Attachment_D_-Rev_01_05_Dec_Vectran_Factory_Cut_Length_Material_Properties.pdf

PDF 986 KB Posted

Attached to
Avian Array Line Repair - John Day Dam
Solicitation number
W9127N-17-R-0007
Issued by

About this file

Attachment D Revision 01 05 December 2016

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

John Day Avian Array Phase I Rope Replacement

Day Day Lock and Dam Rufus OR

Factory Cut Length of Rope per Line #

3/16" Vectran 12 Strand

*All factory cut lengths remain unspliced. Contractor shall be required to cut and splice rope to meet PWS requirements.

Section Line # Factory Cut Length (ft)

10 3000

11 3000

12 3100

39 3100

45 3100

54 3300

56 3300

59 3400

60 3400

61 3400

63 3300

68 3300

70 3300

73 3200

77 3200

Peninsula

Navigation Lock

Spillway g2ecdlar Typewritten Text

FULL AVIAN ARRAY HORIZONTAL DISTANCE AND CUT LENGTH - REFERENCE ONLY

From Previous Inspection Report - November 2015

Attachment D - Vectran 12 Strand Factory Cut Length per Line
15P199 Avian Line Inspection Report (007)
Vectran Rope

File details come from the government source that posted it. Updated .