECORD ALL FREE WATER ADDED TO THE MIX:
AT BATCHING BY PLANT, FOR CONSISTENCY BY DRIVER, AND ANY ADDITIONAL
REQUEST BY CONTRACTOR IF PERMITTED BY THE MIX DESIGN.
D. WATER USED IN MIXING CONCRETE SHALL BE CLEAN AND FREE FROM INJURIOUS
AMOUNTS OF OILS, ACIDS, ALKALIS, SALTS, ORGANIC MATERIALS OR OTHER
SUBSTANCES THAT ARE DELETERIOUS TO CONCRETE OR STEEL REINFORCEMENT.
E. FREQUENCY OF CONDUCTING STRENGTH TESTS SHALL BE AS FOLLOWS:
1. SAMPLES FOR STRENGTH OF EACH CLASS OF CONCRETE PLACED EACH DAY
SHALL BE TAKEN NOT LESS THAN ONCE A DAY, NOR LESS THAN ONCE FOR EACH
150 CUBIC YARDS OF CONCRETE, NOR LESS THAN ONCE FOR EACH 5,000
SQUARE FEET OF SURFACE AREA FOR SLABS OR WALLS.
2. IF THE TOTAL VOLUME OF CONCRETE IS SUCH THAT THE FREQUENCY OF
TESTING WOULD PROVIDE LESS THAN FIVE STRENGTH TESTS FOR A GIVEN
CLASS OF CONCRETE, TESTS SHALL BE MADE FROM AT LEAST FIVE RANDOMLY
SELECTED BATCHES OR FROM EACH BATCH IF FEWER THAN FIVE BATCHES ARE
USED.
F. ALL INSERTS, ANCHOR BOLTS, PLATES, AND OTHER ITEMS TO BE CAST IN THE
CONCRETE SHALL BE HOT-DIPPED GALVANIZED ACCORDING TO ASTM A153 UNLESS
OTHERWISE NOTED.
G. REINFORCING BARS, ANCHOR BOLTS, INSERTS, AND OTHER ITEMS TO BE CAST IN THE
CONCRETE SHALL BE SECURED IN POSITION PRIOR TO PLACEMENT OF CONCRETE.
H. CONDUITS, PIPES, AND SLEEVES PASSING THROUGH A SLAB OR FOOTING AND NOT
CONFORMING TO TYPICAL DETAILS SHALL BE LOCATED AND SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL.
I. CONDUITS AND PIPES, WITH THEIR FITTINGS, EMBEDDED WITHIN A COLUMN SHALL
NOT DISPLACE MORE THAN 4 PERCENT OF THE AREA OF CROSS SECTION ON WHICH
STRENGTH IS CALCULATED OR WHICH IS REQUIRED FOR FIRE PROTECTION.
J. CONDUITS, PIPES, AND SLEEVES EMBEDDED WITHIN A SLAB OR WALL (OTHER THAN
THOSE MERELY PASSING THROUGH) SHALL NOT BE PERMITTED.
K. THE CONTRACTOR SHALL LOCATE CONSTRUCTION JOINTS SO AS NOT TO IMPAIR THE
STRENGTH OF THE STRUCTURE AND TO MINIMIZE SHRINKAGE STRESSES. SUBMIT
LOCATION OF CONSTRUCTION JOINTS TO THE CONTRACTING OFFICER, UNLESS
OTHERWISE NOTED.
L. SEE ARCHITECTURAL DRAWINGS FOR CHAMFERS, EDGE RADII, DRIPS, REGLETS,
FINISHES AND OTHER NON-STRUCTURAL ITEMS NOT SHOWN OR SPECIFIED ON THE
STRUCTURAL DRAWINGS.
M. NON-SHRINK GROUT SHALL BE A PREMIXED NON-METALLIC FORMULA, CAPABLE OF
DEVELOPING A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI IN 1 DAY AND 5,000
PSI IN 28 DAYS.
PLANT PRECAST STRUCTURAL CONCRETE:
A. THE DESIGN AND FABRICATION INCLUDING SHORING OF ALL PRECAST CONCRETE
SHALL BE THE RESPONSIBILITY OF THE MANUFACTURER. LAYOUT, DIMENSIONS,
REINFORCING AND CONNECTIONS SHOWN SHALL BE USED ONLY AS A GUIDE TO
ASSIST IN DESIGN.
B. THE DESIGN OF PRECAST CONCRETE FRAMING MEMBERS AND CONNECTIONS SHALL
BE IN ACCORDANCE WITH AMERICAN CONCRETE INSTITUTE ACI 318 AND PCI DESIGN
HANDBOOK (PRECAST AND PRESTRESSED CONCRETE).
C. FABRICATOR SHALL BE A PCI CERTIFIED PLANT.
D. MEMBERS AND CONNECTIONS SHALL BE DESIGNED BY THE MANUFACTURER IN
ACCORDANCE WITH THE AMERICAN CONCRETE INSTITUTE ACI 318.
E. MANUFACTURER SHALL SUBMIT CALCULATIONS AND SHOP DRAWINGS CERTIFIED BY
A STRUCTURAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF HAWAII. THE
SHOP DRAWINGS SHALL INCLUDE ALL REINFORCING, INSERTS, BEARING PADS,
OPENINGS, BEARING PLATES AND ANCHORS.
F. CEMENT SHALL BE TYPE II OR TYPE III.
G. MINIMUM CONCRETE COMPRESSIVE STRENGTH AT TRANSVERSE OF PRESTRESSING
FORCES SHALL BE 3500 PSI.
H. PRECAST CONCRETE SHALL BE REGULAR WEIGHT HARD ROCK CONCRETE AND SHALL
HAVE THE FOLLOWING MINIMUM 28 DAY COMPRESSIVE STRENGTHS:
1. PRECAST WALLS:
2. PRECAST COLUMNS:
3. PRECAST BEAMS:
4. PRECAST DOUBLE TEES:
5. PRECAST PLANKS:
I. NON-SHRINK GROUT SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF
6000 PSI AND SHALL CONFORM TO ASTM C1107.
J. THE MANUFACTURER SHALL VERIFY TOPPING REINFORCEMENT SHOWN.
K. PRESTRESSING REINFORCEMENT SHALL BE ½” DIAMETER, UNCOATED 7-WIRE LOW
RELAXATION STRANDS CONFORMING TO ASTM A416 WITH MINIMUM ULTIMATE
STRENGTH OF 270 KSI.
L. ALL JOINTS SHALL HAVE JOINT FILLER AND SEALANT, SEE ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS.
M. REINFORCING BARS SHOWN ARE MINIMUM, ADDITIONAL BARS MAY BE REQUIRED BY
PRECAST DESIGNER.
REINFORCING STEEL:
A. REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615, GRADE
60.
B. WELDED REINFORCING STEEL SHALL BE LOW-ALLOY DEFORMED BARS CONFORMING
TO ASTM A706.
C. WELDED WIRE REINFORCEMENT SHALL BE GALVANIZED CONFORMING TO ASTM A185.
D. CLEAR CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS, UNLESS
OTHERWISE NOTED:
1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH:
2. CONCRETE FORMED AND EXPOSED TO EARTH OR WEATHER INCLUDING TOPPING
SLAB:
a. NO. 6 THROUGH NO. 18 BAR:
b. NO. 5 BAR, W31 OR D31 WIRE, AND SMALLER:
3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS, JOISTS:
i. NO. 14 AND NO. 18 BAR:
ii. NO. 11 BAR AND SMALLER:
b. BEAMS, COLUMNS:
i. PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS:
4. CONCRETE PRECAST PANELS CAST AGAINST A RIGID HORIZONTAL SURFACE
SUCH AS CONCRETE SLAB EXPOSED TO THE WEATHER:
a. NO. 8 AND SMALLER:
b. NO. 9 THROUGH NO. 18:
E. CLEAR DISTANCE BETWEEN THE SURFACE OF A BAR AND ANY SURFACE OF A
MASONRY UNIT SHALL BE NOT LESS THAN 1/2 INCH, UNLESS OTHERWISE NOTED.
F. REINFORCING STEEL SHALL BE SPLICED WHERE INDICATED ON PLANS. PROVIDE LAP
SPLICE LENGTH PER TYPICAL DETAILS AND SCHEDULE, UNLESS OTHERWISE NOTED.
G. LAP EDGES AND ENDS OF ADJOINING SHEETS OF WELDED WIRE REINFORCEMENT AT
LEAST ONE MESH SPACING. OFFSET LAPS OF ADJOINING SHEET WIDTHS TO PREVENT
CONTINUOUS LAPS IN EITHER DIRECTION.
H. MECHANICAL SPLICE CONNECTORS SHALL DEVELOP IN TENSION 125 PERCENT OF THE
SPECIFIED MINIMUM YIELD STRENGTH OF REINFORCING BARS.
I. STANDARD HOOKS ON REINFORCING BARS USED SHALL COMPLY WITH ACI 318,
SECTION 7.1.
J. MINIMUM REINFORCEMENT BEND DIAMETERS SHALL COMPLY WITH ACI 318, SECTION
7.2
K. EPOXY COATED REBAR USED SHALL COMPLY WITH ASTM A934.
L. #5 AND #6 BARS PLACED WITHIN THE TOPPING SLAB THAT HAVE LESS THAN 1/2"
CLEAR SPACE BETWEEN THE REBAR AND THE TOP OF THE CONCRETE DOUBLE TEE
OR CONCRETE PLANKS SHALL HAVE A 2" CLEAR NON-CONTACT LAP SPLICE.
MASONRY:
A. CONCRETE MASONRY UNITS SHALL CONFORM TO ASTM C90 FOR LOAD-BEARING
CONCRETE MASONRY UNITS NORMAL WEIGHT WITH A UNIT COMPRESSIVE STRENGTH
OF 2150 PSI. (COMBINED COMPOSITE COMPRESSIVE STRENGTH, f'm = 1500 PSI)
B. SECOND-HAND MASONRY UNITS SHALL NOT BE PERMITTED.
C. MORTAR FOR USE IN MASONRY CONSTRUCTION SHALL CONFORM TO ASTMC 270 WITH
A MINIMUM COMPRESSIVE STRENGTH OF 1,800 PSI. UNUSED MORTAR SHALL BE
DISCARDED WITHIN 2 ½ HOURS AFTER INITIAL MIXING. MORTAR FOR MASONRY SHALL
BE TYPE S.
D. GROUT SHALL CONFORM TO ASTM C476 WITH A MINIMUM COMPRESSIVE STRENGTH
OF 2,000 PSI AT 28 DAYS.
E. ALL CELLS AND BOND COURSES WITH REINFORCEMENT AND INSERTS SHALL BE SOLID
GROUTED. CLEANOUTS SHALL BE PROVIDED FOR ALL GROUT POURS OVER 5’-4” IN
HEIGHT.
F. WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, HORIZONTAL
CONSTRUCTION JOINTS SHALL BE FORMED BY STOPPING THE GROUT POUR 1 1/2
INCHES BELOW THE TOP OF THE UPPERMOST UNIT.
G. THE CONTRACTOR SHALL LOCATE CONSTRUCTION JOINTS SO AS NOT TO IMPAIR THE
STRENGTH OF THE STRUCTURE AND TO MINIMIZE SHRINKAGE STRESSES. SUBMIT
LOCATION OF CONSTRUCTION JOINTS TO THE CONTRACTING OFFICER FOR
APPROVAL, UNLESS OTHERWISE NOTED. MAXIMUM SPACING BETWEEN
CONSTRUCTION JOINTS SHALL NOT EXCEED THE LESSER OF LENGTH TO HEIGHT
RATIO OF 1.5 OR 24 FEET.
H. WALLS SHALL BE CONSTRUCTED IN CONVENTIONAL RUNNING BOND, UNLESS
OTHERWISE NOTED.
