AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127821R0051-0006 20 JULY 2021 MHF20005
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127821R0051
9B. DATED (SEE ITEM 11)
9 JUNE 2021
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: AIRMAN LEADERSHIP SCHOOL FACILITY, EGLIN AIR FORCE BASE, FLORIDA
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0006
NOTE: THE RECEIPT OF PROPOSAL DATE IS HEREBY REVISED BY THIS AMENDMENT. REFER TO BLOCK 13.A OF THE ENCLOSED SF1442.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051
EGLIN AIR FORCE BASE, FLORIDA MHF20005
SF 30 Page 2 W9127821R0051-0006
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
Table of Contents Revised as indicated herein.
SF1442 Revised Block 13.A as indicated herein.
01 00 00 Added Paragraph 1.5.
01 33 00 Added Submittal Registers associated with
Sections 07 24 00, 07 27 26, and 08 14 00.
01 45 00.00 10 Revised Paragraph 3.4.3 as indicated herein.
05 50 13 Revised Paragraphs 1.2, 2.6, and 2.7 as indicated herein.
07 24 00 Added in its entirety.
07 27 26 Added in its entirety.
08 14 00 Added in its entirety.
13 34 19 Revised Paragraph 1.3.1.1 as indicated herein.
23 07 00 Revised Paragraph 1.2.1 as indicated herein.
23 23 00 Revised Paragraph 3.4 as indicated herein.
26 20 00 Revised Paragraphs 1.1, 1.4, 2.8, 2.8.2.2, 3.1.4, 3.1.5.1, 3.1.5.2, 3.1.5.4, 3.1.9, and
3.1.16 as indicated herein. Deleted Paragraphs 3.1.16.1, 3.1.16.2, 3.1.16.3, and 3.1.16.4.
26 51 00 Revised Paragraph 2.2.1 as indicated herein.
32 11 23 Revised Paragraph 2.3.1 as indicated herein.
32 92 19 Revised Paragraphs 2.1.3 and 2.1.4 as indicated herein.
SF 30 Page 3 W9127821R0051-0006
32 92 23 Revised Paragraph 2.1.4.1 as indicated herein.
33 71 02 Revised Paragraph 1.3 as indicated herein.
Appendix H Replaced in its entirety.
PART II - NOTE: Revised, replacement and added drawings are listed below.
These revised, replacement and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised or replaced by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
SHT
REF. TITLE OF DRAWINGS
COVER SHEET
G-002 SHEET INDEX
C-004.1 PROJECT NOTES (REPLACED)
A-101 FLOOR PLAN
A-103 FIRST FLOOR REFLECTED CEILING PLAN
A-104 ROOF PLAN
A-201 NORTH AND SOUTH ELEVATIONS
A-202 EAST AND WEST ELEVATIONS
A-400 ENLARGED CORE PLANS
A-606 EXTERIOR WINDOW TYPES
I-001 INTERIOR TYPICAL SIGNAGE LEGEND
I-101 FURNITURE FIXTURES AND EQUIPMENT PLAN
I-601 FINISH SCHEDULE
I-602 FURNITURE FIXTURES & EQUIPMENT AND SIGNAGE SCHEDULES
P-601 PLUMBING SCHEDULES
Encl as stated Revised pages of the specifications as indicated in Part I.
14 Revised drawing as indicated in Part II.
1 Replaced drawing as indicated in Part II.
TOC Page 1 of 4 Revised by Amendment No. W9127821R0051-0006
TABLE OF CONTENTS
VOLUME 1 OF 3
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
Contract Clauses
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTION TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONTRACT CLAUSES
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING
DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE
SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
FORM DD1354
FORM DD1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTERS
ENGINEERING FORM 4025R
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
CONTRACTOR & INSPECTION STATEMENT
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
TOC Page 2 of 4
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 – WOODS, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 00 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL ROORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 41 13 ALUMINUM DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
VOLUME 2 OF 3
DIVISION 09 – FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
TOC Page 3 of 4
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS – FIRE
ALARM AND MASS NOTIFICATION SYSTEM
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
UTILITY MONITORING CONTROL SYSTEM
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
VOLUME 3 OF 3
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
TOC Page 4 of 4
27 51 16 PUBLIC ADDRESS SYSTEMS
27 51 23.10 INTERCOMMUNICATION SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 16 19 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE OF PLANT (OSP)
APPENDICES
APPENDIX A BORING LOCATION PLAN AND LOGS
APPENDIX B STATEMENT OF SPECIAL INSPECTIONS
APPENDIX C AF SUSTAINABILITY SCORESHEET – FEB 2017
APPENDIX D 96 CS DESIGN GUIDE – FEB 2020
APPENDIX E EGLIN DDC SYSTEM AND CYBERSECURITY REQUIREMENTS – FEB 2020
APPENDIX F EGLIN FIRE SYSTEM REQUIREMENTS – JUNE 2019
APPENDIX G EGLIN STANDARDS ARCHITECTURAL COMPATIBILITY PLAN 2012
APPENDIX H CID-SID PACKAGE
END OF TABLE OF CONTENTS
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9127821R0051
2. TYPE OF
SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
9 JUNE 2021
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
MHF20005
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S. ARMY ENGINEER DISTRICT, MOBILE
CONTRACTING DIVISION (CESAM-CT)
109 SAINT JOSEPH STREET
MOBILE, AL 36628-0001
SAME AS BLOCK 7
9. FOR INFORMATION
CALL : Eli Couch
Kimberly Brackett
A. NAME
Elisha.Couch@usace.army.mil Kimberly.L.Brackett@usace.army.mil
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 251-690-3354 251-441-5170
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
CONSTRUCT FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY EGLIN AIR FORCE BASE, FLORIDA
* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.
**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.
11. The Contractor shall begin performance within _8____ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.
This performance period is mandatory, negotiable. (See _ __ .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 22 27 JULY 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101
STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
STANDARD FORM 1442 BACK (REV. 4-85)
01 00 00
01 00 00
1.5.1 CONTRACTOR SITE USE AND ACCESS
The General Contractor's working hours at the project site shall be 0630 - 1700 hours , Monday thru Friday, except on Federal Holidays or associated military down days. No work is allowed on Saturdays or Sundays. Work outside of these hours may be requested and pre-coordinated as needed.
Submit request 2 weeks before work is required for after hours, for COR approval.
(Note: The remainder of the section is unchanged by this amendment.)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
AIRMEN LEADERSHIP SCHOOL FACILITY, EGLIN AIR FORCE BASE, FLORIDA
07 24 00 SD-02 Shop Drawings
3.3 GShop Drawings
SD-03 Product Data
2.2Sheathing Board
2.6Thermal Insulation
2.3Adhesive
2.5Mechanical Fasteners
2.12Accessories
2.7Base Coat
2.8Portland Cement
2.9Reinforcing Fabric
2.10Finish Coat
2.13Joint Sealant
2.11Sealant Primer
2.14Bond Breaker
2.15Backer Rod
1.4.5Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 GSample Boards
SD-05 Design Data
1.2.1.2Wind Load
1.2.4Moisture Analysis
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
07 24 00 1.2.2.3Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.4Vapor Transmission
1.2.3.6Absorption-Freeze-Thaw
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.1.3Full Scale or Intermediate Scale
Fire Test
1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
1.2.1.2Wind Load
SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
1.4.4Qualifications of Third Party
Inspector
3.5.2 GInspection Check List
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
07 24 00 1.7EIFS
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.2 GSound Transmission Class
Rating
2.1.3 GFire Resistance Rating
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
SD-11 Closeout Submittals
1.5Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
01 45 00.00 10
01 45 00.00 10
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil, structural, environmental, architectural,and Cx Agent/LEED Specialist.
These individuals or specialized technical companies are directly employed by the prime Contractor and can not be employed by a supplier or subcontractor on this project employees of the prime or subcontractor; be responsible to the CQC System Manager;be physically present at the construction site during work on the specialized personnel's areas of responsibility; have the necessary education or experience in accordance with the experience matrix listed herein. These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel's assigned quality control duties as described in the Quality Control Plan. A single person can cover more than one area provided that the single person is qualified to perform quality control activities in each designated and that workload allows.
05 50 13
05 50 13
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Access Doors and Panels, Installation Drawings; G,DO
Cover Plates and Frames, Installation Drawings; G,DO
Expansion Joint Covers, Installation Drawings; G,DO
Embedded Angles and Plates, Installation Drawings; G,DO
Roof Hatch; G,DO
Submit fabrication drawings showing layout(s), cut sections, elevations, connections to structural system, flashing,and anchoring details.
Submit templates, erection and installation drawings indicating thickness, type, grade, class of metal, and dimensions. Show construction details, reinforcement, anchorage, and installation with relation to the building construction.
SD-03 Product Data
Access Doors and Panels
Cover Plates and Frames
Control-Joint Covers
Expansion Joint Covers
Structural Steel Door Frame
Roof Hatch
SD-04 Samples
Expansion Joint Covers
Control-Joint Covers Provide full size samples , taken from manufacturer's stock, and be complete as required for installation in the structure.
05 50 13
Samples may be installed in the work, provided each sample is clearly identified and its location recorded.
Submit color selection that matches color selection indicated.
2.6 ROOF HATCH RETRACTABLE LADDER
See Specification Section 07 72 00 ROOF HATCH AND FOLDING STAIRWAY.
2.6 7 MISCELLANEOUS PLATES AND SHAPES
Provide for items that do not form a part of the structural steel framework, such as lintels, sill angles, miscellaneous mountings and frames. Provide lintels fabricated from structural steel shapes over openings in masonry walls and partitions as indicated and as required to support wall loads over openings. Provide with connections and welds.
Construct to have at least 8 inches bearing on masonry at each end.
Provide angles and plates, ASTM A36/A36M, for embedment as indicated.
Galvanize embedded items exposed to the elements according to ASTM A123/A123M.
SECTION 07 24 00
EXTERIOR INSULATION AND FINISH SYSTEMS
05/ 11, CHG 4: 08/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM C67/C67M (2020) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
ASTM C150/C150M (2020) Standard Specification for Portland Cement
ASTM C473 (2019) Standard Test Methods for Physical Testing of Gypsum Panel Products
ASTM C578 (2019) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C847 (2014a) Standard Specification for Metal Lath
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1278/C1278M (2017) Standard Specification for Fiber-Reinforced Gypsum Panel
ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D3273 (2016) Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
SECTION 07 24 00 Page 1 Added by Amendment No. W9127821R0051-0006
ASTM E330/E330M (2014) Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E2098/E2098M (2013) Determining Tensile Breaking Strength of Glass Fiber Reinforcing Mesh for Use in Class PB Exterior Insulation and Finish Systems (EIFS) after Exposure to a Sodium Hydroxide Solution
ASTM E2486 (2006) Standard Test Method for Impact Resistance of Class PB and PI Exterior Insulation and Finish Systems (EIFS)
ASTM E2570/E2570M (2007; R 2014; E 2014) Standard Test Methods for Evaluating Water-Resistive Barrier (WRB) Coatings Used under Exterior Insulation and Finish Systems (EIFS) or EIFS with Drainage
ASTM G153 (2013) Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2021) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 268 (2012) Standard Test Method for Determining Ignitibility of Exterior Wall Assemblies Using a Radiant Heat Energy Source
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
1.2 SYSTEM DESCRIPTION AND REQUIREMENTS
The exterior insulation and finish system (EIFS) must be a job-fabricated, drainable, exterior wall covering consisting of sheathing, air and moisture barrier, insulation board, reinforcing fabric, base coat, finish coat, adhesive and mechanical fasteners as applicable. The system components must be compatible with each other and with the substrate as recommended or approved by, and the products of, a single manufacturer regularly engaged in furnishing Exterior Insulation and Finish Systems.
All materials must be installed by an applicator approved by the system manufacturer. EIFS must be Class PB and must be per section 09 06 90 COLOR SCHEDULE color and fine finish.
SECTION 07 24 00 Page 2
1.2.1 System Requirements and Tests
The system must meet the performance requirements as verified by the tests listed below. Where a wall system of similar type, size, and design as specified for this project has been previously tested under the condition specified herein, the resulting test reports may be submitted in lieu of job specific tests.
1.2.1.1 Water Penetration
Test the system for water penetration by uniform static air pressure in accordance with ASTM E331. There must be no penetration of water beyond the plane of the base coat/EPS board interface after 15 minutes at 6.4 psf, or 20 percent of positive design wind pressure, whichever is greater.
1.2.1.2 Wind Load
Test the system for wind load by uniform static air pressure in accordance with ASTM E330/E330M (procedure A) to a minimum pressure of 60 psf. There must be no permanent deformation, delamination, or other deterioration.
1.2.1.3 Full scale or intermediate scale fire test
Conduct wall fire test using apparatus, specimen, performance criteria, and procedure in accordance with NFPA 285 when required by ICC IBC
2603.5.5. The following requirements must be met:
a. No vertical spread of flame within core of panel from one story to the next.
b. No flame spread over the exterior surface.
c. No vertical flame spread over the interior surface from one story to the next.
d. No significant lateral spread of flame from compartment of fire origin to adjacent spaces.
1.2.2 Component Requirements and Tests
The components of the system must meet the performance requirements as verified by the tests listed below.
1.2.2.1 Surface Burning Characteristics
Conduct ASTM E84 test on samples consisting of base coat, reinforcing fabric, and finish coat. Cure for 28 days. The flame spread index must be 25 or less and the smoke developed index must be 450 or less.
1.2.2.2 Radiant Heat
The system must be tested in accordance with NFPA 268 on both the minimum and maximum thickness of insulation intended for use with no ignition during the 20-minute period.
SECTION 07 24 00 Page 3
1.2.2.3 Impact Resistance
a. Class PB Systems: Hemispherical Head Test; 28 day cured specimen of PB EIFS in accordance with ASTM E2486. The test specimen must exhibit no broken reinforcing fabric per ASTM E2486 at an impact of 90 to 150 in/lb.
1.2.3 Sub-Component Requirements and Tests
Unless otherwise stated, the test specimen must consist of reinforcing mesh, base coat, and finish coat applied in accordance with manufacturer's printed recommendations to the insulation board to be used on the building. For mildew resistance, only the finish coat is applied onto glass slides for testing. These specimen must be suitably sized for the apparatus used and be allowed to cure for a minimum of 28 days prior to testing.
1.2.3.1 Abrasion Resistance
Test in accordance with ASTM D968, Method A. Test a minimum of two specimens. After testing, the specimens must show only very slight smoothing, with no loss of film integrity after 132 gallons of sand.
1.2.3.2 Accelerated Weathering
Test in accordance with ASTM G153, Cycle 1. After 2000 hours specimens must exhibit no visible cracking, flaking, peeling, blistering, yellowing, fading, or other such deterioration.
1.2.3.3 Mildew Resistance
Test in accordance with ASTM D3273. The specimen shall consist of the finish coat material, applied to clean 3 inch by 4 inch glass slides and must be allowed to cure for 28 days. After 28 days of exposure, the specimen must not show any growth.
1.2.3.4 Salt Spray Resistance
Test in accordance with ASTM B117. The specimen must be a minimum of 4 inch by 6 inch and must be tested for a minimum of 300 hours. After exposure, the specimen must exhibit no observable deterioration, such as chalking, fading , or rust staining.
1.2.3.5 Water Resistance
Test in accordance with ASTM D2247. The specimen must be a minimum of 4 inch by 6 inch. After 14 days, the specimen must exhibit no cracking, checking, crazing, erosion, blistering, peeling, or delamination.
1.2.3.6 Absorption-Freeze/Thaw
Class PB systems must be tested in accordance with ASTM E2570/E2570M for 60 cycles of freezing and thawing. After testing, the specimen must exhibit no cracking, checking, or splitting, and negligible weight gain.
Class PM systems must be tested in accordance with ASTM C67/C67M for 50 cycles of freezing and thawing. After testing, the specimens must exhibit
SECTION 07 24 00 Page 4 no cracking or checking and have negligible weight gain.
1.2.3.7 Sample Boards
Unless otherwise stated, provide sample EIFS Component 12 by 24 inches, on sheathing board, including finish color and texture, typical joints and sealant. If more than one color, finish, or pattern is used, provide one sample for each. The test specimen must consist of reinforcing mesh, base coat, and finish coat applied in accordance with manufacturer's printed recommendations to the insulation board to be used on the building.
1.2.4 Moisture Analysis
Perform a job specific vapor transmission analysis based on project specific climate and specified wall components and materials. Indicate the temperatures and relative humidities for the inside and outside of the building; a complete listing of the building components, their thickness, thermal resistance and permeance, as well as building location and use.
If a mathematical model was used for the analysis, include the name of the model and the supplier/developer.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G
Show wall layout, construction and expansion joints, decorative grooves, layout of sheathing board, thermal insulation board, and reinforcing mesh and strip reinforcing fabric; joint and flashing details; details at wall penetrations; types and location of fasteners; details at windows and doors; and details at base, roof, , , , roof/wall intersections, , .
SD-03 Product Data
Sheathing Board
Thermal Insulation
Adhesive
Mechanical Fasteners
Accessories
Base Coat
Portland Cement
Reinforcing Fabric
Finish Coat
SECTION 07 24 00 Page 5
Joint Sealant
Sealant Primer
Bond Breaker
Backer Rod
Insulation Board
Warranty
Include joint and other details, such as end conditions, corners, windows, and parapet. Include shelf life and recommended cleaning solvents in data for sealants. Include Safety Data Sheets (SDS)for all components of the EIFS. The SDS shall be available at the job site.
SD-04 Samples
Sample Boards; G
Color and Texture
SD-05 Design Data
Wind Load Calculations
Moisture Analysis Calculations
SD-06 Test Reports
Abrasion Resistance
Accelerated Weathering
Impact Resistance
Mildew Resistance
Salt Spray Resistance
Water Vapor Transmission
Absorption-Freeze-Thaw
Wall Fire Test
Water Penetration
Water Resistance
Full Scale or Intermediate Scale Fire Test
Surface Burning Characteristics
Radiant Heat
SECTION 07 24 00 Page 6
Substrate
Wind Load
SD-07 Certificates
Qualifications of EIFS Manufacturer
Qualification of EIFS Installer
Qualification of Sealant Applicator
Certify that EIFS installer meets requirements specified under paragraph "Qualification of Installer," and that sealant applicator is approved by the EIFS Manufacturer.
Qualifications of Third Party Inspector
Inspection Check List; G
Submit filled-out inspection check list as required in paragraph "Quality Control," certifying that the installation of critical items meets the requirements of this specification.
SD-08 Manufacturer's Instructions
Installation
Manufacturer's standard printed instructions for the installation of the EIFS. Include requirements for condition and preparation of substrate, installation of EIFS, and requirements for sealants and sealing.
SD-10 Operation and Maintenance Data
EIFS
Include detailed finish repair procedures and information regarding compatibility of sealants with base and finish coatings.
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of EIFS Manufacturer
The EIFS must be the product of a manufacturer who has been in the practice of manufacturing and designing EIFS for a period of not less than 3 years, and has been involved in at least five projects similar to this project in size, scope, and complexity, in the same or a similar climate as this project.
1.4.2 Qualification of EIFS Installer
The EIFS Installer must be trained by the EIFS manufacturer to perform the installation of the System and must have successfully installed at least five projects at or near the size and complexity of this project. The contractor must employ qualified workers trained and experienced in installing the manufacturer's EIFS.
SECTION 07 24 00 Page 7
1.4.3 Qualification of Sealant Applicator
The sealant applicator must be experienced and competent in the installation of high performance industrial and commercial sealants and must have successfully installed at least five projects at or near the size and complexity of this project.
1.4.4 Qualifications of Third Party Inspector
Submit evidence that third party inspector has current certification from the Exterior Design Institute or equal inspector certification as inspector for the installation of EIFS.
1.4.5 Insulation Board
Insulation Board must be approved and labeled under third party quality program as required by applicable building code.
1.4.6 Pre-Installation Conference
After approval of submittals and before commencing any work on the EIFS, including installation of any sheathing board, insulation, and associated work, the Contracting Officer will hold a pre-installation conference to review:
a. Drawings, specifications, and samples;
b. Procedure for on site inspection and acceptance of EIFS substrate and pertinent details (for example, mock-up installation);
c. Contractor's plan for coordination of work of the various trades involved in providing EIF system and other components;
d. Inspection procedures; and
e. Safety requirements.
Pre-installation conference must be attended by the Contractor, EIFS Q.C.
Specialist (EIFS Inspector), and all personnel directly responsible for installation of the EIF system, including sealant applicator, and personnel responsible for related work, such as flashing and sheet metal, windows and doors, and a representative of the EIFS manufacturer. Before beginning EIFS work, the contractor must confirm in writing the resolution of conflicts among those attending the pre-installation conference.
1.5 DELIVERY AND STORAGE
Deliver materials to job site in original unopened packages, marked with manufacturer's name, brand name, and description of contents. Store materials off the ground and in accordance with the manufacturer's recommendations in a clean, dry, well-ventilated area. Protect stored materials from rain, sunlight, and excessive heat. Keep coating materials which would be damaged by freezing at a temperature not less than 40 degrees F. Do not expose insulation board to flame or other ignition sources.
1.6 ENVIRONMENTAL CONDITIONS
a. Do not prepare materials or apply EIFS during inclement weather unless
SECTION 07 24 00 Page 8 appropriate protection is provided. Protect installed materials from inclement weather until they are dry.
b. Apply sealants and wet materials only at ambient temperatures of 40 degrees F or above and rising, unless supplemental heat is provided.
The system must be protected from inclement weather and maintain this temperature for a minimum of 24 hours after installation.
c. Do not leave insulation board exposed to sunlight after installation.
1.7 WARRANTY
Furnish manufacturer's standard warranty for the EIFS. Warranty must run directly to Government and cover a period of not less than 5 years from date Government accepted the work.
PART 2 PRODUCTS
2.1 COMPATIBILITY
Provide all materials compatible with each other and with the substrate, and as recommended by EIFS manufacturer.
2.2 SHEATHING BOARD
2.2.1 Glass Mat Gypsum Sheathing Board
a. Conform to ASTM C1177/C1177M ; or.
b. ASTM C1278/C1278M , Water Resistant Exterior Type only
c. Flexural Strength 80lbf
d. Nail Pull Resistance: No less than 120 lb when tested in accordance with ASTM C473.
2.3 ADHESIVE
Manufacturer's standard product, including primer as required, must be compatible with substrate and insulation board to which the system is applied.
2.4 LATHING AND FURRING
Conform to ASTM C847, 2.5 lb/sqyd, self-furring, galvanized.
2.5 MECHANICAL FASTENERS
Corrosion resistant and as approved by EIFS manufacturer. Select fastener type and pattern based on applicable wind loads and substrate into which fastener will be attached, to provide the necessary pull-out, tensile, and shear strengths.
2.6 THERMAL INSULATION
2.6.1 Manufacturer's Recommendations
Provide only thermal insulation recommended by the EIFS manufacturer for the type of application intended.
SECTION 07 24 00 Page 9
2.6.2 Insulation Board
Insulation board must be standard product of manufacturer and must be compatible with other systems components. Boards must be factory marked individually with the manufacturer's name or trade mark, the material specification number, the R-value at 75 degree F, and thickness. No layer of insulation shall be less than 3/4 inch thick. The maximum thickness of all layers must not exceed 4 inches. Insulation Board must be certified as aged, in block form, prior to cutting and shipping, a minimum of 6 weeks by air drying, or equivalent.
a. Thermal resistance: As indicated on drawings.
b. Insulating material: ASTM C578 Type I as recommended by the EIFS manufacturer and treated to be compatible with other EIFS components.
Age insulation by air drying a minimum of 6 weeks prior to cutting and shipping.
c. Drainage: Preform channels into the interior face of insulation board or provide polypropylene drainage lath spacer to provide water drainage system.
d. Recycled Content: Provide insulation material that has minimum of 10 percent recycled material. Provide data identifying percentage of recycled content for insulation materials.
2.7 BASE COAT
Manufacturer's standard product and compatible with other systems components.
2.8 PORTLAND CEMENT
Conform to ASTM C150/C150M, Type I or II as required, fresh and free of lumps, and approved by the systems manufacturer.
2.9 REINFORCING FABRIC
Reinforcing fabric mesh must be alkali-resistant, balanced, open weave , glass fiber fabric made from twisted multi-end strands specifically treated for compatibility with the other system materials, and comply with ASTM E2098/E2098M and as recommended by EIFS manufacturer.
2.10 FINISH COAT
Manufacturer's standard product conforming to the requirements in the paragraph on Sub-Component Requirements and Tests. For color consistency, use materials from the same batch or lot number.
2.11 SEALANT PRIMER
Non-staining, quick-drying type recommended by sealant manufacturer and EIFS manufacturer.
2.12 ACCESSORIES
Conform to recommendations of EIFS manufacturer, including trim, edging, anchors, and expansion joints. All metal items and fasteners to be
SECTION 07 24 00 Page 10 corrosion resistant.
2.13 JOINT SEALANT
Non-staining, quick-drying type meeting ASTM C920, as Type S or M, minimum Grade NS, minimum Class 25 and compatible with the finish system type and grade, and recommended by both the sealant manufacturer and EIFS manufacturer.
2.14 BOND BREAKER
As required by EIFS manufacturer and recommended by sealant manufacturer and EIFS manufacturer.
2.15 BACKER ROD
Closed cell polyethylene free from oil or other staining elements and as recommended by sealant manufacturer and EIFS manufacturer. Do not use absorptive materials as backer rod. The backer rod should be sized 25 percent larger than the width of the joint.
PART 3 EXECUTION
3.1 EXAMINATION
Examine substrate and existing conditions to determine that the EIFS can be installed as required by the EIFS manufacturer and that all work related to the EIFS is properly coordinated. Surface must be sound and free of oil, loose materials or protrusions which will interfere with the system installation. If deficiencies are found, notify the Contracting Officer and do not proceed with installation until the deficiencies are corrected. The substrate must be plane, with no deviation greater than 1/4 inch when tested with a 10 foot straightedge. Determine flatness, plumbness, and any other conditions for conformance to manufacturer's instructions.
3.2 SURFACE PREPARATION
Prepare existing surfaces for application of the EIFS to meet flatness tolerances and surface preparation according to manufacturer's installation instructions but provide a flatness of not more that 1/4 inch in 10 feet. Provide clean surfaces free of oil and loose material without protrusions adversely affecting the installation of the insulation board.
For adhesively attached EIFS, existing deteriorated paint must be removed. Due to substrate conditions or as recommended by the system manufacturer, a primer may be required. Apply the primer to existing surfaces as recommended by the manufacturer. Use masking tape to protect areas adjacent to the EIFS to prevent base or finish coat to be applied to areas not intended to be covered with the EIFS. The contractor must not proceed with the installation until all noted deficiencies of the substrate are corrected.
3.3 INSTALLATION
Install EIFS as indicated, comply with manufacturer's instructions except as otherwise specified, and in accordance with the shop drawings. EIFS must be installed only by an applicator trained by the EIFS manufacturer.
Specifically, include all manufacturer recommended provisions regarding flashing and treatment of wall penetrations. Any materials that show
SECTION 07 24 00 Page 11 visual evidence of biological growth due to the presence of moisture must not be installed on the building project.
3.3.1 Sheathing Board
Edges and ends of boards must be butted snugly with vertical joints staggered to provide full and even support for the insulation. Do not align sheathing board joints with wall openings. Provide support at both vertical and horizontal joints. Attach sheathing board to metal studs with self-tapping drywall screws . Place fasteners sufficiently close to support imposed loads, but not more than:
a. Maximum of 8 inches apart on each supporting stud
Space fasteners more closely when required for negative wind load resistance.
3.3.2 Insulation Board
Unless otherwise specified by the system manufacturer, place the long edge horizontally from level base line. Stagger vertical joints and interlock at corners. Butt joints tightly. Provide flush surfaces at joints.
Offset insulation board joints from joints in sheathing by at least 8 inches. Align drainage channels of integral drainage system or provide polypropylene drainage lath space to provide a path for any water weeped from behind the insulation to escape wall construction. Use L-shaped insulation board pieces at corners of openings. Joints of insulation must be butted tightly. Surfaces of adjacent insulation boards must be flush at joints. Gaps greater than 1/16 inch between the insulation boards must be filled with slivers of insulation. Uneven board surfaces with irregularities projecting more than 1/16 inch must be rasped in accordance with the manufacturer's instructions to produce an even surface. Attach insulation board as recommended by manufacturer. The adhered insulation board must be allowed to remain undisturbed for 24 hours prior to proceeding with the installation of the base coat/reinforcing mesh, or longer if necessary for the adhesive to dry. However, do not leave insulation board exposed longer than recommended by insulation manufacturer.
3.3.2.1 Mechanically Fastened Insulation Boards
Fasten with manufacturer's standard corrosion resistant anchors, spaced as recommended by manufacturer, but not more than 2 feet horizontally and vertically.
3.3.2.2 Adhesively Fastened Insulation Boards
Apply insulation board using adhesive spread with a notched trowel to the back of the insulation boards in accordance with the manufacturer’s instructions.
3.3.3 Base Coat and Reinforcing Fabric Mesh,
3.3.3.1 Class PB Systems
Allow the adhered insulation board to dry for 24 hours, or longer if necessary, prior to proceeding with the installation of the base coat/reinforcing fabric mesh. Install reinforcing fabric in accordance with manufacturer's instructions. Mix base coat in accordance with the
SECTION 07 24 00 Page 12 manufacturer's instructions and apply to insulated wall surfaces to the thickness specified by the system manufacturer and provide any other reinforcement recommended by EIFS manufacturer. Trowel the reinforcing fabric mesh into the wet base coat material. Fully embed the mesh in the base coat. When properly worked-in, the pattern of the reinforcing fabric mesh must not be visible. Provide diagonal reinforcement at opening corners. Back-wrap or edge wrap all terminations of the EIFS. Overlap the reinforcing fabric mesh a minimum of 2.5 inches on previously installed mesh, or butted, in accordance with the manufacturer’s instructions.
3.3.4 Finish Coat
The base coat/reinforcing mesh must be allowed…