AM_04_ADVERTISE_PLANS_JD_PH_ANC_Roof_Replacement.pdf

PDF 10 MB Posted

Attached to
John Day Powerhouse Roof and Ancillary Roof Replacements
Solicitation number
W9127N19B0004
Issued by

About this file

Updated Plans for Amendment 0004

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

11'-0"90'-0"

19'-0"5'-0"

281.0' INTAKE DECK ELEVATION:

289.96'TOP OF ROOF DECK:

8TH FLOOR CONFERENCE ROOM CANOPY ELEVATION:

291.00'TOP OF STRUCTURAL ROOF DECK:

8TH FLOOR CONFERENCE ROOM ROOF ELEVATION:

294.83' (HIGH POINT)TOP OF STRUCTURAL ROOF DECK:

296.83'TOP OF PARAPET:

8TH FLOOR OFFICE (MAIN) ELEVATIONS:

311.00' (HIGH POINT)TOP OF STRUCTURAL ROOF DECK:

313.00'TOP OF PARAPET:

PH ELEVATOR PENTHOUSE ELEVATIONS:2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

PROVIDE DRAINAGE SCHEME AS SHOWN4.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 3.

J O

H N D

A Y L

O C

K A

N D D

A M

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T

PORTLAND DISTRICT

R

O F S R

E P

L A

C E

M E

N

J D

P .1

A -4

.d g n

Z A

K

Z A

K

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

A-412

N

NORTH

PROJECT

V W

E N

L A

R G

E D R

O O

F P

L A

N

V

GENERAL NOTES: KEY NOTES:

AREA SHOWN

KEY PLAN

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 SS AB

M A

T T Z

A N

G E

R

R .A

T

H F

L O

O R O

F F

IC

E

(S T

R U

C T

U R

A L S

L O

P E

/8 P

E R F

O O

T

(S T

R U

C T

U R

A L S

L O

P E

/8 P

E R F

O O

T

/4 " P

E R F

O O

T

/4 " P

E R F

O O

T

/4 P

E R F

O O

T

/4 P

E R F

O O

T

8 COLUMNS

TYPICAL OF

5 SKYLIGHTS

TYPICAL OF

PARAPET

TYPICAL

3 33

SLOPE; CRICKETING SLOPES SHALL BE AS INDICATED

ARROW INDICATES DIRECTION AND MAGNITUDE OF ROOF

V

V

V

EXISTING ROOF-MOUNTED HVAC DUCT TO REMAIN.

DRAWING LEGEND:

EXISTING PLUMBING VENT TO REMAIN.

V

VH

S S S

S

S

VH

S

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN.

EXISTING SKYLIGHT DOME TO REMAIN.

REROOFING CONTRACT

INDICATES ROOF AREA NOT A PART OF THIS

/4 P

E R F

O O

T

REQUIRED

SLOPE AS

W

N

B

A-505

A-505

A-506

A-505

A-505

A-505

A-505

A-506

A-506

12"0 5'

"= 1'-0"4

1SCALE:

A-101

ENLARGED ROOF PLAN - 8TH FLOOR OFFICE

EXISTING ELEVATED HVAC EQUIPMENT

PLATFORM TO BE RETAINED

GUARDRAIL ON PARAPET, TYPICAL

SEE STRUCTURAL.

NEW SCUPPER OPENING

J D

P .1

-2

A-508

A-508

4 A-508

A-508

(PH ELEVATOR PENTHOUSE)

(P H E

L E

V A

T O

R P

E N

T H

O U

S E

(8TH FLOOR OFFICE) (8TH FLOOR CONFERENCE)

4 4 4 4

6 CONCRETE CANOPY ROOF

PMMA ROOFING (NO INSULATION)

7 STEEL LADDER, SEE S-502.

(8 T

H F

L O

O R C

O N

F E

R E

N C

E

(C A

N O

P Y

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

SLOPE 1/4"/FOOT, TYP

SEE SPEC 05 50 00

WALL MOUNTED FALL PROTECTION ANCHOR,

TYPE S, SEE DETAIL 3 ON A-508 AND SPEC 07 72 00

REPLACE EXISTING ROOF ACCESS HATCH WITH

A-506

A-509

SIM

/2

/2

ROOF DRAIN AND DRAINAGE SUMP.

S

A D

V E

R T

IS

E M

A W

A -1

OPTIONAL BID ITEMS1

10 EXISTING SEWER VENT PIPE, TO BE RETAINED

ID

E

N T

IF

IC

A T

IO

N O

F O

P T

IO

N A

L B

ID

I T

E M

S E

X

IS

T

IN

G S

E W

E R V

E N

T P

IP

E

12 11

M A

W A -2

CONDENSATE LINES MUST BE COORDINATED WITH THE COR.

POINT DOWN TO STEEL DECK OF EXISTING ROOF. MODIFICATION OF THE EXISTING

(TYP. OF 2). EXISTING LINE TO BE REMOVED BY CONTRACTOR FROM NEW TERMINATION

TERMINATED SUCH THAT THEY DRAIN ONTO THE NEW 8TH FLOOR OFFICE ROOF DECK

EXISTING HVAC CONDENSATE LINES, THAT PENETRATE THE ROOF DECK, TO BE

IFICATION OF THE EXISTING CONDENSATE LINES MUST BE COORDINATED WITH THE COR.

REMOVED AND CAPPED AT THE EXTERIOR OF THE CONCRETE WALL (TYP. OF 2). MOD-

EXISTING HVAC CONDENSATE LINES, THAT PENETRATE THE CONCRETE WALL, TO BE

INSULATION

PMMA ROOFING WITH GENERAL ROOF

U P

D A

T E T

O K

E Y

N O

T E A

D D

IT

IO

N O

F K

E Y

N O

T E

S

A

N D

R

E G

A R

D

IN

G E

X

IS

T

IN

G C

O N

D E

N S

A T

E L

IN

E

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

20'-9"

14'-0"

11'-0"

185.00'TAILRACE DECK ELEVATION:

194.75'CANOPY, TOP OF CONCRETE ROOF DECK:

197.87'LOW ROOF, TOP OF CONCRETE ROOF DECK:

217.75'HIGH ROOF, TOP OF CONCRETE ROOF DECK:

220.00'HIGH ROOF, TOP OF PARAPET:

SOUTH POWERHOUSE ENTRANCE ROOF ELEVATIONS:

281.0' INTAKE DECK ELEVATION:

311.39' (HIGH POINT)TOP OF CONCRETE ROOF DECK:

313.50'TOP OF PARAPET:

FREIGHT ELEVATOR PENTHOUSE ELEVATIONS:2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

PROVIDE DRAINAGE SCHEME AS SHOWN4.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 3.

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.d g n

Z A

K

Z A

K

A R

C H

IT

E C

T U

R A

L

A-413

N

NORTH

PROJECT

U

W

E N

L A

R G

E D R

O O

F P

L A

N S

GENERAL NOTES:

KEY NOTES:

KEY PLAN

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 SS AB

M A

T T Z

A N

G E

R

R .A

SLOPE; CRICKETING SLOPES SHALL BE AS INDICATED

ARROW INDICATES DIRECTION AND MAGNITUDE OF ROOF

ROOF DRAIN INSERT AND DRAINAGE SUMP.

DRAWING LEGEND:

EXISTING PLUMBING VENT TO REMAIN.

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN.

12"0 5'

"= 1'-0"4

1SCALE:

GUARDRAIL ON PARAPET, TYPICAL

SEE STRUCTURAL.

J D

P .1

-2

T H

O R

N T

O N

F R

E

IG

H T E

L E

V A

T O

R A

N D S

O U

T H E

N T

R A

N C

E

A-101

ENLARGED ROOF PLAN - SOUTH POWERHOUSE ENTRANCE

N

NORTH

PROJECT12"0 5'

"= 1'-0"4

1SCALE:

A-101

ENLARGED ROOF PLAN - FREIGHT ELEVATOR PENTHOUSE

AREAS SHOWN

W

N

B

PMMA ROOFING WITH TAPERED INSULATION

V

V

S

S

S

PMMA ROOFING (NO INSULATION)

EXISTING STAIR ASSEMBLY TO REMAIN.

(H

IG

H R

O O

F

(L O

W R

O O

F

(C A

N O

P Y

(CANOPY)

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

R O

O F S R

E P

L A

C E

M E

N T

SEE SPEC 05 50 00

WALL-MOUNTED FALL PROTECTION ANCHOR,

1/4" PER FOOT

FOOT

PER

1/4" F

O O

T

P E

R

/4

F O

O T

/4 " P

E R

1/4" PER FOOT

/4 " P

E R F

O O

T /4 " P

E R F

O O

T

F O

O T

/4 " P

E R

FOOT

1/4" PER

F O

O T

/4 " P

E R

1/4" PER FOOT

A-508

A-508

A-508

SIM

A-508

SIM

A-508

A-508

SIM

SIM

A-506

SIM

A-506

SIM

ON A-508 AND SPECIFICATION SECTION 07 72 00.

ROOF ACCESS HATCH TYPE S. SEE DETAIL 3

REPLACE EXISTING ROOF ACCESS HATCH WITH

A-509

SIM

/2

/2

A-508

A D

V E

R T

IS

E M

A W

A -1

OPTIONAL BID ITEM

OPTIONAL BID ITEM

6 EXISTING ANTENNA, SEE ELECTRICAL

ID

E

N T

IF

IC

A T

IO

N O

F O

P T

IO

N A

L B

ID

I T

E M

S A

N D E

X

IS

T

IN

G A

N T

E N

N A

S

M A

W A

D D

IT

IO

N O

F K

E Y

N O

T E T

O D

R A

W

IN

G D

E T

A

IL

A

-2

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

3'-6""2 113'-

3'-6""2 113'-

281.0' INTAKE DECK ELEVATION:

289.36'CANOPY, TOP OF CONCRETE ROOF:

305.75' (HIGH POINT)TOP OF CONCRETE ROOF:

307.75'TOP OF PARAPET:

BAY 17 ELEVATOR PENTHOUSE ELEVATIONS:

289.36'CANOPY, TOP OF CONCRETE ROOF:

305.75' (HIGH POINT)TOP OF CONCRETE ROOF:

307.75'TOP OF PARAPET:

BAY 9 ELEVATOR PENTHOUSE ELEVATIONS:2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

PROVIDE DRAINAGE SCHEME AS SHOWN4.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 3.

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

O F S R

E P

L A

C E

M E

P .1

A -4

.d g n

Z A

K

Z A

K

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

A-414

N

NORTH

PROJECT

E N

L A

R G

E D R

O O

F P

L A

N S

V

GENERAL NOTES: KEY NOTES:

AREA SHOWN

KEY PLAN

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 SS AB

M A

T T Z

A N

G E

R

R .A

SLOPE; CRICKETING SLOPES SHALL BE AS INDICATED

ARROW INDICATES DIRECTION AND MAGNITUDE OF ROOF

ROOF DRAIN INSERT AND DRAINAGE SUMP.

EXISTING ROOF-MOUNTED HVAC DUCT TO REMAIN.

DRAWING LEGEND:

W

N

B

12"0 5'

"= 1'-0"4

1SCALE:

J D

P .1

-2

A-101

ENLARGED ROOF PLAN - BAY 9 ELEVATOR PENTHOUSE N

NORTH

PROJECT12"0 5'

"= 1'-0"4

1SCALE:

A-101

ENLARGED ROOF PLAN - BAY 17 ELEVATOR PENTHOUSE

L D

B A

Y B

A Y

E

L E

V A

T O

R P

E N

T H

O U

S E

(CANOPY)

(C A

N O

P Y

(ELEVATOR PENTHOUSE)

(E L E

V A

T O

R P

E N

T H

O U

S E

(ELEVATOR PENTHOUSE) (CANOPY)

(C A

N O

P Y

(E L E

V A

T O

R P

E N

T H

O U

S E

4 PMMA ROOFING (NO INSULATION)

PMMA ROOFING WITH TAPERED INSULATION

A-509

A-509

A-508

A-508

A-508

A-508

A-508

A-508

SEE DETAIL 2/A-509

SINGLE POINT FALL PROTECTION ANCHOR,

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

SIM

SIM

SIM

SIM

SIM

SIM

A-509

A-509

/2

/2

A D

V E

R T

IS

E M

A W

A -1

OPTIONAL BID ITEM OPTIONAL BID ITEM

EXISTING AIR HORN TO BE RELOCATED

ID

E

N T

IF

IC

A T

IO

N O

F O

P T

IO

N A

L B

ID

I T

E M

S A

N D A

IR

H

O R

N R

E L

O C

A T

IO

N

NOT IN USE

M A

W U

P D

A T

E O

F D

R A

W

IN

G K

E Y N

O T

E A

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

ROOF DRAINS AND DRAINAGE SCHEME NOT SHOWN FOR CLARITY.6.

- SPRAY-APPLIED ACRYLIC WATERPROOF COATING

- SPRAY-APPLIED POLYURETHANE FOAM INSULATION

CURRENT ROOFING SYSTEM

DESCRIPTION OF EXISTING ROOFING SYSTEMS TO BE REMOVED (BOTTOM-UP):5.

20'-9"

14'-0"

11'-0"

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A D

.d g n

Z A

K

Z A

K

A R

C H

IT

E C

T U

R A

L

AD402

N

NORTH

PROJECT

U

W

KEY PLAN

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 SS AB

M A

T T Z

A N

G E

R

R .A

12"0 5'

"= 1'-0"4

1SCALE:

J D

P .1

-2

T H

O R

N T

O N

F R

E

IG

H T E

L E

V A

T O

R A

N D S

O U

T H E

N T

R A

N C

E

N

NORTH

PROJECT12"0 5'

"= 1'-0"4

1SCALE:

AREAS SHOWN

W

N

B

/2

/2

R O

O F D

E M

O L

IT

IO

N P

L A

N

A-101

ROOF DEMOLITION PLAN - FREIGHT ELEVATOR PENTHOUSE

A-101

ROOF DEMOLITION PLAN - SOUTH POWERHOUSE ENTRANCE

LEGEND: GENERAL NOTES:

KEY NOTES:

EXISTING STRUCTURAL CONCRETE ROOF DECK.

FLASHING TO BE COMPLETELY REMOVED TO THE

INDICATES ROOFING SYSTEM AND SHEET METAL

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

R O

O F S R

E P

L A

C E

M E

N T

A D

V E

R T

IS

E

(H

IG

H R

O O

F

(L O

W R

O O

F

(C A

N O

P Y

(CANOPY)

SPECIFICATION SECTION 02 82 14.00 28 AND 07 01 50.00 28.

ASBESTOS. REMOVAL SHALL BE IN ACCORDANCE WITH

WARNING: EXISTING ROOFING MATERIALS ARE KNOWN TO CONTAIN 3.

194.75'TOP OF CONCRETE ROOF:

SOUTH POWERHOUSE ENTRANCE (CANOPY):

197.87'TOP OF CONCRETE ROOF:

SOUTH POWERHOUSE ENTRANCE (LOW ROOF):

185.37'TAILRACE:

220.00'TOP OF PARAPET:

SOUTH POWERHOUSE ENTRANCE (HIGH ROOF):

281.00' INTAKE DECK :

313.50' TOP OF PARAPET:

FREIGHT ELEVATOR PENTHOUSE:2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES. 1.

M A

W A -1

OPTIONAL BID ITEM

OPTIONAL BID ITEM

ID

E

N T

IF

IC

A T

IO

N O

F O

P T

IO

N A

L B

ID

I T

E M

S A

N D E

X

IS

T

IN

G A

N T

E N

N A

S

EXISTING ANTENNA, SEE ELECTRICAL

NOT IN USE

NOT IN USE

NOT IN USE

NOT IN USE

M A

W U

P D

A T

E O

F D

R A

W

IN

G K

E Y N

O T

E S

A

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

L V

R E

V

IS

E D G

E N

E R

A L N

O T

O F S R

E P

L A

C E

M E

E

C T

R

IC

A L

J D

P .1

E -1

.d g n

J E

F F L

Y O

N P .E

T

H F

L O

O R O

F F

IC

E

E-102

REF

E-405

W

N

B

V A

N S

T E

D U

M

L

V A

N S

T E

D U

M

J D

P .1

-6 -7

A

KEY NOTES

N

IC

I

V Y

/2

/2

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

A D

V E

R T

IS

E

POWERHOUSE ELEVATOR PENTHOUSE

8th FLOOR OFFICE BUILDING AND

OPTIONAL BID ITEM

/1

/1

D

E S

IG

N A

T E

D

T H F

L O

O R O

F F

IC

E W

O R

K A

S O

P T

IO

N A

L W

IT

H N

O T

E C

L A

R

IF

IC

A T

IO

N A -1

L V

GENERAL NOTES:

RAIL TO PREVENT PARALLEL BONDING PATHS. ARROWS DEPICT PATH OF BONDING CIRCUIT WITH ORIGINATION FROM THE GROUNDING PAD.

FLOOR OFFICE GUARD RAIL SECTION. THE 8TH FLOOR OFFICE GUARD RAIL SECTION SHALL ONLY BE TERMINATED ON ONE END OF THE GUARD

ON THE EXTERIOR WALL OF THE POWERHOUSE ELEVATOR PENTHOUSE; (3) BASE PLATE OF 8TH FLOOR OFFICE GUARD RAIL SECTION; (4) 8TH

GUARD RAIL BASE PLATE; (2) POWERHOUSE ELEVATOR PENTHOUSE GUARD RAIL BASE PLATE TO BONDING CONDUCTOR RUNNING VERTICALLY

THE POWERHOUSE ELEVATOR PENTHOUSE. THE BONDING CIRCUIT ROUTE IS AS FOLLOWS: (1) GROUNDING PAD TO POWERHOUSE ELEVATOR

BOTH POWERHOUSE ELEVATOR PENTHOUSE AND 8TH FLOOR OFFICE GUARD RAILS ARE BONDED TO THE GROUNDING PAD LOCATED INSIDE 5.

COR PRIOR TO WORK COMMENCING. ROOF PENETRATIONS SHALL BE KEPT TO A MINIMUM.

LINES, RECEPTACLES, AND PLUMBING FIXTURES. EQUIPMENT MOUNTING CONFIGURATIONS SHALL BE SUBMITTED AND APPROVED BY THE

RAIL SYSTEMS. EXISTING EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, ANTENNAS, CAMERAS, CONDUITS, CONDUCTORS, REFRIGERANT

CONTRACTOR SHALL COORDINATE MOUNTING CONFIGURATION OF EXISTING EQUIPMENT TO ACCOMMODATE BOTH ROOFING AND GUARD4.

MINIMUM OF 14 DAYS PRIOR TO WORK COMMENCING.

PENTHOUSE ROOF SHALL BE DE-ENERGIZED DURING DEMOLITION AND INSTALLATION EFFORTS. COORDINATE OUTAGES WITH THE COR A

EXISTING ANTENNAS AND APPURTENANCES LOCATED ON BOTH THE 8TH FLOOR OFFICE BUILDING AND POWER HOUSE ELEVATOR 3.

LOCATED ON BOTH 8TH FLOOR OFFICE BUILDING AND POWERHOUSE ELEVATOR PENTHOUSE ROOF WITH THE COR.

CONTRACTOR SHALL COORDINATE TEMPORARY REMOVAL AND INSTALLATION OF EXISTING ELECTRICAL EQUIPMENT AND APPURTENANCES2.

THAT NO CIRCULAR GROUNDING PATHS ARE CREATED.

PROVIDE A SINGLE PATH BACK TO THE EXISTING DAM GROUNDING GRID EXCEPT WHERE NOTED. BONDING CONFIGURATION SHALL ENSURE

ALL CONTINUOUS POWERHOUSE ELEVATOR PENTHOUSE AND 8TH FLOOR OFFICE GUARD RAIL SECTIONS SHALL BE BONDED TOGETHER TO 1. 2

GROUNDING PATHS. SEE SHEET E-103 FOR ADDITIONAL BONDING CIRCUIT ROUTING.

END OF BONDED GUARD RAIL. THIS END OF THE RAIL SECTION IS NOT CONNECTED ON BOTH SIDES IN ORDER TO PREVENT CIRCULAR OR PARALLEL

EXISTING ANEMOMETER AND HF ANTENNA TO REMAIN.

MACHINERY ROOM AND TERMINATE ON EXISTING COPPER GROUNDING PAD LOCATED ON THE WEST WALL. SEE SHEET E-301 FOR CONDUIT PENETRATION DETAILS.

TO THE POWERHOUSE ELEVATOR PENTRHOUSE GUARD RAIL BASE PLATE. ROUTE BONDING CONDUCTOR INSIDE POWERHOUSE ELEVATOR PENTHOUSE

EXISTING WALL PENETRATION USED TO ROUTE BONDING CONDUCTOR FROM INSIDE THE POWERHOUSE ELEVATOR PENTHOUSE MACHINERY ROOM

ELEVATOR PENTHOUSE GUARD RAIL TO THE 8TH FLOOR OFFICE.

PER DETAILS SHOWN ON SHEET E-501. SECURE CONDUCTOR USING CABLE CLAMPS. THIS CONDUCTOR IS USED AS A BONDING PATH FROM THE POWERHOUSE

SURFACE MOUNT #2 AL CONDUCTOR FROM POWERHOUSE ELEVATOR PENTHOUSE GUARD RAIL BASE PLATE TO 8TH FLOOR OFFICE BASE PLATE AND BOND

OF THE GROUNDING SYSTEM PER DETAILS ON SHEET E-501.

THE GUARD RAIL FUNCTIONS AS THE GROUND PATH FOR BOTH THE RAIL AND LADDER. BOND NEW GUARD RAIL AND NEW LADDER TO MAINTAIN CONTINUITY

BOND #2 AL GROUND CONDUCTOR TO GUARD RAIL BASE PLATE AS SHOWN ON DETAIL 3 OF SHEET E-501.

CONNECTOR. SEE SHEET E-501 DETAIL 3 FOR BASE PLATE BONDING.

BOND 8TH FLOOR OFFICE GUARD RAIL SECTION TO POWERHOUSE ELEVATOR PENTHOUSE GUARD RAIL BASE PLATE USING A GALVANIZED BOLTED

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

R E

V

IS

E D G

E N

E R

A L N

O T

E S

A D

D E

D C

O N

D

IT

O F S R

E P

L A

C E

M E

N T

W

N

B

J D

P .1

-6 -7

A

J D

P .1

E -1

.d g n

N

N

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

A N

S I

D

E-103

/8

N

IV

Y

E L E

C T

R

IA

L P

L A

N

P H F

R E

IG

H T E

L E

V A

T O

R P

E N

T H

O U

S E

GENERAL NOTES:

1 3

V A

N S

T E

D U

M

V A

N S

T E

D U

M

J E

F F L

Y O

N P .E

KEY NOTES:

HATCH VENT

CONDUIT

EXISTING

CAMERA

ROTATING

EXISTING

EXISTING CONDUIT

VENT

HATCH

C

E-301

C

E-301

/2

/2

A D

V E

R T

IS

E P

O W

E R

H O

U S

E A

N D A

N C

IL

L A

R Y

E-101

IN STATION SERVICE BAY

FREIGHT ELEVATOR PENTHOUSE ROOF (EL.313.50)

OPTIONAL BID ITEM

E-101

IN ASSEMBLY BAY

PH ELEVATOR PENTHOUSE ROOF (EL.311.00)

OPTIONAL BID ITEM

EXISTING VENT PIPE

ANTENNA JUNCTION BOX TO REMAIN

STEEL PLATE TO REMAIN

EXISTING RECEPTACLE &

L V

U P

D A

T E

D N

O T

E S T

O M

A K

E A

N C

IL

L A

R Y R

O O

F S O

P T

IO

N A

L B

ID

I T

E M

A -1

ANTENNA TO REMAIN

EXISTING ATOMIC CLOCK

ANTENNA TO REMAIN

EXISTING SATELLITE

CONDUIT WITH ELBOW

EXISTING SURFACE MOUNT

TO REMAIN

EXISTING ANEMOMETER MAST

TO REMAIN

EXISTING ANTENNA

AND OPERATION PERSONNEL.

ASSOCIATED WITH THE FREIGHT ELEVATOR PENTHOUSE ROOF. CONTRACTOR TO COORDINATE REMOVAL OF THE CAMERA WITH THE COR

THE DISCONNECTION AND REMOVAL OF THE EXISTING CAMERA IS ONLY PERMITTED AT THE START OF ROOF DEMOLITION WORK DIRECTLY 5.

COR PRIOR TO WORK COMMENCING. ROOF PENETRATIONS SHALL BE KEPT TO A MINIMUM.

LINES, RECEPTACLES, AND PLUMBING FIXTURES. EQUIPMENT MOUNTING CONFIGURATIONS SHALL BE SUBMITTED AND APPROVED BY THE

RAIL SYSTEMS. EXISTING EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, ANTENNAS, CAMERAS, CONDUITS, CONDUCTORS, REFRIGERANT

CONTRACTOR SHALL COORDINATE MOUNTING CONFIGURATION OF EXISTING EQUIPMENT TO ACCOMMODATE BOTH ROOFING AND GUARD4.

A MINIMUM OF 14 DAYS PRIOR TO WORK COMMENCING.

PENTHOUSE ROOF SHALL BE DE-ENERGIZED DURING DEMOLITION AND INSTALLATION EFFORTS. COORDINATE OUTAGES WITH THE COR

EXISTING ANTENNAS AND APPURTENANCES LOCATED ON BOTH POWER HOUSE ELEVATOR PENTHOUSE ROOF AND FREIGHT ELEVATOR 3.

APPURTENANCES LOCATED ON BOTH THE POWERHOUSE AND FREIGHT ELEVATOR PENTHOUSES WITH THE COR.

CONTRACTOR SHALL COORDINATE TEMPORARY REMOVAL AND INSTALLATION OF EXISTING ELECTRICAL EQUIPMENT AND 2.

DAM GROUNDING GRID. BONDING CONFIGURATION SHALL ENSURE THAT NO CIRCULAR GROUNDING PATHS ARE CREATED.

ALL CONTINUOUS PENTHOUSE GUARD RAIL SECTIONS SHALL BE BONDED TOGETHER TO PROVIDE A SINGLE PATH BACK TO THE EXISTING1.

E-102 FOR ADDITIONAL ROUTING GUIDANCE.

TERMINATE NEW BONDING CONDUCTOR ROUTED TO 8TH FLOOR OFFICE SPACE TO NEAREST GUARD RAIL MOUNTING PLATE. SEE SHEET

COORDINATE ROUTING OF BONDING CONDUCTOR WITH EXISTING 480-V CRANE BUS INTERMEDIATE SUPPORT POLE.

BE INSTALLED BY THE GOVERNMENT FOLLOWING COMPLETION OF THE FREIGHT ELEVATOR PENTHOUSE ROOF.

EXISTING CAMERA IS TO BE 'COILED UP' AND TEMPORARILY PROTECTED FOR FUTURE USE BY THE GOVERNMENT. A NEW CAMERA AND CAMERA MOUNT WILL

EXISTING CAMERA AND CAMERA MOUNT TO BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE GOVERNMENT. CABLING ASSOCIATED WITH THE

COORDINATE NEW ROOFING SYSTEM WITH EXISTING SURFACE MOUNTED CONDUITS.

COORDINATE MOUNTING OF EXISTING EQUIPMENT WITH THE INSTALLATION OF NEW ROOF AND GUARD RAIL SYSTEM.

EXISTING BRACKET TO BE REMOVED BY CONTRACTOR. CONFIRM WITH CONTRACTING OFFICER PRIOR TO REMOVAL.

RAIL SYSTEMS.

EXISTING ANTENNA SUPPORTING STRUCTURES SHALL REMAIN. COORDINATE ANTENNA SUPPORTING STRUCTURES WITH NEW ROOF AND GUARD

SECTION OF GUARD RAIL TO REMAIN DISCONNECTED TO PREVENT CIRCULAR OR PARALLEL GROUNDING PATHS.

LOCATION. SEE SHEET E-501 DETAIL 3 FOR BONDING TO GUARD RAIL BASE PLATES. SEE SHEET E-301 FOR EXTERIOR WALL SECTION VIEW.

SEAL EXTERIOR END OF CONDUIT WITH WATERTIGHT BUSHING. SEE SHEET E-104 FOR GROUND CONDUCTOR PRECESSION AND GROUNDING PAD

TERMINATE GROUND CONDUCTOR ROUTED FROM THE FREIGHT ELEVATOR PENTHOUSE MECHANICAL ROOM TO CLOSEST GUARD RAIL BASE PLATE.

PAD LOCATION AND SHEET E-501 DETAIL 3 FOR BONDING TO GUARD RAIL BASE PLATES. SEE SHEET E-301 FOR EXTERIOR WALL SECTION VIEW.

PLATE. SEAL EXTERIOR END OF CONDUIT WITH WATERTIGHT BUSHING. SEE SHEET E-104 FOR GROUND CONDUCTOR PRECESSION AND GROUNDING

TERMINATE GROUNDING CONDUCTOR ROUTED FROM THE POWERHOUSE ELEVATOR PENTHOUSE MECHANICAL ROOM TO CLOSEST GUARD RAIL BASE

TERMINATE BONDING CONDUCTOR TO GUARD RAIL AND BASE PLATE. SEE SHEET E-501 DETAIL 3 FOR BONDING TO GUARD RAIL BASE PLATES.

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

D N

ELEVATOR GOVERNOR

CONTROLLER

ELEVATOR

EXISTING ROOF ACCESS LADDER

AND MOTOR

ELEVATOR HOIST MACHINE

EXISTING WALL PENETRATION

COPPER PAD

GROUNDING GRID

MOUNTED

EXISTING WALL

www

THROUGH CONCRETE WALL

EXISTING CONDUIT TRANSITIONING

UP

DOWN

PENTHOUSE ROOF

FREIGHT ELEVATOR

LADDER ACCESS TO

34 EXISTING WALL MOUNTED CONDUIT

LOWER FLOOR

LADDER ACCESS TO

LOWER FLOOR

LADDER ACCESS TO

MACHINE AND MOTOR

ELEVATOR HOIST

GRID COPPER PAD

MOUNTED GROUNDING

EXISTING FLOOR

EXISTING ELECTRICAL EQUIPMENT

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

V

IS

E D G

E N

E R

A L N

O T

O F S R

E P

L A

C E

M E

N T

W

N

B

J D

P .1

-6 -7

A

J D

P .1

E -1

.d g n

N

N

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

A N

S I

D

E-104

/8

N

IV

Y

E L E

C T

R

IA

L P

L A

N

P H F

R E

IG

H T E

L E

V A

T O

R P

E N

T H

O U

S E

GENERAL NOTES:

V A

N S

T E

D U

M

V A

N S

T E

D U

M

J E

F F L

Y O

N P .E

KEY NOTES:

/2

/2

EXISTING GROUNDING CONDUCTOR

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

A D

V E

R T

IS

E

E-101

IN ASSEMBLY BAY

PH ELEVATOR PENTHOUSE MECHANICAL ROOM (EL 300.17)

OPTIONAL BID ITEM

E-101

IN STATION SERVICE BAY

FREIGHT ELEVATOR MECHANICAL ROOM (EL301.33)

OPTIONAL BID ITEM

/1

/1

L

V D

E S

IG

N A

T E

D O

P T

IO

N A

L B

ID

I T

E M

S A -1

BE SUBMITTED AND APPROVED BY THE COR PRIOR TO WORK COMMENCING. ROOF PENETRATIONS SHALL BE KEPT TO A MINIMUM.

CONDUCTORS, REFRIGERANT LINES, RECEPTACLES, AND PLUMBING FIXTURES. EQUIPMENT MOUNTING CONFIGURATIONS SHALL

AND GUARD RAIL SYSTEMS. EXISTING EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, ANTENNAS, CAMERA, CONDUITS, CONTRACTOR SHALL COORDINATE MOUNTING CONFIGURATION OF EXISTING EQUIPMENT TO ACCOMMODATE BOTH ROOFING 3.

APPURTENANCES LOCATED ON BOTH THE POWERHOUSE AND FREIGHT ELEVATOR PENTHOUSE WITH THE COR.

CONTRACTOR SHALL COORDINATE TEMPORARY REMOVAL AND INSTALLATION OF EXISTING ELECTRICAL EQUIPMENT AND 2.

ALL BOLTED TERMINALS SHALL BE DUAL RATED FOR USE WITH BOTH COPPER AND ALUMINUM ELECTRICAL COMPONENTS.1.

OFFICE GUARD RAIL BASE PLATE. SEE SHEET E-102 FOR ADDITIONAL ROUTING GUIDANCE.

TERMINATE NEW BONDING CONDUCTOR ROUTED FROM THE POWERHOUSE ELEVATOR PENTHOUSE GUARD RAIL BASE PLATE TO THE 8TH FLOOR

EXTERIOR SECTION TO PREVENT WATER INTRUSION. INSTALL ELECTRICAL BUSHING ON EXTERIOR SECTION OF CONDUIT.

INSTALL NEW GALVANIZED CONDUIT THROUGH EXISTING WALL PENETRATION. CONDUIT SHALL INCLUDE 2" OF ADDITIONAL LENGTH ON

03 01 32.00 25 FOR CORE DRILLING REQUIREMENTS.

CONDUIT LENGTH ON EXTERIOR OF WALL. INSTALL BUSHING ON EXTERIOR CONDUIT SECTION. SEE SPEC SECTION

CORE DRILL THROUGH EXTERIOR WALL AND ROUTE 1" GALVANIZED CONDUIT THROUGH NEW PENETRATION. PROVIDE 2" ADDITIONAL

NEW GUARD RAIL SECTION.

INSTALL A TWO CONDUCTOR DUAL RATED TERMINAL TO FACILITATE GROUNDING OF EXISTING EQUIPMENT GROUND AND

ROUTE #2 AL GROUNDING CONDUCTOR ALONG WALL FROM COPPER GROUNDING PAD AND TERMINATE AT BASE OF GUARD RAIL.

SURFACE MOUNT GROUND CABLE ON THE EXTERIOR OF THE PENTHOUSE AND TERMINATE TO NEAREST GUARD RAIL MOUNTING PLATE

TRANSITION GROUND CABLE THROUGH EXISTING WALL PENETRATION TO EXTERIOR OF POWERHOUSE ELEVATOR PENTHOUSE.

REMOVE EXISTING COPPER GROUNDING CONDUCTOR AND PROVIDE NEW #2 AL CONDUCTOR SURFACE MOUNTED TO THE INTERIOR WALL.

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

R E

V

IS

E D G

E N

E R

A L N

O T

O F S R

E P

L A

C E

M E

E

C T

R

IC

A L

020' 20'

SCALE: 1"= 20'

J D

P .1

E -4

.d g n

GENERAL NOTES

T

H F

L O

O R O

F F

IC

E P

L A

N

J E

F F L

Y O

N P .E

E-405

L

V A

N S

T E

D U

M

V A

N S

T E

D U

M

N

NORTH

PROJECT

W

N

B

E-102

J D

P .1

-6 -7

A

E-301

B

KEY NOTES:

N

IC

I

V Y

/2

/2

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

Y

V E

R T

IS

E

A

POWERHOUSE ELEVATOR PENTHOUSE

8th FLOOR OFFICE BUILDING AND

OPTIONAL BID ITEM

EL. 296

EL. 311

L V

D E

S

IG

N A

T E

D O

P T

IO

N A

L B

ID

I T

E M

S A

D D

E D E

L E

M E

N T S

A -1

COR PRIOR TO WORK COMMENCING. ROOF PENETRATIONS SHALL BE KEPT TO A MINIMUM.

LINES, RECEPTACLES, AND PLUMBING FIXTURES. EQUIPMENT MOUNTING CONFIGURATIONS SHALL BE SUBMITTED AND APPROVED BY THE

RAIL SYSTEMS. EXISTING EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, ANTENNAS, CAMERAS, CONDUITS, CONDUCTORS, REFRIGERANT

CONTRACTOR SHALL COORDINATE MOUNTING CONFIGURATION OF EXISTING EQUIPMENT TO ACCOMMODATE BOTH ROOFING AND GUARD4.

TO WORK COMMENCING.

DE-ENERGIZED DURING DEMOLITION AND INSTALLATION EFFORTS. COORDINATE OUTAGES WITH THE COR A MINIMUM OF 14 DAYS PRIOR

EXISTING EQUIPMENT LOCATED ON BOTH THE 8TH FLOOR OFFICE BUILDING AND POWERHOUSE ELEVATOR PENTHOUSE ROOF SHALL BE 3.

APPURTENANCES LOCATED ON BOTH THE 8TH FLOOR OFFICE AND POWERHOUSE ELEVATOR PENTHOUSE ROOF WITH THE COR.

CONTRACTOR SHALL COORDINATE TEMPORARY REMOVAL AND INSTALLATION OF EXISTING ELECTRICAL EQUIPMENT AND 2.

MAINTAIN ELECTRICAL CONTINUITY OF THE GUARD RAIL SYSTEM.

EXISTING DAM GROUNDING GRID. WHERE BREAKS IN GUARD RAIL EXIST, CONTRACTOR SHALL PROVIDE A BONDING CONDUCTOR TO

ALL CONTINUOUS 8TH FLOOR OFFICE GUARD RAIL SECTIONS SHALL BE BONDED TOGETHER TO PROVIDE A SINGLE PATH BACK TO THE 1.

SEE SHEET E-103 FOR ELECTRICAL WORK THIS SPACE.

PROVIDE #2 AL CONDUCTOR FASTENED TO GUARD RAIL BASE PLATES PER DETAIL 3 ON SHEET E-501.

BOND NEW LADDER TO NEW GUARD RAIL TO MAINTAIN CONTINUITY FOR GROUNDING CIRCUIT.

SURFACE MOUNT GROUND CONDUCTOR TO EXTERIOR OF BUILDING. SEE SHEET E-102 FOR ROUTING PATH.

ALUMUNUM CONDUCTOR.

BOND 8TH FLOOR GUARD RAIL SYSTEM TO POWERHOUSE ELEVATOR PENTHOUSE GUARD RAIL BASE PLATE USING #2 AWG

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D R

A W

N B

Y

C H

E C

K E

D B

Y

7'-4"7'-0"9"

7'-5"6'-0"9" 6'-0" 9"

7'-4"7'-0"9" 7'-0" 9"

1'

1'

16'-0"4'-6" 17'-0"4'-6"5'-0"

BETWEEN RAILS TYP

3" MAX GAP

7'-0" MAX 9"

FIELD VERIFY

RAILS AND POST TYP

3" MAX GAP BETWEEN

7'-5"6'-0"9" 6'-0" 9"

1'

1'

J O

H N D

A Y L

O C

K A

N D D

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

O F S R

E P

L A

C E

M E

N T

W

N

B

J D

P .1

-3 -1

J D

P .1

S -1

.d g n

N

N

N

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

6"0 2.5' 5'

"= 1'-0"8

3SCALE:

A N

S I

D

S-107

/8

T C

H A

M D J

A

G O

N Z

A L E

Z

M A

T T Z

A N

G E

R

R .A

S-302

D S-302

D

CLCLCLCL

C L C L

C L

C L C L

C L

CLCLCLCL

CL CL CL CL

C L C L

C L

VENT

VENT

HATCH

VENT

PIPE

EXISTING

PIPE

EXISTING

ANTENNA

EXISTING

ANTENNA

EXISTING

S T

R U

C T

U R

A L P

L A

N

P H F

R E

IG

H T E

L E

V A

T O

R P

E N

T H

O U

S E

HATCH

S-502

E

LADDER

S-101

Q

VISITORS' GALLERY ENTERANCE

S-106

R

IN ASSEMBLY BAY

PH ELEVATOR PENTHOUSE

S-101

S

IN STATION SERVICE BAY

FREIGHT ELEVATOR PENTHOUSE

TYP TYP

SIGN (SEE NOTES)

JOHN DAY BUILDING

SEE SPEC (TYP)

GUARDRAIL SYSTEM.

WITH INTEGRAL

ROOF ACCESS HATCH

M P

A R

K S

PLATE (SEE NOTE 1)

GUARDRAIL MOUNTING

PLATE (SEE NOTES)

GUARDRAIL MOUNTING

SPEC 05-50 00

ANCHOR SEE

FALL PROTECTION

WALL MOUNTED

FINISHED ROOF ELEVATION.

INSTALLED AS SPECIFIED AT 48" ELEVATION FROM THE

2. THE WALL MOUNTED FALL PROTECTION SHALL BE

ANCHORS LEFT OR RIGHT TO AVOID SIGN.

OFF THE TOP OF THE PARAPET WALL. ADJUST

SHALL BE POSITIONED 6" MIN OFF THE SIDE AND 8" MIN

EXISTING JOHN DAY BUILDING SIGN. MOUNTING PLATES

HOUSE PENTHOUSE DUE TO THE LOCATION OF THE

MOUNTING PLATES ON THE EAST WALL OF THE POWER

FIELD VERIFY MOUNTING LOCATION FOR THE GUARDRAIL 1.

NOTES:

SEE SPEC 05-50 00

PROTECTION ANCHOR

WALL MOUNTED FALL

S-401

D

S-401

D

S-302

P O

W E

R H

O U

S E A

N D A

N C

IL

L A

R Y

M A

W A -1

A D

V E

R T

IS

E

/2

/2

1 OPTIONAL BID ITEM 1 OPTIONAL BID ITEM

1 OPTIONAL BID ITEM

SEE ELECTRICAL

EXISTING ANTENNAS,

ID

E

N T

IF

IC

A T

IO

N O

F O

P T

IO

N A

L B

ID

I T

E M

S A

N D E

X

IS

T

IN

G A

N T

E N

N A

S

FOR THE CRANE BUS

EXISTING SUPPORT

A -2

M A

W

CL CL CL CL

DRAWING FOR DETAIL.

REMOVED. SEE ELECTRICAL

EXISTING CAMERA TO BE

C L C L

C L

M O

D

IF

IE

D G

U A

R D

R A

IL

F

O R E

X

IS

T

IN

G C

R A

N E B

U S A

N D C

A M

E

JDP1.137_A-412
JDP1.137_A-413
JDP1.137_A-414
JDP1.137_AD402
JDP1.137_E-102
JDP1.137_E-103
JDP1.137_E-104
JDP1.137_E-405
JDP1.137_S-107

File details come from the government source that posted it.