BCD_M-501 - 5 May 21.pdf

PDF 394 KB Posted

Attached to
Big Cliff 40 Ton Intake Gantry Crane
Solicitation number
W9127N-21-R-0023
Issued by

About this file

This solicitation package describes requirements for a new 40 ton intake gantry crane at Big Cliff Dam. The U.S. Army Corps of Engineers, Portland District is seeking to replace the existing intake crane with a new 40 ton gantry crane including a main hoist trolley and maintenance jib hoist. The new crane will provide for placement of spillway and penstock stoplogs and general servicing of the spillway deck. Accompanying the crane installation, the contractor must modify the existing cable reel power supply to a conductor rail and collector system, convert from a 3-wire to 4-wire power feed, and install emergency stop buttons. This is a hybrid supply and construction contract utilizing full and open competition. The solicitation will use the FAR Part 15.101-1 best value tradeoff source selection process.

View the file

Other files

File Type Posted
Amendment 0010 - Extend Proposal Validity for Discussions.pdf PDF
Amendment 0009 - Extend Proposal Validity.pdf PDF
Amendment 0008 - Ext of Proposals.pdf PDF
Work Specification 01 11 00.00 25.pdf PDF
Amendment 0007 - Spec Revision.pdf PDF
Work Specification 41 01 20.74 26.pdf PDF
Amendment 0006 - Extension of Closing Date.pdf PDF
Moffett Drawing 546-S2 - BC-20125-7.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 - Add 52.232-16 & Extension to Due Date.pdf PDF
Amendment 0002 - Site Visit Adjustment.pdf PDF
Amendment 0001 - Site Visit Adjustment.pdf PDF
Attachment C - Small Business Commitment - BC.docx DOCX document
Attachment A - Offeror Experience Form.docx DOCX document
Big Cliff Work Specificatins and Solicitation. - W9127N21R0023.pdf PDF
E1_BCL_IGC_Contract Drawings_FINAL.pdf PDF
E3_BCL_IGC_Reference_Drawings_Vendor.pdf PDF
Enclosure 1- Small Business Subcontracting Plan.docx DOCX document
Big Cliff Gantry Crane Solicitation - W9127N21R0023.pdf PDF
E4_BCL_IGC_Reference_Drawings_ODOT.pdf PDF
Attachment B - USACE Past Performance Questionnaire.docx DOCX document
Attachment D - Ltr Notice to Large Business.pdf PDF
E2_BCL_IGC_Reference_Drawings_USACE.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12

H

J

13 14

K

L

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G N

O

HOIST DRUM

FLOATING SHAFT

TROLLEY GIRDER

FRAME STRINGER

TROLLEY MACHINERY

OPEN GEARING

MOTOR

REDUCER

TRUCK WHEEL

IDLER GEAR

REDUCER

GEARMOTOR

DRUM BRAKE

DRUM BRAKE

HOIST MOTOR

SEE NOTE 2

PIVOT BASE

JIB ARM

SEE NOTE 4

INSPECTION COVER

MACHINERY GUARD

SEE NOTE 4

INSPECTION COVER

MACHINERY GUARD

TROLLEY GIRDER

TROLLEY WHEEL

SEE NOTE 2

ROPE HOIST

2 TON WIRE

ACCESS DECK

GRATING ON MACHINERY

TROLLEY RAIL

SEE NOTE 6

GUARD

TROLLEY MACHINERY

END PLATE

REMOVABLE

SEE NOTE 5

ON THIS SIDE ONLY

HANDRAIL

STRUCTURAL DESIGN

COORDINATED WITH

TO STRUCTURE TO BE

JIB HOIST ATTACHMENT

SEE NOTE 3

(TYP AT ALL TRUCKS)

MACHINERY GUARDS

/2 M

A X

SEE NOTE 4

NOT SHOWN FOR CLARITY,

OPEN GEARING SET, GUARD

SHOWN FOR CLARITY

COUPLING, GUARD NOT

SHOWN FOR CLARITY

COUPLING, GUARD NOT

SHOWN FOR CLARITY

COUPLING, GUARD NOT

SHOWN, SEE NOTE 7

SLEWING MOTOR NOT

SHOWN FOR CLARITY

BEARING, GUARD NOT

SHOWN FOR CLARITY

BEARING, GUARD NOT

NOT SHOWN FOR CLARITY

ANTI-FRICTION BEARINGS, GUARD

®of Engineers

US Army Corps

D R

A W

IN

G N

O

F

IL

E N

A M

E

A N

S I E

B

M A

S O

U M

P A

N A

H

J F

O L

G A

T E

M A

C H

IN

E R

Y L

A Y

O U

T

M-501

P O

R T

L A

N D

O R

E G

O N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

IN

A K

E G

A N

T R

Y C

R A

N E

P O

W E

R H

O U

S E

N O

R T

H S

A N

T

IA

M R

IV

E R

B

IG

C

L

IF

F D

A M A

N D R

E S

E R

V O

IR

W

N

R

E V

E N R

M

IL

E S P .E

B C

D X .X

X X

M -5

X X

X .d g n

B C

D -9 -3 -1 /6

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T E

R

H

IN

N E

N

B3 SCALE: 3"=1'-0"

TROLLEY MACHINERY GUARD DETAIL

0 3" 6" 9" 12"

D3

TROLLEY MACHINERY LAYOUT

SCALE: 1-1/2"=1'-0" 1' 2'0 6"

C8 SCALE: 1-1/2"=1'-0" 1' 2'0 6"

TROLLEY MACHINERY ELEVATION

G8 SCALE: NOT TO SCALE

JIB HOIST ISOMETRIC

1/2" MAX 1/2" MAX

/2

TROLLEY WHEEL

EVERYTHING THIS SHEET TO BE NEW.8.

PLACE WHEN NOT IN USE.

PIVOTING OF THE JIB BOOM AND ALLOWS THE BOOM TO BE FIXED IN

JIB HOIST TO BE EQUIPPED WITH A SLEWING MOTOR THAT DRIVES 7.

PINCHING WITH MACHINERY.

REACHING UNDER THE COVER WHEN INSTALLED TO PREVENT

MAXIMUM CLEARANCES ARE DESIGNED TO PREVENT FINGERS FROM 6.

TROLLEY COVER IS INSTALLED.

THE GUIDE SPECIFICATION. HANDRAIL SHALL BE COVERED WHEN THE

DRUM. HANDRAIL TO MEET REQUIREMENTS FOR SAFETY AS LISTED IN

ALLOW ACCESS FOR MAINTENANCE OF MACHINERY, WIRE ROPES, AND

HANDRAIL TO BE PROVIDED ON MACHINERY SIDE OF TROLLEY TO 5.

THE FACE WIDTH OF THE WIDEST GEAR IN THE MESH.

LEAST 8" LONG AND SHALL HAVE A WIDTH THAT IS 2" GREATER THAN

FULL REMOVAL OF MACHINERY GUARD. THE HATCHES SHALL BE AT

ALLOW INSPECTION AND LUBRICATION OF OPEN GEARING WITHOUT

INSPECTION COVERS SHALL BE PROVIDED AT ALL GEAR MESHES TO 4.

WHEEL DURING GANTRY TRAVEL.

OTHER ITEMS OBSTRUCTING THE RAIL OUT OF THE PATH OF THE

SHALL BE PROVIDED WITH RAIL SWEEPERS THAT PUSH DEBRIS AND

ALLOWED BETWEEN THE GUARD, GROUND AND RAIL. THE GUARDS

COMPONENTS (GEARS AND WHEELS). A MAXIMUM GAP OF 1" SHALL BE

PROTECT PERSONNEL FROM PINCH POINTS ON ALL MOVING

PREVENT DEBRIS FROM COLLECTING ON THE MACHINERY AND

MACHINERY GUARDS SHALL BE PROVIDED FOR ALL TRUCKS THAT 3.

SHALL WEIGH LESS THAN THE RATED CAPACITY OF THE JIB HOIST.

FPM AND A WORKING CAPACITY OF 2 TONS. ALL MACHINERY GUARDS

JIB HOIST TO BE A WIRE ROPE HOIST WITH A MINIMUM SPEED OF 15 2.

JIB HOIST BASE AND ARM TO BE RATED TO 2 TON.1.

NOTES:

File details come from the government source that posted it. Updated .