cbs.xls
XLS spreadsheet 68 KB Posted
- Attached to
- CONSTRUCT FORT BLISS COMMISSARY Federal contract opportunity
- Solicitation number
- W9127S09R6002
About this file
Cost Breakdown Structure (Excel Format)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 09R6002Amd9.pdf | ||
| 09-R-6002.Amd0008Binder.pdf | ||
| Amd.P0007.pdf | ||
| 09R6005_0006.pdf | ||
| SA-12.pdf | ||
| 08R6002Amd.5B.pdf | ||
| 09R6002_0004.zip | ZIP file | |
| 09R6002_0004.pdf | ||
| 09R6002_0003.pdf | ||
| 09R6002_0002.pdf | ||
| 09R6002_0002.zip | ZIP file | |
| Site_Visit_Sign-in.pdf | ||
| 09R6002_0001.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product line for COMMISSARY
| Ft Bliss Commissary | ||||||||
| CLIN Item No. | Ratio Qty/GFA | Unit Cost/Rate | Cost per Unit GFA | |||||
| WBS LEVEL II Group Elements | Work Descripton | Quantity | Unit | Amount | ||||
| Product Line - Commissary | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| Bid Item 0001 | COMMISSARY BUILDING CONSTRUCTION | 1 | Lump Sum | |||||
| 1001AC1 | Facilities | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a | Product Line -Commissary | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | xxxx |
| 1001AC2a-01 | 01 Substructure | xxxx | xxxx | xxxx | xxxx | 3 | xxxx | |
| 1001AC2a-01-01 | Prime Contractor | 1 | ||||||
| 1001AC2a-01-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-01-03 | a. Footings and Foundations | 1 | ||||||
| 1001AC2a-01-04 | b. Piles and Caissons | 1 | ||||||
| 1001AC2a-01-05 | c. Excavation and Backfill | |||||||
| 1001AC2a-01-06 | d. Slab on Grade | |||||||
| 1001AC2a-01-07 | e. Special Substructures | |||||||
| 1001AC2a-02 | 02 Superstructure | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-02-01 | Prime Contractor | |||||||
| 1001AC2a-02-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-02-03 | a. Columns & Beams | |||||||
| 1001AC2a-02-04 | b. Structural Walls | |||||||
| 1001AC2a-02-05 | c. Elevated Floors | |||||||
| 1001AC2a-02-06 | d. Roof Decks, | |||||||
| 1001AC2a-02-07 | e. Stairs | |||||||
| 1001AC2a-03 | 03 Exterior Closure | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-03-01 | Prime Contractor | |||||||
| 1001AC2a-03-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-03-03 | a. Walls | |||||||
| 1001AC2a-03-04 | b. Exterior Wall Finishes | |||||||
| 1001AC2a-03-05 | c. Exterior Doors | |||||||
| 1001AC2a-03-06 | d. Windows and Glazed Walls | |||||||
| e. Specialty Doors | ||||||||
| 1001AC2a-04 | 04 Roofing | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-04-01 | Prime Contractor | |||||||
| 1001AC2a-04-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-04-03 | a. Roof Coverings | |||||||
| 1001AC2a-04-04 | b. Insulation | |||||||
| 1001AC2a-04-05 | c. Openings & Specialties (Hatches, skylights, Etc.) | |||||||
| 1001AC2a-04-06 | d. Gutters, Downspouts | |||||||
| 1001AC2a-05 | 05 Interior Construction | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-05-01 | Prime Contractor | |||||||
| 1001AC2a-05-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-05-03 | a. Partitions | |||||||
| 1001AC2a-05-04 | b. Interior Doors | |||||||
| 1001AC2a-05-05 | c. Interior Surface of Exterior Wall | |||||||
| 1001AC2a-05-06 | d. Specialties | |||||||
| 1001AC2a-05-07 | e. Casework | |||||||
| 1001AC2a-06 | 06 Interior Finishes | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-06-01 | Prime Contractor | |||||||
| 1001AC2a-06-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-06-03 | a. Wall Finishes | |||||||
| 1001AC2a-06-04 | b. Floor Finishes | |||||||
| 1001AC2a-06-05 | c. Ceiling Finishes | |||||||
| 1001AC2a-07 | 07 Conveying Systems | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-07-01 | Prime Contractor | |||||||
| 1001AC2a-07-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-07-03 | a. Elevators | |||||||
| 1001AC2a-07-04 | b. Escalators & Moving Walks | |||||||
| 1001AC2a-07-05 | c. Material Handling Systems | |||||||
| 1001AC2a-08 | 08 Plumbing | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-08-01 | Prime Contractor | |||||||
| 1001AC2a-08-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-08-03 | a. Plumbing Fixtures | |||||||
| 1001AC2a-08-04 | b. Plumbing Equipment | |||||||
| 1001AC2a-08-05 | c. Domestic Water Distribution | |||||||
| 1001AC2a-08-06 | d. Sanitary Waste | |||||||
| 1001AC2a-08-07 | e. Rain Water Drainage | |||||||
| 1001AC2a-08-08 | f. Special Plumbing Systems | |||||||
| 1001AC2a-09 | 09 HVAC | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-09-01 | Prime Contractor | |||||||
| 1001AC2a-09-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-09-03 | a. Energy Supply | |||||||
| 1001AC2a-09-04 | b. Heat Generating Systems | |||||||
| 1001AC2a-09-05 | c. Cooling Generating Systems | |||||||
| 1001AC2a-09-06 | d. Distribution Systems (Air, Chilled and Hot Water, Steam) | |||||||
| 1001AC2a-09-07 | e. Terminal & Package Units | |||||||
| 1001AC2a-09-08 | f. Control & Instrumentation | |||||||
| 1001AC2a-09-09 | g. Special HVAC Systems & Equipment | |||||||
| 1001AC2a-09-10 | h. Systems Testing & Balancing | |||||||
| 1001AC2a-09-11 | i. Exhaust Systems | |||||||
| 1001AC2a-09-12 | i. Building Automation Systems | |||||||
| 1001AC2a-10 | 10 Fire Protection Systems | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-10-01 | Prime Contractor | |||||||
| 1001AC2a-10-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-10-03 | a. Fire Protection & Sprinkler Systems | |||||||
| 1001AC2a-10-04 | b. Stand-Pipe & Hose Systems | |||||||
| 1001AC2a-10-05 | c. Fire Protection Specialties | |||||||
| 1001AC2a-10-06 | d. Special Fire Protection Systems | |||||||
| 1001AC2a-10-07 | e. Fire Pump and Controller | |||||||
| 1001AC2a-11 | 11 Electric Power & Lighting | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-11-01 | Prime Contractor | |||||||
| 1001AC2a-11-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-11-03 | a. Electrical Services & Distribution | |||||||
| 1001AC2a-11-04 | b. Lighting & Branch Wiring | |||||||
| 1001AC2a-12 | 12 Electrical Systems | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 1 | xxxx |
| 1001AC2a-12-01 | Prime Contractor | 1 | ||||||
| 1001AC2a-12-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-12-03 | a. Telephone Systems | |||||||
| 1001AC2a-12-04 | b. Fire Alarm Systems | |||||||
| 1001AC2a-12-05 | c. Public Address/Intercom Systems | |||||||
| 1001AC2a-12-06 | d. CATV Systems | |||||||
| 1001AC2a-12-07 | e. Security Systems (Access Control, and Intrusion Detection ) | |||||||
| 1001AC2a-12-08 | f. CCTV Systems | |||||||
| 1001AC2a-12-09 | g. Building Grounding & Lightning Protection Systems | |||||||
| 1001AC2a-12-10 | h. Mass Notification Systems | |||||||
| 1001AC2a-12-11 | i. Emergency Lighting & Power | |||||||
| 1001AC2a-12-12 | k. Energergy Management And Control Systems Connections | |||||||
| 1001AC2a-13 | 13 Equipment | 2 | ||||||
| 1001AC2a-13-01 | Prime Contractor | 1 | ||||||
| 1001AC2a-13-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-13-03 | a. Commercial Equipment | |||||||
| 1001AC2a-13-04 | b. Security and Vault Equipment | |||||||
| 1001AC2a-13-05 | c. Vending Equipment | |||||||
| 1001AC2a-13-06 | d. Laundry & Dry Cleaning Equipment | |||||||
| 1001AC2a-13-07 | e. Office Equipment | 1 | ||||||
| 1001AC2a-13-08 | f. Institutional Equipment | |||||||
| 1001AC2a-13-09 | g. Audio-Visual Equipment | |||||||
| 1001AC2a-13-10 | h. Vehicular Service Equipment | |||||||
| 1001AC2a-13-11 | i. Loading Dock Equipment | |||||||
| 1001AC2a-13-12 | j. Other Equipment | |||||||
| 1001AC2a-13-13 | k. Kitchen Equipment | |||||||
| 1001AC2a-13-13a | Fixed Kitchen Equipment (i.e. walk-in refrigerator/freezers, ventilation exhaust hoods, clipper, etc.) | |||||||
| 1001AC2a-13-13aa | Purchase of Fixed Kitchen Equipment | |||||||
| 1001AC2a-13-13ab | Installation of Fixed Kitchen Equipment | |||||||
| 1001AC2a-13-13b | Moveable Kitchen Equipment | |||||||
| 1001AC2a-13-13ba | Purchase of Moveable Kitchen Equipment | |||||||
| 1001AC2a-13-13bb | Installation of Moveable Kitchen Equipment | |||||||
| 1001AC2a-14 | 14 Furnishings | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-14-01 | Prime Contractor | |||||||
| 1001AC2a-14-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-14-03 | a. Fixed Furnishings | |||||||
| 1001AC2a-14-04 | b. Window Treatment | |||||||
| 1001AC2a-14-05 | c. Movable Furnishings | |||||||
| 1001AC2a-14-05a | Purchase of Moveable Furnashings | |||||||
| 1001AC2a-14-05b | Installation of Moveable Furnishings | |||||||
| 1001AC2a-14-06 | d. Furniture Systems | |||||||
| 1001AC2a-15 | 15 Special Construction | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 4 | xxxx |
| 1001AC2a-15-01 | Prime Contractor | |||||||
| 1001AC2a-15-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-15-03 | a. Special Structures | |||||||
| 1001AC2a-15-04 | b. Pre-Engineered Structures | 4 | ||||||
| 1001AC2a-15-05 | c. Integrated Construction | |||||||
| 1001AC2a-15-06 | d. Special Purpose Rooms | |||||||
| 1001AC2a-15-07 | e. Special Construction Systems | |||||||
| 1001AC2a-15-08 | f. Special Facilities | |||||||
| 1001AC2a-15-09 | g. Kennels and Animal Shelters | |||||||
| 1001AC2a-15-10 | h. Liquid and Gas Storage Tanks | |||||||
| 1001AC2a-15-11 | i. Building Automation Systems | |||||||
| 1001AC2a-15-12 | j. Energy Monitoring & Control Systems | |||||||
| 1001AC2a-16 | 16 Selective Building Demolition | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | 0 | xxxx |
| 1001AC2a-16-01 | Prime Contractor | |||||||
| 1001AC2a-16-02 | Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| 1001AC2a-16-03 | a. Building Elements Demolition | |||||||
| 1001AC2a-16-04 | b. Hazardous Compounds Abatement | |||||||
| 1001AC2aa | Operation & Maintenance Manuals | xxxxxxxxxxxxxxxxxxxx | ********* | 1 | LS | ******* | $ 2.00 | |
| 1001AC2ab | As-Built Drawings | xxxxxxxxxxxxxxxxxxxx | ********* | 1 | LS | ******* | $ 2.00 | |
| SUBTOTAL for Construction of Product Line Bid Item 0001 (Bid Item Nos. 1001AC2a-01through 1001AC2ab, including all sub-items.) | $ - 0 | |||||||
| 1001AC3 | BUILDING TRADE COST FOR COMMISSARY | xxxx | xxxx | xxxx | xxxx | |||
| 1001AC3-01 | Prime Contractor OVERHEAD AND PROFIT | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | 0 | ||
| 1001AC3-01a | a. Overhead | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | |||
| 1001AC3-01b | b. Profit | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | |||
| c. Bond | ||||||||
| Total-Bid Item 001 | $ - 0 | |||||||
| xxxx | xxxx | xxxx | xxxx | |||||
| Bid Item 0002 | COMMISSARY EQUIPMENT | 1 | LUMP SUM | |||||
| 1002AC1 | Commissary Equipment, Materials | |||||||
| 1002AC2 | Installation Labor | |||||||
| Total-Bid Item 002 | ||||||||
| Bid Item 0003 | SITE WORK | |||||||
| xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |||
| 1003AC1 | Site Preparation | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | |
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Clearing | ||||||||
| b. Site Demolition and Relocation | ||||||||
| c. Site Earthwork | ||||||||
| d. Clean-up | ||||||||
| 1003AC2 | Site Improvements | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | xxxxxxxxxxxxxxxxxxxx | xxxx | xxxx | xxxx | xxxx | xxxx | ||
| a. Roadways | ||||||||
| b. Parking lots | ||||||||
| c. Walks, Steps, Ramps | ||||||||
| d. Fencing and Gates | ||||||||
| e. Security Structures | ||||||||
| f. Signage | ||||||||
| g. Storm Water Detention/Retention | ||||||||
| h. Landscaping | ||||||||
| i. Irrigation and Sprinkler Systems | ||||||||
| 1003AC3 | Site Civil/Utilities | |||||||
| 1003AC3a | a. Water Supply & Distribution | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Potable Water Distribution | ||||||||
| b. Fire Protection Water Line, Hydrants, PIV | ||||||||
| c. Pumping Stations | ||||||||
| 1003AC3b | b. Sanitary Sewer Systems | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Sanitary Sewer Piping, Manholes | ||||||||
| b. Lift Stations | ||||||||
| 1003AC3c | c. Storm Sewer Systems | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Storm Sewer Piping, Manholes | ||||||||
| b. Lift Stations | ||||||||
| 1003AC3d | d. Gas Distribution Systems | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Gas Disttribution Piping | ||||||||
| 1003AC3e | e. Heating/Cooling Distribution Systems | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Heating Distribution Piping | ||||||||
| b. Cooling Distribution Piping | ||||||||
| 1003AC4 | Site Electrical Utilites | |||||||
| 1003AC4A | A. Exterior Electrical Distribution | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Transformers | ||||||||
| b. Switches, controls | ||||||||
| c. Overhead Electric Conductors | ||||||||
| d. Poles, Crossarms | ||||||||
| e. Underground Electric Conductors | ||||||||
| f. Ductbanks, Manholes, Handholes | ||||||||
| 1003AC4B | B. Exterior Lighting | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Underground Electric Conductors | ||||||||
| b. Ductbanks, Manhole, Handhole | ||||||||
| c. Overhead Electric Conductors | ||||||||
| d. Poles, Crossarms | ||||||||
| e. Exterior Lighting Fixtures | ||||||||
| 1003AC4C | C. Exterior Communications | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Communication Cable (Copper & Fiber Optic) | ||||||||
| b. Ductbanks, manholes, Handholes | ||||||||
| 1003AC4D | D. Exterior Security Systems | |||||||
| Prime Contractor | ||||||||
| Subcontractors (By Trade) | ||||||||
| a. Cable & Wiring | ||||||||
| b. Ductbanks, manholes, Handholes | ||||||||
| Total-Bid Item 0003 (Site Work) | 1 | Lump Sum | ||||||
| TOTAL FOR CLINS 0001 THROUGH 0003 |
&C&P of &N
CESWF-IM:
&C&P of &N &C&P of &N
File details come from the government source that posted it. Updated .