Solicitation Amendment W9127N26BA0240006_Package.pdf

PDF 3 MB Posted

Attached to
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation number
W9127N26BA024
Issued by

About this file

This document is Amendment 0006 to Solicitation W9127N26BA024, a federal construction contract for the Bonneville Powerhouse I Navigation Lock Bridge Replacement project, effective October 14, 2026. The amendment modifies solicitation specifications and drawings without extending the offer receipt deadline.

The amendment introduces two key specification changes: (1) addition of Paragraph 3.8.1 "Governing Field Testing Standards and Frequencies" to Section 01 45 00.00 25 (Quality Control), requiring all field sampling, testing, and materials acceptance testing for civil, structural, and highway infrastructure features comply with the current edition of the Oregon Department of Transportation Manual of Field Test Procedures (MFTP), with the most stringent requirement applying when conflicts exist between USACE and ODOT frequencies; and (2) addition of Paragraph 3.13.1 "General" to Section 03 30 00.00 99 (Cast-In-Place Reinforced Concrete), establishing the same MFTP compliance requirement for concrete sampling, field testing, specimen fabrication, and laboratory analysis. The amendment also updates three contract drawings: C-102, C-104, and C-106, replacing them with revised versions incorporating demolition notes, paving area updates, and fencing/gate definitions. The issuing contracting officer is Christopher Burroughs at the W071 ENDIST Portland KO Contracting Division. Contractors must acknowledge receipt of this amendment prior to the specified offer deadline using one of three methods outlined in the solicitation terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

This amendment affects changes to the Block 14 (Description of Amendment/Modification):

Block 14 (Description of Amendment/Modification):

CHANGE IN SOLICITATION SPECIFICATIONS:

Solicitation Specifications, Section 01 45 00.00 25 QUALITY CONTROL Paragraph 3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES added.

Solicitation Specifications, Section 03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE Paragraph 3.13.1 GENERAL added.

CHANGE IN SOLICITATION DRAWINGS:

Remove drawing C-104 and replace with C-104 - MARK 1 - AMD-0006 - UPDATE TO

DEMOLITION NOTES.

Remove drawing C-106 and replace with C-106 - MARK 1 - AMD-0006 - UPDATE TO PAVING

AREA AND NOTES, MARK 2 - AMD-0006 - UPDATE TO DEFINE FENCING AND GATE.

Remove drawing C-102 and replace with C-102 - MARK 1 - AMD-0006 - UPDATE TO

DEMOLITION NOTES.

W9127N26BA0240006

Bonneville Powerhouse I Navigation Lock Bridge Replacement

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.00 25 CONTRACT ADMINISTRATION DATA

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 11 00.00 25 SUMMARY OF WORK

01 12 00.00 25 SECURITY REQUIREMENTS

01 15 00.01 25 PARTNERING: LEVEL ONE

01 22 00.00 25 MEASUREMENT AND PAYMENT

01 32 01.00 25 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 27.00 25 DIVING

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP)

01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19.00 25 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 23.00 25 OPERATION AND MAINTENANCE DATA

01 78 39.10 25 AS-BUILT DRAWINGS

DIVISION 02 - EXISTING CONDITIONS

02 41 00.00 99 DEMOLITION AND DECONSTRUCTION

02 81 00.00 99 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00.00 25 ASBESTOS REMEDIATION

02 83 00.00 99 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE

DIVISION 05 - METALS

05 12 00.00 99 STRUCTURAL BRIDGE STEEL

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 10 00.00 99 STRUCTURAL BRIDGE EXPANSION JOINTS

DIVISION 09 - FINISHES

09 90 00.00 99 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00.00 99 SEISMIC ISOLATION BRIDGE BEARINGS

10 14 53.00 99 TRAFFIC SIGNAGE

DIVISION 26 - ELECTRICAL

26 05 19.00 99 INSULATED WIRE AND CABLE

26 56 00.00 99 EXTERIOR LIGHTING

DIVISION 31 - EARTHWORK

31 00 00.00 99 EARTHWORK

PROJECT TABLE OF CONTENTS Page 1

AMD #0006

31 05 19.13 99 GEOTEXTILES FOR EARTHWORK

31 11 00.00 99 CLEARING AND GRUBBING

31 52 00.00 25 COFFERDAMS

31 63 29.00 99 DRILLED CONCRETE PIERS AND SHAFTS

31 66 10.00 99 ROCK FOUNDATION PREPARATION

31 68 13.00 99 GROUND ANCHORS

31 73 20.00 99 JET GROUTING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 99 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33.00 99 LANDSCAPE ESTABLISHMENT

