Foundation Prep and Treatment 1991 Fnd Report.pdf
PDF 2 MB Posted
- Solicitation number
- W9127N25BA007
About this file
This document is Appendix E from a 1991 SRS Foundation Report, detailing embankment foundation preparation and treatment during the initial construction of a dam structure completed in 1987. The report focuses on foundation preparation for the right abutment, valley, and left abutment areas, describing the technical processes of cleaning, excavating, and preparing the foundation rock for dam construction.
Key technical details include thoroughly cleaning bedrock in sections, removing debris and loose rock using backhoes, hand tools, compressed air, and pressurized water, and applying techniques like shotcrete and consolidation grouting to create a smooth surface for the impervious core. The documentation includes specific elevation references (e.g., between Els. 830 and 860) and describes challenges such as highly fractured and diced rock, which required specialized treatment. Photographs document the step-by-step foundation modification process, showing rock scaling, trimshot techniques, contact clay blanket placement, and the use of heavy machinery in preparing the dam's foundation areas.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX E
Embankment Foundation Preparation and Treatment, from 1991 SRS Foundation Report g2enctgh Text Box 25 AUG 2025 Note to Bidders - The description and pre-1987 photos within this document show conditions encountered during initial construction of the SRS, completed 1987. Photos show excavation and construction of the dam structure, including the impervious dam core, keyed into competent bedrock which required trim blasting.
File details come from the government source that posted it. Updated .