AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the specifications, Salvage section 1.26.1. All other requirements remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N19B0004
X 9B. DATED (SEE ITEM 11)
13-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Dec-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N19B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
John Day Dam Powerhouse and Ancillary Roofs Replacement
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 82 14.00 28 ASBESTOS CONTAINING MATERIAL (ACM) REMOVAL AND DISPOSAL
02 83 20.00 25 LEAD BASE PAINT (LBP) ABATEMENT, REMOVAL, AND DISPOSAL
DIVISION 03 - CONCRETE
03 01 32.00 25 CONCRETE REHABILITATION FOR CIVIL WORKS AND CORE DRILL
DIVISION 05 - METALS
05 50 00.10 28 METAL: MISCELLANEOUS AND FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.10 28 ROOF REMOVAL AND DISPOSAL
07 18 00.00 28 TRAFFIC-BEARING POLYURETHANE WATERPROOF SYSTEM AND
POLYURETHANE JOINT SEALANT
07 22 00.00 28 ROOF INSULATION
07 53 23.00 28 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
07 56 00.10 28 PMMA FLUID-APPLIED ROOFING
07 61 00.00 28 SHEET METAL FLASHING
07 72 00.00 28 ROOF ACCESSORIES
07 92 00.00 28 JOINT SEALANTS
DIVISION 09 - FINISHES
09 22 16.00 28 NON-STRUCTURAL METAL FRAMING
DIVISION 22 - PLUMBING
22 00 00.00 25 PLUMBING, GENERAL PURPOSE
DIVISION 26 - ELECTRICAL
26 05 00.00 28 GENERAL ELECTRICAL WORK
26 05 19.00 28 WIRE AND CABLE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10.00 25
CONTRACTOR'S OPERATIONS AND REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 INCLEMENT WEATHER CONSTRUCTION
1.5 PROVISIONS BETWEEN ON-SITE CONSTRUCTION PERIODS
1.6 UNIT OUTAGES AND BAY SEQUENCING RESTRICTIONS
1.6.1 Outage Coordination
1.6.2 Special Sequencing Requirements
1.7 UTILITY OUTAGE REQUEST AND UTILITY CONNECTION REQUEST
1.7.1 Utility Outage of the 480-V Crane Bus
1.8 HAZARDOUS ENERGY CONTROL PROGRAM COORDINATION
1.9 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK
1.10 WORK BY OTHER CONTRACTORS CONCURRENT WITH CONTRACTOR WORK
1.11 CONTRACTOR EMPLOYEES
1.12 PAGERS
1.13 ACCESS AGREEMENTS AND WORK AREAS
1.13.1 Access Agreements
1.13.2 Work Plan
1.13.3 Contractor Laydown and Office Area
1.13.4 Employee Access and Parking
1.14 SECURITY PROCEDURES
1.14.1 Project Security
1.14.2 Contractor's General Personnel
1.14.3 Verification of Employment Eligibility
1.14.4 Identification of Employees
1.14.5 Non-US Citizens
1.14.6 Safeguarding of Information
1.15 SUPPLEMENTAL SECURITY REQUIREMENTS
1.15.1 7 Year Criminal Background Check
1.15.2 NERC Critical Infrastructure Protection (CIP) Training
1.15.3 Quarterly NERC CIP Security Awareness Program
1.16 SECURITY TRAINING
1.17 DECK ACCESS RESTRICTIONS
1.17.1 Tailrace Deck Access
1.17.2 Intake Deck Access
1.18 AVIAN WIRE ACCESS RESTRICTIONS
1.19 CONSTRUCTION PROJECT IDENTIFICATION SIGN
1.20 UTILITIES
1.20.1 Sanitary Facilities
1.20.2 Electrical Power
1.20.2.1 General
1.20.2.2 Temporary Electrical Wiring
1.20.3 Telephone
1.20.4 Water
1.21 CONTRACTOR'S EQUIPMENT
1.21.1 Contractor's Planned Equipment Methods
SECTION 01 10 10.00 25 Page 1
1.21.2 Plant and Equipment List
1.21.3 Movement of Equipment by the Contractor
1.22 CONTRACTOR USE OF GOVERNMENT CRANES
1.23 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
1.24 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE
1.24.1 General
1.24.2 Additional Provisions
1.24.3 Protection of Generator Units
1.25 DAILY CLEANUP AND DISPOSAL
1.26 DISPOSAL AND SALVAGE OF EQUIPMENT AND MATERIALS
1.26.1 Salvage
1.26.2 Reuse
1.26.3 Recycle
1.26.4 Waste
1.26.5 Return
1.27 PROTECTION OF MATERIAL AND WORK
1.28 PROTECTION OF EXISTING UTILITIES
1.29 RESTORATION OF PROJECT ROADS
1.30 STATE BOUNDARY LINE
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 10 10.00 25 Page 2
The Contractor may retain these items in usable form and take possession of them providing that there is no subsequent cost or inconvenience to the Government. The Government does not guarantee that these items are complete or in working order and the Contractor must assume responsibility for any damages caused by their use immediately upon taking possession of them. Submit a disposal and salvage plan for approval detailing items, quantities, means and methods.
b. Control accumulation of waste materials and trash. Recycle or dispose of collected materials off-site at intervals approved by the Contracting Officer and in compliance with waste management procedures. Except as otherwise specified in other sections of the specifications, dispose of in accordance with the following:
1.26.1 Salvage
Salvage 400 'rectangular' roof pavers (nominal size of 12 inches by 17 inches). Salvage 900 'square' roof pavers (nominal size of 12 inches by 12 inches). Secure and store salvaged pavers on pallets. A total of 500 'square' pavers shall be secured on pallets and marked "John Day". A total of 400 'square' pavers and a total of 400 'rectangular' pavers shall be secured on pallets and marked "Chief Joseph". Pavers for "John Day" and pavers for "Chief Joseph" shall not be secured on the same pallets.
Deliver palletized salvaged pavers to a storage area within the confines of John Day Project as determined by the Contracting Officer's Representative (COR) and Project Staff. Ensure salvaged pavers are not damaged during storage and delivery. The Contractor is responsible to replace, at their own expense, any salvaged pavers that are damaged during Contractor handling or due to improper storage. Salvage for recycling the lead pan flashings at roof drains and the lead flashings on plumbing vents. Submit Evidence of Recycling including a Bill of Lading and receipting from the approved recycling facility.
1.26.2 Reuse
Give first consideration to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Coordinate reuse with the Contracting Officer. Consider sale or donation of waste suitable for reuse.
1.26.3 Recycle
Recycle waste materials not suitable for reuse, but having value as being recyclable. Recycle all pavers removed from the existing roof. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials. Recycle the lead pan flashings at roof drains and the lead flashings on plumbing vents and provide submittal as indicated under paragraph 1.26.1 above.
1.26.4 Waste
Dispose of materials with no practical use or economic benefit to waste-to-energy plants where available. As the last choice, dispose of materials at a landfill or incinerator.
1.26.5 Return
Set aside and protect misdelivered and substandard products and materials
SECTION 01 10 10.00 25 Page 20
| A.07.24 JD Roof Amendment 0002 |
| Technical_Sections |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| PART 1 GENERAL |
| 1.26 DISPOSAL AND SALVAGE OF EQUIPMENT AND MATERIALS |
| 1.26.1 Salvage |
| 1.26.2 Reuse |
| 1.26.3 Recycle |
| 1.26.4 Waste |
| 1.26.5 Return |
| Amd0002: AMD #0002 |
| [2]: [2] |