JDD1.109_S500XXX.pdf

PDF 112 KB Posted

Attached to
Avian Array Line Repair - John Day Dam
Solicitation number
W9127N-17-R-0007
Issued by

About this file

A.07.24 Revision 2 S-500 Drawing

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BILL OF MATERIALS

DESCRIPTIONPART NUMBERQTYITEM

GALVANIZED STEEL CABLE3/8" 6 X 19 GALV CABLE11

3/8 WIRE GALV. ROPE CLIPCROSBY PN 1010097 OR APPROVED

EQUAL

OPEN SWAGE SOCKETCROSBY PN 1054029 OR APPROVED

EQUAL.

GOVERNMENT FURNISHED3/16" VECTRAN ROPE14

GALV. WIRE ROPE THIMBLECROSBY G-414, PN 1037675, HOT

DIPPED GALVANIZED EXTRA HEAVY

3/8 THIMBLE, OR APPROVED EQUAL

BILL OF MATERIALS

DESCRIPTIONPART NUMBERQTYITEM

EXISTING. KINETIC PN RQ-525 C, RQ VIBRATIONAL

ISOLATOR

EXISTING. CROSBY HG-4037, PN 1072494, 3/4 X 9

GALV. JAW END FITTING

WIRE ROPE SLING ASSEMBLY18

PLAIN WASHER (INCH) TYPE A AND B. ANSI B18.22.1 - 3/4 - REGULAR - TYPE B19

HEX NUT (INCH SERIES) HEX NUTANSI B18.2.2 - 3/4 - 10210

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N A

M E

D R

AW

N

B Y

C

H E

C K

E D

B Y:

D

ES

IG

N

E D

B Y:

D E

SC

R

IP

TI

O N

M

AR

K

D

AT

E:

SI

ZE

SU

B

M

IT

TE

D

B Y:

P

LO

T S

C A

LE

C O

N

TR

A C

T N

O

SHEET

IDENTIFICATION

D A

TE

A

P

PR

D R

AW

IN

G N

U M

BE

R

US Army Corps of Engineers ®

P

LO

T D

AT

E

54321

D

C

B

A

SHEET OF

BORDER VERSION UPDATE [06-2013]

S-500

JO

H

N D

A Y

LO

C

K

AN

D D

A M

A

VI

AN

A

R R

AY

IM

PR

O

VE

M

EN

TS

P H

A

SE

I R

O

PE

R E

PL

AC

EM

E

N T

W

IR

E

R O

P E

S

LI

N G

D

ET

A

IL

S

G 2E

C D

LA

R

/2

8/

G 2E

C D

LA

R

G 2E

C D

A M

S W

N -1

7- R

-0

AL

A

N M

. S

TO

K K

E , P

.E

JD

D 1.

9_

S

0X

XX

AN

S

I D

JD

D 1.

9_

S5

X X

X.

D

G N

R E

V

C O

R R

E C

TE

D

IT

E

M C

A

LL

O U

T

TO

C R

O S

BY

O

R A

P P

R O

V E

D E

Q U

A L

/2

3/

R E

V

IT

M

N O

. 5 H

A S

B E

E N

C H

A N

G E

D F

R O

M S

S T

O G

A

LV

A N

IZ

E

D S

TE

E

L

/2 9/

R

V

W

IR

E R

O P

E C

A

LL

O U

T C

H A

N G

E D

. 7 X

T

O

X1

G A

LV

S

TE

EL

C A

B

LE

/2

PORTLAND DISTRICT

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

PO

R

TL

AN

D

D

IS

TR

IC

T

PO

R

TL

A N

D , O

R

A

SCALE: 3"= 1'-0"

0 3" 6" 12"

SCALE:

WIRE ROPE SLING ASSEMBLY

3" = 1'-0"

5 2

SCALE:

WIRE ROPE SLING AND

DAMPENING ASSEMBLY - ISOMETRIC VIEW

3" = 1'-0"

3/16" AVIAN LINE AND

MACHINED THIMBLE

SECTION

SCALE:A 2'-0" = 1'-0"

VECTRAN 3/6" CABLE THIMBLE.

SEE MACHINE THIMBLE DETAILS.

THIS SHEET

SYM

SYM

SYM

SYM

SCALE:

MACHINED THIMBLE

MATERIAL:

PER:

NO. REQD:

2'-0" = 1'-0"

1 1/2" OD X 1" ID SS TUBING

ASTM A304

1 PER WIRE ROPE SLING

R3

R1

TABLE 1 : WIRE ROPE SLING REINSTALLATION PER LINE

LINE SECTION LINE # SOUTH CONNECTION NORTH CONNECTION WIRE ROPE CUT LENGTH

PENINSULA 10

PENINSULA 11

PENINSULA 12

NAVIGATION LOCK 39 S2 TOWER : INSTALL WIRE ROPE SLING 10'-0"

NAVIGATION LOCK 45 S2 TOWER : INSTALL WIRE ROPE SLING 10'-0"

NAVIGATION LOCK 54 S2 TOWER : INSTALL WIRE ROPE SLING 12'-0"

NAVIGATION LOCK 56 S2 TOWER : INSTALL WIRE ROPE SLING 12'-0"

NAVIGATION LOCK 59 S2 TOWER : INSTALL WIRE ROPE SLING 10'-0"

NAVIGATION LOCK 60 S2 TOWER : INSTALL WIRE ROPE SLING 12'-0"

SPILLWAY 61 S2 TOWER : INSTALL WIRE ROPE SLING SPILL TOWER : INSTALL WIRE ROPE SLING 10'-0" (SOUTH CONNECTION)

8'-0" (NORTH CONNECTION)

SPILLWAY 63 SPILL TOWER : INSTALL WIRE ROPE SLING 8'-0"

SPILLWAY 68 SPILL TOWER : INSTALL WIRE ROPE SLING 8'-0"

SPILLWAY 70 SPILL TOWER : INSTALL WIRE ROPE SLING 8'-0"

SPILLWAY 73 SPILL TOWER : INSTALL WIRE ROPE SLING 8'-0"

SPILLWAY 77 SPILL TOWER : INSTALL WIRE ROPE SLING 8'-0"

NOTES:

1. SEE G-001 FOR GENERAL NOTES.

2. AVIAN LINE MATERIAL IS GOV'T FURNISHED. LINES SHALL BE FIELD SPLICED PER

MANUFACTURER'S RECOMMENDATION. THE SPLICE SHALL BE PERFORMED BY A

SKILLED LABORER. EACH SKILLED LABORER WHO MAY SPLICE THE LINE WILL NEED TO

PROVE THEIR SPLICING APTITUDE BY PERFORMING TWO SUCCESSFUL SPLICE TESTS.

RESULTS OF A SUCCESSFUL TEST WILL MEET THE REQUIRED MINIMUM BREAKING

STRENGTH. CONTRACTOR SHALL SUBMIT TEST RESULTS BEFORE THE SKILLED

LABORER SPLICES ROPE FOR AVIAN CONNECTION POINTS.

3. CONTRACTOR SHALL KEEP EXISTING VIBRATIONAL ISOLATOR AND JAW END FITTINGS

AT CONNECTIONS. IF EXISTING COMPONENTS ARE DAMAGED, CONTRACTOR SHALL

REPLACE IN KIND AND WITH APPROVAL BY COR.

SEE TABLE 1 FOR WIRE ROPE CUT LENGTH PER LINE

SEE NOTE 3

3/16" VECTRAN CABLE

SEE NOTE 2

QTY: 13

QTY: 13

File details come from the government source that posted it. Updated .