Attachment_D_-Rev_01_05_Dec_Vectran_Factory_Cut_Length_Material_Properties.pdf
PDF 986 KB Posted
- Attached to
- Avian Array Line Repair - John Day Dam
- Solicitation number
- W9127N-17-R-0007
About this file
Attachment D Revision 01 05 December 2016
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
John Day Avian Array Phase I Rope Replacement
Day Day Lock and Dam Rufus OR
Factory Cut Length of Rope per Line #
3/16" Vectran 12 Strand
*All factory cut lengths remain unspliced. Contractor shall be required to cut and splice rope to meet PWS requirements.
Section Line # Factory Cut Length (ft)
10 3000
11 3000
12 3100
39 3100
45 3100
54 3300
56 3300
59 3400
60 3400
61 3400
63 3300
68 3300
70 3300
73 3200
77 3200
Peninsula
Navigation Lock
Spillway g2ecdlar Typewritten Text
FULL AVIAN ARRAY HORIZONTAL DISTANCE AND CUT LENGTH - REFERENCE ONLY
From Previous Inspection Report - November 2015
| Attachment D - Vectran 12 Strand Factory Cut Length per Line |
| 15P199 Avian Line Inspection Report (007) |
| Vectran Rope |
File details come from the government source that posted it. Updated .