I. SEE ARCHITECTURAL DRAWINGS FOR LAYING PATTERN, HEIGHT OF UNITS, SURFACE
TEXTURE, AND JOINT TYPE.
J. OPEN-ENDED BLOCKS MAY BE SUBSTITUTED FOR STANDARD CONCRETE MASONRY
UNITS.
STRUCTURAL STEEL:
A. FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION MANUAL OF STEEL CONSTRUCTION,
THIRTEENTH EDITION.
B. STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 UNLESS OTHERWISE NOTED.
C. CHANNELS, ANGLES SHALL CONFORM TO ASTM A36.
D. PLATES AND BARS SHALL CONFORM TO ASTM A36.
E. STEEL TUBES SHALL CONFORM TO ASTM A500, GRADE B.
F. BOLTS SHALL CONFORM TO ASTM A307, GRADE A UNLESS OTHERWISE NOTED.
G. WELDS AND WELDING PROCEDURES SHALL CONFORM TO THE STRUCTURAL WELDING
CODE AWS D1.1 OF THE AMERICAN WELDING SOCIETY.
H. WELDING SHALL BE PERFORMED BY WELDERS PREQUALIFIED FOR WELDING
PROCEDURES TO BE USED.
I. WELDING ELECTRODES SHALL BE E70XX.
J. ALL STEEL SHALL BE HOT-DIPPED GALVANIZED
ACCORDING TO ASTM A153.
K. ALL ANCHOR BOLTS, PLATES, AND OTHER ITEMS TO BE
CAST IN CONCRETE SHALL BE HOT-DIPPED GALVANIZED
ACCORDING TO ASTM A153 UNLESS OTHERWISE NOTED.
3,000 PSI
4,000 PSI
3,000 PSI
4,000 PSI
3,000 PSI
6,000 PSI (MINIMUM)
6,000 PSI (MINIMUM)
6,000 PSI (MINIMUM)
6,000 PSI (MINIMUM)
6,000 PSI (MINIMUM)
3"
2"
1.5"
1.5"
0.75"
1.5"
1"
2"
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/1
/2
:3
:1 A
M
/1
/2
:3
:1
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-001
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
G E
N E
R A
L N
O T
E S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -0
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
C M
HGFEDC
FOURTH FLOOR
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
BASEMENT
PRECAST CONCRETE
INVERTED TEE BEAM, TYPPRECAST CONCRETE
COLUMN, TYP
8" CONCRETE INFILL WALL, TYP
2-1
2-4
2-3
2-6
2-2 TYP
2-5 TYP
12" PRECAST
CONCRETE
PARAPET
2-7 2-8 2-9 2-10 2-11
12" PRECAST CONCRETE
WALL PANELS, TYP
PANEL JOINT, TYP
12"x12" PRECAST BEAM, CONNECTION TO WALL PANELS
BY PRECAST MANUFACTURER
1/2"ø GALV. STRAND CABLE BARRIER
(CROSS SECTIONAL AREA = 0.153 SQ. INCH)
GRADE 250 KSI STRESS CABLE UNTIL TAUT. 1.5 KIPS
TENSION WITH MANUFACTURER'S CABLE ANCHOR
TOP AND BOTTOM WITH 5 KIPS PULL OUT CAPACITY
B A
TOP OF WALL
FOURTH FLOOR
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
BASEMENT
TOP OF ELEV WALL
8" PRECAST
CONCRETE WALL
PANEL, TYP
PRECAST CONCRETE
ROOF PLANK WITH
TOPPING, SEE PLAN
ELEV MACHINE ROOM
CONCRETE
FOUNDATION WALL, TYP
ELEVATOR PIT
1.1-5
1.1-4
1.1-3
1.1-2
1.1-1
PANEL JOINT, TYP
CMU INFILL,
TYP PER
C4
S-514
CMU INFILL,
TYP PER
B4
S-514
PRECAST/PRESTRESSED CONCRETE WALL PANEL NOTES:
1. PRECAST MANUFACTURER TO VERIFY ALL WALL PANEL DIMENSIONS.
2. OPENINGS, SEE ARCH DWGS, TYP U.N.O.
3. LOADS PROVIDED ARE UNFACTORED (IBC 2012) SEISMIC LOADS IN KIPS AT
FLOOR LINES APPLIED TO WALL PANELS
4. PRECAST COLUMNS ARE NOT PART OF THE LATERAL SYSTEM U.N.O.
5. INDICATES PRECAST WALL PANEL TYPE, SEE SCHEDULE FOR REINF.1-1HGFEDC
FOURTH FLOOR
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
BASEMENT
12" PRECAST CONCRETE
WALL PANELS, TYP
PRECAST CONCRETE
INVERTED TEE BEAM, TYP
PRECAST CONCRETE
COLUMN, TYP
12" PRECAST
CONCRETE PARAPET
CABLES, TYP8" CONCRETE INFILL WALL, TYP
3-1
3-4
3-3
3-6
3-2 TYP
3-5 TYP
3-7 3-8 3-9 3-10 3-11
PANEL JOINT, TYP
12"x12" PRECAST BEAM, CONNECTION TO WALL PANELS
BY PRECAST MANUFACTURER
1/2"ø GALV. STRAND CABLE BARRIER
(CROSS SECTIONAL AREA = 0.153 SQ. INCH)
GRADE 250 KSI STRESS CABLE UNTIL TAUT. 1.5 KIPS
TENSION WITH MANUFACTURER'S CABLE ANCHOR
TOP AND BOTTOM WITH 5 KIPS PULL OUT CAPACITY
FOURTH FLOOR
PRECAST
CONCRETE
PARAPET
C.5-1
B A
TOP OF WALL
FOURTH FLOOR
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
BASEMENT
TOP OF ELEV WALL
ELEV MACHINE ROOM
ELEVATOR PIT
8" PRECAST
CONCRETE WALL
PANEL, TYP
PRECAST CONCRETE
ROOF PLANK WITH
TOPPING, SEE PLAN
CONCRETE
FOUNDATION WALL, TYP
1.1-5
1.1-4
1.1-3
1.1-2
1.1-1
PANEL JOINT, TYP
CMU INFILL,
TYP PER C4
S-514
OPTION 1
ELEVATOR 2
SECOND FLOOR
FIRST FLOOR
BASEMENT
i
RETAINING WALL
PRECAST WALL
PANEL
PRECAST WALL
PANEL
A1
S-514 iii-1
8" THICK CAST-IN-
PLACE CONCRETE
8" THICK PRECAST
12" THICK PRECAST
LEGEND:NOTE: PRECAST WALL
PANEL THICKNESS ABOVE
DISREGARDS ADDITIONAL
THICKNESSES FROM
CORBELS AND
ARCHITECTURAL ELEMENTS
16" THICK PRECAST
6" THICK PRECAST
8" CMU WALL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/3
/1
/2
:3
:1 A
M
/1
/2
:3
:1
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-205
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S T
R U
C T
U R
A L E
L E
V A
T
IO
N S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -2
3/32" = 1'-0" C3
STRUCTURAL ELEVATION - GRID 2
3/32" = 1'-0" C1
STRUCTURAL ELVATION - GRID 1.1
3/32" = 1'-0" A1
STRUCTURAL ELEVATION - GRID 3
0 4 8 16
0 4 8 16
0 4 8 16
3/32" = 1'-0" A4
STRUCTURAL ELEVATION - GRID C.5
0 4 8 16
3/32" = 1'-0" C2
STRUCTURAL ELEVATION - GRID 1.1
3/32" = 1'-0" A5
STRUCTURAL ELEVATION
0 4 8 16
0 4 8 16
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
FIRST FLOOR
BASEMENT
COLUMN FOOTING BEYOND
8"
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE
SCHEDULE FOR REINFORCING
(2) #5 TOP AND BOTTOM IN CORBEL
#5 TIES AT 8"
24" DOUBLE TEE, SEE PLAN
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE ELEVATIONS AND SCHEDULE
FINISH GRADE,
SEE CIVIL DWGS
1' -0
1'-0"
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION) WRAPPED
IN GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
8" CONCRETE FOUNDATION WALL
1/2"
PREFORMED
JOINT FILLER
WITH SEALANT
4"ø PERFORATED PVC
PIPE, SEE CIVIL DWGS
3' -0
#5 AT 12" HORIZ
#5 AT 12" VERT
DOWEL TO MATCH
VERT REINF
CONCRETE
SLAB-ON-GRADE,
SEE PLAN
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
DOWEL, SEE PLAN
CHORD REINF,
SEE PLAN
WALL FOOTING,
SEE PLAN
1" JOINT PER
C1
S-609
BRACE WALL UNTIL FIRST FLOOR CONCRETE TOPPING
HAS ATTAINED 100% DESIGN COMPRESSIVE STRENGTH,
-OR- DO NOT BACKFILL UNTIL FIRST FLOOR CONCRETE
TOPPING HAS ATTAINED 100% DESIGN COMPRESSIVE
STRENGTH
KEYWAY WITH WATERSTOP
FIRST FLOOR
BASEMENT
4' -0
1'-4" 8"
1/2" BEARING PAD
4" DAP
(2) #5 TOP AND BOTTOM IN CORBEL
24" DOUBLE TEE, SEE PLAN
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
FINISH GRADE,
SEE CIVIL DWGS
1' -0
1'-0"
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION) WRAPPED
IN GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
PREFORMED
JOINT FILLER
WITH SEALANT
4"ø PERFORATED PVC
PIPE, SEE CIVIL DWGS.
JOG ELBOW PIPE AT
16" FOUNDATION WALL
DOWEL TO MATCH
VERT REINF
CONCRETE
SLAB-ON-GRADE,
SEE PLAN
#5 AT 12" HORIZ
#5 AT 12" VERT
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
COLUMN FOOTING,
SEE PLAN
DOWEL, SEE PLAN
CHORD REINF,
SEE PLAN
1" JOINT PER
C1
S-609
12" CORBEL, SEE
SCHEDULE FOR REINFORCING
#5 TIES AT 8"
16" CONCRETE FOUNDATION WALL
BRACE WALL UNTIL FIRST FLOOR CONCRETE TOPPING
HAS ATTAINED 100% DESIGN COMPRESSIVE STRENGTH,
-OR- DO NOT BACKFILL UNTIL FIRST FLOOR CONCRETE
TOPPING HAS ATTAINED 100% DESIGN COMPRESSIVE
STRENGTH
3' -0
KEYWAY WITH WATERSTOP
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:2 A
M
/1
/2
:3
:2
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
J J Y
L J C
B C
M
S-501
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" A1
SECTION
3/4" = 1'-0" A2
SECTION
0 1 2 4 0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
A
BASEMENT
CONCRETE SLAB-ON-GRADE,
SEE PLAN
COLUMN BEYOND
COLUMN FOOTING
BEYOND
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
PRECAST WALL PANEL
BEYOND
PRECAST INVERTED
TEE BEYOND
PRECAST COLUMN
WITH CORBEL BEYOND
POUR STRIP
1" JOINT PER
FINISH GRADE,
SEE CIVIL DWGS
PRECAST WALL PANEL
COLUMN BEYOND
4' -0
8" 8"
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
CHORD REINF,
SEE PLAN
DOWELS WITH BAR COUPLER,
SEE PLAN
C1
S-609
FLOOR GRATING,
SEE PLAN
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
CONTINUOUS WALL
FOOTING, SEE PLAN
RETAINING WALL FOOTING
CONCRETE SLAB-ON-GRADE
KEYWAY WITH
WATERSTOP
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION)
WRAPPED IN
GEOTEXTILE
FILTER
WATERPROOFING,
SEE ARCH DWGS
4"ø PERFORATED
PVC PIPE, SEE
CIVIL DWGS
DOWEL TO MATCH
VERT REINF
#5 AT 12"
4' -0
LA
P
#6 AT 8"
#5 AT 12"
1' -0
10" CONCRETE RETAINING WALL
#5 AT 12" HORIZ
#5 AT 12" VERT
#6 AT 8" VERT
1'-0"
1' -0
1'
-4
2' -6
7" 1'-4" 6'-7"
8'-6"
PRECAST WALL
PANEL, SEE
ELEVATIONS
AND SCHEDULE
8"
16" WIDE x 8" PRECAST WALL PANEL TIE
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
1/2" PREFORMED
JOINT FILLER
WITH SEALANT
SAWCUT JOINT CJ-3
1" J
O
IN
T
A
FIRST FLOOR
BASEMENT
CONCRETE SLAB-ON-GRADE,
SEE PLAN
PRECAST CONCRETE COLUMN
1" J
O
IN
T
COLUMN FOOTING,
SEE PLAN
FOUNDATION WALL
FOOTING BEYOND
1'-4"
1" GAP
1'-3"
3" CONCRETE
TOPPING
24" DOUBLE TEE, SEE PLAN
1/2" BEARING PAD
PRECAST INVERTED TEE, SEE PLAN
POUR STRIP
1" JOINT
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
1' -0
1'-0"
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION)
WRAPPED IN
GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
4"ø PERFORATED
PVC PIPE, SEE
CIVIL DWGS
FINISH
GRADE,
SEE CIVIL
DWGS
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
PRECAST COLUMN
WITH CORBEL, SEE
CHORD REINF,
SEE PLAN
C1
S-609
A1
S-608
RETAINING WALL FOOTING
KEYWAY WITH
WATERSTOP
DOWEL TO MATCH
VERT REINF
#5 AT 12"
4' -0
LA
P
#6 AT 8"
#5 AT 12"
10" CONCRETE RETAINING WALL
#5 AT 12" HORIZ
#5 AT 12" VERT
#6 AT 8" VERT
1' -4
2'
-6
7" 1'-4" 6'-7"
8'-6"
8" 8"
PRECAST WALL PANEL,
SEE ELEVATIONS AND
SCHEDULE
1/2" PREFORMED
JOINT FILLER
WITH SEALANT
PRECAST WALL
PANEL BEYOND
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
FLOOR GRATING,
SEE PLAN
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:2 A
M
/1
/2
:3
:2
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
J J Y
L J C
B C
M
S-503
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" A1
SECTION AT FOUNDATION WALL
3/4" = 1'-0" A3
SECTION AT COLUMN
0 1 2 4 0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
BASEMENT
L
8" 8"
CONTINUOUS WALL FOOTING BEYONDRETAINING WALL FOOTING
1'
-0
T Y
P
CONCRETE SLAB-ON-GRADE
8'-6"
KEYWAY WITH
WATERSTOP
10" CONCRETE RETAINING WALL
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION) WRAPPED
IN GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
4"ø PERFORATED PVC
PIPE, SEE CIVIL DWGS
1' -0
" 1'-0"
#5 AT 12" HORIZ
#5 AT 12" VERT
#5 AT 12"
4' -0
LA
P
#6 AT 8"
#6 AT 8" VERT
11"
FINISHED GRADE
CONCRETE SLAB-ON-GRADE
6'-7"1'-4"
2' -6
1'
-4
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
SLOPED TOPPING
2' -5
4'
-0
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
COLUMN FOOTING, SEE PLAN
#5 AT 12"
7"
CHORD REINF,
SEE PLAN
1" JOINT PER
C1
S-609
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
7'-8 207/256"
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
1/2" PREFORMED
JOINT FILLER
WITH SEALANT
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
DOWEL TO MATCH
VERT REINF
FLOOR GRATING,
SEE PLAN
M
FIRST FLOOR
BASEMENT
L
CONTINUOUS WALL
FOOTING, SEE PLAN
RETAINING WALL FOOTING
1' -0
T
Y P
CONCRETE SLAB-ON-GRADE
8'-6"
KEYWAY WITH
WATERSTOP
10" CONCRETE RETAINING WALL
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION) WRAPPED
IN GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
4"ø PERFORATED PVC
PIPE, SEE CIVIL DWGS
1'-0"
#5 AT 12" HORIZ
#5 AT 12" VERT
#5 AT 12"
4' -0
LA
P
#6 AT 8"
#6 AT 8" VERT
11"
FINISHED GRADE,
SEE CIVIL DWGS
CONCRETE SLAB-ON-GRADE
6'-7"1'-4"
2' -6
1'
-4
1' -0
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
SLOPED TOPPING
2' -5
4'
-0
PRECAST WALL
PANEL, SEE
ELEVATIONS
AND SCHEDULE
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
16" WIDE x 8" PRECAST WALL PANEL TIE
1" J
O
IN
T
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
CHORD REINF, SEE PLAN
7"
#5 AT 12"
PRECAST WALL PANEL BEYOND
1" JOINT PER
C1
S-609
PRECAST WALL PANEL BEYOND
8" 8"
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
1/2" PREFORMED
JOINT FILLER
WITH SEALANT
L3x3x1/4 LEDGER WITH 5/8"ø x 5" LONG WEDGE
ANCHOR AT 2'-0" AND
4" FROM ENDS
SAWCUT JOINT CJ-3
DOWEL TO MATCH
VERT REINF
FLOOR GRATING,
SEE PLAN
1' -0
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:2 A
M
/1
/2
:3
:2
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
J J Y
L J C
B C
M
S-505
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" A3
SECTION
3/4" = 1'-0" A1
SECTION
0 1 2 4 0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
#5 AT 12"
5'-0"
(2) #4 CONT HORIZ IN BOND
BEAM AT TOP OF WALL
#5 AT 16"CONCRETE SLAB-ON-
GRADE, SEE PLAN
8" CMU WALL
(2) #4 CONT HORIZ IN BOND
BEAM AT 24" MAX
GRAVEL, SEE PLAN
PRECAST DOUBLE-TEE,
SEE PLAN
1' -0
1'-0"#5 AT 12" EACH WAY
#5 AT 16" VERT
24"
ADDED BARS, TYP PER PLAN
DOUBLE TEE TO CMU WALL CONNECTION
BY PRECAST MANUFACTURER
VOID SPACE
#4 AT 16"
FIRST FLOOR
BASEMENT
iii
CONCRETE
SLAB-ON-GRADE,
SEE PLAN
KEYWAY WITH WATERSTOP
10" CONCRETE RETAINING WALL
#3B FINE GRAVEL
(ASTM C-33 NO. 67
GRADATION) WRAPPED
IN GEOTEXTILE FILTER
WATERPROOFING,
SEE ARCH DWGS
4"ø PERFORATED PVC
PIPE, SEE CIVIL DWGS
1' -0
1'-0"
CONTINUOUS WALL
FOOTING, SEE PLAN
DOWEL TO MATCH
VERT REINF
#5 AT 12" HORIZ
#5 AT 12" VERT
#5 AT 12"
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE SKEWED,
SEE PLAN
12" CORBEL
SLOPED TOPPING
4' -0
PRECAST WALL
PANEL, SEE
ELEVATIONS AND
SCHEDULE
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
16" WIDE x 8" PRECAST WALL PANEL TIE
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
FINISH GRADE
CONCRETE
SLAB-ON-GRADE,
SEE PLAN
CHORD REINF, SEE PLAN
1" JOINT PER
C1
S-609
10 1/2" DAP
PRECAST WALL PANEL BEYOND
PRECAST WALL PANEL BEYOND
LEDGER PER
C3
S-509
SAWCUT JOINT CJ-3
2' -5
1/2" PREFORMED
JOINT FILLER
WITH SEALANT
1"
3' -0
LA
P
BASEMENT
iii
6"
PRECAST
WALL BEYOND
PRECAST
WALL BEYOND
WALL FOOTING SEE
PLAN AND SCHEDULE
TRENCH DRAIN
GRATING, SEE
MECH DWGS
CJ-1, SEE PLAN
(2)#4
#4 AT 12"
2"-6"
(2) #4 CONT
CONCRETE
SLAB-ON-GRADE,
SEE PLAN
CONTINUOUS WALL
FOOTING, SEE PLAN
8"4"
PAVING, SEE
CIVIL DWGS V
A R
IE
S
(2) #4 CONT
REINF SEE PLAN #5x AT 12" 2'-6" 2'-6"
GALV. L1 1/2x1 1/2x3/16 OR AS REQD BY
TRENCH DRAIN GRATING
MANUFACTURER, WITH 1/2"ø x 6"
WELDED HEADED SHEAR STUDS AT 12",
TYP
FIRST FLOOR
PRECAST WALL
PANEL BEYOND
CONCRETE
FOUNDATION
WALL BEYOND
APPROXIMATE
EXISTING GRADE,
SEE CIVIL DWGS
PRECAST WALL
PANEL BEYOND
WALL FOOTING WF-9, SEE
PLAN AND SCHEDULE,
EXTEND HORIZ-BARS 2'-6"
INTO ADJACENT
FOUNDATION WALLS
(2)#5
#5x AT 12" TOP
REINF SEE PLAN
#5 AT12" BOTTOM
TRENCH DRAIN
GRATING, SEE
MECH DWGS
CJ-1, SEE PLAN
A1
S-504
8" FOUNDATION WALL AND
CORBEL PER
SIM
(2) #4
CONT
2'-6"
#5x AT 12" 2'-6" 2'-6"
#5 AT 12" BOTTOM
2'-6"
(2) #4 CONT
ADDED #4x
SEE PLAN
24" 4'-6"
PAVING, SEE
CIVIL DWGS
V A
R
IE
S 6"
#5 AT 12"
GALV. L1 1/2x1 1/2x3/16 OR AS
REQD BY TRENCH DRAIN
GRATING MANUFACTURER,
WITH 1/2"ø x 6" WELDED
HEADED SHEAR STUDS AT 12",
TYP
#5x AT 12"
BOTTOM
2'-6"
PRECAST
DOUBLE TEE
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:2 A
M
/1
/2
:3
:2
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-506
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" C3
SECTION
3/4" = 1'-0" A1
SECTION
3/4" = 1'-0" A3
SECTION
3/4" = 1'-0" B3
SECTION
0 1 2 4 0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
C M
0 1 2 4
0 1 2 4
A
SECOND FLOOR
3" CONCRETE TOPPING
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
PRECAST WALL PANEL
PRECAST INVERTED
TEE, SEE PLAN
POUR STRIP
1" JOINTS
PRECAST COLUMN
WITH CORBEL PER
A1
S-608
CHORD REINF, SEE PLAN
DOWELS WITH
MECHANICAL COUPLER,
SEE PLAN
SLOPED TOPPING
A
THIRD FLOOR
3" CONCRETE TOPPING
1/2" BEARING PAD
PRECAST WALL PANEL
POUR STRIP
1" JOINT
CHORD REINF, SEE PLAN
DOWELS WITH
MECHANICAL COUPLER,
SEE PLAN
24" DOUBLE TEE,
SEE PLAN
PRECAST INVERTED
TEE, SEE PLAN
PRECAST COLUMN
WITH CORBEL PER
A1
S-608
#4 CONT
#3
AT18"
1'-0"
SLOPED TOPPING
A
FOURTH FLOOR
3" CONCRETE
TOPPING
1/2" BEARING PAD
CHORD REINF,
SEE PLAN
SLOPED TOPPING
PRECAST WALL PANEL
POUR STRIP
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
PRECAST WALL PANEL
24" DOUBLE TEE,
SEE PLAN
PRECAST INVERTED
TEE, SEE PLAN
PRECAST COLUMN
WITH CORBEL PER
A1
S-608
TOP OF PARAPET
6"
SLOPE 1/2"
4' -0
A
SECOND FLOOR
3" CONCRETE TOPPING
PRECAST WALL PANEL
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
PRECAST WALL PANEL
COLUMN BEYOND
PRECAST INVERTED
TEE BEYOND
PRECAST COLUMN
WITH CORBEL BEYOND
POUR STRIP
1" JOINT
2' -0
2'
-1
1/ 2"
8" 8"
L SIM
CHORD REINF, SEE PLAN
DOWELS WITH
MECHANICAL COUPLER,
SEE PLAN
C1
S-509
6"
SLOPED TOPPING
A
THIRD FLOOR
3" CONCRETE TOPPING
PRECAST WALL PANEL
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
PRECAST WALL PANEL
COLUMN BEYOND
PRECAST INVERTED
TEE BEYOND
PRECAST COLUMN
WITH CORBEL BEYOND
POUR STRIP
2' -0
2'
-1
1/ 2"
V A
R
IE
S
L SIM
CHORD REINF, SEE PLAN
1" JOINT
DOWELS WITH
MECHANICAL COUPLER,
SEE PLAN
C1
S-509
6"
#4 CONT
#3
AT18"
1'-0"
SLOPED TOPPING
A
FOURTH FLOOR
3" CONCRETE
TOPPING
SLOPED TOPPING
PRECAST WALL PANEL
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
PRECAST WALL PANEL
COLUMN BEYOND
PRECAST INVERTED
TEE BEYOND
PRECAST COLUMN
WITH CORBEL BEYOND
POUR STRIP
3' -5
L SIM
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
TOP OF PARAPET
6"
SLOPE 1/2"
4' -0
A
FOURTH FLOOR
3" CONCRETE
TOPPING
SLOPED TOPPING
24" DOUBLE TEE,
SEE PLAN
PRECAST WALL PANEL
POUR STRIP
3' -5
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
TOP OF PARAPET
X PLAN
X
6" 6"
1' -4
8" 4"
(3) #4 VERT
#4 TIES AT 12" AND
(2) #4 TIES AT TOP 5"
LIGHT POLE
BASE ABOVE
4' -0
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:3 A
M
/1
/2
:3
:3
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-508
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" C2
SECTION AT COLUMN
3/4" = 1'-0" C3
SECTION AT COLUMN
3/4" = 1'-0" C4
SECTION AT COLUMN
3/4" = 1'-0" A2
SECTION
3/4" = 1'-0" A3
SECTION
3/4" = 1'-0" A4
SECTION
0 1 2 4 0 1 2 4 0 1 2 4
0 1 2 40 1 2 40 1 2 4
3/4" = 1'-0" C5
SECTION AT LIGHT POLE
0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
3" CONCRETE TOPPING
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE SCHEDULE
FOR REINFORCING
PRECAST WALL PANEL BEYOND
SLOPED TOPPING
1" J
O
IN
T
2' -1
1/
2" 2'
-0
8" 8" 8" #5 TIES AT 8"
1 i
C1
S-509
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
PRECAST WALL PANEL BEYOND
THIRD FLOOR
3" CONCRETE TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE SCHEDULE
FOR REINFORCING
1" BEVEL
V A
R
IE
S 2'
-1
1/ 2"
2' -0
1" J
O
IN
T SLOPED TOPPING
8" 8" 8"
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
PRECAST WALL PANEL BEYOND
C1
S-509
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
#5 TIES AT 8"
PRECAST WALL PANEL BEYOND
#4 CONT
#3
AT18"
1'-0"
FOURTH FLOOR
2' -1
1/
2"
3" CONCRETE
TOPPING
SLOPED TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE SCHEDULE
FOR REINFORCING
8"8"
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
#5 TIES AT 8"
PRECAST WALL PANEL BEYOND
TOP OF PARAPET
SLOPE 1/2"
4' -0
SECOND FLOOR
3" CONCRETE TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE SCHEDULE
FOR REINFORCING
SLOPED TOPPING
1" J
O
IN
T
2' -1
1/
2" 2'
-0
8"
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
#5 TIES AT 8"
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
8"8"
THIRD FLOOR
3" CONCRETE TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL, SEE SCHEDULE
FOR REINFORCING
V A
R
IE
S 2'
-1
1/ 2"
2' -0
SLOPED TOPPING
8" 8" 8"
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
#5 TIES AT 8"
#4 CONT
#3
AT18"
1'-0"
FOURTH FLOOR
2' -1
1/
2"
3" CONCRETE
TOPPING
SLOPED TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL BEYOND
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
#5 TIES AT 8"
TOP OF PARAPET
4' -0
TOP BARS; SEE
SCHEDULE
EPOXY COATED
RAILING, SEE ARCH DWGS
GROUT SOLID WITH CROWN
PRECAST WALL
BLOCKOUT FOR
RAILING
FOURTH FLOOR
3" CONCRETE TOPPING
SLOPED TOPPING
1/2" BEARING PAD
4" DAP
12" CORBEL,SEE SCHEDULE
FOR REINFORCING
1 i
PRECAST WALL PANEL, SEE
ELEVATIONS AND SCHEDULE
24" DOUBLE TEE,
SEE PLAN (BEYOND)
CHORD REINF,
SEE PLAN
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
#5 TIES AT 8"
TOP OF PARAPET, SEE ARCH DWGS
X
X PLAN
6" 6"
1" J
O
IN
T 1'
-4
8" 4"
(3) #4 VERT
EPOXY COATED
#4 TIES AT 12" AND
(2) #4 TIES AT TOP 5"
EPOXY COATED
LIGHT POLE
BASE ABOVE
8" 8"
WALL PANEL BARS EXTENDING
INTO THE LIGHT POLE BASE
SHALL BE EPOXY COATED
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
A s i n d ic a te d
/1
/2
:3
:3 A
M
/1
/2
:3
:3
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-509
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" C3
SECTION
3/4" = 1'-0" C4
SECTION
3/4" = 1'-0" C5
SECTION
3/4" = 1'-0" A3
SECTION
3/4" = 1'-0" A4
SECTION 3/4" = 1'-0"
A5
SECTION
1 1/2" = 1'-0" C1
DETAIL AT RAILING
0 1 2 40 0.5 1 2 0 1 2 4 0 1 2 4
0 1 2 40 1 2 40 1 2 4
3/4" = 1'-0" A1
SECTION AT LIGHT POLE
0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
H G
4'-0" 8'-0" INTERVALS, TYP4'-0"8'-0" INTERVALS, TYP
4'-0" 4'-0"
C TEELC TEEL C TEEL C TEEL C TEEL
24" DOUBLE TEE,
SEE PLAN, TYP
12" DOUBLE TEE,
SEE PLAN, TYP
DROP DOUBLE TEE TO MAINTAIN
MINIMUM TOPPING THICKNESS
SLOPE TOPPING AT
FOURTH FLOOR (3" MIN)
3" MIN CONCRETE TOPPING, TYP
3" MIN CONCRETE TOPPING, TYP
ADDED BARS,
TYP PER PLAN
ADDED BARS,
TYP PER PLAN
ADDED BARS,
TYP PER PLAN
8'-0" INTERVALS, TYP
SEE ARCH DWGS SEE ARCH DWGS
B3
S-604
SIM
8" CMU WALL, AT
BASEMENT LEVEL
BEND ANGLE, TYP
D C
FIRST FLOOR
4'-0" 8'-0" INTERVAL, TYP 8'-0" 4'-0" 4'-0" 4'-0" 4'-0"
C TEEL C TEEL C TEEL C TEEL C TEEL
SEE ARCH DWGS SEE ARCH DWGS
3" MIN CONCRETE TOPPING, TYP
ADDED BARS,
TYP PER PLAN
ADDED BARS,
TYP PER PLAN
24" DOUBLE TEE,
SEE PLAN, TYP
12" DOUBLE TEE,
SEE PLAN, TYP
FOURTH FLOOR
12" DOUBLE TEE, SEE PLAN
PRECAST PARAPET WALL, SEE
ELEVATIONS AND SCHEDULE
1' -0
CONCRETE POUR STRIP
CONCRETE TOPPING
DOWELS WITH MECHANICAL
COUPLER, SEE PLAN
CHORD REINF,
SEE PLAN
#4 x4'-0" AT 18"
SLOPE 1/2"
4' -0
C
THIRD FLOOR
RAMP
12" DOUBLE TEE,
SEE PLAN, TYP
24" DOUBLE TEE,
SEE PLAN, TYP
(2) #4x EPOXY COATED
4" M
IN
16" 16"
#4x AT 12" EPOXY COATED 16" 16"
TRENCH DRAIN PER
MECH. DWG AND
DETAIL
C4
M-502
FOURTH FLOOR
CONTINUOUS "TOOLED" JOINT
IN TOPPING PER
C1
S-610
1/
2"
CONCRETE
TOPPING
12" PRECAST CONCRETE
WALL PANEL BEYOND
1/2"ø STEEL CABLE
CABLE ANCHOR
TURNBUCKLE
CORBEL AT PRECAST
WALL BEYOND
24" DOUBLE TEE,
SEE PLAN
12" DOUBLE TEE,
SEE PLAN
#4 TIES AT 12"
(2) #5 TOP
AND BOTTOM
ADDED BARS,
SEE PLAN
12"x12" PRECAST
CONCRETE BEAM,
CONNECTION TO WALL
PANELS BY PRECAST
MANUFACTURER
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
B R
I A N
C M U R D
O C
K
PROFESSIONAL
ENGINEER
H
AW
IA ,I U S.
A.
LICENSED
No. 11208-S
SHEET
IDENTIFICATION
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
D B
Y
US Army Corps of Engineers ® x
D
C
B
A
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
SHEET OF
EXPIRATION DATE OF THE LICENSE 4/30/2016
/4
/1
/2
:3
:3 A
M
/1
/2
:3
:3
A
M
L R
E V
IT
B
A C
K U
P S
\R e v it
\2
.0
-K A
I_ s b S
B H
C -P a rk in g
-S tr u c tu re R
S
T R
U C
T -C e n tr a l_ ta m a n a h a .r v t
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
A W
A
II
N
O V
R
T A
B C
M
L J C
B C
M
S-511
H O
N O
L U
L U
D
IS
T R
IC
T
F T
S H
A F
T E
R H
A W
A
II
D E
S
IG
N B
R A
N C
H B
U
IL
D
IN
G
F T
S H
A F
T E
R H
I
-5
J K
P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
S B
H C
P A
R K
IN
G
S T
R U
C T
U R
E
S -5
3/4" = 1'-0" B1
TOP OF RAMP DETAIL
3/4" = 1'-0" A1
BOTTOM OF RAMP DETAIL
3/4" = 1'-0" C4
S-511_C4 RAMP PARAPET SECTION
3/4" = 1'-0" C2
SECTION AT TRENCH DRAIN
0 1 2 4
0 1 2 4
0 1 2 4 0 1 2 4
3/4" = 1'-0" C1
SECTION
0 1 2 4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
L A
R
IF
IC
A
T
IO
N S
/2
/2
B
DOWELS WITH
MECHANICAL
COUPLER, SEE PLAN
GRAVEL, SEE PLAN
VOID SPACE
TOP OF FOOTING
6" M
IN
CONCRETE TOPPING
12" DOUBLE TEE,
SEE PLAN
STEEL CORBEL AT
PRECAST WALL BEYOND
12" PRECAST CONCRETE
WALL BEYOND
8" CAST-IN-PLACE
CONCRETE WALL
STEEL CABLE
TURNBUCKLE
CABLE ANCHOR
#4 AT 12"
#4 AT 12"
(2) #5 WITH HORIZ DOWELS
TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .