This is a pre-proposal conference presentation for solicitation W9127825R0021, a switchgear installation project at St. Stephens, South Carolina, issued by the USACE Mobile District. The presentation outlines key requirements for the 100% small business set-aside opportunity under NAICS code 335313 with a size standard of 1,250 employees.
The solicitation requires offerors to submit three volumes: Volume I (Past Performance and Technical Approach), Volume II (Cost/Price Proposal), and Volume III (Administrative Requirements). Past performance examples must be within 10 years of the December 2, 2024 RFP issue date. Technical evaluations will be conducted using a combined technical/risk rating system with ratings from Outstanding to Unacceptable. The contract will be firm-fixed-price with a 15-month period of performance from award. Questions are due by December 19, 2024 at 1700 Central Time via ProjNet, and proposals must be submitted through PIEE (https://piee.eb.mil) by December 30, 2024 at 1400 Central Time. The evaluation factors in Volume I are considered more important than price (Volume II), and the government will use a technical-price trade-off analysis for award determination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 Revised Evaluation Criteria AM02.pdf | ||
| Attachment 1 Projnet questions and answers.pdf | ||
| Attachment 2 St. Stephens Pre-proposal Conference Slides.pptx | PPTX presentation | |
| Bid Schedule.xlsx | XLSX spreadsheet | |
| W9127825R0021 Solicitation AM02.pdf | ||
| W9127825R0021 Solicitation AM01.pdf | ||
| Attachment 1 Instructions to Bidders AM01.pdf | ||
| Attachment 1 Instructions to Bidders.pdf | ||
| Attachment 3 St Stephens Switchgear Specifications.pdf | ||
| W9127825R0021 Solicitation.pdf | ||
| Attachment 5 Wage Determination.pdf | ||
| Attachment 4 Quality Assurance Surveillance Plan (QASP).pdf | ||
| Attachment 2 Evaluation Criteria.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Trusted Partners Delivering Value Today for a Better Tomorrow Trusted Partners Delivering Value Today for a Better Tomorrow
Pre-Proposal Conference Switchgear Installation, St. Stephens, South Carolina
Solicitation W9127825R0021
PeKita Taliaferro-Littles
Contract Officer
Richard Bonnell
Contract Specialist
USACE Mobile District
11 December 2024
BUILDING STRONG
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Disclaimer
This pre-proposal conference is for informational purposes only.
Any remarks or explanations given during this conference (or in the conference notes) will not change the terms and conditions of the solicitation.
Offerors are cautioned to carefully read the requirements of the solicitation and comply accordingly. Oral exchanges between offerors and the Government will not be binding unless changes are incorporated by a written amendment.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Topics
• General Information.
• What offerors should submit?
• How will offerors proposals be evaluated?
• What if you have questions?
• Proposal due dates.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
General Information
• Check https://sam.gov/ for solicitation & amendments.
• 100% Small Business set-aside
• NAICS Code 335313 “Switchgear & Switchboard
Apparatus Manufacturing”.
• Small Business Size Std: No. of Employees 1250.
• Firm-Fixed Price Contract.
• Contract Duration 15 months from Contract Award.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What do offerors need to submit?
• Instructions to Bidders (Attachment 6 - AM 01).
• Complete proposal includes 3 Volumes are required:
o Vol I - Past Performance and Technical Approach
ABSOLUTELY NO COST INFO HERE
o Vol II – Cost Proposal o Vol III - Administrative Requirements
• 6 files (4 PDF files and 2 Excel files)
• Proposal Validity should be 90 days
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What do offerors need to submit in Volume I, Factor 1, Tab A: Past Performance of Prime
• Relevant Company Effort o Is the effort recent?
Contract is 100% complete within 10 years of the RFP issue date (2 December 2024);or
Contract is ongoing and at least one year of the contract is 100% complete by the RFP issue date.
o How is Offeror’s effort relevant to this RFP?
Describe how your project is similar to the scope, magnitude, and complexity to the solicitation.
• Quality of Past Performance
CPARS
If no CPARS, then Past Performance Questionnaire (PPQ)
(Solicitation Attachment 2 -Evaluation Criteria-Attachment 2) o Can provide a copy of a previously obtained PPQ from your customer
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What do offerors need to submit in Volume I, Factor 1, Tab A: Past Performance of Prime
…continue from previous slide.
• Submit no more than 5 examples (Attachment 2, Evaluation Criteria Section 2.1.1(a)
• Evaluation Criteria Section 2.1.1(b) will be amended.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What do offerors need to submit in Volume I:
Factor 2,Tab B: Technical Approach for Work
• Submit your company’s technical approach to managing and executing the installation, testing, and commissioning of the 15kV switchgear at the St. Stephens plant.
• Be sure to address subcontracting efforts (if applicable).
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What do offerors need to submit in Volume I:
Factor 3 Tab C, Technical Approach for Schedule
• Submit a schedule outline of the projected work as defined in Solicitation Attachment 3 “Switchgear Specifications”
• Be sure to identify major milestones and dates.
• Ensure that the schedule demonstrates the Offerors understanding of special circuit outage scheduling and phasing requirements as required in Attachment
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Volume II Cost/Price Proposal
• Submit electronic copy of Excel Workbook in Excel format (read-only) o Use most recent version available o Do not change or modify worksheets
• Insert a price on all numbered items of the Bid Schedule, unless otherwise noted in the Specifications.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Volume III Administrative Requirements
• Signed and dated SF1449 o Acknowledge any and all Amendments
• Completed Proposal Data Sheet (Instructions to Bidders, Attachment 1)
• Representations & Certifications (Complete FAR clause 52.212-3 or a copy from Sam.gov
• Joint Venture documents, if applicable
• Financial Statements
• Bank Reference
• Notice of Exceptions
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
How will I be evaluated?
• Solicitation Attachment 2 Evaluation Criteria details four parts process:
1. Proposal compliance review
2. Volume I Technical proposal evaluations
3. Volume II – Cost/price analysis
4. Technical-price trade-off analysis
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Evaluation of Volume 1
Volume 1Past Performance:
•Looks at Recent, Relevant and Quality
•Each project example is assigned a relevancy rating
•Performance Confidence Assessment Rating •All project examples are combined for an overall rating
•Ratings: Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence, No Confidence
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
…continue Evaluation of Volume 1
Technical Approach:
• Will be conducted without the knowledge of price
• Looks at Strengths, Weaknesses, Significant Weaknesses and Deficiencies of the technical approach
• Combined Technical/Risk Rating to reflect the degree to which the proposal meet or does not meet minimum capabilities
• Consists of evaluation and adjectival ratings of all source selection factors: Outstanding, Good, Acceptable, Marginal, Unacceptable
• A proposal with a deficiency will preclude award action to an offeror
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
…continue Evaluation of Volume 1
• Volume I is more important than Volume II
• Order of relative importance
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Evaluation of Volume 2
• Price is not rated.
• Proposal analysis be performed IAW FAR 15.404- 1.
• Price analysis will be IAW FAR 15.404-1(b).
• Pricing evaluator will check for unbalanced pricing.
• The Government reserves the right to accept other than the lowest price offer
• The evaluation factors (Volume I), other than cost or price, are more important than price (Volume II).
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Performance / Technical Tradeoff
Upon completion of its evaluations, the SSEB will then assess price in connection with the technical evaluation to determine the proposal offering the most advantage to the Government.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
What if I have a question?
• Refer to AM 01: SF30 and Attachment 6,”
Instructions to bidder”
• Submit via https://www.ProjNet.org/projnet
• Deadline 19 December 2024, 1700 Central
Time
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
Proposal Due Date
• Submit via PIEE Site at https://piee.eb.mil
• Due NLT:
30 December 2024 1400 (2:00pm Central Time)
Refer to the Summary of Changes in the Solicitation SF 1449 and the Instructions to Bidders in SF 30 AM01.
Trusted Partners Delivering Value Today for a Better TomorrowTrusted Partners Delivering Value Today for a Better Tomorrow
QUESTIONS?