32 11 20.00 99 BASE COURSE FOR RIGID AND SUBBASE FOR FLEXIBLE PAVING

32 12 16.16 99 ROAD-MIX ASPHALT PAVING

32 13 13.06 99 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19.00 99 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23.00 99 PAVEMENT MARKINGS

32 31 13.00 99 CHAIN LINK FENCES AND GATES

32 84 24.00 99 IRRIGATION SPRINKLER SYSTEMS

32 92 19.00 99 SEEDING

32 93 00.00 99 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00.00 99 WATER UTILITY DISTRIBUTION PIPING

33 40 00.00 99 STORMWATER UTILITIES

33 46 16.00 99 SUBDRAINAGE PIPING

33 71 02.00 99 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 34 - TRANSPORTATION

34 71 13.16 99 VEHICLE CRASH BARRIERS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 45 00.00 25

QUALITY CONTROL

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 LABORATORY VALIDATION

1.4 PAYMENT

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Quality Control System

3.1.2 Project Superintendent

3.2 CONTRACTOR QUALITY CONTROL PLAN

3.2.1 Content of the CQC Plan

3.2.2 Acceptance of CQC Plan

3.2.3 Notification of Changes

3.3 COORDINATION MEETING

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

3.4.2 CQC System Manager Qualifications

3.4.3 CQC Specialized Personnel

3.4.4 Construction Quality Management for Contractors

3.4.5 Organizational Changes

3.5 FAILURE TO COMPLETE PERSONNEL DUTIES

3.6 SUBMITTALS AND DELIVERABLES

3.7 QUALITY CONTROL

3.7.1 Preparatory Phase

3.7.2 Initial Phase

3.7.3 Follow-up Phase

3.7.4 Additional Preparatory and Initial Phases

3.8 TESTS

3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES

3.8.2 Testing Procedure

3.8.3 Testing Laboratories

3.8.4 Onsite Laboratory

3.8.5 Furnishing or Transportation of Samples for Testing

3.9 COMPLETION INSPECTION

3.9.1 Punch-Out Inspection

3.9.2 Pre-Final Inspection

3.9.3 Final Acceptance Inspection

3.10 DOCUMENTATION

3.11 NOTIFICATION OF NONCOMPLIANCE

SECTION 01 45 00.00 25 Page 1

-- End of Section Table of Contents --

SECTION 01 45 00.00 25 Page 2

SECTION 01 45 00.00 25

QUALITY CONTROL

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1077 (2024) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1093 (2022) Standard Practice for Accreditation of Testing Agencies for Masonry

ASTM D3666 (2016) Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials

ASTM D3740 (2019) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM E329 (2023) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection

Oregon Department of Transportation (ODOT)

MFTP (2026) Manual of Field Test Procedures

(MFTP)

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Contractor Quality Control Plan; G

Construction Quality Management for Contractors

SECTION 01 45 00.00 25 Page 3

1.3 LABORATORY VALIDATION

For tests performed under this Contract, use a testing laboratory validated by the Corps of Engineers Material Testing Center (MTC). See Paragraph entitled TESTS.

1.4 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control system, and all associated costs will be included in the applicable unit prices or lump-sum prices contained in the Price Schedule.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Quality Control System

Establish and maintain an effective quality control (QC) system in compliance with Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION. The quality control system must consist of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system must cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence.

3.1.2 Project Superintendent

Identify an individual, within the onsite work organization, as Project Superintendent. The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract. The designated Project Superintendent must be acceptable to the Contracting Officer (CO). The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the CO for non-compliance with the quality requirements specified in the Contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the Project Superintendent. The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site. The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position. Identify an alternate for the Project Superintendent to serve in the event of the Project Superintendent's absence or to cover work performed on additional shift. The requirements for the alternate are the same as the designated Project Superintendent.

3.2 CONTRACTOR QUALITY CONTROL PLAN

Submit no later than 30 days after receipt of Notice to Proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION. The Government will consider an interim plan for the first 10 days of operation. Construction will be permitted to begin only after acceptance

SECTION 01 45 00.00 25 Page 4 of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work.

3.2.1 Content of the CQC Plan

Include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff must implement the three phase control system for all aspects of the work specified. Include in the staff a CQC System Manager.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see Paragraph entitled QUALITY CONTROL ORGANIZATION.

c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities must be issued by the CQC System Manager. Copies of these letters must be furnished to the Government.

d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Use laboratory facilities approved by the CO.)

f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

h. Reporting procedures, including proposed reporting formats.

i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each Section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular

SECTION 01 45 00.00 25 Page 5

Section. This list will be agreed upon during the coordination meeting.

3.2.2 Acceptance of CQC Plan

Acceptance of the CQC plan is required prior to the start of construction.

Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in the CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.2.3 Notification of Changes

After acceptance of the CQC Plan, notify the CO in writing of any proposed change. Proposed changes are subject to acceptance by the CO.

3.3 COORDINATION MEETING

After the Preconstruction Conference, before start of construction and prior to acceptance by the Government of the CQC Plan, the Contractor must meet with the CO and discuss the Contractor's quality control system.

Submit the CQC Plan for review a minimum of 10 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management, and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government and signed by both the Contractor and the CO and will become a part of the Contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure Contract compliance. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly must be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. All CQC staff members must be subject to acceptance by the CO. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules, and all other project documentation to the CQC organization. The CQC organization must maintain these documents and records at the site at all times, except as otherwise acceptable to the CO.

3.4.2 CQC System Manager Qualifications

Identify an individual, within the onsite work organization, as CQC System Manager who must be responsible for writing and executing a complete CQC plan, overall management of CQC, and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must have a minimum of ten years of experience in a verifiable CQC role on jobs similar to this

SECTION 01 45 00.00 25 Page 6

Contract. This CQC System Manager must be on the site at all times during construction and be employed by the Prime Contractor. The CQC System Manager must be assigned no other duties. Identify in the plan an alternate for the CQC System Manager to serve in the event of the CQC System Manager's absence or to cover work performed on additional shifts. The requirements for the alternate are the same as the designated CQC System Manager.

3.4.3 CQC Specialized Personnel

In addition to CQC personnel specified elsewhere in the Contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil, structural, if the CQC manager is not qualified to cover these areas at the discretion of the CO. These individuals may be employees of the Prime or subcontractor; must be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; must have five years of experience in a verifiable CQC role on jobs similar to this Contract; and must be a graduate engineer, journeyman, or licensed in their own discipline. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan.

3.4.4 Construction Quality Management for Contractors

The CQC System Manager and Alternate CQC System Manager must have successfully completed the course entitled "Construction Quality Management For Contractors." This course is periodically offered by the Associated Builders and Constructors, Inc., or Associated General Contractor, Inc. and must be retaken every five years. The course has been coordinated with the Navy and certificates from the Navy will be accepted. For further information regarding courses in the Portland area contact: Associated General Contractors, Oregon-Columbia Chapter at (503) 682-3363 or https://www.agc-oregon.org/training/professional-development/. Furnish documentation that the Contractor Quality Control System Manager has completed the course.

3.4.5 Organizational Changes

Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the CO for acceptance.

3.5 FAILURE TO COMPLETE PERSONNEL DUTIES

Superintendent and QC Manager are subject to dismissal if the above duties are not being effectively carried out. If the Superintendent and QC Manager are dismissed project work will be stopped and will not be allowed to resume until a suitable replacement is approved and the above duties are again being effectively carried out.

3.6 SUBMITTALS AND DELIVERABLES

Submittals, if needed, must comply with the requirements in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization must be responsible for certifying that all submittals and deliverables are in compliance with Contract requirements.

SECTION 01 45 00.00 25 Page 7 https://www.agc-oregon.org/training/professional-development

3.7 QUALITY CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the Contract. At least three phases (Preparatory, Initial, and Follow-up) of control must be conducted by the CQC System Manager for each definable feature of the construction work as follows:

3.7.1 Preparatory Phase

This phase must be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

a. Review each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those Sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.

b. Review of the Contract drawings.

c. Check to assure that all materials or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.

f. Physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. Review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the CO.

j. Discussion of the initial control phase.

k. Notify the Government at least 24 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The CQC System Manager must prepare and document the results of the preparatory phase actions by separate minutes, and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet Contract specifications.

SECTION 01 45 00.00 25 Page 8

3.7.2 Initial Phase

This phase must be accomplished at the beginning of a definable feature of work. Accomplish the following:

a. Check work to ensure that it is in full compliance with Contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full Contract compliance.

Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. Notify the Government at least 24 hours in advance of beginning the initial phase. Document separate minutes of this phase, prepared by the CQC System Manager, and attach to the daily CQC report. Indicate exact location of initial phase for future reference and comparison with follow-up phases.

g. Repeat the initial phase for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.7.3 Follow-up Phase

Perform daily checks to assure control activities, including control testing, are providing continued compliance with Contract requirements, until completion of the particular feature of work. Record the daily checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.

3.7.4 Additional Preparatory and Initial Phases

Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision, or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.8 TESTS

3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES

a. Execute all field sampling, testing, specimen fabrication, laboratory analysis, and materials acceptance testing for civil, structural, and highway infrastructure features of work-including but not limited to earthwork, embankments, subgrades, aggregate bases, asphalt pavements, and structural concrete in accordance with the current edition of the Oregon Department of Transportation (ODOT) Manual of Field Test Procedures (MFTP).

SECTION 01 45 00.00 25 Page 9

b. The Contractor's Quality Control Plan (QCP) must explicitly incorporate the testing methods, sampling frequencies, and lot/sublot definitions outlined in the ODOT MFTP Field Tested Materials Acceptance Guide (FTMAG) for each applicable material class. In the event of a conflict between USACE (UFGS) testing frequencies and the ODOT MFTP, the most stringent requirement applies.

3.8.2 Testing Procedure

Perform specified or required tests to verify that control measures are adequate to provide a product that conforms to Contract requirements.

Report all test results using industry standard forms at the frequency specified in the Contract. Upon request, furnish to the Government duplicate samples of test specimens for QA verification testing by the Government. Procure the services of a Corps of Engineers approved testing laboratory, as described in Subparagraph entitled TESTING LABORATORIES, or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with Contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Record results of all tests taken, both passing and failing, on the CQC report for the date taken. Include Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the CO, actual test reports may be submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the CO. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this Contract.

3.8.3 Testing Laboratories

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the Contract specifications and to check the laboratory technician's testing procedures and techniques.

a. Validation. The validation of a testing laboratory is site-specific and cannot be transferred to a facility at a different location. Costs for validation by the Corps of Engineers MTC must be borne by the laboratory or the Contractor. Validation is granted only for the specific testing procedures requested to be validated. The laboratory may select the testing procedures to be validated, except for the Quality Assurance requirements of the applicable ASTM standards listed in this Paragraph.

b. Validation Procedures. Validation of a testing laboratory consists

SECTION 01 45 00.00 25 Page 10 of either an inspection or audit, as defined below:

(1) Inspection must be performed by the MTC to verify compliance with the applicable provisions of ASTM C1077, ASTM C1093, ASTM D3666, ASTM D3740, and ASTM E329.

(2) An audit would be performed by the MTC in lieu of an inspection for laboratories holding a current AASHTO accreditation. Inspection by the MTC may be required after auditing if critical testing procedures required in the Contract were not included in the applicable CCRL or AMRL inspections.

c. Validation Schedule. For aggregate, concrete, bituminous materials, soil, rock, riprap, and metal components, the frequency of validation inspections or audits is once every two years. For water quality and sediment testing the validation schedule is every 18 months. When conditions change substantially from the time of the last validation, laboratories must be re-validated.

d. Validation Process. For information on the validation process and costs contact the MTC at (601) 634-2496. Procedures for validation, including forms requesting validation may be obtained from the MTC web site at: https://mtc.erdc.dren.mil/. The Contractor is cautioned that the validation process is lengthy and that it requires immediate action. Keep the CO informed about the validation process as it proceeds in a timely manner.

3.8.4 Onsite Laboratory

The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

3.8.5 Furnishing or Transportation of Samples for Testing

Costs incidental to the transportation of samples or materials must be borne by the Contractor. Samples of materials for test verification and acceptance testing by the Government must be delivered to the Portland District Contract commercial Laboratory in the District area. Coordination for each specific test, exact delivery location, and dates must be made through the Portland District Resident Office.

3.9 COMPLETION INSPECTION

3.9.1 Punch-Out Inspection

The CQC Manager must conduct an inspection of the work near the end of the work, or any increment of the work established by a time stated in the specifications, or the Contract Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. As required by Paragraph DOCUMENTATION, prepare and include in the CQC documentation a punch list of items which do not conform to the approved drawings and specifications.

Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. The CQC System Manager or staff must make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the Government Pre-Final inspection.

SECTION 01 45 00.00 25 Page 11

3.9.2 Pre-Final Inspection

The Government will perform the pre-final inspection to verify that the work is complete. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager must ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled.

Correct any items noted on the Pre-Final inspection in a timely manner.

These inspections and any deficiency corrections required by this Paragraph must be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.

3.9.3 Final Acceptance Inspection

The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the CO must be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the CO based upon results of the Pre-Final inspection. Notify the CO at least 14 days prior to the final acceptance inspection and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the Contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all Contract work acceptably complete for this inspection will be cause for the CO to bill the Contractor for the Government's additional inspection cost in accordance with Contract Clause 52.246-12, INSPECTION OF CONSTRUCTION.

3.10 DOCUMENTATION

Daily CQC Report:

a. Maintain current records providing factual evidence that required quality control activities and tests have been performed. Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:

(1) Contractor/subcontractor and their area of responsibility.

(2) Operating plant and equipment with hours worked, idle, or down for repair.

(3) Work performed each day, giving location, description, and by whom. When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.

(4) Test and control activities performed with results and references to specifications and drawings requirements. Identify the control phase (Preparatory, Initial, or Follow-up). List of deficiencies noted, along with corrective action.

(5) Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications and drawings requirements.

(6) Submittals and deliverables reviewed, with Contract reference, SECTION 01 45 00.00 25 Page 12 by whom, and action taken.

(7) Offsite surveillance activities, including actions taken.

(8) Job safety evaluations stating what was checked, results, and instructions or corrective actions.

(9) Instructions given or received and conflicts in plans and specifications.

(10) Contractor's verification statement.

(11) Deficiency Tracking System. Maintain a cumulative list of deficiencies identified for the duration of the project.

Deficiencies to be listed include those failures, Government oral observations, and Notifications of Noncompliance. Maintain the list at the project site. Submit copies of updated listings to the Government at least every 30 days.

b. Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract. Electronically submit daily reports and a signed, printed copy of these records to the Government within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed.

As a minimum, prepare and submit one report for every seven days of no work and on the last day of a no work period. All calendar days must be accounted for throughout the life of the Contract. The first report following a day of no work must be for that day only. Reports must be signed and dated by the CQC System Manager. Include copies of test reports and copies of reports prepared by all subordinate quality control personnel within the Daily CQC Report.

3.11 NOTIFICATION OF NONCOMPLIANCE

The CO will notify the Contractor of any detected noncompliance with the foregoing requirements. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, must be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the CO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor must make no part of the time lost due to such stop orders the subject of claim for extension of time or for excess costs or damages.

-- End of Section --

SECTION 01 45 00.00 25 Page 13

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 30 00.00 99

CAST-IN-PLACE REINFORCED CONCRETE

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 SUBMITTALS

1.4 MODIFICATION OF REFERENCES

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Reinforcement

1.5.1.1 Epoxy Coated Reinforcing Steel

1.6 QUALITY ASSURANCE

1.6.1 Design Data

1.6.1.1 Formwork Calculations

1.6.1.2 Concrete Mix Design

1.6.1.3 Mass Concrete Design

1.6.2 Shop Drawings

1.6.2.1 Formwork

1.6.2.2 Reinforcing Steel

1.6.3 Control Submittals

1.6.3.1 Concrete Curing Plan

1.6.3.2 Pumping Concrete

1.6.3.3 Silica Fume Manufacturer's Representative

1.6.3.4 Finishing Plan

1.6.3.5 Safety Data Sheets

1.6.4 Test Reports

1.6.4.1 Fly Ash and Pozzolan

1.6.4.2 Slag Cement

1.6.4.3 Aggregates

1.6.4.4 Fiber-Reinforced Concrete

1.6.5 Field Samples

1.6.5.1 Slab Finish Sample

1.6.5.2 Surface Finish Samples

1.6.6 Quality Control Plan

1.6.7 Concrete Deck Pre-Placement Conference

1.6.8 Quality Control Personnel Certifications

1.6.8.1 Quality Manager Qualifications

1.6.8.2 Field Testing Technician and Testing Agency

1.6.8.3 ADA Sidewalk Certification

1.6.9 Laboratory Qualifications for Concrete Qualification Testing

1.6.10 Laboratory Accreditation

1.7 ENVIRONMENTAL REQUIREMENTS

1.7.1 Submittals for Environmental Performance

1.8 SUSTAINABLE DESIGN REQUIREMENTS

1.8.1 Local/Regional Materials

1.9 QUALIFICATIONS FOR WELDING WORK

PART 2 PRODUCTS

SECTION 03 30 00.00 99 Page 1

2.1 STRUCTURAL CONCRETE

2.2 FORMWORK MATERIALS

2.2.1 Wood Forms

2.2.1.1 Concrete Form Plywood (Standard Rough)

2.2.1.2 Overlaid Concrete Form Plywood (Standard Smooth)

2.2.2 Plastic Forms

2.2.3 Carton Forms

2.2.4 Steel Forms

2.3 FORMWORK ACCESSORIES

2.3.1 Form Ties

2.3.2 Waterstops

2.3.2.1 PVC Waterstop

2.3.2.2 Rubber Waterstop

2.3.2.3 Thermoplastic Elastomeric Rubber Waterstop

2.3.2.4 Hydrophilic Waterstop

2.3.3 Biodegradable Form Release Agent

2.3.4 Chamfer Materials

2.3.5 Construction Joints

2.4 CONCRETE MATERIALS

2.4.1 Cementitious Materials

2.4.1.1 Portland Cement

2.4.1.2 Blended Cements

2.4.1.3 Fly Ash

2.4.1.4 Slag Cement

2.4.1.5 Silica Fume

2.4.1.6 Other Supplementary Cementitious Materials

2.4.2 Water

2.4.3 Aggregate

2.4.3.1 Normal-Weight Aggregate

2.4.4 Admixtures

2.5 MISCELLANEOUS MATERIALS

2.5.1 Concrete Curing Materials

2.5.2 Nonshrink Grout

2.5.3 Surface Finish Materials

2.5.3.1 Deck Roadway Finish

2.5.3.2 Deck Sidewalk and Curb Finish

2.5.3.3 Bridge Approach Slab Finish

2.5.3.4 Other Surface Finish

2.5.4 Joint Filler

2.5.5 Joint Sealants

2.6 CONCRETE MIX DESIGN

2.6.1 Properties and Requirements

2.6.2 Durability

2.6.2.1 Alkali-Aggregate Reaction

2.6.2.2 Concrete Temperature

2.6.2.3 Concrete permeability

2.6.3 Trial Sampling and Testing

2.6.4 Ready-Mix Concrete

2.7 REINFORCEMENT

2.7.1 Reinforcing Bars

2.7.1.1 Epoxy-Coated Reinforcing Bars

2.7.1.2 Headed Shear Stud Reinforcement

2.7.2 Welded Wire Reinforcement

2.7.3 Welding

PART 3 EXECUTION

3.1 EXAMINATION

SECTION 03 30 00.00 99 Page 2

3.2 CONSTRUCTION METHODS

3.3 FORMS

3.4 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS

3.4.1 General

3.4.2 Reinforcement Supports

3.4.3 Epoxy Coated Reinforcing

3.4.3.1 Epoxy Coated Reinforcing Steel Placement and Coating Repair

3.4.4 Splicing

3.4.5 Future Bonding

3.4.6 Setting Miscellaneous Material

3.4.7 Fabrication

3.4.8 Placing Reinforcement

3.4.9 Spacing of Reinforcing Bars

3.4.10 Concrete Protection for Reinforcement

3.4.11 Welding

3.5 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE

3.5.1 Measuring

3.5.2 Mixing

3.5.3 Transporting

3.6 PLACING CONCRETE

3.6.1 Footing Placement

3.6.2 Approach Slab Placement

3.6.3 Bridge Rail Placement

3.6.4 Mass Concrete Placement

3.6.5 Pumping

3.6.6 Cold Weather

3.6.7 Hot Weather

3.6.8 Preparation of Surfaces to Receive Grout, Mortar, or Concrete

3.7 WASTE MANAGEMENT

3.7.1 Mixing Equipment

3.7.2 Hardened, Cured Waste Concrete

3.7.3 Reinforcing Steel

3.7.4 Other Waste

3.8 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES

3.8.1 Defects

3.8.2 Formed Surfaces

3.8.2.1 Tolerances

3.8.2.2 Deck Finishing Machine

3.8.2.3 Surface Finish

3.9 CONCRETE SLAB AND MISCELLANEOUS CONSTRUCTION

3.9.1 Deck Roadway Texturing

3.10 TOLERANCES

3.10.1 Tolerance Report

3.11 JOINTS

3.11.1 Construction Joints

3.11.2 Contraction Joints in Slabs on Ground

3.11.3 Sealing Joints in Slabs on Ground

3.12 CURING AND PROTECTION

3.12.1 Curing Periods

3.12.2 Curing Formed Surfaces

3.12.3 Curing Unformed Surfaces

3.12.4 Temperature of Concrete During Curing

3.12.5 Protection from Mechanical Injury

3.12.6 Protection After Curing

3.13 FIELD QUALITY CONTROL

3.13.1 General

3.13.2 Aggregate Testing

3.13.3 Concrete Sampling

3.13.4 Concrete Testing

SECTION 03 30 00.00 99 Page 3

3.13.4.1 Slump Tests

3.13.4.2 Temperature Tests

3.13.4.3 Compressive Strength Tests

3.13.4.4 Air Content

3.13.4.5 Strength of Concrete Structure

3.13.4.6 Non-Conforming Materials

3.13.4.7 Testing Concrete Structure for Strength

3.14 REPAIR, REHABILITATION AND REMOVAL

3.14.1 Crack Repair

3.14.2 Repair of Weak Surfaces

3.14.3 Failure of Quality Assurance Test Results

-- End of Section Table of Contents --

SECTION 03 30 00.00 99 Page 4

SECTION 03 30 00.00 99

CAST-IN-PLACE REINFORCED CONCRETE

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO LRFD (9th Edition; 2020 with 2022 Interims) Bridge Design Specifications

AASHTO M 240/M 240M (2023) Standard Specification for Blended Hydraulic Cement

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 117 (2010; R 2015) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO

ACI 301 (2020) Specifications for Structural Concrete

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 308.1 (2023) Specification for Curing Concrete

ACI 347R (2014; Errata 1 2017) Guide to Formwork for Concrete

ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection

ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M (2018) Structural Welding Code -

SECTION 03 30 00.00 99 Page 5

Reinforcing Steel

AWS D1.5M/D1.5 (2020; Errata 1 2022) Bridge Welding Code

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2022) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A706/A706M (2022a) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

ASTM A775/A775M (2022) Standard Specification for Epoxy-Coated Steel Reinforcing Bars

ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A884/A884M (2019; Errata 1) Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement

ASTM A934/A934M (2022) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars

ASTM A1022/A1022M (2016b) Standard Specification for Deformed and Plain Stainless Steel Wire and Welded Wire for Concrete Reinforcement

ASTM A1044/A1044M (2016a; Errata 1) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete

ASTM A1060/A1060M (2016b) Standard Specification for Zinc-Coated (Galvanized) Steel Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A1064/A1064M (2024) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM C31/C31M (2024b) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2023) Standard Specification for Concrete Aggregates

ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C78/C78M (2022) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam

SECTION 03 30 00.00 99 Page 6 with Third-Point Loading)

ASTM C94/C94M (2024a) Standard Specification for Ready-Mixed Concrete

ASTM C150/C150M (2022) Standard Specification for Portland Cement

ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C330/C330M (2017a) Standard Specification for Lightweight Aggregates for Structural Concrete

ASTM C494/C494M (2019; E 2022) Standard Specification for Chemical Admixtures for Concrete

ASTM C595/C595M (2023) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2023; E 2023) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C989/C989M (2024) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1074 (2019; E 2021) Standard Practice for Estimating Concrete Strength by the Maturity Method

ASTM C1077 (2024) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C1116/C1116M (2023) Standard Specification for Fiber-Reinforced Concrete

ASTM C1240 (2020) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C1260 (2023) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction

ASTM C1567 (2023) Standard Test Method for Potential

SECTION 03 30 00.00 99 Page 7

Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2022) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM D412 (2016; R 2021) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids

ASTM E329 (2023) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP (2023) Manual of Standard Practice

CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood

OREGON DEPARTMENT OF TRANSPORTATION (ODOT)

ODOT SSC (2024) Oregon Standard Specifications for Construction

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops

COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops

Oregon Department of Transportation (ODOT)

MFTP (2026) Manual of Field Test Procedures

(MFTP)

1.2 DEFINITIONS

a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, slag cement, and silica fume.

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.

SECTION 03 30 00.00 99 Page 8

c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.

d. "Supplementary cementing materials" (SCM) include coal fly ash, silica fume, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.

e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this Section to meet structural design criteria.

f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.

In addition, it includes all concrete elements with a Section thickness of 3 feet or more regardless of temperature.

g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.

h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.

i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious…