About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT FORT BLISS COMMISSARY, newest first.
File Type Posted
09R6002Amd9.pdf PDF
09-R-6002.Amd0008Binder.pdf PDF
Amd.P0007.pdf PDF
09R6005_0006.pdf PDF
SA-12.pdf PDF
08R6002Amd.5B.pdf PDF
09R6002_0004.pdf PDF
09R6002_0004.zip ZIP file
09R6002_0003.pdf PDF
cbs.xls XLS spreadsheet
09R6002_0002.zip ZIP file
Site_Visit_Sign-in.pdf PDF
09R6002_0001.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

CONSTRUCT COMMISSARY, FORT BLISS, TEXAS

SEE CONTINUATION PAGE:

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jan-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127S-09-R-6002

X 9B. DATED (SEE ITEM 11)

11-Dec-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jan-2009

CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

W9127S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127S-09-R-6002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

ADDENDUM 0002:

This Addendum 0002 modifies the drawings and project manual dated BID SET December 11, 2008 as noted herein and shall be considered part of the official contract documents for the New Commissary, Fort Bliss Texas, Solicitation No. W9127S-09-R-6002. Wherein provisions of this Addendum differ from the provisions of the original Specifications and Drawings, the provisions of this Addendum shall govern and take precedence.

Bidder shall acknowledge receipt of this addendum where indicated on the bid form. All parties are hereby notified that they are to make any adjustment in their proposals which they deem necessary on account of this Addendum, and it will be considered that the proposal is submitted with full knowledge of all modifications and changes specified herein. This Addendum shall become a component of the proposal documents.

Addendum No. 0002 will consist of 7 Pages with Modifications to the Solicitation, Specifications and Documentation as indicated and 22 Attachments.

Attachments: 09R6002_0002.zip with the following attachments:

1. 00110 – Lowest Price Technically Acceptable Selection Procedures

2. 00320 – Geotechnical Report

3. 07840 – Firestopping

4. 08950 – Skylights

5. SC-01 – Clarification to sheet C3.01

6. SC-02 – Clarification to sheet C5.01

7. SC-03 – Clarification to sheet C12.01

8. SC-04 – Clarification to sheet C12.02

9. SC-05 – Clarification to sheet C12.02

10. SC-06 – Clarification to sheet C17.01

11. SD-01 – Add rated door and enclosure

12. SD-02 – Add rated door and enclosure

13. SD-03 – Add rated partitions

14. SD-04 – Add rated doors

15. SD-05 – Add rated door and enclosure

16. SD-06 – Add rated door and enclosure

17. SD-07 – Updated Skylight details

18. SD-08 – Add general note #7 to sheet A1.07

19. SD-09 – Updated freezer curb details

20. SD-10 – Updated freezer curb details

21. SS-01 – Concrete sections and details

22. SE-01 – Update to lighting plan, sheet E1.03

Item 1: Make the following additions, corrections or deletions to the designated solicitation sections.

A. 00110 – LOWEST PRICE TECHNICALLY ACCEPTABLE SELECTION

PROCEDURES

1. Delete Section 00110 in its entirety and replace with the attached Revised

Section 00110.

B. 00700 – CONTRACT CLAUSES

1. 52.211-10 Commencement, Prosecution, and Completion of Work calendar days is revised from 657 to 660.

REFER TO THE PROJECT MANUAL FOR THE FOLLOWING ITEMS:

Item 2: The following specification sections have been modified, added or deleted.

A. 00002 – TABLE OF CONTENTS

B. 00320 – GEOTECHNICAL REPORT

C. 01720 – PHASE TURNOVER AND CONTRACT CLOSEOUT

D. 02870 – SITE FURNISHINGS

E. 03300 – CAST-IN-PLACE CONCRETE

F. 07840 – FIRESTOPPING

G. 08950 – SKYLIGHTS

H. 09260 - GYPSUM BOARD ASSEMBLIES

I. 09671 – RESINOUS FLOORING

J. 10750 – TELEPHONE SPECIALTIES

K. 15651 – PRODUCT REFRIGERATION SYSTEMS

L. 16500 – INTERIOR/EXTERIOR LIGHTING

Item 3: Make the following additions, corrections or deletions to the designated specification sections.

A. 00002 – TABLE OF CONTENTS

2. Add the following line to 00002, Page 3 under the Division 7 listing:

“07840 Firestopping 07840-1-5”

3. Delete the following line from Division 10

“10750 Telephone Specialties 10750-1-4”

B. 00320 – GEOTECHNICAL REPORT

2. Insert the attached Geotechnical report to section 00320

C. 01720 – PHASE TURNOVER AND CONTRACT CLOSEOUT

1. Delete paragraph “1.8.6 Record Document Deliverable”

D. 02870 – SITE FURNISHINGS

1. Delete line “2870.1.1.1.a Benches”

2. Delete line “2870.1.1.1.c Trash receptacles”

3. Delete section “2870.2.3 BENCHES:

4. Delete section “2870.2.5 TRASH RECEPTACLES:

E. 03300 – CAST-IN-PLACE CONCRETE

1. Add the following line to paragraph 03300.1.4.9

“d. In the event that none of the listed subcontractors agree to bid this project, alternate subcontractors that meet the requirements of paragraphs 1.4.9.b. and 1.4.9.c. will be considered. In that case provide documentation from each listed bidder that they will not bid this project.”

F. 07840 – FIRESTOPPING

1. Insert the attached specification section “07840-Firestopping” into Volume

One of the Specification Project Manual.

G. 08950 – SKYLIGHTS

1. Replace the existing specification section “08950 – skylights” dated December 11, 2008, with the attached specification section “08950 – Skylights” dated January 14, 2009

H. 09260 – GYPSUM BOARD ASSEMBLIES

1. Add the following paragraph to specification section 09260.2.3.1.a:

“General: Indicated metal material gage or decimal thickness establishes the minimum metal thickness allowed. Special texturing or other metal forming process which produces a lesser thickness metal claiming to be “equivalent” to the metal thickness or gage required is not acceptable.”

2. Delete the following text indicated by “strikeout” in line 09260.2.4.1.a.(1):

Thickness: Provide gypsum board in thicknesses indicated or, if not otherwise indicated, in either 1/2 inch or 5/8 inch thicknesses to comply with ASTM C 840 for application system and support spacing indicated.

3. Replace line 09260.2.4.2.a.(2) with the following:

“(2) Type: Foil backed gypsum board at perimeter of sales floor.”

4. Add the following line to paragraph 09260.2.4.2.a.:

“(6) Type: Type X at rated assemblies.”

5. Add the following line to paragraph 09260.2.7.4.:

“b. At fire rated partition heads anchored to fluted metal floor or roof deck provide mineral fiber safing material equal to unfaced USG “Thermafiber.””

I. 09671 – RESINOUS FLOORING

1. Delete paragraph “1.2 UNIT PRICE FOR OSMOTIC GROUT”

J. 10750 – TELEPHONE SPECIALTIES

1. Delete entire specification section “10750 – Telephone Specialties”

K. 15651 – PRODUCT REFRIGERATION SYSTEMS

1. In line 15651.1.2.9.2 Change basis of design product to “Hussmann HGM-

3BS.”

2. In line 15651.1.2.9.6.(a)(10) Delete -”Provide power cord.” And substitute – “Provide unit with integral NEC disconnect and hardwired via power pole to structure above.”

L. 16500A/B – INTERIOR/EXTERIOR LIGHTING

1. Add the following to line 16500.1.5.3 “IESNA is a lighting resource”

Item 4: The following Drawing Sheets have been modified without additional issued drawings

A. M1.0 B. R1.01 C. R2.01

D. E1.01 THRU E1.05

E. E1.02 F. E1.03 G. E2.03 H. E2.04 I. E5.03 J. E6.02 K. P1.01 thru P1.04 and R1.01 thru R1.04

Item 5: Make the following additions, corrections or deletions to the designated drawing sheets.

A. Sheet M1.0

1. Add the following note to room 31D3:

a. “Adjust EF-16 duct to room 31D3 to avoid crossing above electrical panel boards, Coordinate with Electrical and sheet E2.04.”

B. Sheet R1.01

1. Make the following changes to the plan:

a. “Remove 1G12A-3 from refrigeration circuit CS1-8. Provide new refrigeration circuit CS2-33 to serve 1G12A-3 case.

b. “Remove 1G12A-3 from refrigeration circuit CS1-1. Provide new refrigeration circuit CS2-34 to serve 1G12A-3 case.

C. Sheet R2.01

1. Make the following changes to the “Compressor Systems Schedule”:

a. “Change condensing temperature at CS-1 and CS-2 to read 115.”

b. “Change condensing temperature at CS-3 and CS-4 to read 120.”

2. Make the following change to the “Air Cooled Condensers Schedule”:

a. “Change condensing temperature at ACC-1 and ACC-2 to read 115.”

3. Make the following changes to the “Refrigeration Equipment and Piping Schedule”

a. “At circuit CS1-1 – Delete 1G12-3 and 3 doors of refrigeration.”

b. “At circuit CS1-8 – Delete 1G12-3 and 3 doors of refrigeration.”

c. “Add circuit CS2-33 to serve 1G12-3 case, match other data with other 1G12 circuits.”

d. “Add circuit CS2-34 to serve 1G12-3 case match other data with other 1G12 circuits.”

e. “Updated refrigeration loads as required for changes in circuits.”

D. Sheet E1.01 thru E1.05

1. Make the following changes to all plan sheets listed above:

a. “Delete occupancy sensor light switch and provide manual light switch in rooms 31C, 31D, 31D1, 31D2 31D3, 31D4, 31E and 31F.”

E. Sheet E1.02

1. Add the following room designation to the plan sheet listed above:

a. 31E Elevator Pump Room

F. Sheet E1.03

1. Make the following updates to the plan sheet listed above:

a. “Add a leader from the room 35 tag pointing to room 35.”

b. “Move lighting, switch, circuiting and room tag for room 31B at column G-3 to correct location at column F-3. Add type K fixture.” See attached sketch.

G. Sheet E2.03

1. Add the following note to room 31D4:

a. “Adjust location of electrical panel LF to avoid placement below supply duct, coordinate with Mechanical and sheet M1.03.”

H. Sheet E2.04

1. Add the following note at the service feeder to the utility transformer:

a. “See detail 5/ME2.01 for duct bank.”

I. Sheet E5.03

1. Make the following change to the plan sheet listed above:

a. “Delete fire sprinkler pump disconnect and feeder connection to MDC.

Connect fire sprinkler pump feeder directly to utility transformer secondary.”

J. Sheet E5.03

1. Make the following change to the plan sheet listed above:

a. “At Circuit #9, delete reference to panel HE1 and substitute "ATS1 (Panel

HE)."

H. Sheets P1.01-P1.04 and R1.01-R1.04, Add the flowing note:

1. Add the following note to all plan sheets listed above:

a. “Coordinate location of floor drains below refrigerated product display cases with product refrigeration system installer. Provide shop drawing for review and coordination of floor drain locations in sales area for all drains located below refrigerated display equipment. Locate floor drains as directed by refrigeration installer to avoid conflict with case supports and allow maintenance access to drains.”

END OF ADDENDUM 0002