This is Amendment 0001 to solicitation W9127825R0021, issued by the US Army Corps of Engineers Mobile District, which extends key dates for a switchgear installation project at St. Stephen powerhouse.
The amendment pushes the proposal due date from December 17, 2024 to December 30, 2024 at 2:00 PM, moves the site visit from December 4 to December 11, 2024, and extends the ProjNet inquiries period from December 9 to December 19, 2024. The amendment also adds a new Attachment 6 (Instructions to Bidders AM01) to the solicitation package while maintaining all other existing attachments, including specifications for switchgear, evaluation criteria, quality assurance surveillance plan, and wage determinations. All other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Projnet questions and answers.pdf | ||
| Attachment 2 Site Visit Power Point Slides.pdf | ||
| Attachment 3 Revised Evaluation Criteria AM02.pdf | ||
| Attachment 2 St. Stephens Pre-proposal Conference Slides.pptx | PPTX presentation | |
| Bid Schedule.xlsx | XLSX spreadsheet | |
| W9127825R0021 Solicitation AM02.pdf | ||
| Attachment 1 Instructions to Bidders AM01.pdf | ||
| Attachment 3 St Stephens Switchgear Specifications.pdf | ||
| W9127825R0021 Solicitation.pdf | ||
| Attachment 1 Instructions to Bidders.pdf | ||
| Attachment 5 Wage Determination.pdf | ||
| Attachment 4 Quality Assurance Surveillance Plan (QASP).pdf | ||
| Attachment 2 Evaluation Criteria.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
Extend Proposal due date from 17 Dec 2024 to 30 Dec 2024
Site visit w ill be moved from 04 Dec 2024 to 11 Dec 2024
Projnet inquiries w ill be extended from 09 Dec 2024 to 19 Dec 2024
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Dec-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127825R0021
X 9B. DATED (SEE ITEM 11)
19-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2024
CODE
ENDIST MOBILE CONTRACTING DIVISION
109 ST JOSEPH ST
MOBILE AL 36602
W91278 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127825R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Dec-2024 02:00 PM to 30-Dec-2024 02:00 PM.
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Instructions to Bidders 9 19-NOV-2024 Attachment 2 Evaluation Criteria 21 19-NOV-2024 Attachment 3 Switchgear Specifications 152 19-NOV-2024 Attachment 4 Qualiyt Assurance
Surveillance Plan (QASP)
8 19-NOV-2024
Attachment 5 Wage Determination 14 22-JUL-2024 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Instructions to Bidders 9 19-NOV-2024 Attachment 2 Evaluation Criteria 21 19-NOV-2024 Attachment 3 Switchgear Specifications 152 19-NOV-2024 Attachment 4 Qualiyt Assurance
Surveillance Plan (QASP)
8 19-NOV-2024
Attachment 5 Wage Determination 14 22-JUL-2024 Attachment 6 Attachment 1 Instructions to Bidders AM01
02-DEC-2024
(End of Summary of Changes)