Attachment 4 - Drawings 07 Plumbing.pdf

PDF 1 MB Posted

Attached to
Eglin NICoE Initial Outfitting Project
Solicitation number
W9127S20Q6000
Issued by

About this file

This is a combined synopsis/solicitation for commercial items issued by the Department of the Army Corps of Engineers Engineering District Little Rock. The solicitation seeks quotes for the Eglin NICoE Initial Outfitting Project at Eglin Air Force Base in Florida. Quotes are due no later than January 8, 2020 by 1:00pm Central Time. A site visit is scheduled for December 4, 2019 at 9:00am Central Time at the Eglin Air Force Base West Visitors Center. Interested contractors must RSVP by November 29, 2019 with required contact information. The solicitation is set aside for total Service-Disabled Veteran-Owned Small Businesses and has a NAICS code of 337127 for the size standard of 500 employees. More information regarding entrance onto the base will be provided once attendance is confirmed. The solicitation will use simplified acquisition procedures in conjunction with commercial items procedures.

View the file

Other files

File Type Posted
Amendment 2 Attachment 10 - Site Visit Sign-In.pdf PDF
Amendment 2 Attachment 3A - Project Room Contents_25Dec2019.pdf PDF
Amendment 2 Attachment 2A - Cut Sheets (Salient Features_Specs).pdf PDF
W9127S20Q6000 AMENDMENT 0002.pdf PDF
Amendment 2 Attachment 1 - Bid Schedule.xlsx XLSX spreadsheet
Amendment 2 Attachment 8 - ESS_Video_Surveillance_VSS (ProjNet ID 8304557).pdf PDF
Amendment 2 Attachment 9 - Sound_Masking_Systems (ProjNet ID 8304607).pdf PDF
Amendment 2 Attachment 11 - ProjNet Questions_Answers.pdf PDF
Amendment 1 Attachment 2 - Cut Sheets (Salient Features_Specs).pdf PDF
Amendment 1 Attachment 3 - Project Room Contents.pdf PDF
W9127S20Q6000 Amendment 0001.pdf PDF
Amendment 1 Attachment 1 - Bid Schedule (Amendment 01).xlsx XLSX spreadsheet
Amendment 1 Attachment 4 - Eglin Invisible Wounds Clinic (IWC)_As-Built Drawings.pdf PDF
Attachment 1 - Bid Schedule.xlsx XLSX spreadsheet
Attachment 4 - Drawings 06 Mechanical.pdf PDF
Attachment 4 - Drawings 09 Fire Protection.pdf PDF
Attachment 4 - Drawings MEDICAL EQUIPMENT.pdf PDF
Attachment 4 - Drawings 08 Fire Alarm.pdf PDF
Attachment 2 - Cut Sheets.pdf PDF
Attachment 4 - Drawings 10 Electrical.pdf PDF
Attachment 4 - Drawings Specifications Vol 2.pdf PDF
Attachment 4 - Drawings 01 General.pdf PDF
W9127S20Q6000 - Combined Synopsis Solicitation NICoE - Eglin AFB IO Project.pdf PDF
Attachment 5 - Reuse List.xlsx XLSX spreadsheet
Attachment 7 - IO&T Submittal Examples.pdf PDF
Attachment 6 - DMLSS RPIE List.xls XLS spreadsheet
Attachment 4 - Drawings 02 Civil.pdf PDF
Attachment 4 - Drawings 11 Technology.pdf PDF
Attachment 4 - Drawings FFE.pdf PDF
Attachment 4 - Drawings 05 Architecture.pdf PDF
Attachment 4 - Drawings FURNITURE.pdf PDF
Attachment 3 - Project Room Contents_15Nov2019.pdf PDF
Attachment 4 - Drawings Specifications Vol 1.pdf PDF
Attachment 4 - Drawings 03 Landscape Arch.pdf PDF
Attachment 4 - Drawings 04 Structure.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ST

ST

V

SAN

SAN

G

HWR

HW

CW

F

PLUMBING PIPING LEGEND

PLUMBING ABBREVIATIONS PLUMBING FLOOR PLAN SYMBOLS PLUMBING GENERAL NOTES

UNDER SLAB SANITARY DRAIN

UNDER SLAB STORM DRAIN

SANITARY OR WASTE DRAIN

SANITARY VENT

NATURAL GAS (PRESSURE AS INDICATED)

STORM (RAINWATER) DRAIN

DOM HOT WATER RETURN

FIRE PROTECTION PIPING

DOM COLD WATER

DOM HOT WATER

(TEMP 110° OR AS INDICATED)

(TEMP 110° OR AS INDICATED)

DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL

AIR VENT WITH VALVE

WATER HAMMER ARRESTOR

ELBOW - TURNED UP

FLOW INDICATING BALANCE VALVE

PLUG VALVE or GAS COCK

BALL VALVE

BUTTERFLY VALVE

PRESSURE GAUGE WITH COCK

DIRECTION OF FLOW

BRANCH TOP CONNECTION

TEE OUTLET - DOWN

ELBOW - TURNED DOWN

QUICK COUPLING

FLOW METER

DROP OR RISE

CAP OR PLUG

THERMOMETER

PIPE ALIGNMENT GUIDE

REDUCER - ECCENTRIC

REDUCER - CONCENTRIC

FLOOR DRAIN (ROUND)

ROOF DRAIN

FLOOR CLEANOUT or EXTERIOR CLEANOUT

PIPE UNION

PIPE ANCHOR

HOSE BIBB

WALL HYDRANT

CLEANOUT

PRESSURE REGULATOR VALVE FLANGED

FLEXIBLE CONNECTION

MECHANICAL EXPANSION JOINT

BASKET STRAINER

PRESSURE RELIEF VALVE or

STRAINER

SOLENOID VALVE

BALANCING VALVE

ISOLATION VALVE or GATE VALVE

CHECK VALVE

ANGLE VALVE

POINT OF DISCONNECT

POINT OF CONNECTION

DESCRIPTIONDESCRIPTIONSYMBOL SYMBOL

BACKFLOW PREVENTOR (TYPE

AS

INDICATED BY ASSE STANDARD)

TEMP PRESSURE RELIEF VALVE

FLOOR DRAIN (RECTANGULAR)

HEAT TRACED PIPE

(SYSTEM AS INDICATED)

INSTALL ALL PLUMBING IN ACCORDANCE WITH THE 2012 INTERNATIONAL PLUMBING CODE AND REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION.

TO OBTAIN COMPLETE CONSTRUCTION INFORMATION ALL SPECIFICATIONS AND DRAWINGS (I.E. ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION) MUST

BE USED JOINTLY.

BRING TO THE ATTENTION OF THE ARCHITECT ANY INFORMATIONAL CONFLICTS WITHIN THE SPECIFICATIONS AND DRAWINGS. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK EXCEPT AT HIS OWN RISK UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING INFORMATION IS ISSUED TO THE CONTRACTOR BY THE ARCHITECT.

THE CONTRACTOR SHALL VERIFY AND COORDINATE THE LOCATION OF ALL STRUCTURAL MEMBERS BELOW FLOORS FOR ANY CONFLICTS WITH PIPING. THE CONTRACTOR WILL NOTIFY THE

ARCHITECT IMMEDIATELY IF A CONFLICT IS DETERMINED.

INSTALL ALL SANITARY AND STORM DRAINAGE PIPING 3" AND LARGER AT 1/8" PER FOOT SLOPE. INSTALL PIPING SMALLER THAN 3" AT 1/4" PER FOOT SLOPE.

PROVIDE CLEANOUTS WHERE INDICATED ON DRAWINGS AND WHERE REQUIRED BY THE APPLICABLE CODES.

INSTALL ALL SANITARY AND STORM PIPING WHICH TURNS AT A 90° ANGLE AFTER PASSING THROUGH A FLOOR AS TIGHT TO THE UNDERSIDE OF STRUCTURE AS POSSIBLE.

FIRE STOP ALL OPENINGS AROUND PIPES TO MAINTAIN THE REQUIRED FIRE RATING.

COORDINATE ALL PIPING INSTALLED WITH ALL OTHER TRADES (I.E. STRUCTURAL, MECHANICAL, ELECTRICAL AND FIRE PROTECTION) TO INSURE THAT ALL PIPING SYSTEMS ARE INSTALLED ABOVE FINISHED CEILING OR IN A CONCEALED LOCATION. ALL CEILING HEIGHTS ARE INDICATED ON THE ARCHITECTURAL AND/OR INTERIOR DESIGN DRAWINGS. MAINTAIN MINIMUM CLEARANCES REQUIRED

BY THE APPLICABLE CODES THROUGH OUT THE BUILDING.

PROVIDE FREEZE PROTECTION FOR ALL SANITARY TRAPS, WATER PIPING AND PUMPED DISCHARGE PIPING INSTALLED IN UNHEATED AREAS WITH ELECTRIC HEAT TRACE. INCLUDE ALL ACCESSORIES

FOR A COMPLETE SYSTEM, PROVIDE INSULATION AS INDICATED IN THE SPECIFICATION.

PROVIDE TRAP PRIMER VALVES AND DISTRIBUTION UNITS AS REQUIRED TO PROVIDE TRAP SEALS ON ALL FLOOR DRAINS INDICATED FOR TRAP PRIMING. INSTALL TRAP PRIMER VALVE AND

DISTRIBUTION UNITS LEVEL AND LOCATED IN AN ACCESSIBLE LOCATION.

PROVIDE WATER HAMMER ARRESTORS WHERE QUICK CLOSING VALVES ARE UTILIZED. LOCATE ARRESTORS AS PER PDI RECOMMENDATIONS AND IN AN ACCESSIBLE LOCATION.

INSTALL BACKFLOW PREVENTOR ASSEMBLIES IN AN ACCESSIBLE LOCATION AND IN ACCORDANCE WITH THE APPLICABLE CODES. PIPE RELIEF OUTLET DISCHARGE TO NEAREST FLOOR DRAIN.

PROVIDE AIR GAP FITTING AND FUNNEL AS REQUIRED.

IDENTIFY ALL PIPING SYSTEMS, VALVES AND EQUIPMENT AS INDICATED IN THE SPECIFICATION.

INSULATE ALL HORIZONTAL DRAINAGE PIPING AND TRAPS FROM DRAINS RECEIVING CONDENSATE.

INSULATE ALL DOMESTIC WATER PIPING AS INDICATED IN THE SPECIFICATION.

INSULATE WATER SUPPLIES AND DRAINAGE PIPING SERVING ADA LAVATORIES AND SINKS AS PER THE SPECIFICATIONS.

INSULATE ALL HORIZONTAL STORM PIPING AND DRAIN BODIES.

INSTALL VALVES AND ACCESSORIES ON PIPING SERVING EQUIPMENT TO ALLOW SERVICING OR REMOVAL OF EQUIPMENT WITHOUT HAVING TO REMOVE ALL PIPING AND ACCESSORIES.

PROVIDE UNIONS, VACUUM BREAKERS, STRAINERS, ETC. AS REQUIRED ON ALL PIPE CONNECTIONS TO EQUIPMENT AT LOCATIONS INDICATED. MAKE FULLY OPERABLE IN ACCORDANCE WITH ALL

APPLICABLE CODES AND REGULATIONS.

FOR THE EXACT LOCATION OF FIXTURES, FLOOR DRAINS, ROOF DRAINS, STORM LEADERS AND STACKS REFER TO ARCHITECTURAL PLANS AND DETAILS.

FOR SIZES TO INDIVIDUAL PLUMBING FIXTURES SEE THE "FIXTURE CONNECTION SCHEDULE".

FOR ADDITIONAL INFORMATION AND PIPE SIZES SEE DIAGRAMS.

A

L

M

B

C

N

O D

E

P

Q

R

S

F

G

T H

U

V

W

I

K

ABBR ABBREVIATION

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AG ABOVE GRADE

AMB AMBIENT

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

AP ACCESS PANEL

APPROX APPROXIMATE

LAV LAVATORY

LGT LENGTH

LPG LIQUID PETROLEUM GAS

LWT LEAVING WATER TEMPERATURE

BFP BACKFLOW PREVENTOR

BFV BUTTERFLY VALVE

BHP BRAKE HORSEPOWER

BLV BALANCING VALVE

BTU/H BRITISH THERMAL UNIT PER HOUR

MAX MAXIMUM

MBH 1000 BTU/HR

MIN MINIMUM

MISC MISCELLANEOUS

MTG MOUNTING

NA NOT APPLICABLE

N.C. NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NITROUS OXIDE

N.O. NORMALLY OPEN

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

CAP. CAPACITY

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

COMP COMPRESSOR

COND CONDENSATE

CONT CONTINUATION

CV CHECK VALVE

CW COLD WATER

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DOM DOMESTIC

DWH DOMESTIC WATER HEATER

DWG DRAWING

DWS (CHILLED) DRINKING WATER SUPPLY

DWR (CHILLED) DRINKING WATER RETURN

OD OUTSIDE DIAMETER

OFL OVERFLOW

ORD OVERFLOW ROOF DRAIN

OSD OPEN SITE DRAIN

PC PUMPED CONDENSATE

PD PUMPED DISCHARGE (TYPE AS

INDICATED)

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE (ELECTRICAL)

PPM PARTS PER MILLION

QTY QUANTITY

REF REFERENCE

RD ROOF DRAIN

RL RELOCATED MATERIAL OR EQUIPMENT

RV PRESSURE RELIEF VALVE

RPZ REDUCED PRESSURE ZONE

RO REVERSE OSMOSIS SUPPLY

SAN SANITARY OR WASTE

SCFM STANDARD CUBIC FEET PER MINUTE

SCW SOFTENED COLD WATER

SE SEWAGE EJECTOR

SG SPECIFIC GRAVITY

SK SINK

SH SHOWER

SHW SOFTENED HOT WATER

SP SUMP PUMP

SPEC SPECIFICATION

SQ. FT. SQUARE FEET

SS STAINLESS STEEL

SSD SUB-SOIL DRAINAGE

ST STORM (RAINWATER)

STD STANDARD

STM STEAM

SV SOLENOID VALVE

TEMP TEMPERATURE

TP TRAP PRIMER

TPU TRAP PRIMER UNIT

TPV TEMPERATURE AND PRESSURE

UON UNLESS OTHERWISE NOTED

V SANITARY VENT

VEL VELOCITY

VTR VENT THRU ROOF

W/ WITH

WC WATER CLOSET

WG WATER GAGE

WHA WATER HAMMER ARRESTOR

WH WALL HYDRANT

W/0 WITHOUT

EA EACH

ECO EXTERIOR CLEANOUT

EEW EMERGENCY EYE WASH

EEW/ESH COMBINATION EMERGENCY EYE WASH/

EEW/EFW COMBINATION EMERGENCY EYE WASH/

EFF EFFICIENCY

EFW EMERGENCY FACE WASH

EL ELEVATION

EQ EQUIVALENT

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXP EXPANSION

EXT EXTERNAL

(E) EXISTING MATERIAL OR EQUIPMENT

_°F DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FL FLOOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOOR SINK

FT FOOT OR FEET

FTD FOOTER DRAINAGE

G NATURAL GAS (PRESSURE AS

INDICATED)

GAL GALLON

GS GAS COCK

HB HOSE BIBB

HG MERCURY

HGT HEIGHT

HP HORSE POWER

HPCW HIGH PRESSURE DOM. COLD WATER

HPHW HIGH PRESSURE DOM. HOT WATER

(TEMP. 110° OR AS INDICATED)

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN. INCHES

KW KILOWATTS

SEE MECHANICAL SYMBOLS, LEGENDS AND EQUIPMENT SCHEDULES FOR ADDITIONAL ABBREVIATIONS. ALL ABBREVIATIONS, SYMBOLS, AND LEGENDS SHOWN ON THIS DRAWINGS ARE NOT NECESSARILY USED.

BV BALL VALVE

(PRESSURE AS INDICATED)

CA UTILITY COMPRESSED AIR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GV GATE VALVE

HPHWR HIGH PRESSURE DOM. HOT WATER

RETURN (TEMP. 110° OR AS INDICATED)

HR HOUR

MSB MOP SERVICE BASIN

PRESS. PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH - GAUGE

PV PLUG VALVE

PW PROCESS WATER

TW TEMPERED WATER

TYP TYPICAL

UR URINAL

Y

YD YARD

(TYPE AS INDICATED)

EMERGENCY SHOWER

EMERGENCY FACE WASH

RELIEF VALVE

REFERENCE SYMBOLS

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

PRESSURE REGULATOR VALVE THREADED

S

HB

RD

FD

FD

CO

CO

RISER DESIGNATION (TYPE AS INDICATED)

SECTION NUMBER

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

E1-1.0

E1-1.0

KEY NOTE 1 DEMO KEY NOTE

ETP ELECTRONIC TRAP PRIMER

RECIRC RECIRCULATION

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

NONE

1/ 3/

:2

8:

P

M PLUMBING

ABBREVIATIONS

/SYMBOLS/GENERAL

NOTES

P0.1 10822.000

DESIGN DEVELOPMENT 11/08/2018

CONTRACT DOCUMENTS 01/04/2019

8.38.69

8 7.1

6.9 6.5 6.2

6 5.4

5.2

4.8

5 4.5 4 3.6 3 2.8 2 1

0.2A

0.3A

0.4A

0.7A

0.9A A

A.2

A.9

A.7

B B

D D

D.7

E E

F F

0.5A

2"W UP

2"W UP

4" SAN FROM

ABOVE2"W UP

2"W UP

4"W UP

2"W UP

4" SAN FROM

ABOVE

2"W UP

4"W UP

4"W UP

4"W UP

4"W UP

3" SAN FROM

ABOVE

2"W UP

3"W UP

2"W UP

2" V UP

2"V UP

4" UP TO

FCO

3" UP

TO FCO

4" UP

TO FCO

6" SAN

INV. ELEV. 49.5'

SEE CIVIL DWGS

FOR CONT.

C

W GF

6.8 6.4

B2

C C

E.8

2"W UP

2"W UP

4" SAN FROM

ABOVE

4"

2"W UP

2"W UP

2"2"

2"

4"

3" S

AN

4"

2"W UP

2"W UP

4"

2"

2"W UP

2"

6" ST (3,170 SF)

FOR CONT. SEE

CIVIL DWGS.

3"

P101 P102

P103 P104

P105

P106

2"W UP

2"W UP

2" W UP

4" S

AN

2"

2"

2"W UP

2" W UP

2" S

AN

2"W UP

2"V UP

4" SAN

3" W UP

4" ST (960 SF)

FOR CONT. SEE

CIVIL DWGS.

4" ST (1,244 SF)

FOR CONT. SEE

CIVIL DWGS.

8" ST (5,760 SF)

FOR CONT. SEE

CIVIL DWGS.

8" ST (5,100 SF)

FOR CONT. SEE

CIVIL DWGS.

8" ST (5,840 SF)

FOR CONT. SEE

CIVIL DWGS.

8" ST (17,600 SQ)

FOR CONT. SEE

CIVIL DWGS.

2"W UP

2"

2"W UP 2"W UP

2"W UP

4" SAN FROM

ABOVE

3"SAN UP

4"SAN UP

2"W UP

4" UP TO FCO

4" SAN

4" S

AN

4"

S

AN

3" SAN3" SAN

4" SAN4" SAN 4" SAN

4" S

AN

2"W UP

2"W UP

2"W UP 2"W UP

3"W UP

3" W UP

3"

4"

3"

3"

3"

3" W UP

2"W UP

4" SAN FROM

ABOVE

2"W UP

4" SAN FROM

ABOVE

2"W UP

2"

2"

3"

2"

4"

3"

4"

2" W UP

4" UP TO

FCO

4" UP TO

FCO

4" UP TO

FCO

2"V UP

2"V UP

3"W UP

2"

4"

4"

4"W UP

4" SAN

4" SAN4" SAN4" SAN

2"W UP4"

S

AN

6" S

AN

4" SAN

4" SAN3" SAN

4" SAN

4" SAN

INV. ELEV. 52.5'

FURTHERMOST

FIXTURE

2"V UP

2"V UP

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

PLAN

NORTH

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

1/8" = 1'-0"

1/ 3/

:3

2:

P

M UNDERGROUND

PLUMBING PLAN

P2.00 10822.000

GENERAL SHEET NOTES

SHEET KEYNOTES

P101 6" FIRE SERVICE. SEE CIVIL DRAWINGS FOR

CONTINUATION

P102 4" DCW (120 GPM). SEE CIVIL DRAWINGS FOR

CONTINUATION.

P103 4" DCW UP.

P104 6" FIRE WATER UP.

P105 2" NATURAL GAS AT 2 PSI. SEE CIVIL DRAWINGS

FOR CONTINUATION.

P106 2" NATURAL GAS UP

A. SEE SHEET P0.1 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.

8 7.1

7 6.9 6.5 6.2

6 5.4

5.2

4.8

5 4.5 4 3.6

2.8 2 1

0.2A

0.3A

0.4A

0.7A

0.9A A

A.2

A.9

A.7

B B

D D

D.7

E E

F F

0.5A

FCO

FCO

FCO

4"VTR

4"VTR

4" ST UP

TO RD-1

4" ST UP

TO RD-1

3" ST UP

TO RD-1

3" ST

3" ST

4" ST UP

TO RD-14" ST UP

TO RD-1

4" ST UP

TO RD-1

ST

ST

ST

4" ST UP

TO RD-1

ST

4" ST DN INTO

SCUPPER BOX

(1,244 SF)

65 GPM

4" ST UP

TO RD-1

4" ST UP

TO RD-1

FCO

HWCWHWCW

HW

H W

HW

CW

CW

H W

C W

H W

C W

H W

C W

CW

HW

CW

HW

HWR

HW

CW

HWR HWR

CW

CW

HW

H W

CW

C W

HWR

HW

CW

TP-1

TP-1

2" CW TO DWH-1

1"CW MAKE-UP LINE W/ PRZ-BFP

FOR MECH EQUIP. SEE MECH

DWGS

C W

C W

CW

HW

2"V

FROM

BELOW

H W G

G G

G

G

G

1 1/2"

C W

CW

C W

6.8 6.4

B2

C C

E.8

SH-1A

SH-1A

WC-1A

SK-1A

SK-1A

SK-1A

LA

V-

1A

LA

V-

1A

LA

V-

1A

LA

V-

1A

FD-1

UR

-1

W C-

1A

W C-

W C-

W C-

1A

UR

-1

A

LAV-2A

WC-1A

MSB-1 FD-1

EW-1

SK-2A

SK-1A

SK-1A

SK-1A

SK-1A

SK-1A

SK-1A

SK-1A

LA

V-

2A

FD-1

WC-1A

FD-1

LAV-2A

EWC-1

SK-2A W/

DISPOSAL

SK-1A

SK-1A

SK-1A

SK-1A

LAV-2A

WC-1A

SK-1A

SK-1A

SK-1A

SK-1A

LAV-2A WC-1A

WC-1A

LAV-2A

SK-1A

FCO

2"V DN

4"VTR

4"FCO

GAS REGULATOR

& METER BY

UTILITY COMPANY

6" FIRE WATER

FROM BELOW

4" CW FROM

BELOW

P301

HW

HWR

BALANCING

ASSEMBLY

2" V FROM

BELOW

ST

C W

HW

CW CW

H W

HW

H W

R

CW

C W

C W

CW C

W

HWR

H W

H W

C W

ST

P302

CW HW HW CW

H W

CW

ELEC

COMM

STAFF LOUNGE

CLEAN UTIL

MUSIC THERAPY

RECEPTION

CORR

C303

NP PSYCH

CORR

C302

MAIN CORRIDOR / LOBBY

C100

CHANGING / LOCKER (W)

COMM

MECHANICAL

ELEC

DAILY LIVING SKILLS

DIR. OF OPERATIONS

RESEARCH SHARED OFFICE

NICoE DIR.

NCOIC / ADMIN

CLASSROOM

103.1

CENTRAL PARK

MAIN CORRIDOR / LOBBY

C100

FAMILY WAITING

VESTIBULE

PT GYM

200 NEURO REHAB AREA

WH-1

WH-1

WH-1

WH-1

WH-1

WH-1

FEMALE TOILET

HOUSEKEEPING

MALE TOILET

PAT TLT

CHANGING / LOCKER (M)

DWH-1

FD-2

FD-2

FD-2FD-2

FD-2

RP-1

CW

ET

P-

ET-1

SK-2A

SDB-1

CORR

C200

H W

C W

SK-2A

1 1/2"

EWC-1

CORR

C301

CORR

C304

CORRIDOR

C300

CORR

C306

P207

HWR BALANCING

ASSEMBLY

2" V FROM

BELOW

FD-1

6" ST

8" ST

6" ST

6" ST

CO

CO

6" ST

6" ST

ST

4" ST

4"ST UP

TO RD-1

CHIRO TREATMENT

CHIRO TREATMENT

BH / SW PROVIDERS

BH / SW PROVIDER

SK-1A

4" ST

4" ST DN INTO

SCUPPER BOX

(960 SF) 50 GPM

6" ST DN INTO

SCUPPER BOX

(3,170 SF)

165 GPM

6" ST DN INTO

SCUPPER BOX

(3,250 SF)

167 GPM

8" ST DN INTO

SCUPPER BOX

(5,840 SF)

304 GPM

8" ST DN INTO

SCUPPER BOX

(5,100 SF)

266 GPM

8" ST DN INTO

SCUPPER BOX

(5,760 SF)

300 GPM

6" ST

6" ST

8" ST

8" ST

8" ST

CO

CO

CO

STAFF TLT

NEUROPSYCH

PSYCH TECH

PSYCH TECH

GROUP THERAPY

335.1

PSYCHOLOGIST

ART AND CLAY THERAPY

BH / SW PROVIDERS

EQPT STOR

BIO NEUROFEEDBACK

TRANS-CRANIAL MAGNETIC STIM

GROUP THERAPY

TREATMENT IPMC

NUTRITIONIST

EXAM

EXAM

EYE TESTING

PAIN MD

EXAM

FLEX STORAGE

EXAM

EXAM

TEAM ROOM

EXAM

EXAM

EXAM

PAT TLT

CASE MGMT

NEUROLOGIST

PC MD

307 CLINICAL PHARMACIST

CASE MGMT

BRAIN LAB

SPIRITUAL COUNSELLING

ACUPUNCTURE

341.2

STORAGE / KILN

338.1

ALCOVE / STORAGE

C303.1

CASE MGMT

EYE LANE

OT O/E

OT O/E

MULTI-STATION TREATMENT RM

217 PT O/E

PT O/E

PT GYM

EQPT STOR

SOIL UTIL

TLT / SHR

219.1

TLT/ SHR

218.2

TLT/ SHR

218.1

AV SUPPLY

CORR

C202

CORR

C202

TRAZER / FATS

SPEECH THERAPY - OFFICE

6" ST

8" ST8" ST

DAYROOM

SPEECH THERAPY - TESTING

CO

SK-1A

WC-1A

LAV-2A

HOUSEKEEPING

STAFF TLT

EW-1MSB-1

FCO

FCO

FCO

ICE MAKER

(EXIST)

REF/FRZ

W/ICE MAKER

REF/FRZ

W/ICE MAKER

4"VTR

V

V

V

V V

V

V

V

V

V V

V

V

V

V

VV

V

V

V

V

V V

V

V

V

V

V

V

3" V

V

V

HW

OSD-1

2" HW

2" H

W

WH-1

4" ST UP

TO RD-1

REF/FRZ

W/ICE MAKER

SOIL UTIL

CORR

C102

EWC-1

SH-1A

FD-1

4" ST(OF) UP

TO RD-2

4" ST(OF) UP

TO RD-2

6" ST

8" ST

6" ST

6" ST

8" ST(OF)

18" ABOVE FINISH

GRADE. (5560 SF)

290 GPM

OFD

HW

MANIFOLD

RECIRC.

SYSTEM

RM

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

PLAN

NORTH

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

1/8" = 1'-0"

1/ 3/

:2

9:

P

M GROUND FLOOR

PLUMBING PLAN

P2.01 10822.000

GENERAL SHEET NOTES

SHEET KEYNOTES

P301 1-1/4" GAS AT 30 PSI FROM BELOW. 1-1/2"

GAS AT 2 PSI TO BLDG. GAS METER &

REGULATOR BY LOCAL GAS UTILITY

COMPANY (OKALOOSA). FOR CONT. SEE

CIVIL DWGS.

P302 2" CW DN FOR TEMPORARY IRRIGATION

SYSTEM BY IRRIGATION CONTRACTOR.

A. SEE SHEET P0.1 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.

8 7.1

7 6.9 6.5 6.2

6 5.4

5.2

4.8

5 4.5 4 3.6 3 2.8 2 1

0.2A

0.3A

0.4A

0.7A

0.9A A

A.2

A.9

A.7

B B

D D

D.7

E E

F F

0.5A

4"VTR

4"VTR 4"VTR

3" RD-1

(200 SF)

10 GPM

4" RD-1

(2,780 SF)

145 GPM

4" RD-1

(1,244 SF)

65 GPM

4" RD-1

(2,550 SF)

133 GPM

4" RD-1

(3,250 SF)

167 GPM 4" RD-1

(3,170 SF)

165 GPM

4" RD-1

(960 SF)

50 GPM

6.8 6.4

B2

C C

E.8

6" RD-1

(2,920 SF)

152 GPM

4"VTR

RD-1

RD-1 RD-1

RD-1 RD-1

RD-1

RD-1

RD-1

RD-1RD-1

6" RD-1

(2,920 SF)

152 GPM

4" RD-1

(2,780 SF)

145 GPM

4" RD-1

(2,550 SF)

133 GPM

RD-1

RD-2RD-2

4" RD-2

(2,780 SF)

145 GPM

4" RD-2

(2,780 SF)

145 GPM

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

PLAN

NORTH

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

1/8" = 1'-0"

1/ 3/

:2

9:

P

M ROOF PLUMBING

PLAN

P2.02 10822.000

GENERAL SHEET NOTES

SHEET KEYNOTES

A. SEE SHEET P0.1 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.

RETURN FROM BUILDINGMIXED OUTLET

H. EPOXY COATED STRUT

RETURN TO COLD WATER FEED

OF HOT WATER SOURCE (WATER HEATER)

COLD SUPPLY INLETHOT SUPPLY INLET

B. THERMOMETER

A. FULL PORT BALL VALVE

D. CHECK VALVE

E. RECIRCULATION PUMP (RP-1)

F. CIRCUIT SETTING BALANCING VALVE

G. STOP AND CHECK VALVE

C. LAWLER 800 SERIES VALVERP-1

A

B

C

D

E

F

D

G G

H

ROOF

GROUND FLOOR

SK

-2

A

HW

CW

DAILY LIVING SKILLS

CW CW CW

W C-

1A

UR

-1

UR

-1

A

MALE TOILET

LA

V-

1A

LA

V-

1A

HWR

HW

CW

HWR

HW

CW

HWR HWR

CW CW

HW

FEMALE TOILET

SK-1A

HW

CW

MULTI-STATION

TREATMENT RM

HWR

HW

CW

HWR

HW

CW

HWR

HW

CW

HWR

HW

HWR

HW

CW

HW

CWHW

CW

HW HW HW HW

1/2"3/4"1 1/2"

HWR BALANCING ASSEMBLY

SET @ 1.0 GPM

SEE 3/ P5.02

3/4"

3/4" 1 1/2" 1"

3/4"

ROOF

GROUND FLOOR

HWR

HW

CW

HWR

HW

CW

WH-1

PRESSURE GAUGE

2" FOR CW IRRIGATION.

SEE LANDSCAPE DWG FOR CONT.

1 4" NEW DOMESTIC WATER SERVICE

SEE CIVIL DWGS FOR CONT.

2" REDUCED PRESSURE

BACKFLOW PREVENTER ASSE 1013.

RUN DRAIN TO THE NEAREST FLOOR DRAIN.

EXPANSION

TANK ET-1

HW

R

DW

H-

2" @ 140°

SEE DETAIL 2

THIS SHEET

TO FD-2TO FD-2 TO FD-2 TO FD-2 TO FD-2

ETP-1

ELECTRONIC TRAP PRIMER (ETP-1)

SEE SCHEDULE ON SHEET P7.014

RUN TO THE NEAREST FLOOR DRAIN

1-1/4" REDUCED PRESSURE

BACKFLOW PREVENTER

ASSE 1013. RUN DRAIN TO

THE NEAREST FLOOR DRAIN.

2"

3/4"

CW

CW CW

115° 115° 115° 115° 115° 115° 115° 115°

CW

CW

CW

1-1/4" CW MAKE-UP LINE

FOR MECH EQUIPMENT

SEE MECH DWGS

1 1/4" 3/4"

BFP

4"

3"

3"

2 1/2"

2"

GROUND FLOOR

ROOF

GROUND FLOOR

HWR

CW

115°

HW

CW

HW 115° HW 115°

HW HW

CW

HW 115°

HW

CW

HW

SK-1A

CW

HW

SK-1A SK-1A

CW

HW

1/2" 1/2"

HW 115°HW 115°

HW

EXAM

EYE LANE

HW

CW

1/2" 1/2" 1/2" 1/2"

CW

3/4"

HW

CW

HW

CWCW

HW

HWR

B

B

3/4"3/4"1"3/4"1 1/2"2"2"3/4"2"1"2"2"1"2"1" 2"

2" 1"

2" 1" 2 1/2" 2 1/2"2"

2"

1" 3/4"

1" 2 1/2" 3/4" 1" 2" 2" 1" 2"

2"

1 1/4"

HWR BALANCING ASSEMBLY

SET @ 1.0 GPM

SEE 3/ P5.02

SK-1A SK-1A

CW CW

CW

HW HW

CW

HW HW

OT O/E

OT O/E

1/2" 1/2"

3/4" 1/2"

BFP

TO

IC

E M

AK

ER

IN

R

EF

/F

RZ

R

1/2"

FILTRINE MODEL

TMS2-0.5 FILTER

DUAL CHECK BFP

ASSE 1024, WATTS

SERIES 7

CW

HW

MSB-1

EW-1

3/4"

HOUSE KEEPING

TMV

1/2"

CW

HW

WH-1

3/4"

CW

CW

3/4"

CW

CW HW

SDB-1

FOR CLOTH WASHER

DAILY LIVING SKILL

3/4"

HW

W C-

1A

W C-

W C-

1/2" 3/4"

LA

V-

1A

LA

V-

1A

CW HW

CW

CW

HW

LAV-2A

1/2"

CW

WC-1A

1 1/2"

CW HW

TLT/SHR

219.1

SH-1A3/4" 3/4"

SK

-1

A

HW

CW

PT GYM

3/4"

BFP

TO

E

XI

ST

IC

E

M

AK

ER

1/2"

FILTRINE MODEL

TMS2-0.5 FILTER

DUAL CHECK BFP

ASSE 1024, WATTS

SERIES 7

HW

CW

HW

CW

CW

HW

SOIL UTIL

SK

-1

A

EW

C-

3/4" 1/2"

1/2"

CORR

C200

CW

HW

HWR

2"

2"

LAV-2A

SK

-2 A

CW CW

CW HW

HW

CW

HW HW

1/2"

TLT/SHR

218.1

DAYROOM

CW

CW

1 1/2"

WC-1A BFP

TO

IC

E M

AK

ER

IN

R

EF

/F

RZ

R

1/2"

FILTRINE MODEL

TMS2-0.5 FILTER

DUAL CHECK BFP

ASSE 1024, WATTS

SERIES 7

3/4"

EW

C-

CW

1/2"

CORR

C102

CW

CW HW

TLT/SHR

218.1

SH-1A

3/4" 3/4"

CW HW

TLT/SHR

218.2

SH-1A

3/4"3/4"

LAV-2A

CW

HW

1/2" 1/2"

WC-1A

CW

1-1/2"

TLT/SHR

218.2

HWR

CASE MGMT

CW

HW

1/2" 1/2"

HW

CW

CAP FOR FUTURE

SK-1A

CW

HW

1/2" 1/2"

EXAM

CLINICAL

PHARMACIST

CW

HW

1/2"

CAP FOR FUTURE

SK-1A

CW

HW

1/2" 1/2"

EXAM

PC MD

CW

HW

1/2"

CAP FOR FUTURE

1/2"

SK-1A

CW

HW

1/2" 1/2"

EXAM

NEUROLOGIST

CW

HW

1/2"

CAP FOR FUTURE

1/2"

CW

HW

1 1/2" 1/2"

W C-

1A

1 1/2"

LA

V-

2A

PAT TLT

CASE MGMT

CW

HW

1/2"

CAP FOR FUTURE

1/2"

EW

C-

CW

1/2"

CORR

C301

SK

-2

A W

DI

SP

OS

ERHW

CW

STAFF LOUNGE

BFP

TO

IC

E M

AK

ER

IN

R

EF

/F

RZ

R

1/2"

FILTRINE MODEL

TMS2-0.5 FILTER

DUAL CHECK BFP

ASSE 1024, WATTS

SERIES 7

3/4"

CW

HW

SK-1A

1/2" 1/2"

CW

HW

SK-1A

1/2" 1/2"

CW

HW

SK-1A

1/2" 1/2"

TREATMENT IPMC

EXAM

EXAM

EXAM

SK-1A

CW

HW

1/2" 1/2"

ACCUPUNCTURE

341.2

CW

HW

HW 115°

HW

CW

CW

HW

SK-1A

1/2" 1/2"

CW

HW

SK-1A

1/2" 1/2"

CW

HW

SK-1A

1/2" 1/2"

CW

HW

SK-1A

1/2" 1/2"

TRANS-CRANIAL

MAGNETICSTIM

EXAM

SOIL UTIL

322PAT TLT

CW

HW

1 1/2"

1/2"

W C-

1A

1 1/2"

LA

V-

2A

HW 115°

HW

CW

C

GROUND FLOOR

HW 115°

HW

CW

C

ROOF

ROOF

GROUND FLOOR

ROOF

CW

HW

SK-1A

1/2" 1/2"

BIO

NEUROFEEDBACK

CW

HW

SK-1A

1/2" 1/2"

CHIRO

TREATMENT

CHIRO

TREATMENT

CW

HW

LAV-2A

1/2" 1/2"

STAFF TLT

WC-1A

CW

1-1/2"

CW

HW

3/4" 3/4"

HOUSEKEEPING

WH-1

CW

3/4"

HW 115°

HW

CW

HW 115°

HW

CW

CW

HW

SK-2A

3/4" 3/4"

ART AND CLAY

THERAPY

WH-1

CW

3/4"

CW

HW

LAV-2A

1/2"

CW

1-1/2"

STAFF TLT

HW

115°HW

CW

WC-1AMSB-1

EW-1

TMV

1/2"

1-1/2"

1-1/2"2"2"2"

CW

CW

CW CW

HW

HWHW

1-1/2"

1-1/2"

2"3/4"

2"2"2"2"

1/2"

2" 2" 2"

3/4"

2"

2"

3/4"

HW

CW CW

WH-1

CW

3/4"

NEAR

COLUMN

D/9

CW

2"2"

3/4" 3/4"3/4"3/4"

B

GROUND FLOOR

ROOF

ROOF

GROUND FLOOR

GROUND FLOOR

ROOF

ROOF

GROUND FLOOR

6"

2"

V

SK-1A

EXAM

2"

V

NEUROLOGIST

ROUGH-IN

BOX FOR THE

FUTURE SINK

4"

V

PAT TLT

CO

LAV-2A

WC-1A

1-1/2"

2"

V

CASE MGMT

ROUGH-IN

BOX FOR THE

FUTURE SINK

2"

V

SK-2A

W/DISPOSAL

STAFF

LOUNGE

CO 2"

V

FCO

CORR

C301 4"

2"

V

PC MD

ROUGH-IN

BOX FOR THE

FUTURE SINK

FCO

4"

2"

V

SK-1A

EXAM

2"

V

CLINICAL

PHARMACIST

ROUGH-IN

BOX FOR THE

FUTURE SINK

2"

V

SK-1A

EXAM

2"

V

CASE MGMT

ROUGH-IN

BOX FOR THE

FUTURE SINK

2"

V

SK-1A

EXAM

2"

V

SK-1A

TREATMENT

IPMC

2"

V

SK-1A

EXAM

2"

V

SK-1A

EXAM

2"

V

SK-1A

EXAM

V

STAFF

TLT 318

CO

LAV-2A

WC-1A

1-1/2"

4"

3"

4"

FCO

MSB-1

HOUSEKEEPING

SAN

SAN

4"

2"

V

SK-1A

EYE LANE

2"

V

SK-1A

ACCUPUNCTURE

341.2

V

CO

LAV-2A

WC-1A

1-1/2"

4" PAT TLT

SANSANSAN SAN

SAN

SANSAN

SAN

SAN

SAN

4"4"4"

2"

V

SK-1A

TRANS-CRANIAL

MAGNETICSTIM

2"

V

SK-1A

EXAM

3"

2"

V

SK-1A

SOILED

UTILITY

2"

V

SK-1A

BIO-NEURO

FEEDBACK

2"

V

SK-1A

CHIRO

TREATMENT

2"

V

SK-1A

CHIRO

TREATMENT

3"

FCO

SAN SAN

3" 3" 3"4" 4" 4" 4"

SAN SAN

2"

V

SK-2A

ART AND CLAY

THERAPY

V

CO

LAV-2A

WC-1A

1-1/2"

4"

FCO

SAN SAN

4" 4"

STAFF

TLT 334

4"

FCO

V

FD-1

TO TP

4"

SAN

3"

FD-1

TO TP

2"

V

LAV-2A

SH-1A

3" 2"

4" V

WC-1A

4"

SAN

3" 3"

2"

V

LAV-2A

SH-1A SH-1AFD-1

TO TP

V

4"

V

WC-1A

SAN

4"

SAN

2"

V

LAV-2A

4"

V

WC-1A 2"

V

CORR

C102

A

GROUND FLOOR

ROOF

GROUND FLOOR

ROOF

SAN

4"

V W

C- 1A

4"

MALE & FEMALE TLT

107&108

TLT/SHR

219.1

TLT/SHR

218.2

TLT/SHR

218.1

2"

LA

V-

1A

2"

V LA

V-

1A

LA

V-

1A

LA

V-

1A

3"

2"

V

SK-2A

DAYROOM

FD-1

TO TP

V

2"

V

SOIL UTIL

SK-1A

EWC-1

2"

V

LAV-1A

2"

V

SK-1A

B

W C-

1A

V W

C-

UR

-1

V W

C-

UR

-1

A

4" FCO 2"

V

SDB-1

MSB-1

FD-1

TO TP

DAILY LIVING

SKILLS

HOUSEKEEPIG

SAN

VV

FD-1

TO TP

V

2"

V

SK-1A

2"

V

SK-1A

OSD-1

V

DRAIN FROM

ICE MAKER

FD-2

TO TP

V

FD-2

TO TP

V

4" FCOFD-2

TO TP

V

FD-2

TO TP

V

FD-2

TO TP

V

2"

V

SK-2A

DRAIN FROM

DISHWASHER

4" 4"

A

4"

SANSAN

4"4" 2"2"2"2"

MECHANICAL

MULTI-STATION

TREATMENT RM

FEMALE

TOILET

MALE TOILET

EWC-1

V

2"

2" 2" V 2" V

2" V 3" V

2" V

2" V 2" V

2" V 44

2" V 2" V 2" V 2" V

2" V2" V

2" V 2" V

2" V

2" V

2" V 2" V 2" V 2" V 2" V 2" V

2" V 2" V

2" V

2" V 2" V

2" V

2" V

2" V2" V2" V2" V2" V2" V2" V2" V

2" V2" V2" V3" V

SAN

SAN

SAN

SAN SANSAN SANSANSAN

3" V

2" V

2" V 2" V

2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" V

2" V 2" V

2" V

3" V3" V

2" V2" V2" V2" V2" V2" V2" V2" V2" V2" V2" V2" V

3" V

2" V2" V2" V

2" V 2" V

3" V

2" V 2" V2" V2" V 3" V

2" V

3" V

PT GYM

DAILY LIVING SKILLS

PT O/E

PT O/E

2" V

2" V

2" V

4" VTR

W/4" SURESEAL

VENT-GUARD

4" VTR

W/4" SURESEAL

VENT-GUARD

4" VTR

W/4" SURESEAL

VENT-GUARD

4" VTR

W/4" SURESEAL

VENT-GUARD

FFE 54.50

FFE 54.50

FFE 54.50

6" SAN (155 DFU)

INV ELEV 49.50

SEE CIVIL FOR

CONTINUATION

4" 4"

4"4"4" 6"6" 4"4"4"

4"

2" 4"

4"

4" 4" 4"

3"

3"3"3"3" 4"3" 2"3"4"

TP FOR FD-1

IN TOILET ROOMS

WATER SAVER TYPE

BY J.R.SMITH 2698

HWR BRANCH

BALL VALVE

BALANCING VALVE: (FLOW

INDICATING BALANCING

VALVE OR SELF

CONTAINED FLOW

REGULATION VALVE)

UNION

BALL VALVE

HWR WATER

RETURN MAIN

CHECK VALVE

THERMOSTAT

ENLARGED PIPING FOR

THERMOSTAT WELL

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

NONE

1/ 3/

:2

9:

P

M DOMESTIC WATER,

SANITARY WASTE &

VENT RISER

DIAGRAMS

P5.01 10822.000

SCALE: NOT TO SCALE1 DOMESTIC WATER RISER DIAGRAM

SCALE: NONE2 MANIFOLD RECIRCULATION SYSTEM- TMV LAWLER MODEL 802 MS

SCALE: NOT TO SCALE4 SANITARY WASTE & VENT RISER DIAGRAM

SCALE: NOT TO SCALE3 HWR BALANCING ASSEMBLY

GROUND FLOOR

ROOF

GROUND FLOOR

ROOF

GROUND FLOOR

ROOF

GROUND FLOOR

ROOF

1-1/4" GAS SERVICE @ 30 PSI

FROM LOCAL GAS UTILITY

(OKALOOSA). SEE CIVIL DWG

FOR CONTINUATION

GAS REGULATOR & METER

PROVIDED BY THE LOCAL

UTILITY COMPANY (OKALOOSA)

DWH-1

399 CFH

14" W.C. MAX.

SET TEMP

TO 140 DEG F

INSIDE TANK

B-1

750 CFH

14" W.C. MAX

G

G

1-1/2"

G

3/4"

PRESSURE

REGULATOR

BY PLUMBING

CONTRACTOR

G

1-1/4"

G

1"

PRESSURE

REGULATOR

BY PLUMBING

CONTRACTOR

B-2

750 CFH

14" W.C. MAX

1"

G

1"

PRESSURE

REGULATOR

BY PLUMBING

CONTRACTOR

TOTAL FEET OF PIPING FROM GAS METER TO THE

MOST REMOTE OUTLET (DWH-1) = 100 FEET

2015 IFGC TABLE 402.4(5). INLET PRESSURE = 2 PSI,

PRESSURE DROP = 1.0 PSI AND S.G. 0.60

6" 8"

ST

4" RD-1

(2,780 SQ FT)

145 GPM

CO

ST

6"

4"

4"

ST

8"

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

ST

GROUND FLOOR

ROOF

GROUND FLOOR

ROOF

ST

4"

4"

ST

4" RD-1

(1,244 SQ FT)

65 GPM

ST

4" (65 GPM)

ST

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

A

4" ST

(1,244 SQ FT)

65 GPM

SEE CIVIL DWG

FOR CONT.

ST

4"

4"

ST

4" RD-1

(960 SQ FT)

50 GPM

ST

4" (50 GPM)

ST

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

A

4" ST

(960 SQ FT)

50 GPM

SEE CIVIL DWG

FOR CONT.

ST

6"

6"

ST

ST

6" (165 GPM)

ST

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

6" ST

(3,170 SQ FT)

165 GPM

SEE CIVIL DWG

FOR CONT.

4" RD-1

(3,170 SQ FT)

165 GPM

CO

ST

6"

4" 4"

ST

6"

ST

ST

6" (167 GPM)

ST

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

6" ST

(3,250 SQ FT)

167 GPM

SEE CIVIL DWG

FOR CONT.

4" RD-1

(3,250 SQ FT)

167 GPM

CO

ST

6"

4"

ST

6"8"

ST

4" RD-1

(2,920 SQ FT)

152 GPM

CO

ST

6"

4"4"

4" RD-1

(2,920 SQ FT)

152 GPM

ST

8"

8" (304 GPM)

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

8" ST

(5,840 SQ FT)

304 GPM.

SEE CIVIL DWG

FOR CONT.

ST

ST

6"8"

ST

4" RD-1

(2,550 SQ FT)

133 GPM

CO

ST

6"

4"4"

ST

8"

S/S SCUPPER

BOX. SEE ARCH

DWGS FOR DETAIL

ST

4" RD-1

(2,550 SQ FT)

133 GPM

8" (300 GPM)

ST

8" ST

(5,760 SQ FT)

300 GPM

SEE CIVIL DWG

FOR CONT.

B

CO

ST

3" RD-1

(200 SQ FT)

10 GPM

4"

ST

ST

8"

3"6"

6"

4" RD-1

(2,780 SQ FT)

145 GPM

1-1/2"

G

G

1-1/2"

M

1-1/4"

G

2" PSIG PRESSURE

8" (304 GPM)

ST

8" ST

(5,100 SQ FT)

266 GPM.

SEE CIVIL DWG

FOR CONT.

8" (266 GPM)

8" (266 GPM)

ST

B

6"

B

B

B

8"

OFD

4" RD-2

(2,780 SQ FT)

145 GPM

CO

ST(OF)

6"

4"

4"

ST

(O

F)

8" ST(OF)

5560 SQ FT

290 GPM)

8" ST(OF)

SPILL ON GRADE

THRU DOWNSPOUT

NOZZLE ZURN MODEL

Z199-DC

CO

ST(OF)

8"

6"

6"

4" RD-2

(2,780 SQ FT)

145 GPM

6"

ST(OF)

ST(OF)

8"

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

12" = 1'-0"

1/ 3/

:2

9:

P

M STORM WATER AND

GAS RISER DIAGRAM

P5.02 10822.000

DRAWING NUMBER

PROJECT NUMBER

SCALE

DRAWING TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

Cagley & Associates

STRUCTURAL ENGINEERING

6141 Executive Boulevard Rockville, Maryland 20852 301.881.9050

1700 NEW YORK AVE, NW

SUITE 100

WASHINGTON, DC 20006

202.842.2100 www.smithgroup.com

Pl ot

D at e:

EGLIN AIR FORCE BASE

BUILDING XX

ASH DR, EGLIN AIR FORCE BASE

FLORIDA

32542

IMEG Corporation

ELECTRONIC SECURITY / TELECOMMUNICATIONS

2882 106th Street Suite 100 Des Moines, Iowa 50322 515.334.9906

Baskerville-Donovan, Inc.

CIVIL ENGINEERING

449 W Main Street Pensacola, Florida 32502 850.438.9661 Engineering Business: EB-0000340

SmithGroup

MEP-FP ENGINEERING

1700 New York Ave, Suite 100 Washington, D.C. 20006 202.842.2100

1/ 3/

:3

0:

P

M PLUMBING

SCHEDULES

P7.01 10822.000

NICoE PLUMBING FIXTURE SCHEDULE

FIXTURE

DESIGNATION DESCRIPTION

INDIRECT

WASTE WASTE

COLD

WATER

HOT

WATER

VENT

PIPE FLOW/CAPACITY BASIS OF DESIGN REMARKS

EW-1 EYE WASH 1 1/2" 1/2" ATTACHED TO SPEAKMAN SERVICE SINK FAUCET, SPEAKMAN SEF-9000-TW WITH HOT & COLD WATER, AND THERMOSTATIC MIXING

VALVE

EWC-1 ELECTRIC WATER COOLER WITH BFS 1 1/2" 1/2" 1 1/2" WATER COOLER WITH BOTTLE FILLING STATION: ELKAY LZSTL8WSLK WITH FILTER AND CARRIER: WATTS: CA-431-1 ADA, PROVIDE P-TRAP. ENSURE TO PROVIDE CONCEALED ARM CARRIER.

ICE MAKER (EXIST) 3/4" 1/2" 2" EXISTING ICE MAKER FLOOR MODEL 115V, 60HZ. PROVIDE WATER FILTER KIT, SHUT-OFF VALVE AND DOUBLE CHECK BACKFLOW

PREVENTER IN THE WATER LINE. INDIRECT WASTE DISCHARGE THROUGH AN AIR GAP FITTING.

ICE MAKER DISPENSER TOUCH FREE ICE MACHINE/ DISPENSER 3/4" 1/2" 2" MDT3F12 - TOUCH FREE ICE MACHINE/ DISPENSER 115V, 60HZ. PROVIDE WATER FILTER KIT, SHUT-OFF VALVE AND DOUBLE CHECK BACKFLOW

PREVENTER IN THE WATER LINE. INDIRECT WASTE DISCHARGE THROUGH AN AIR GAP FITTING.

LAV-1A LAVATORY (PUBLIC TLT) 1 1/2" 1/2" 1/2" 1 1/2" 0.5 GPM KOHLER K-2205-G UNDER MOUNTED, OVAL CHINA W/GLAZED UNDERSIDE. CHICAGO FAUCETS: 116.102.21.1 ADA, ELECTRONIC FAUCET, HARD-WIRED, COORDINATE WITH ELEC.

LAV-2A LAVATORY 1 1/2" 1/2" 1/2" 1 1/2" AMERICAN STANDARD: 0356.015, CHICAGO FAUCETS: 786-GN1A-CP ADA, GOOSENECK, WRIST BLADES, PROVIDE CONCEALED ARM LAVATORY SUPPORT MSB-1 MOP SERVICE BASIN 3" 1/2" 1/2" 2" SERVICE SINK: FIAT TSB3010; SPEAKMAN FAUCETS: SC-5811-RCP WITH STAINLESS STEEL CAPS ON THRESHOLD ONLY SDB-1 SUPPLY DRAIN BOX (FOR CLOTH WASHER) 2" 1/2" 1/2" 1 1/2" GUY GRAY T200 MOUNT MINIMUM 4' AFF.

SH-1A SHOWER TRIM, VALVE & SHOWER PAN

(HANDICAP)

3" 1/2" 1/2" 1 1/2" 1.5 GPM POWERS E420S12-1-W (24" GRAB BAR), PROVIDE OMNI FLOW CONTROL A-710 (1.5 GPM). SHOWER PAN: SWANSTONE STS-3738, ADA

PROVIDE COLLAPSIBLE DAM WITH END CAPS. COLOR: CLOUD BONE

HAND SHOWER ONLY, SEE ARCH FOR SHOWER AND SHOWER DRAIN.

SK-1A SINK 1 1/2" 1/2" 1/2" 1 1/2" AMERICAN STANDARD: 0356.015, CHICAGO FAUCETS: 786-CP ADA, GOOSENECK, WRIST BLADES, PROVIDE CONCEALED ARM SINK SUPPORT

SK-2A 1 1/2" 1/2" 1/2" 1 1/2"

SK-2A W/ DISPOSAL SINK W/ DISPOSAL 1 1/2" 1/2" 1/2" 1 1/2" ELKAY: DLR191910-PD, K-15175-P (8-1/2" SPOUT), AERATOR: 1054432, BADGER #1 DISPOSER: 120V, 1/3HP PF Connector UR-1 URINAL 2" 3/4" 1 1/2" 0.125 GPF SLOAN SU-1000-0.125, WITH OVERRIDE BUTTON WALL HUNG, ELECTRONIC FLUSH VALVE, HARD-WIRED, COORDINATE WITH ELEC.

UR-1A URINAL (HANDICAP) 2" 3/4" 1 1/2" 0.125 GPF SLOAN SU-1000-0.125, WITH OVERRIDE BUTTON ADA, WALL HUNG, ELECTRONIC FLUSH VALVE, HARD-WIRED, COORDINATE WITH ELEC.

WC-1 WATER CLOSET 4" 1 1/4" 2" 1.28 GPF SLOAN 2050. 1001-1.28

WC-1A WATER CLOSET (HANDICAP) 4" 1 1/4" 2" 1.28 GPF SLOAN 2050. 1001-1.28

WH-1 WALL HYDRANT 3/4" ZURN Z1320

NICoE DOMESTIC WATER HEATER SCHEDULE

TAG LOCATION

STORAGE

GALLON

RECOVERY GPH 40°

F-140° F

TEMPERATURE

INPUT BTU

MINIMUM

PRESSURE

MAXIMUM

PRESSURE

ELECTRICAL

OPERATING

WEIGHT (LBS) Model Type CommentsTYPE INLET WATER (° F) OUTLET WATER (° F) VOLTAGE MFLA

INPUT

POWER

DWH-1 MECHANICAL 220 NATURAL GAS 130 471 45 140 399,000 3.5 W.C 14" W.C 120 V 1800 PVI 40 L 130A-GCML PROVIDE WITH TMV LAWLER MODEL 802 MS AND EXPANSION TANK

BY WESSELS MODEL TTA-12 2" HOT/COLD, RETURN AND 3/4" GAS

CONNECTION

NICoE DRAIN SCHEDULE

TAG DRAIN TYPE

System Served BASIS OF DESIGN Comments

FD-1 FLOOR DRAIN FINISHED AREAS SANITARY ZURN MODEL Z415S-6X6-P-VP SEE DRAWINGS FOR SIZES, PROVIDE TRAP PRIMER CONNECTION FD-2 FLOOR DRAIN UNFINISHED AREAS SANITARY ZURN MODEL Z554-P SEE DRAWINGS FOR SIZES, PROVIDE TRAP PRIMER CONNECTION

OSD-1 FLOOR DRAIN PT GYM 200 SANITARY ZURN MODEL Z554-P

RD-1 ROOF DRAIN PRIMARY STORM ZURN MODEL Z100-ZC-E-EA SEE DRAWINGS FOR SIZES

RD-2 ROOF DRAIN SECONDARY(OVERFLOW) STORM ZURN MODEL Z100-ZC-E-EA WITH W2 OPTION (2" INTERNAL WATER DAM)

NICoE HOT WATER EXPANSION TANK SCHEDULE

TAG LOCATION

TANK

VOLUME

(GAL)

MAX

ACCEPTANCE

(GAL) DIAMETER HEIGHT

BASIS OF

DESIGN Comments

ET-1 MECHANICAL

5 3.1 1' - 0" 1' - 2" WESSELS

TTA-12

NICoE PUMP SCHEDULE

TAG SYSTEM TYPE LOCATION

CAPACITY

(GPM)

DISCHARGE

HEAD (FT) SUCTION DISCHARGE HP RPM VOLTAGE PHASE Manufacturer Model

Type Comments

RP-1 DOMESTIC HOT WATER MECHANICAL 220 0-31 20 1" 1" 1/8 3250 115 V 1 TACO 0011-SF4

NICoE TRAP PRIMER SCHEDULE TAG LOCATION BASIS OF DESIGN Type Comments

ETP-1 MECHANICAL 220 PPP TS-8 ELECTRONIC TRAP PRIMER (FOR FD-2), SURFACE MOUNTED

P2 - Sheet - P0-1 - PLUMBING ABBREVIATIONS -SYMBOLS-GENERAL NOTES
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P2-00 - UNDERGROUND PLUMBING PLAN
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P2-01 - GROUND FLOOR PLUMBING PLAN
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P2-02 - ROOF PLUMBING PLAN
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P5-01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P5-02 - STORM WATER AND GAS RISER DIAGRAM
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2 - Sheet - P7-01 - PLUMBING SCHEDULES
Sheets
P0.1 - PLUMBING ABBREVIATIONS /SYMBOLS/GENERAL NOTES
P2.00 - UNDERGROUND PLUMBING PLAN
P2.01 - GROUND FLOOR PLUMBING PLAN
P2.02 - ROOF PLUMBING PLAN
P5.01 - DOMESTIC WATER, SANITARY WASTE & VENT RISER DIAGRAMS
P5.02 - STORM WATER AND GAS RISER DIAGRAM
P7.01 - PLUMBING SCHEDULES
P2-00 - UNDERGROUND PLUMBING PLAN.pdf
Sheets
P2.00 - UNDERGROUND PLUMBING PLAN

File details come from the government source that posted it. Updated .