Attachment 0002 - PWS Supporting Technical Documentation (REV1).pdf

PDF 210 KB Posted

Attached to
Bonneville Lock & Dam Elevator & Escalator Monthly Maintenance, Minor Repairs, Emergency Egress, & Inspections
Solicitation number
W9127N26QA066
Issued by

About this file

This is a Performance Work Statement (PWS) attachment providing supporting technical documentation for elevator and escalator maintenance services at Bonneville Lock & Dam. The contract number is W9127N26QA066.

The document identifies 25 elevators and escalators across two locations requiring maintenance services. Oregon facilities house 8 units including geared passenger elevators (GE models from 1936, Otis from 1941, US models from 1975), a geared freight elevator (Montgomery from 1942), a hydraulic passenger elevator (Esco from 1993), and a rack and pinion wheelchair lift (Access Industries from 1994). Washington facilities contain 8 geared and hydraulic passenger/freight elevators (Otis from 1982) and 9 escalators (48-inch J-type and HDB type units, all Otis from 1982). As of October 2020, three units are out of service and excluded from maintenance requirements: one hydraulic passenger elevator in Oregon (item #7), and two escalators in Washington (items #23 and #25). The pricing schedule establishes individual monthly line items for each unit across a base year and four option years. The contractor must submit numerous deliverables including emergency response procedures, periodic test and inspection reports, state elevator inspection results, maintenance schedules, monthly maintenance and test check sheets, defect notifications, and various compliance training certifications (AT Level 1, OPSEC, CUI, NERC-CIP, and suspicious activity reporting) with submission deadlines ranging from 14 days after contract award to 30 days prior to onsite work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N26QA066 – Bonneville Lock & Dam Elevator & Escalator PWS Attachment 0002 - Supporting Technical Documentation

LOCATION OF ELEVATORS AND ESCALATORS

Oregon Elevators

Elevators MFG/YR. Ser No. CE No.

1) Geared Pass. GE/1936 170557 1-P1-1

2) Geared Pass. GE/1936 170249 2-P1-2

3) Geared Frt. Mont/1942 12751 3-P1-3

4) Geared Pass. Otis/1941 154283 4-P1-4

5) Geared Pass. US/1975 G1893GK 5-P1-5

6) Geared Pass. US/1975 G1754GK 6-P1-6

7) Hyd. Pass. Esco/1993 10648 1-N2-24

8) Rack & Pinion

Wheelchair Lift Access Ind./1994 B1194IL0969932

FA

1-AU-25

Washington Elevators

Elevators MFG/YR. Ser. No. CE No.

9) Geared Pass. Otis/1982 812251 1-P2-7

10) Geared Pass. Otis/1982 812252 2-P2-8

11) Geared Frt. Otis/1982 812253 3-P2-9

12) Geared Frt. Otis/1982 812254 4-P2-10

13) Geared Pass. Otis/1982 812255 5-P2-11

14) Hyd. Pass. Otis/1982 812256 6-P2-12

15) Geared Pass. Otis/1982 812257 7-P2-13

16) Geared Pass. Otis/1982 812258 8-P2-14

Washington Escalators

Escalators MFG/YR. Ser. No. CE No.

17) 48” J-type Otis/1982 812259 1-P2-15

18) 48” J-type Otis/1982 812260 2-P2-16

19) 48” J-type Otis/1982 812261 3-P2-17

20) 48” J-type Otis/1982 812262 P1-P2-18

21) 48” J-type Otis/1982 812263 P2-P2-19

22) 48” J-type Otis/1982 812264 P3-P2-20

23) 48” HDB type Otis/1982 812265 P4-P2-21

24) 48” J-type Otis/1982 812266 P5-P2-22

25) 48” J-type Otis/1982 812267 P6-P2-23

*Note: As of October 2020, items #7, #23, and #25 are OOS (out of service) and are not included for maintenance needs of this requirement.

ELEVATOR AND ESCALATOR INDIVIDUAL PRICE SCHEDULE PER MONTH

Oregon Elevators

Sub- Contract Line Item

(SLIN)

Elevators Location # of Landings

Base Year

Opt 1 Opt 2 Opt 3 Opt 4

1) AA Geared Pass. PH1 +55 & up 6

2) AB Geared Pass. PH1 +55 down 6

3) AC Geared Frt. Warehouse 2

4) AD Geared Pass. Main Dam 2

5) AE Geared Pass. BIVC #1 5

6) AF Geared Pass. BIVC #2 5

7) Hyd. Pass. Navlock2 *** *** *** *** ***

8) AH Rack & Pinion

Wheelchair lift Auditorium 2

Washington Elevators

Line Item

(SLIN)

Elevators Location # of Landings

Base Year

Opt 1 Opt 2 Opt 3 Opt 4

9) AJ Geared Pass. Glass PH2 D/S 6

10) AK Geared Pass. Glass PH2 U/S 6

11) AL Geared Frt. PH2 North 6

12) AM Geared Frt. PH2 South 7

13) AN Geared Pass. PH2 South 2

14) AP Hyd. Pass. Fish View 3

15) AQ Geared Pass. VOB Staff 4

16) AR Geared Pass. VOB Visit 3

Washington Escalators

Line Item

(SLIN)

Escalators Location Base Year

Opt 1 Opt 2 Opt 3 Opt 4

17) AS 48” J-type VOB Bldg.

18) AT 48” J-type VOB Bldg.

19) AU 48” J-type VOB Bldg.

20) AV 48” J-type PH2

21) AW 48” J-type PH2

22) AX 48” J-type PH2

23) 48” J-type PH2 *** *** *** *** ***

24) AY 48” J-type PH2

25) 48” J-type PH2 *** *** *** *** ***

*** This equipment is currently out of service for an extended period of time and shall not be included for pricing/maintenance consideration within this contract.

DELIVERABLES SCHEDULE

The Contractor shall submit these deliverables to the Contracting Officer’s Representative via electronic .pdf format and/or hard copy as identified below.

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Emergency Response Procedures, paragraph 5.3

Within 14 days after contract award

2 copies Paper (hard copy) and electronic (pdf)

COR

Periodic Test and Inspection Reports, paragraph 5.4

14 days after Inspection date

2 copies Paper (original hard copy) and electronic

COR

State Elevator Inspection Results, paragraph 5.5.1

14 days after State Inspection

2 copies Paper (original hard copy), and electronic

COR

Maintenance Schedule, paragraph 5.7.1

Within 14 days after contract award

2 copies Paper (hard copy) and electronic (pdf)

COR

Maintenance and Test Check Sheet, paragraph 5.7.2

By 7th day of each Month, with invoice

2 copies Paper (hardcopy) and electronic pdf

Posted in Machinery Room and to COR

Notification of Defects, paragraph 5.7.3

Immediately upon discovery

1 copy Electronic COR

Proposed Changes, paragraph 5.7.4

As Needed 2 copies Paper (hard copy) and electronic

COR

CQC Program, paragraph 6.2

7 days prior to pre-work conference

2 copies Paper (hard copy) and electronic (pdf)

COR

Identification of Employees, paragraph 7.1.3

7 days prior to post-award conference

1 copy Paper (hardcopy) COR

Verification of Employment Eligibility, paragraph 7.1.4

Within 3 business days after contract award

1 copy Paper (hardcopy) or electronic (pdf)

COR

AT Level 1 Training, paragraph 7.1.8a

30 days prior to onsite work 1 copy Paper (hardcopy) or electronic (pdf)

COR

Suspicious Activity Reporting Training, paragraph 7.1.8b

30 days prior to onsite work 1 copy Paper (hardcopy) or electronic (pdf)

COR

OPSEC Training, paragraph 7.1.8c

30 days prior to onsite work 1 copy Paper (hardcopy) or electronic (pdf)

COR

CUI Training, paragraph 7.1.8d

30 days prior to onsite work 1 copy Paper (hardcopy) or electronic (pdf)

COR

NERC-CIP Training, paragraph 7.1.8e

30 days prior to onsite work 1 copy Paper (hardcopy) or electronic (pdf)

COR

Seven-Year Criminal Background Check, paragraphs 7.1.12 and 7.1.12.a

7 days prior to required unescorted access

1 copy Paper (hardcopy) or electronic (pdf)

Project Security Specialist

Accident Prevention Program/Activity Hazard Analysis, paragraph 7.2.1

7 days prior to pre-work conference

2 copies Paper (hard copy) and electronic (pdf).

COR

HECP Training, paragraph 7.2.2a

7 days prior to post-award conference

2 copies Paper (hard copy) and electronic (pdf).

COR and Project

SOH

Hazard Communication Plan, paragraph 7.2.3

7 days prior to pre-work conference

2 copies Paper (hard copy) and electronic (pdf)

COR

ELEVATOR AND ESCALATOR INDIVIDUAL PRICE SCHEDULE PER MONTH
DELIVERABLES SCHEDULE

File details come from the government source that posted it. Updated .