Attachment 4 - Drawings 09 Fire Protection.pdf

PDF 719 KB Posted

Attached to
Eglin NICoE Initial Outfitting Project
Solicitation number
W9127S20Q6000
Issued by

About this file

This is a combined synopsis and solicitation for an initial outfitting project at the Eglin National Intrepreneurship Center of Excellence (NICoE). The solicitation requests quotes for construction and installation services including fire protection and alarm systems. Quotes are due by January 8, 2020. A mandatory site visit is scheduled for December 4, 2019 at Eglin Air Force Base. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses with a NAICS code of 337127 and size standard of 500 employees. The solicitation will use simplified acquisition procedures under FAR Part 13 in conjunction with commercial item procedures under FAR Part 12. More information on base access for the site visit must be provided by interested contractors by November 29, 2019. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Little Rock.

View the file

Other files

File Type Posted
Amendment 2 Attachment 9 - Sound_Masking_Systems (ProjNet ID 8304607).pdf PDF
Amendment 2 Attachment 11 - ProjNet Questions_Answers.pdf PDF
Amendment 2 Attachment 2A - Cut Sheets (Salient Features_Specs).pdf PDF
W9127S20Q6000 AMENDMENT 0002.pdf PDF
Amendment 2 Attachment 1 - Bid Schedule.xlsx XLSX spreadsheet
Amendment 2 Attachment 8 - ESS_Video_Surveillance_VSS (ProjNet ID 8304557).pdf PDF
Amendment 2 Attachment 10 - Site Visit Sign-In.pdf PDF
Amendment 2 Attachment 3A - Project Room Contents_25Dec2019.pdf PDF
Amendment 1 Attachment 3 - Project Room Contents.pdf PDF
W9127S20Q6000 Amendment 0001.pdf PDF
Amendment 1 Attachment 1 - Bid Schedule (Amendment 01).xlsx XLSX spreadsheet
Amendment 1 Attachment 4 - Eglin Invisible Wounds Clinic (IWC)_As-Built Drawings.pdf PDF
Amendment 1 Attachment 2 - Cut Sheets (Salient Features_Specs).pdf PDF
Attachment 3 - Project Room Contents_15Nov2019.pdf PDF
Attachment 4 - Drawings Specifications Vol 1.pdf PDF
Attachment 4 - Drawings 03 Landscape Arch.pdf PDF
Attachment 4 - Drawings 04 Structure.pdf PDF
Attachment 4 - Drawings Specifications Vol 2.pdf PDF
Attachment 4 - Drawings 01 General.pdf PDF
W9127S20Q6000 - Combined Synopsis Solicitation NICoE - Eglin AFB IO Project.pdf PDF
Attachment 5 - Reuse List.xlsx XLSX spreadsheet
Attachment 7 - IO&T Submittal Examples.pdf PDF
Attachment 6 - DMLSS RPIE List.xls XLS spreadsheet
Attachment 4 - Drawings 02 Civil.pdf PDF
Attachment 4 - Drawings 11 Technology.pdf PDF
Attachment 4 - Drawings 07 Plumbing.pdf PDF
Attachment 4 - Drawings FFE.pdf PDF
Attachment 4 - Drawings 05 Architecture.pdf PDF
Attachment 4 - Drawings FURNITURE.pdf PDF
Attachment 1 - Bid Schedule.xlsx XLSX spreadsheet
Attachment 4 - Drawings 06 Mechanical.pdf PDF
Attachment 4 - Drawings MEDICAL EQUIPMENT.pdf PDF
Attachment 4 - Drawings 08 Fire Alarm.pdf PDF
Attachment 2 - Cut Sheets.pdf PDF
Attachment 4 - Drawings 10 Electrical.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SPRINKLER SYSTEM DESIGN CRITERIA:

a. LIGHT HAZARD OCCUPANCY - PATIENT ROOMS, ADMINISTRATIVE AREAS, COMPUTER ROOMS, ETC.

b. ORDINARY HAZARD OCCUPANCY - HOUSEKEEPING, CLEAN/SOILED UTILITIES, LOCKER ROOMS, STORAGE AREAS, MECHANICAL AND ELECTRIC ROOMS AND SIMILAR AREAS WHERE STOCKPILES OF COMBUSTIBLE

MATERIALS DO NOT EXCEED 8'-0".

c. MINIMUM SCHEDULE 40 STEEL PIPING SHALL BE USED.

2. SYSTEM PROTECTION AREA LIMITATIONS:

a. THE MAXIMUM FLOOR AREA ON ANY ONE FLOOR TO BE PROTECTED BY SPRINKLERS SUPPLIED BY ANY ONE SPRINKLER RISER OR COMBINED SYSTEM SHALL BE 52,000 SQ FT FOR LIGHT AND ORDINARY HAZARD.

3. SPRINKLER DESIGN DENSITIES/DEMAND CRITERIA:

a. LIGHT HAZARD - 0.10 GPM PER SQ FT OVER THE HYDRAULICLLY MOST REMOTE 2500 SQ FT.

b. ORDINARY HAZARD GROUP 1 - 0.2 GPM PER SQ FT OVER THE HYDRAULICLLY MOST REMOTE 2500 SQ FT.

c. DESIGN AREA REDUCTIONS ARE NOT PERMITTED.

d. HYDRAULIC CALCULATIONS SHALL INCLUDE A MINIMUM PRESSURE DROP OF 12 PSI ACROSS THE BACKFLOW PREVENTER ASSEMBLY.

e. HOSE STREAM ALLOWANCE SHALL BE 250 GPM FOR LIGHT AND ORDINARY HAZARD.

f. SPRINKLER K-FACTOR SHALL BE MINIMUM 5.6 FOR LIGHT HAZARD AND 8.0 FOR ORDINARY HAZARD.

g. NO DESIGN AREA REDUCTION ASSOCIATED WITH QUICK RESPONSE SPRINKLERS IS PERMITTED.

DESIGN PARAMETERS

TS

WF

NSFIRE PROTECTION PIPING

FIRE HOSE VALVE

FIRE HOSE VALVE IN CABINET

THROUGH THE WALL, FIRE DEPARTMENT CONNECTION

FREE STANDING, FIRE DEPARTMENT CONNECTION

(SIAMESE)

FIRE PUMP TEST HEADER

VALVE SUPERVISORY SWITCH, TAMPER

ALARM CHECK VALVE

DRY PIPE VALVE

DELUGE VALVE

PRE-ACTION VALVE

FLOW SWITCH

(SIAMESE)

BACKFLOW PREVENTER

OS&Y VALVE

CHECK VALVE

INSPECTOR'S TEST CONNECTION

POST INDICATING VALVE

POINT OF DISCONNECT

POINT OF CONNECTION

ELBOW - TURNED DOWN

CAP OR PLUG

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AMBIENT

AMERICAN NATIONAL STANDARDS

APPROXIMATE

BACKFLOW PREVENTER (TYPE AS

INDICATED)

BOTTOM OF PIPE

BRITISH THERMAL UNIT PER HOUR

BALL VALVE

CUBIC FEET PER MINUTE

CAST IRON

COMPRESSOR

CONDENSATE

CONTINUATION

CHECK VALVE

DOWN

DRAWING

EACH

EFFICIENCY

ELEVATION

EXPANSION TANK

ENTERING WATER TEMPERATURE

EXPANSION

EXTERNAL

EXISTING MATERIAL OR EQUIPMENT

NIC NOT IN CONTRACT

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

ACCESS PANEL

AMERICANS WITH DISABILITIES ACT

ABBREVIATION

BRAKE HORSEPOWER

CAPACITY

DIAMETER

EQUIVALENT

N.C. NORMALLY CLOSED

NA NOT APPLICABLE

N.O. NORMALLY OPEN

DOMESTIC

OS&Y OUTSIDE SCREW AND YOKE

AFF

AFG

AMB

ANSI

APPROX

BFP

BOP

BTU/H

BV

CFM

CI

COMP

COND

CONT

CV

DN

DWG

EA

EFF

EL

ET

EWT

EXP

EXT

(E)

AP

ADA

ABBR

BHP

CAP.

DIA

EQ

DOM

LIGHT HAZARD SPRINKLER DENSITY CLASSIFICATION

ORDINARY HAZARD 1 SPRINKLER DENSITY CLASSIFICATION

EXISTING ROOM/AREA SPRINKLER SYSTEM TO

REMAIN. NO NEW WORK.

FIRE

FAN COIL UNIT

FLOOR

FEET PER MINUTE

FEET OR FOOT

GALLON

GALLONS PER MINUTE

GATE VALVE

HEIGHT

HORSE POWER

HIGH PRESSURE STEAM

HOUR

DEGREES IN FAHRENHEIT

FEET PER SECOND

GALLONS PER HOUR

GALLONS PER DAY

MERCURY

FIRE HOSE VALVE

FLOW SWITCH

HYDRAULIC GRADE LINE

F

FCU

FL

FPM

FT

GAL

GPM

GV

HGT

HP

HPS

HR

%%U %%U°F

FPS

GPH

GPD

HG

FHV

FS

HGL

INSIDE DIAMETER

INVERT ELEVATION

IN. INCHES

KW KILOWATTS

LGT LENGTH

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1000 BTU/HR

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

MTG MOUNTING

IE

ID

WHERE ANY CONFLICT AND/OR DISCREPANCY BETWEEN THESE GENERAL NOTES AND ANY OTHER INFORMATION CONTAINED IN THE CONTRACT DOCUMENTS EXISTS, THE MORE STRINGENT REQUIREMENT SHALL PREVAIL AND BE A REQUIREMENT OF THE WORK. THAT NOTWITHSTANDING, ANY SUCH CONFLICT AND/OR DISCREPANCY SHALL PROMPTLY BE BROUGHT TO THE ATTENTION OF THE OWNER, ARCHITECT AND ENGINEER.

THE TERM “PROVIDE” SHALL MEAN FURNISH, INSTALL AND CONNECT EQUIPMENT/DEVICE FOR A COMPLETE AND OPERATIONAL SYSTEM.

THE TERM “REMOVE” SHALL MEAN DISCONNECT AND CLEAR EQUIPMENT/DEVICE FROM SITE, AS WELL AS MAINTAINING UPSTREAM AND DOWNSTREAM EQUIPMENT/DEVICES AS REQUIRED.

THE CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INTENDED TO SHOW DESIGN INTENT ONLY.

PROVIDE A COMPLETE HYDRAULICALLY- CALCULATED AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING, INCLUDING BUT NOT LIMITED TO WATERFLOW ALARM SWITCHES, VALVE SUPERVISORY SWITCHES, CHECK VALVES, CONTROL VALVES, PIPING, HANGERS, SPRINKLERS, ALL ASSOCIATED EQUIPMENT, WIRING AND APPURTENANCES, NORMALLY AND CUSTOMARILY REQUIRED, WHETHER INDICATED OR INHERENTLY NECESSARY DUE

TO THE NATURE OF THE WORK, FOR A COMPLETE AND OPERATIONAL SYSTEM.

SPRINKLER PIPING INDICATED ON THE CONTRACT DOCUMENTS IS SHOWN FOR DESIGN INTENT ONLY AND IS SUBJECT TO THE PRECEDING NOTE. RUN ALL PIPING STRAIGHT AND TIGHT TO THE FACE OF STRUCTURAL MEMBERS AND WALLS, PARALLEL AND AT RIGHT ANGLES TO STRUCTURAL STEEL OR CONCRETE ELEMENTS.

ALL WORK SHALL CONFORM TO THE APPLICABLE PROVISIONS OF THE UNITED FACILITIES CRITERIA, THE EGLIN AIR FORCE BASE ENGINEERING DESIGN MANUAL (APPENDIX 2, EGLIN SPECIFIC FIRE SUPPRESSION REQUIREMENTS), AMENDED CODE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING JURISDICTION, UFC 3-600-01, AND THE REFERENCED EDITIONS OF NFPA 13, 14, 20, 70 AND 72 . WHERE THERE ARE ANY CONFLICTS IN

REQUIREMENTS, THE MOST STRINGENT REQUIREMENTS SHALL BE APPLIED.

VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE PRIOR TO PROCEEDING WITH THE WORK .

COORDINATE ALL WORK AND AVOID ALL CONFLICTS WITH LIGHTING FIXTURES, DIFFUSERS, GRILLS, DUCTS, STRUCTURAL MEMBERS, PIPES AND OTHER OBSTRUCTIONS .

NO STRUCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED UNLESS PREVIOUSLY APPROVED BY OWNER. FURTHER, ANY APPROVED CUTTING OR PATCHING OF ANY STRUCTURAL WORK SHALL NOT RESULT IN A REDUCTION OF LOAD-CARRYING AND/OR LOAD-DEFLECTION RATIO. PRIOR TO SUCH WORK, OBTAIN APPROVAL FROM THE OWNER.

ALL WALL AND FLOOR PENETRATIONS SHALL BE CORE-DRILLED. PROVIDE PIPE SLEEVES FOR WALL AND FLOOR PENETRATIONS AS INDICATED IN THE SPECIFICATIONS. ALL PENETRATIONS IN WALLS, CEILINGS AND FLOORS SHALL BE SEALED TO THE FULL THICKNESS OF THE PENETRATION WITH APPROVED FIRESTOPPING MATERIAL OF EQUAL OR GREATER FIRE RESISTANCE. ALL (CORRIDOR, ROOM SEPARATION, AND SLAB-TO-SLAB WALLS SHALL BE CONSIDERED TO BE OF 1-HOUR FIRE RESISTIVE RATED CONSTRUCTION. STAIRWAYS, SHAFT ENCLOSURES, AND FLOOR SLABS SHALL BE CONSIDERED 2-HOUR FIRE RESISTIVE RATED CONSTRUCTION .

ALL DAMAGE TO WALLS, CEILINGS, FLOORS, AND STRUCTURAL MEMBERS FROM THE WORK SHALL BE PATCHED, REPAIRED AND PAINTED WITH NEW MATERIALS TO MATCH ADJACENT WORK, WHETHER SPECIFICALLY NOTED

OR NOT .

AS A MINIMUM, MAINTAIN 6 FT 8 INCH HEAD ROOM CLEARANCE BETWEEN BOTTOM OF SPRINKLER PIPE AND ADJACENT FLOOR, INCLUDING STAIRWELLS .

CONTRACTOR TO PROVIDE CONCEALED PENDENT SPRINKLERS THROUGHOUT THE BUILDING EXCEPT IN SPACES WITHOUT CEILINGS WHERE UPRIGHT BRASS SPRINKLERS SHALL BE PROVIDED. CONTRACTOR TO PROVIDE

BLACK ESCUTCHEON AND BLACK COVER PLATES IN MAIN CORRIDOR/LOBBY IN WOOD CEILINGS.

LOCATE SPRINKLERS ON CENTER OF ACOUSTICAL CEILING TILE.

CONTRACTOR TO PROTECT THE SPRINKLER SYSTEM IN ACCORDANCE WITH SEISMIC CRITERIA FOUND IN ASCE 7.1 AND NFPA 13.

DO NOT ROUTE SPRINKLER PIPING DIRECTLY OVER ELECTRICAL PANELS OR EQUIPMENT. DO NOT ROUTE SPRINKLER PIPING THROUGH ELECTRICAL ROOMS; BRANCH LINES SHOULD TERMINATE IN ELECTRICAL ROOMS.

FIRE SUPPRESSION SYSTEMS INSPECTOR'S TEST VALVES SHALL NOT BE MOUNTED ANY HIGHER THAN 72 INCHES ABOVE FINISHED FLOOR.

ALL CHECK VALVES OVER 2 INCHES MUST HAVE A COVER PLATE FOR MAINTENANCE WITHOUT REMOVING THE CHECK VALVE ASSEMBLY FROM THE PIPING SYSTEM.

WHEN PIPE THREAD SEALANT IS USED, USE A NON-PETROLEUM BASED PRODUCT. OIL RESIDUALS HAVE BEEN FOUND ON HEADS FROM THE OIL SEPARATING FROMT THE BASE OF THE THREAD SEALANT.

THE INSPECTOR'S TEST VALVE SHALL BE LOCATED IN THE MOST HYDRAULICALLY REMOTE PORTION OF THE BUILDING.

A

B

C

D

E

F

G

H

I

K

L

M

N

P

PRESS. PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH - GAUGE

REF REFERENCE

RL RELOCATED MATERIAL OR EQUIPMENT

RPM REVOLUTIONS PER MINUTE

SCFM STANDARD CUBIC FEET PER MINUTE

SE SEWAGE EJECTOR

SF SQUARE FEET

SG SPECIFIC GRAVITY

SS STAINLESS STEEL

STM STEAM

TEMP TEMPERATURE

TYP TYPICAL

VEL VELOCITY

W/ WITH

WG WATER GAUGE

W/0 WITHOUT

PH PHASE (ELECTRICAL)

PPM PARTS PER MILLION

SPEC SPECIFICATION

SQ. FT. SQUARE FEET

STD STANDARD

UON UNLESS OTHERWISE NOTED

V VOLT

YD YARD

SPRINKLER/ STANDPIPE

SPRINKLERSPR

SPR/STP

TAMPER SWITCHTS

O

R

S

T

U

V

W

Y

REFERENCE SYMBOLS

FIRE PROTECTION GENERAL NOTESFIRE PROTECTION FLOOR PLAN SYMBOLSFIRE PROTECTION ABBREVIATIONS

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

RISER DESIGNATION (TYPE AS INDICATED)

SECTION NUMBER

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

E1-1.0

E1-1.0

KEY NOTE 1 DEMO KEY NOTE

PRESSURE GAUGE

SECTION VIEWS

KEYED NOTES

FLOW TEST AND SITE INFORMATION

ROOF

EL +14' - 0"

T.O. BRICK

EL +16' - 0"

ROOF PLAN

14'-0"

FP206FP206

ROOF

14' - 0"

H.P. ROOF DECK - WEST

18' - 0"

T.O. CURTAIN WALL

18' - 8"

T.O. BRICK

16' - 0"

AA.7 A.2A.9 0.9A

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

As indicated

1/ 4/

2:

:2

PM FIRE PROTECTION

ABBREVIATIONS AND

SYMBOLS

FP0.1

10822.000

SCALE: 3/16" = 1'-0"

CENTRAL PARK SPRINKLER SECTION

FP206 PROVIDE INTERMEDIATE TEMPERATURE-RATED HORIZONTAL SIDEWALL SPRINKLERS TO PROTECT SKYLIGHT. EXACT LOCATION OF SIDEWALL SPRINKLER SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS.

SCHEMATIC DESIGN 8.17.2018

DESIGN DEVELOPMENT 11.08.2018

CONTRACT DOCUMENTS 01.04.2019

FP0.1

OH-1

OH-1

OH-1

OH-1

OH-1

OH-1

FP201

FP202

FP204

FP206FP206 FP207

TLT/ SHR

218.2

CHANGING / LOCKER (M)

CHANGING / LOCKER (W)

VESTIBULE

MECHANICAL

ELEC

SOIL UTIL

TREATMENT IPMC

DAYROOM

COMM

SOIL UTIL

NEUROLOGIST

PUBLIC WAITING

C101

WORKSTATION PT

201PT GYM

CORRIDOR

C300

CORR

C200

TLT/ SHR

218.1

CORR

C302

CORR

C305

CORR

C304

CORR

C306

CORR

C303

CORR

C301

CORR

C201

CORR

C202

CASE MGMT

MAT / PLATFORM

GAIT OBS LANE

EQPT STOR

PC MD

CLEAN UTIL

NEURO REHAB AREA

CORR

C102.1

FAMILY WAITING

CENTRAL PARK

MAIN CORRIDOR / LOBBY

C100

NUTRITIONIST

EYE TESTING

SPEECH THERAPY - TESTING

SPEECH THERAPY - OFFICE

EXAM

SCALE

C306.1

PAT TLT

STAFF TLT

EXAM

CLINICAL PHARMACIST

GROUP THERAPY

TEAM ROOM

PSYCH TECH

EXAM

HOUSEKEEPING

PAT TLT

PSYCH TECH

FLEX STORAGE

BRAIN LAB

ELEC

TRANS-CRANIAL MAGNETIC STIM

COMM

ACUPUNCTURE

341.1

SPIRITUAL COUNSELLING

NP PSYCH

NEUROPSYCH

ACUPUNCTURE

341.2

BH / SW PROVIDERS

BH / SW PROVIDERS

PAIN MD

PSYCHOLOGIST

CHIRO TREATMENT

CASE MGMT

STAFF LOUNGE

EXAM

EXAM

BH / SW PROVIDER

MUSIC THERAPY

CHIRO TREATMENT

RECEPTION

PTNT INTAKE CUBICLES

300.1

CASE MGMT

ART AND CLAY THERAPY

MALE TOILET

FEMALE TOILET

HOUSEKEEPING

MULTI-STATION TREATMENT RM

PT O/E

OT O/E

TRAZER / FATS

COPY

109.1

OT O/E

DAILY LIVING SKILLS

EXAM

BREAK ALCOVE

105.1

RESEARCH SHARED OFFICE

NCOIC / ADMIN

NICoE DIR.

DIR. OF OPERATIONS

AV SUPPLY

CLASSROOM

103.1

CHAPLAIN

VENDING ALCOVE

106.1

EXAM

EYE LANE

EXAM

STAFF TLT

CLASSROOM

CORR

C102

BIO NEUROFEEDBACK

GROUP THERAPY

335.1

STORAGE / KILN

338.1

CHECK-IN KIOSK

300.2

STORAGE / ALCOVE

200.1

EQPT STOR

OH-1

PT O/E

OH-1

OH-1

TLT / SHR

219.1

123456789

B

C

D

E

F

A

0.4A

A.7

A.2

6.2 5.46.97.1 6.5 4.5 3.3 2.8

0.5A

0.2A

D.7

5.2

0.3A

8.6 8.3 6.8 6.4

4.8

A.9

0.7A

0.9A

B.2

E.8

FP209

ZCA

FP205

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

PLAN

NORTH

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

1/8" = 1'-0"

1/ 4/

2:

:3

PM GROUND FLOOR FIRE

PROTECTION PLAN

FP2.1

10822.000

SCALE: 1/8" = 1'-0"1 FIRE PROTECTION PLAN

GENERAL SHEET NOTES

A. SEE SHEET FP0.1 FIRE PROTECTION ABBREVIATIONS AND

SYMBOLS FOR ADDITIONAL INFORMATION.

B. ALL AREAS INDICATED BY DIAGONAL-DOWN HATCHING ARE TO

BE PROTECTED AS ORDINARY HAZARD GROUP 1 PER NFPA 13.

ALL OTHER AREAS ARE TO BE PROTECTED PER LIGHT HAZRD

REQUIREMENTS.

C. CONTRACTOR TO PROVIDE PENDENT SPRINKLERS, CONCEALED

WITH WHITE COVER PLATES, THROUGHOUT THE BUILDING

EXCEPT IN SPACES WITHOUT CEILINGS WHERE UPRIGHT BRASS

SPRINKLERS SHALL BE PROVIDED. CONTRACTOR TO PROVIDE

BLACK ESCUTCHEON AND BLACK COVER PLATES IN MAIN

CORRIDOR/LOBBY IN WOOD CEILINGS AS INDICATED BY

HORIZONTAL LINE HATCHING.

D. SPRINKLER CONTRACTOR TO AVOID ROUTING WET-PIPE OVER

VAVS OR ELECTRONIC EQUIPMENT/PANELS.

E. CONTRACTOR TO PROVIDE ELECTRONIC SUPERVISION OF

INDOOR FIRE BACKFLOW PREVENTER.

F. PROVIDE A BOX AND A COPY OF ALL FIRE SUPPRESSION O&M'S

NEAR RISER, MOUNTED TO A WALL.

SHEET KEYNOTES

FP201 LOCATION OF INCOMING 6-INCH FIRE

SERVICE LINE. CIVIL CONTRACTOR IS

RESPONSIBLE FOR COORDINATING ALL

PIPING LOCATED OUTSIDE OF THE

BUILDING. REFER TO CIVIL DRAWINGS

FOR EXACT LOCATION OF INCOMING

SERVICE.

FP202 PROVIDE AND INSTALL NEW 6-INCH

DOUBLE CHECK DETECTOR BACKFLOW

PREVENTER ASSEMBLY.

FP204 PROVIDE NEW THROUGH-THE-WALL

SIAMESE FIRE DEPARTMENT

CONNECTION (FDC) AND CHECK VALVE

WITH AN AUTOMATIC BALL DRIP. REFER

TO ARCHITECTURAL EXTERIOR

ELEVATION DRAWINGS FOR EXACT

LOCATION.

FP205 INSTALL ZONE CONTROL ASSEMBLY IN

THE VERTICAL RISER. ZONE CONTROL

ASSEMBLY SHALL CONSIST OF A

PRESSURE RELIEF VALVE, CHECK VALVE,

VALVE SUPERVISORY SWITCH, WATER

FLOW SWITCH, PRESSURE GAUGE, AND

INSPECTOR'S TEST AND MAIN DRAIN.

FP206 PROVIDE INTERMEDIATE

TEMPERATURE-RATED HORIZONTAL

SIDEWALL SPRINKLERS TO PROTECT

SKYLIGHT. EXACT LOCATION OF

SIDEWALL SPRINKLER SHALL BE

COORDINATED WITH ARCHITECTURAL

PLANS.

FP207 REFER TO ARCHITECTURAL REFLECTED

CEILING PLAN FOR DIRECTION ON

PLACEMENT OF SPRINKLERS IN AREA

INDICATED BY VERTICAL LINE HATCHING.

FP209 PROVIDE BLACK COVER PLATES IN

WOOD CEILINGS IN MAIN

CORRIDOR/LOBBY AS INDICATED BY

HORIZONTAL LINE HATCHING.

SCHEMATIC DESIGN 8.17.2018

DESIGN DEVELOPMENT 11.08.2018

CONTRACT DOCUMENTS 01.04.2019

FP0-1 - FIRE PROTECTION ABBREVIATIONS AND SYMBOLS
Sheets
FA0.1 - FIRE ALARM ABBREVIATIONS AND SYMBOLS
FA2.1 - GROUND FLOOR FIRE ALARM SYSTEMS PLAN
FP0.1 - FIRE PROTECTION ABBREVIATIONS AND SYMBOLS
FP2.1 - GROUND FLOOR FIRE PROTECTION PLAN
FP2-1 - GROUND FLOOR FIRE PROTECTION PLAN
Sheets
FA0.1 - FIRE ALARM ABBREVIATIONS AND SYMBOLS
FA2.1 - GROUND FLOOR FIRE ALARM SYSTEMS PLAN
FP0.1 - FIRE PROTECTION ABBREVIATIONS AND SYMBOLS
FP2.1 - GROUND FLOOR FIRE PROTECTION PLAN

File details come from the government source that posted it. Updated .