BCD_M-501 - 5 May 21.pdf
PDF 394 KB Posted
- Attached to
- Big Cliff 40 Ton Intake Gantry Crane
- Solicitation number
- W9127N-21-R-0023
About this file
This solicitation package describes requirements for a new 40 ton intake gantry crane at Big Cliff Dam. The U.S. Army Corps of Engineers, Portland District is seeking to replace the existing intake crane with a new 40 ton gantry crane including a main hoist trolley and maintenance jib hoist. The new crane will provide for placement of spillway and penstock stoplogs and general servicing of the spillway deck. Accompanying the crane installation, the contractor must modify the existing cable reel power supply to a conductor rail and collector system, convert from a 3-wire to 4-wire power feed, and install emergency stop buttons. This is a hybrid supply and construction contract utilizing full and open competition. The solicitation will use the FAR Part 15.101-1 best value tradeoff source selection process.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10 11 12
H
J
13 14
K
L
SHEET ID
F
IL
E N
A M
E
D R
A W
IN
G N
O
HOIST DRUM
FLOATING SHAFT
TROLLEY GIRDER
FRAME STRINGER
TROLLEY MACHINERY
OPEN GEARING
MOTOR
REDUCER
TRUCK WHEEL
IDLER GEAR
REDUCER
GEARMOTOR
DRUM BRAKE
DRUM BRAKE
HOIST MOTOR
SEE NOTE 2
PIVOT BASE
JIB ARM
SEE NOTE 4
INSPECTION COVER
MACHINERY GUARD
SEE NOTE 4
INSPECTION COVER
MACHINERY GUARD
TROLLEY GIRDER
TROLLEY WHEEL
SEE NOTE 2
ROPE HOIST
2 TON WIRE
ACCESS DECK
GRATING ON MACHINERY
TROLLEY RAIL
SEE NOTE 6
GUARD
TROLLEY MACHINERY
END PLATE
REMOVABLE
SEE NOTE 5
ON THIS SIDE ONLY
HANDRAIL
STRUCTURAL DESIGN
COORDINATED WITH
TO STRUCTURE TO BE
JIB HOIST ATTACHMENT
SEE NOTE 3
(TYP AT ALL TRUCKS)
MACHINERY GUARDS
/2 M
A X
SEE NOTE 4
NOT SHOWN FOR CLARITY,
OPEN GEARING SET, GUARD
SHOWN FOR CLARITY
COUPLING, GUARD NOT
SHOWN FOR CLARITY
COUPLING, GUARD NOT
SHOWN FOR CLARITY
COUPLING, GUARD NOT
SHOWN, SEE NOTE 7
SLEWING MOTOR NOT
SHOWN FOR CLARITY
BEARING, GUARD NOT
SHOWN FOR CLARITY
BEARING, GUARD NOT
NOT SHOWN FOR CLARITY
ANTI-FRICTION BEARINGS, GUARD
®of Engineers
US Army Corps
D R
A W
IN
G N
O
F
IL
E N
A M
E
A N
S I E
B
M A
S O
U M
P A
N A
H
J F
O L
G A
T E
M A
C H
IN
E R
Y L
A Y
O U
T
M-501
P O
R T
L A
N D
O R
E G
O N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
P O
R T
L A
N D D
IS
T R
IC
IN
A K
E G
A N
T R
Y C
R A
N E
P O
W E
R H
O U
S E
N O
R T
H S
A N
T
IA
M R
IV
E R
B
IG
C
L
IF
F D
A M A
N D R
E S
E R
V O
IR
W
N
R
E V
E N R
M
IL
E S P .E
B C
D X .X
X X
M -5
X X
X .d g n
B C
D -9 -3 -1 /6
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
H
IN
N E
N
B3 SCALE: 3"=1'-0"
TROLLEY MACHINERY GUARD DETAIL
0 3" 6" 9" 12"
D3
TROLLEY MACHINERY LAYOUT
SCALE: 1-1/2"=1'-0" 1' 2'0 6"
C8 SCALE: 1-1/2"=1'-0" 1' 2'0 6"
TROLLEY MACHINERY ELEVATION
G8 SCALE: NOT TO SCALE
JIB HOIST ISOMETRIC
1/2" MAX 1/2" MAX
/2
TROLLEY WHEEL
EVERYTHING THIS SHEET TO BE NEW.8.
PLACE WHEN NOT IN USE.
PIVOTING OF THE JIB BOOM AND ALLOWS THE BOOM TO BE FIXED IN
JIB HOIST TO BE EQUIPPED WITH A SLEWING MOTOR THAT DRIVES 7.
PINCHING WITH MACHINERY.
REACHING UNDER THE COVER WHEN INSTALLED TO PREVENT
MAXIMUM CLEARANCES ARE DESIGNED TO PREVENT FINGERS FROM 6.
TROLLEY COVER IS INSTALLED.
THE GUIDE SPECIFICATION. HANDRAIL SHALL BE COVERED WHEN THE
DRUM. HANDRAIL TO MEET REQUIREMENTS FOR SAFETY AS LISTED IN
ALLOW ACCESS FOR MAINTENANCE OF MACHINERY, WIRE ROPES, AND
HANDRAIL TO BE PROVIDED ON MACHINERY SIDE OF TROLLEY TO 5.
THE FACE WIDTH OF THE WIDEST GEAR IN THE MESH.
LEAST 8" LONG AND SHALL HAVE A WIDTH THAT IS 2" GREATER THAN
FULL REMOVAL OF MACHINERY GUARD. THE HATCHES SHALL BE AT
ALLOW INSPECTION AND LUBRICATION OF OPEN GEARING WITHOUT
INSPECTION COVERS SHALL BE PROVIDED AT ALL GEAR MESHES TO 4.
WHEEL DURING GANTRY TRAVEL.
OTHER ITEMS OBSTRUCTING THE RAIL OUT OF THE PATH OF THE
SHALL BE PROVIDED WITH RAIL SWEEPERS THAT PUSH DEBRIS AND
ALLOWED BETWEEN THE GUARD, GROUND AND RAIL. THE GUARDS
COMPONENTS (GEARS AND WHEELS). A MAXIMUM GAP OF 1" SHALL BE
PROTECT PERSONNEL FROM PINCH POINTS ON ALL MOVING
PREVENT DEBRIS FROM COLLECTING ON THE MACHINERY AND
MACHINERY GUARDS SHALL BE PROVIDED FOR ALL TRUCKS THAT 3.
SHALL WEIGH LESS THAN THE RATED CAPACITY OF THE JIB HOIST.
FPM AND A WORKING CAPACITY OF 2 TONS. ALL MACHINERY GUARDS
JIB HOIST TO BE A WIRE ROPE HOIST WITH A MINIMUM SPEED OF 15 2.
JIB HOIST BASE AND ARM TO BE RATED TO 2 TON.1.
NOTES: