VOLUME 1 OF 3
THIS PROJECT IS A TOTAL SMALL BUISNESS SETASIDE
SOLICITATION NO: W9127821R0051
CADD CODE: MHF20005
SPECIFICATIONS
FOR
FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY
EGLIN AIR FORCE BASE, FLORIDA
(OKALOOSA COUNTY)
“GOOD ENGINEERING RESULTS IN A BETTER ENVIRONMENT”
U.S. ARMY ENGINEER DISTRICT, MOBILE
109 St. Joseph St
Mobile, Alabama 36602
This page was intentionally left blank for duplex printing.
AIRMAN LEADERSHIP SCHOOL FACILITY W9127821R0051
EGLIN AIR FORCE BASE, FLORIDA MHF20005
CHECKLIST FOR PREPARATION OF OFFERS
Before sending your offer to us, review it for the following documents--without these, your offer could be rejected.
If you have questions, confusion, or doubts, contact the Project Office of the Corps of Engineers.
This checklist is designed for your convenience to assist you in completing your offer. Its completion does not guarantee that your offer will be acceptable. A complete and acceptable offer is solely the responsibility of the Contractor.
1. Your attention is directed to the following clause:
Section 00 45 00, FARS Clause 52.204-7, “System for Award Management”. LACK OF REGISTRATION IN THE SAM DATABASE WILL RENDER BIDDER INELIGIBLE FOR AWARD. Information on how to register and the time it takes is detailed in the clause.
2. Standard Form 1442 Titled “SOLICITATION, OFFER AND AWARD”
a. Is it signed in Block 20B? Yes (Y)___Not Applicable(NA) ___
b. Have you verified with the Project Office that you have received all Amendments? Have you acknowledged all Amendments using block 19? Y__ NA__
c. Is the complete, correct address of the company printed in Block 14? (ALSO INCLUDE YOUR TIN, DUNS, AND CAGE NUMBERS IN THIS BLOCK) Y__ NA__
d. Are the correct phone numbers, and fax numbers including country codes, included in Block 15? Y__ NA__
e. Is the mailing address of the company is different from the address in Block 14, is the mailing address written in Block 16? (ALSO INCLUDE YOUR EMAIL ADDRESS IN THIS BLOCK) Y__ NA__
f. If you are a Partnership or Joint Venture, have all partners or joint ventures signed in Block 20; or has authority properly been delegated pursuant to the provisions of the solicitation clause entitled JOINT VENTURE BID
REQUIREMENTS? Y__ NA__
g. . If you are a Joint Venture have you submitted your Joint Venture Agreement and taken the other actions necessary to comply with the “Joint Venture Bid Requirement” Clause? Y__ NA__ h.. Is the time you are allowing for acceptance of the offer, the same or longer than the time set out in block 13?.
Y__ NA__
3. Representations, Certifications, and Other Statements of the Offeror
Are all of the clauses in this section completed and signed in the appropriate places and returned attached to the offer? Y__ NA__
4. The Bidding Schedule
a. Is it completely filled out? Y__ NA__
b. It may not be altered either as to quantities or as to items offered. Y__ NA__
c. There can be no language of limitation either as to quantities or as to items offered. Y__ NA__
d. If you corrected your numbers, have you initialed these corrections? Y__ NA__
e. If the bidding schedule has been changed by Amendment, is the bidding schedule that you are submitting from the most recent amendment ? Y__ NA__
f. Do prices for each bid item include all costs, mark-ups and taxes (if any taxes are imposed)? Y__ NA__
g. Is the cost of obtaining your bid and performance guarantee included in the total bid price specified on the bid schedule? Y__ NA__
h. In preparing your bid, remember the Corps does not make advanced payments on its contracts Y__ NA__
5. Bid Guarantees
Did you attach a Bid Guaranty/ Letter of Credit Y__ NA_ If you are using a Bid Guaranty, does the Guaranty comply with the requirements set out in Section 00 21 16? Y__
NA__
Remember insurance policies are not acceptable Y_ If you are using a Letter of Credit, does it contain the exact language set out in section 00 70 00? Y__ NA Is the amount of the Bid Guaranty/Letter of Credit equal to the amount required in section 00 21 16? Y__ NA__?
Is the time period of the Bid Guaranty/Letter of Credit equal to or greater than the period set out in block 13 of the
1442? Y__ NA__
Is there a Power of Attorney or other document attached that establishes the authority of the surety to sign the Bid Guaranty or Letter of Credit? Y__ NA__
6. Technical Documents that Pertain to Evaluation Factors, Award will be based on the specific factors set out in Section 00 12 00, “TRADE OFF BEST VALUE ACQUISITION (EVALUATION OF PROPOSALS).”
a. Have you responded to all the evaluation factors (if required by the solicitation)? Y__ NA__
b. Is a summary of the experience and special qualifications of your Administration staff included (if required by the solicitation)? Y__ NA__
c. Is a quality control plan included (if required by the solicitation)? Y__ NA__
d. Are time tables and schedules included (if required by the solicitation)? Y__ NA__
e. Is a current audit of your company’s financial status included or a certificate attached to a past audit stating the financial status has not changed since the time of the past audit (if required by the solicitation)? Y__ NA__
f. Is a list of the contracts you are currently working on attached (if required by the solicitation)? Y__ NA__
g. Have you included a list of the names and phone numbers of references for whom you have done past contracts (if required by the solicitation)? Y__ NA__
7. Pre-award Information- Although not required to be submitted with the solicitation, the pre-award information is necessary for award. A detailed list of this information is found in the Pre-Award Clause in the solicitation.
Submission of this information with your offer will expedite the award process.
a Your latest financial statement Y__ NA__
b. Your present financial commitments Y__ NA__
c. Your banking institutions and financial resources Y__ NA__
All your documents must be in English
TOC Page 1 of 4
TABLE OF CONTENTS
VOLUME 1 OF 3
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
Contract Clauses
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTION TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONTRACT CLAUSES
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING
DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE
SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
FORM DD1354
FORM DD1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTERS
ENGINEERING FORM 4025R
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
CONTRACTOR & INSPECTION STATEMENT
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
TOC Page 2 of 4
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 – WOODS, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 00 BUILDING AIR BARRIER SYSTEM
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL ROORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 41 13 ALUMINUM DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
VOLUME 2 OF 3
DIVISION 09 – FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
TOC Page 3 of 4
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS – FIRE
ALARM AND MASS NOTIFICATION SYSTEM
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
UTILITY MONITORING CONTROL SYSTEM
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
VOLUME 3 OF 3
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
27 51 23.10 INTERCOMMUNICATION SYSTEM
TOC Page 4 of 4
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 16 19 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE OF PLANT (OSP)
APPENDICES
APPENDIX A BORING LOCATION PLAN AND LOGS
APPENDIX B STATEMENT OF SPECIAL INSPECTIONS
APPENDIX C AF SUSTAINABILITY SCORESHEET – FEB 2017
APPENDIX D 96 CS DESIGN GUIDE – FEB 2020
APPENDIX E EGLIN DDC SYSTEM AND CYBERSECURITY REQUIREMENTS – FEB 2020
APPENDIX F EGLIN FIRE SYSTEM REQUIREMENTS – JUNE 2019
APPENDIX G EGLIN STANDARDS ARCHITECTURAL COMPATIBILITY PLAN 2012
APPENDIX H CID-SID PACKAGE
END OF TABLE OF CONTENTS
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9127821R0051
2. TYPE OF
SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
9 JUNE 2021
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
MHF20005
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S. ARMY ENGINEER DISTRICT, MOBILE
CONTRACTING DIVISION (CESAM-CT)
109 SAINT JOSEPH STREET
MOBILE, AL 36628-0001
SAME AS BLOCK 7
9. FOR INFORMATION
CALL : Eli Couch
Kimberly Brackett
A. NAME
Elisha.Couch@usace.army.mil Kimberly.L.Brackett@usace.army.mil
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 251-690-3354 251-441-5170
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
CONSTRUCT FY-21 AIRMAN LEADERSHIP SCHOOL FACILITY EGLIN AIR FORCE BASE, FLORIDA
* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.
**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.
11. The Contractor shall begin performance within _8____ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.
This performance period is mandatory, negotiable. (See _ __ .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 12 JULY 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101
STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(e)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
STANDARD FORM 1442 BACK (REV. 4-85)
BIDDING SCHEDULE ONE (West Entry Vestibule and High Glazing)
BIDDER'S NAME: _______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price ____ Amount_____
BASE BID
1.1 Airmen Leadership School
Construction of New Facility 1 Job XXX ___________
1.2 Construction of Site Work 1 Job XXX _
1.3 CHELCO (Privatized Electrical
Utility) Site Electrical work 1 Job XXX _ 47,467___
1.4 ASUS (Privatized Water
Utility) Water and Wastewater work 1 Job XXX _ 123,412__
1.5 Okaloosa Gas (Privatized Gas
Utility) Utility to the building 1 Job XXX __18,500__
Total Base Bid ___________
BID OPTION NO. 1
1.6 Construction of Reveille Pad 1 Job XXX _
BID OPTION NO. 2
1.7 Fixed Seating at Auditoriums 1 Job XXX ___________
BID OPTION NO. 3
1.8 Furniture, Fixtures, and Equipment(FF&E) 1 Job XXX ___________
BID OPTION NO. 4
1.9 Moveable Seating at Auditoriums 1 Job XXX ___________
BID OPTION NO. 5
1.10 Public Address System 1 Job XXX ___________
BID OPTION NO. 6
1.11 Intercom System 1 Job XXX ___________
TOTAL BASE BID AND BID OPTIONS ____________
BIDDING SCHEDULE 2 (Basic)
BIDDER'S NAME: _______________________________________________________________
Item Estimated Unit Estimated No. Description Quantity Unit Price ____ Amount_____
BASE BID
2.1 Airmen Leadership School
Construction of New Facility 1 Job XXX ___________
2.2 Construction of Site Work 1 Job XXX _
2.3 CHELCO (Privatized Electrical
Utility) Site Electrical work 1 Job XXX _ 47,467___
2.4 ASUS (Privatized Water
Utility) Water and Wastewater work 1 Job XXX _ 123,412__
2.5 Okaloosa Gas (Privatized Gas
Utility) Utility to the building 1 Job XXX __18,500___
Total Base Bid ___________
2.6 Construction of Reveille Pad 1 Job XXX _
2.7 Fixed Seating at Auditoriums 1 Job XXX ___________
2.8 Furniture, Fixtures, and Equipment(FF&E) 1 Job XXX ___________
2.9 Moveable Seating at Auditoriums 1 Job XXX ___________
2.10 Public Address System 1 Job XXX ___________
2.11 Intercom System 1 Job XXX ___________
TOTAL BASE BID AND BID OPTIONS ____________
NOTES FOR BIDDING SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to contract line items, bidder should state the revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.
NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.
NOTE NO. 3. If a modification to a bid is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the lump-sum adjustment shall be applied on a prorata basis to every bid item in the bid schedule.
NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF TASK ORDERS.
In accordance with the source selection criteria established in this solicitation, award will be made for only one of the two bidding schedules. Evaluation of Base Bid and all Options of each bidding schedule shall be in accordance with Section 00 12 00 and the following clause:
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of clause)
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise Bid Option No. 1 by written notice to the Contractor within 120 days of Notice to Proceed. Subject to the availability of funds, the Contracting Officer may exercise Bid Option 2, 3, 4, 5, 6 by written notice to the Contractor within 365 days of Notice to Proceed.
NOTE NO. 5. The construction budget for this project is $5,500,000.
NOTE NO. 6. ADDITIONAL SUBMISSION REQUIREMENTS:
a. Upon the Government’s request, the offeror shall submit a price breakdown of the bid items directly to the Mobile District Office. Details on where and how to send the breakdown will be provided by the requesting official making the request on behalf of the Government. The format of the breakdown will be left up to the offeror. However, as a minimum, the offeror shall provide pricing for the major categories of work under each bid item, for example: site improvements, landscaping, electrical, mechanical, etc. This information will not be needed sooner than three (3) working days after the proposal submission due date.
b. This information may required for the initial and, if requested, for any revised proposals.
END OF BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
GENERAL: This section comprises an explanation of the bid items identified in the bid schedule. This section is a general scope of work for the bid items described in the bid schedule and is not intended to be all encompassing in the descriptions. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The Contractor shall bid each type of work under the applicable bid item. Measurement for payment will not be made. Payment described for the various bid items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the bid schedule shall be included in the payment for the item of work to which it is made subsidiary.
BIDDING SCHEDULE NO. 1
BASE BID
BID IEM NO. 1.1: Airmen Leadership School Construction of New Facility
Payment under Bid Item No. 1 "Construction of New Facility" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of new Building Facility for The Airman Leadership School on Hymes Road, and related work, all as required by the contract document drawings and specifications including Entry Vestibule and High Glazing.
BID IEM NO. 1.2: Construction of Site Work
Payment under Bid Item No. 2 "Construction of Site Work” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the site work beyond the 5 foot building lines of the facility as required by the contract document drawings and specifications. Work includes but not limited to clearing, grubbing, and grading the site, hauling fill material, the installation of all exterior utilities, pavements, sod landscaping, site improvements, equipment enclosure, and demolition of existing site improvements. Includes the complete cost to construct the site work required to support the primary facility.
BID IEM NO. 1.3: CHELCO (Privatized Electrical Utility) Site Electrical work
Payment under Bid Item No. 3 "Privatized Utility Authority (CHELCO) Site Electrical Work” will constitute full compensation for the payment in the amount shown on the bid schedule to Choctawhatchee Electrical Cooperative (CHELCO) for their work to provide and install the privatized exterior primary power system supporting the new facility Building Airman Leadership School.
CHELCO to install concrete riser pole with riser, bore 3 x 3" conduits to a new 300 kVA pad mount transformer set on a CHELCO provided concrete pad. Includes transformer, cable, and all terminations. Built to CHELCO standards and specs.
Does not include metering or temporary power. CHELCO to remove existing 50 foot wood primary pole. Contractor to provide connections to transformer and cable to MDP inside Airmen Leadership School.
All erosion control measures and finish grading of the site impacted by utility installation will be completed by the Contractor as part of the Base Bid costs.
Contractor to coordinate with CHELCO to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to CHELCO for the amount shown on the bid schedule.
BID IEM NO. 1.4: ASUS (Privatized Water Utility) Water and Wastewater work
Payment under Bid Item No. 4 "Privatized Utility Authority (ASUS) Water and Wastewater Utility Work” will constitute full compensation for the payment in the amount shown on the bid schedule to the privatized utility authority, American States Utility Services (ASUS) for the water and wastewater related work as defined in the solicitation drawings and specifications. Their work to provide and install the privatized water and wastewater system to the 5 foot line of the new facility Airman Leadership and connections to the existing water and sanitary sewer systems including but not limited to trenching, dewatering, filling and compaction for installation of the water and sewer system service components. ASUS will provide and install cathodic protection systems for metallic components of the ASUS installed water system.
The project will include a new building facility planned on Hymes Road, just north of North 8th Street. The Airmen Leadership School requires approximately 110 LF of 8” domestic water service for operation and personnel needs including one Hydrant for fire protection. A 3” PVC water supply will tee off the 8-inch pipe for domestic water. Approximately 105 LF of 3” domestic water service will be installed for operation and personnel needs.
The project will also include approximately 55 LF of 6” domestic sewer service for operation and personnel needs, including one dog house manhole and a cleanout.
ASUS shall be responsible for patching of pavements and sidewalks, restoration of any damaged landscaping, and additional site restoration to areas outside the project boundaries associated with the project's water and wastewater related work. Contractor to coordinate with ASUS to schedule the installation of this work to be completed within the required Construction Completion duration.
Contractor shall be responsible for patching of pavements, sidewalks and restoration of any damaged landscaping related to the water and sewer line service utility system installation as part of the Base Bid costs. All erosion and sedimentation control measures, final site grading, restoration of pavements, and installation of grass sod work for the area of the site impacted by utility installation will be completed by the Contractor. All soils and materials testing, if required, must be provided by Contractor.
Contractor to coordinate with ASUS to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to ASUS for the amount shown on the bid schedule.
BID IEM NO. 1.5: Okaloosa Gas (Privatized Gas Utility) Utility to the building
Payment under Bid Item No. 5 "Privatized Utility Authority Okaloosa Gas utility Work” will constitute full compensation for the payment in the amount shown on the bid schedule to the privatized utility authority for their work in provide and install the privatized gas system to the 5 foot line of the new facility Airman Leadership School and connections to the existing Gas systems including but not limited to trenching, dewatering, filling and compaction for installation of the gas service components. Okaloosa Gas will provide and install cathodic protection systems for metallic components of the Okaloosa Gas installed Gas system.
This will include the tap on the main, the service line to the building as well as the gas meter and harness based on the two appliances, boiler and water heater at a total of 600 cfh.
Okaloosa Gas will saw-cut existing pavements to perform the installation of piping, remove the pavement from the pipe trench, pavement debris will be left to the side of the work area to be removed and disposed by Contractor. Okaloosa Gas will install pipes, backfill & compact the utility trenches, and rough grade only.
Contractor shall be responsible for patching of pavements, sidewalks and restoration of any damaged landscaping related to the gas line service utility system installation as part of the Base Bid costs. All erosion and sedimentation control measures, final site grading, restoration of pavements, and installation of grass sod work for the area of the site impacted by utility installation will be completed by the Contractor. All soils and materials testing, if required, must be provided by Contractor. Contractor to coordinate with Okaloosa Gas to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to Okaloosa for the amount shown on the bid schedule.
BID OPTIONS
BID IEM NO. 1.6: Construction of Reveille Pad
Payment under Bid Item No. 6 (Bid Option No. 1): “Construction of Reveille Pad” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the installation of the Reveille Pad as required by the contract document drawings and specifications.
BID IEM NO. 1.7: Fixed Seating at Auditoriums
Payment under Bid Item No. 7 (Bid Option No. 2): “Fixed Seating at Auditoriums ” will constitute full compensation for the work associated with this Fixed Seating Package for Auditoriums 106 and 123, in accordance with requirements of the Seating Package included in the contract documents as Appendix “H” of the specifications, which includes product order data sheets and associated contract document drawings.
BID IEM NO. 1.8: Furniture, Fixtures, and Equipment(FF&E)
Payment under Bid Item No. 8 (Bid Option No. 3): “Furniture, Fixtures, and Equipment (FF&E)” will constitute full compensation for the work associated with this FF&E/CID/SID Package, in accordance with requirements specified in Appendix
“H” of the project Specifications, included in the contract documents as an Appendix of the specifications, which includes product order data sheets and associated contract document drawings.
BID IEM NO. 1.9: Moveable Seating at Auditoriums
Payment under Bid Item No. 9 (Bid Option No. 4): “Moveable Seating at Auditoriums ” will constitute full compensation for the work associated with this Moveable Seating Package for Auditoriums 106 and 123, in accordance with requirements of the Seating Package included in the contract documents as Appendix “H” of the specifications, which includes order data sheets and
BID IEM NO. 1.10: Public Address System
Payment under Bid Item No. 10 (Bid Option No. 5): “Public Address System” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to provide and install a complete public address system, all as required by the contract document drawings and specifications. Base Bid provides power and pathways supporting the public address system.
BID IEM NO. 1.11: Intercom System
Payment under Bid Item No. 11 (Bid Option No. 6): “Intercom System” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to provide and install a complete Intercom system, all as required by the contract document drawings and specifications. Base Bid provides power and pathways supporting the public address system.
BIDDING SCHEDULE NO. 2
BASE BID
BID IEM NO. 2.1: Airmen Leadership School Construction of New Facility
Payment under Bid Item No. 1 "Construction of New Facility" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of new Building Facility for The Airman Leadership School on Hymes Road, and related work, all as required by the contract document drawings and specifications.
BID IEM NO. 2.2: Construction of Site Work
Payment under Bid Item No. 2 "Construction of Site Work” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the site work beyond the 5 foot building lines of the facility as required by the contract document drawings and specifications. Work includes but not limited to clearing, grubbing, and grading the site, hauling fill material, the installation of all exterior utilities, pavements, sod landscaping, site improvements, equipment enclosure, and demolition of existing site improvements. Includes the complete cost to construct the site work required to support the primary facility.
BID IEM NO. 2.3: CHELCO (Privatized Electrical Utility) Site Electrical work
Payment under Bid Item No. 3 "Privatized Utility Authority (CHELCO) Site Electrical Work” will constitute full compensation for the payment in the amount shown on the bid schedule to Choctawhatchee Electrical Cooperative (CHELCO) for their work to provide and install the privatized exterior primary power system supporting the new facility Building Airman Leadership School.
CHELCO to install concrete riser pole with riser, bore 3 x 3" conduits to a new 300 kVA pad mount transformer set on a CHELCO provided concrete pad. Includes transformer, cable, and all terminations. Built to CHELCO standards and specs.
Does not include metering or temporary power. CHELCO to remove existing 50 foot wood primary pole. Contractor to provide connections to transformer and cable to MDP inside Airmen Leadership School.
All erosion control measures and finish grading of the site impacted by utility installation will be completed by the Contractor as part of the Base Bid costs.
Contractor to coordinate with CHELCO to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to CHELCO for the amount shown on the bid schedule.
BID IEM NO. 2.4: ASUS (Privatized Water Utility) Water and Wastewater Work
Payment under Bid Item No. 4 "Privatized Utility Authority (ASUS) Water and Wastewater Utility Work” will constitute full compensation for the payment in the amount shown on the bid schedule to the privatized utility authority, American States Utility Services (ASUS) for the water and wastewater related work as defined in the solicitation drawings and specifications. Their work to provide and install the privatized water and wastewater system to the 5 foot line of the new facility Airman Leadership and connections to the existing water and sanitary sewer systems including but not limited to trenching, dewatering, filling and compaction for installation of the water and sewer system service components. ASUS will provide and install cathodic protection systems for metallic components of the ASUS installed water system.
The project will include a new building facility planned on Hymes Road, just north of North 8th Street. The Airmen Leadership School requires approximately 110 LF of 8” domestic water service for operation and personnel needs including one Hydrant for fire protection. A 3” PVC water supply will tee off the 8-inch pipe for domestic water. Approximately 105 LF of 3” domestic water service will be installed for operation and personnel needs.
The project will also include approximately 55 LF of 6” domestic sewer service for operation and personnel needs, including one dog house manhole and a cleanout.
ASUS shall be responsible for patching of pavements and sidewalks, restoration of any damaged landscaping, and additional site restoration to areas outside the project boundaries associated with the project's water and wastewater related work. Contractor to coordinate with ASUS to schedule the installation of this work to be completed within the required Construction Completion duration.
Contractor shall be responsible for patching of pavements, sidewalks and restoration of any damaged landscaping related to the water and sewer line service utility system installation as part of the Base Bid costs. All erosion and sedimentation control measures, final site grading, restoration of pavements, and installation of grass sod work for the area of the site impacted by utility installation will be completed by the Contractor. All soils and materials testing, if required, must be provided by Contractor.
Contractor to coordinate with ASUS to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to ASUS for the amount shown on the bid schedule.
BID IEM NO. 2.5: Okaloosa Gas (Privatized Gas Utility) Utility to the building
Payment under Bid Item No. 5 "Privatized Utility Authority Okaloosa Gas utility Work” will constitute full compensation for the payment in the amount shown on the bid schedule to the privatized utility authority for their work in provide and install the privatized gas system to the 5 foot line of the new facility Airman Leadership School and connections to the existing Gas systems including but not limited to trenching, dewatering, filling and compaction for installation of the gas service components. Okaloosa Gas will provide and install cathodic protection systems for metallic components of the Okaloosa Gas installed Gas system.
This will include the tap on the main, the service line to the building as well as the gas meter and harness based on the two appliances, boiler and water heater at a total of 600 cfh.
Okaloosa Gas will saw-cut existing pavements to perform the installation of piping, remove the pavement from the pipe trench, pavement debris will be left to the side of the work area to be removed and disposed by Contractor. Okaloosa Gas will install pipes, backfill & compact the utility trenches, and rough grade only.
Contractor shall be responsible for patching of pavements, sidewalks and restoration of any damaged landscaping related to the gas line service utility system installation as part of the Base Bid costs. All erosion and sedimentation control measures, final site grading, restoration of pavements, and installation of grass sod work for the area of the site impacted by utility installation will be completed by the Contractor. All soils and materials testing, if required, must be provided by Contractor. Contractor to coordinate with Okaloosa Gas to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to Okaloosa for the amount shown on the bid schedule.
BID OPTIONS
BID IEM NO. 2.6: Construction of Reveille Pad
Payment under Bid Item No. 6 (Bid Option No. 1): “Construction of Reveille Pad” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the installation of the Reveille Pad as required by the contract document drawings and specifications.
BID IEM NO. 2.7: Fixed Seating at Auditoriums
Payment under Bid Item No. 7 (Bid Option No. 2): “Fixed Seating at Auditoriums ” will constitute full compensation for the work associated with this Fixed Seating Package for Auditoriums 106 and 123, in accordance with requirements of the Seating Package included in the contract documents as Appendix “H” of the specifications, which includes product order data sheets and associated contract document drawings.
BID IEM NO. 2.8: Furniture, Fixtures, and Equipment(FF&E)
Payment under Bid Item No. 8 (Bid Option No. 3): “Furniture, Fixtures, and Equipment (FF&E)” will constitute full compensation for the work associated with this FF&E/CID/SID Package, in accordance with requirements specified in Appendix “H” of the project Specifications, included in the contract documents as an Appendix of the specifications, which includes product order data sheets and
BID IEM NO. 2.9: Moveable Seating at Auditoriums
Payment under Bid Item No. 9 (Bid Option No. 4): “Moveable Seating at Auditoriums ” will constitute full compensation for the work associated with this Moveable Seating Package for Auditoriums 106 and 123, in accordance with requirements of the Seating Package included in the contract documents as Appendix “H” of the specifications, which includes order data sheets and
BID IEM NO. 2.10: Public Address System
Payment under Bid Item No. 10 (Bid Option No. 5): “Public Address System” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to provide and install a complete public address system, all as required by the contract document drawings and specifications. Base Bid provides power and pathways supporting the public address system.
BID IEM NO. 2.11: Intercom System
Payment under Bid Item No. 11 (Bid Option No. 6): “Intercom System” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to provide and install a complete Intercom system, all as required by the contract document drawings and specifications. Base Bid provides power and pathways supporting the public address system.
BID BOND
(See instructions on reverse)
OMB Control Number: 9000-0045 Expiration Date: 7/31/2019
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PERCENT
OF BID
PRICE
PENAL SUM OF BOND
AMOUNT NOT TO EXCEED
MILLION(S) THOUSAND(S) HUNDRED(S) CENTS
BID IDENTIFICATION
BID DATE INVITATION NUMBER
PRINCIPAL
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1. 2.
2.
3.
3.
(Seal) (Seal) (Seal) Corporate Seal
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
NAME(S)
(Typed)
1.
1.
2.
2.
(Seal) (Seal)
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is NOT usable
STANDARD FORM 24 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
FOR (Construction, Supplies or Services)
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
DATE BOND EXECUTED (Must not be later than bid opening date)
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
JOINT VENTURE
OTHER (Specify)
PARTNERSHIPINDIVIDUAL
CORPORATION
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.
The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
SU
R
ET
Y
B
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
SIGNATURE(S)
NAME(S) &
TITLE(S)
(Typed)
1.
1.
2.
2. Corporate Seal
Corporate Seal
LIABILITY LIMIT ($)STATE OF INCORPORATION
2.
2.
1.
1.NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
C
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
D
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
E
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
F
Corporate Seal
LIABILITY LIMIT ($)
2.
2.
STATE OF INCORPORATION
1.
1.
NAME(S) &
TITLE(S)
(Typed)
SIGNATURE(S)
NAME &
ADDRESS
SU
R
ET
Y
G
STANDARD FORM 24 (REV. 8/2016) BACK
DISCLOSURE OF LOBBYING ACTIVITIES
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352
(See reverse for public burden disclosure.)
1. Type of Federal Action:
a.
b.
c.
d.
e.
f.
contract grant cooperative agreement loan loan guarantee loan insurance
2. Status of Federal Action:
a.
b.
c.
bid/offer/application initial award post-award
3. Report Type:
a.
b.
initial filing material change
For Material Change Only:
year quarter date of last report
4. Name and Address of Reporting Entity:
Congressional District, if known:
Prime Subawardee Tier , if known:
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Congressional District, if known:
6. Federal Department/Agency:
7. Federal Program Name/Description:
CFDA Number, if applicable:
8. Federal Action Number, if known:
9. Award Amount, if known:
10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):
b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
11. Amount of Payment (check all that apply):
$ actual planned
12. Form of Payment (check all that apply):
a.
b.
cash in-kind; specify: nature value
13. Type of Payment (check all that apply):
a.
b.
c.
d.
e.
f.
retainer one-time fee commission contingent fee deferred other; specify:
14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment indicated in Item 11:
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
15. Continuation Sheet(s) SF-LLL-A attached: Yes No
Information requested through this form is authorized by title 31 U.S.C section 1352.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .